HomeMy WebLinkAbout20210513 Ver 1_PreFiling 30-Day Clock Reached Email_20210405Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, April 5, 2021 12:02 AM
To: lauren.norris-heflin@timmons.com
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Wexford (fka Manning Avenue) -
20210513 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Wexford (fka
Manning Avenue) that you submitted on 3/5/2021. The ID number for that project is 20210513, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210513
Version*
1
Winston-Salem Regional Office - (336) 776-9800
Sue Homewood
Pre -Filing Meeting Request submitted 3/5/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Lauren Norris -Heflin
lauren.norris-heflin@timmons.com
Wexford (fka Manning Avenue)
Eastwood Homes
Alamance
Street Address
2857 Westport Road
Address Line 2
City State / Province / Region
Charlotte NC
Fbstal / Zip Code Country
28208 USA
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
i7 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information. *
The proposed Wexford project, formerly known as Manning Avenue,
is located at 1031 Gibsonville-Ossippee Road in Elon, Alamance
County, NC. The project area consists of approximately 79.8 acres
and is largely occupied by mixed hardwood forest with a relatively
small relict agricultural field located in the southern portion of the
property. The project is proposing the development of a residential
subdivision within the site.
Impact maps and site plans are in progress and expected to be
finalized within the next 30 days, but proposed impacts to
jurisdictional features within the site are anticipated.
Impacts to wetlands and streams delineated onsite should be minimal
and limited to those necessary to install necessary utility connections,
road crossings, and grading (where necessary) to ensure safety and
accessibility of the site. Further, wetland and stream delineation is
being used to avoid and minimize impacts to jurisdictional features to
the maximum extent possible.
The NC DWR and Town of Elon Buffer Determination letters are
attached for reference.
Please give a couple of dates you are available for a meeting.
3/10/2021
3/12/2021
3/16/2021
3/19/2021
3/23/2021
Please attach the documentation you would like to have the meeting about.
2020.12.18_Elon Buffer Confirmation.pdf
Manning Ave-Elon Stream Determination
Letter -signed with attachments (003).pdf
pdf only
152.79KB
15.76MB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 3/5/2021