Loading...
HomeMy WebLinkAbout20060403 Ver 3_PreFiling 30-Day Clock Reached Email_20210405Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, April 5, 2021 12:01 AM To: richard.harmon@woodplc.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Duke Energy Allen Steam Station Allen Ash Basin Landfill Project - 20060403 Ver 3 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Duke Energy Allen Steam Station Allen Ash Basin Landfill Project that you submitted on 3/5/2021. The ID number for that project is 20060403, Version 3. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20060403 Version * 3 Winston-Salem Regional Office - (336) 776-9800 Sue Homewood Pre -Filing Meeting Request submitted 3/5/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Dicky Harmon richard.harmon@woodplc.com Duke Energy Allen Steam Station Allen Ash Basin Landfill Project Duke Energy Carolinas, LLC (Duke Energy) Gaston Street Address 526 South Church Street, Address Line 2 City State / Rovince / Region Charlotte NC Fbstal / Zip Code Country 28202 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: r 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fJ Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information. * Duke Energy has developed closure plans for the Retired Ash Basin (RAB) and the Active Ash Basin (AAB) at the Allen Station for the disposal of Coal Combustion Residuals (CCR). Duke Energy proposes to permit and build three new lined landfills, including the Minimized Ash Basin Landfill (Min ABLF), the North Starter Landfill (NSLF), and the South Starter Landfill (SSLF). These three landfills will be capable of containing the estimated 19.36 million tons (16.33 million cubic yards [(cy]) of CCR from the adjacent ash basins. Duke Energy submitted closure plans for the RAB and AAB at the Allen Station on December 31, 2019, as required by CAMA-14 (AECOM 2020a). The purpose of the project (proposed action) is to build three new lined landfills (Min ABLF, NSLF, and SSLF) within the Allen Station and to excavate CCR waste from the RAB and the AAB. The existing unlined RAB and AAB historically received wet sluiced bottom ash and had a total capacity of approximately 15.50 million cy of CCR waste, including the approximately 0.83 million cy located in the Distribution of Residual Solids (DORS) areas, that must be excavated from the RAB and AAB. Construction of the new landfills will require the placement of fill material, which will be excavated from four stockpile/borrow sites located at the Allen Station and in the vicinity of the landfill areas. The NSLF and SSLF will be single -celled landfills between 22 and 29 25 acres in each landfill; the ABLF will contain about five individual cells which are approximately 12 to 15 acres for each cell. The landfills will require construction of supporting infrastructure and facilities, including Leachate Collection and Removal Systems (LCRS) for each of the three landfills and a single receiving 3-acre leachate basin that will support all three landfills. Construction of the preferred alternative (Alternative 1) considered a 6774-acre Min ABLF constructed fully within the northern section of the AAB, a 2925-acre NSLF and a 22-acre SSLF located on Duke Energy property at Allen Station. Additionally, the alternative would include construction of LCRS and a 3-acre leachate basin. Unavoidable impacts to WOTUS include 233 linear feet (If) of stream impacts and 0.17 acres of wetland impacts associated with the construction of the SSLF Please give a couple of dates you are available for a meeting. 4/5/2021 Please attach the documentation you would like to have the meeting about. Draft Allen IP 02.17.2021.pdf 935.18KB Areas of Constraint Map - 03.03.21 Update.pdf 4.59MB Fig 7.3a Allen Flood Plain Cross -Section 2.pdf 367.4KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date �r22d farm 3/5/2021