Loading...
HomeMy WebLinkAbout20080828 Ver 2_More Info Letter_20121024��� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakdd, RE Dee Freeman Governor Director Secretary October 24, 2012 DWQ Project # 08 -0828, Ver. 2 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Joseph V. lonnane JVI Construction Company 501 North Salem Street Apex, NC 27502 Subject Property: Marco Drive Extension Ut to Middle Creek [030403, 27- 43- 15 -(1), C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. lonnane: On September 26, 2012, the Division of Water Quality (Division) received your application dated September 18, 2012, requesting a 401 Water Quality Certification and Buffer Authorization for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage from this site must be discharged through a correctly designed level spreader. Level spreader design requirements are set forth in Chapter 8 of the North Carolina Stormwater BMP Manual, available at: http: / /portal.ncdenr.org /web /wq /ws /su /bmp- manual. Please provide the following items: a. Full -size plan sheet(s) that show the entire site with its storm drainage system, including every inlet, outlet and conveyance device. Please show how diffuse flow requirements have been met at every proposed outlet location. b. One Level Spreader- Vegetated Filter Strip Supplement Form for each proposed level spreader, available at: http: / /portal.ncdenr.org /web /wq /ws /su /bmp- manual. Please include the Required Items checklist and all items listed therein. Pursuant to Title 15A NCAC 02B.0233 (8), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. ,tam ds uifels ot,,r"v-Vats , l , nnhincP diii P :t ',B,, ,ar ,n, ,u n,�prin-ty io:itP- t.� =ii� Marco Drive Extension Page 2 of 2 October 24, 2012 Please respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of the above requested information to the Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit, 1650 Mail Service Center, Raleigh, NC 27699 -1650. Please be aware that you have no authorization under Section 401 of the Clean Water Act or the Neuse Riparian Buffer Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact me at karen.higgins @ncdenr.gov or 919 - 807 -6360 if you have any questions or concerns. Sincerely, n< Karen Higgins, SuperJtstV Wetlands, Buffers, Stormwater, Compliance and Permitting Unit cc: USACE Raleigh Regulatory Field Office File Copy Jeff Harbour, ESI, 524 S. New Hope Road, Raleigh, NC 27591 Filename: 080828Ver2MarcoDriveExtension (Wake)On_Hold