HomeMy WebLinkAboutNCC202131_NOT Closeout Documents_20210331North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Moore Project: Brookwood Phase IA - Lots 1, 7 &14 River basin: Cape Fear
Person financially responsible: Caviness Land Development, Inc. - Watson G Project #: MOORE-2020-070
Caviness, President NCC202131
Address: 1041 B Robeson Street, Fayetteville, NC 28305
1. Project Location: Enfield Drive, McNeill
Pictures: No
2. Weather and soil conditions: sunny/workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: November 25, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Penny Markle Others present:
Date of inspection: November 24, 2020 Time arriving on site: 1:00 PM Time leaving site: 1:20 PM
cc: