Loading...
HomeMy WebLinkAbout20120972 Ver 1_More Info Received_20121026Dennison, Laurie From: Steenhuis, Joanne Sent: Friday, October 26, 2012 1.13 PM To: Dennison, Laurie Subject: FW: Wantlands Ferry dwq #120972 Attachments: SKMBT_C45212102610520 pdf Made them revise to after -the fact From: Parker & Associates, Inc. [mailto:paitextC�bizec.rr.com] Sent: Friday, October 26, 2012 10:58 AM To: Steenhuis, Joanne Subject: Wantlands Ferry Joanne, Attached is copy of Revised page 9 of 10 per your request. Tim Timothy M. Stewart, P. E. / jus Parker & Associates, Inc. Engineers * Surveyors * Planners (910) 455 -2414 Firm License Number - F -0108 1 I- ©q -I 2, F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ® Yes ❑ No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after -the -fact permit application? ® Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): We received the USACE 404 Permit and started work. Received verbal notice of Violation from Joanne Steenhuis on 10- 26 -12, 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility, Each lot will have a sewer service which will flow to ONWASA's sewer system, which is routed to a USMC wastewater treatment plant for treatment. Do OCT 2 6 2012 DENR - WATER QUALITY Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version