HomeMy WebLinkAbout20190225 Ver 2_Pre-Filing Meeting Information_20210326DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Please give a couple of dates you are available for a meeting.
James Mason
james.mason@threeoaksengineering.com
Town of Apex
Middle Creek Greenway
Wake
City
Apex
State / Province / Region
NC
Postal / Zip Code
27502
Country
USA
Street Address
73 Hunter Street
Address Line 2
P.O. Box 250
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Phase I of the Town of Apex’s Middle Creek Greenway - Miramonte to
Holly Springs Connector Project is comprised of the greenway
connection that runs between the northern right-of-way boundary of
future NC Highway 540 (also southern property boundary of the
Reunion Pointe subdivision) to the southern right-of-way of Sunset
Lake Road/ the Town of Holly Springs border at Sunset Lake Road. A
portion of the greenway within the I-540 right-of-way has been
permitted by and will be constructed by NCDOT; the remainder of the
greenway will be constructed by the Town.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
2/24/2021
3/3/2021
3/10/2021
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
2/17/2021