Loading...
HomeMy WebLinkAbout20160787_Email_20110419 M Wainwright, David From Biddlecome William J SAW[William J Biddlecome @usace army mil] Sent Thursday October 11 2012 3 47 PM To Clawson Marshall W Ron Lucas (ron lucas @fhwa dot gov) Gary Jordan (gary jordan @fws gov) Chris Militscher(militscher chns @epa gov) Wilson Travis W Wainwright David Lovenng Gary R Jonathan Henderson Azizi Omar R Richards John E Staley Mark K Merritt John S Rivenbark Chris Harris Philip S Capehart Bob Rice James R (James Rice @hdrinc com) dan bacon @usace army mil Chang David S Rivers Vincent N Subject RE R 3826 Martin Co 4B Meeting Minutes (UNCLASSIFIED) Attachments August 3 2012 e mail pdf Follow Up Flag Follow up Flag Status Flagged Classification UNCLASSIFIED Caveats NONE All, Sorry it s taken so long to get back to everyone on this project concerning the conversation we had at the 4B meeting about 3 1 side slopes with guardrails vs 4 1 without guardrails at wetland WM You can refer to the attachment (Chris M s e mail) -For EPA s response on the matter If DOT wishes to proceed with the 4 1 slopes in this area I ask that DOT write up a new 4a concurrence form (addendum to original) removing the commitment for 3 1 side slopes in this wetland area with a short descriptive justification of why DOT wishes to do this If DOT will then send out a PDF copy to the team and whomever wants to sign, abstain or whatever can do so I plan on signing if the written justification is reasonable based on safety considerations As I stated at this meeting, DOT is going to have to do a better job coordinating earlier on in our Merger 01 process so we aren t continually being asked to reverse decisions and commitments made at the 4a (avoidance and minimization) stage If anyone wants to discuss this with me further please contact me and we 11 talk Thanks! John Merritt, I will wait to hear from you concerning the re verification of the jurisdictional areas on this project Bill Biddlecome Regulatory Project Manager Washington Regulatory Field Office 2407 West 5th Street Washington, North Carolina 27889 (910) 251 4558 william 1 biddlecome(iusace army mil We at the U S Army Corps of Engineers Regulatory Branch are committed to improving service to our customers We would appreciate your feedback on how we are performing our duties Our automated Customer Service Survey is located at http //per2 nwp usace army mil/survey html I Thank you for taking the time to visit this site and complete the survey -- Original Message 1 ,-,-_ From Clawson, Marshall W [mailto mclawson(ncdot gov] Sent Wednesday, August 01, 2012 8 20 AM To Ron Lucas (ron lucasPfhwa dot gov), Biddlecome, William J SAW, Gary Jordan (gary JordanPfws gov), Chris Militscher (militscher chrisPepa gov), Wilson, Travis W , Wainwright, David, Lovering, Gary R, Jonathan Henderson, Azizi, Omar R, Richards, John E, Staley, Mark K, Merritt, John 5, Rivenbark, Chris, Harris, Philip S, Capehart, Bob, Rice, James R (James Rice @hdrinc com), dan bacon(usace army mil, Chang, David S, Rivers, Vincent N Subject R 3826, Martin Co , 4B Meeting Minutes Please find attached meeting minutes Marshall Clawson, PE NCDOT Hydraulics Unit 919 707 6713 Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties Classification UNCLASSIFIED Caveats NONE 2 Wainwright, David From Lovenng Gary R Sent Friday October 12 2012 11 21 AM To Biddlecome William J SAW Clawson Marshall W Ron Lucas (ron lucas @fhwa dot gov) Gary Jordan (gary jordan @fws gov) Chris Militscher(militscher chns @epa gov) Wilson Travis W Wainwright David Jonathan Henderson Azizi Omar R Richards John E Staley Mark K Merritt John S Rivenbark Chris Harris Philip S Capehart Bob Rice James R (James Rice @hdrinc corn) dan bacon @usace army mil Chang David S Rivers Vincent N Cc Clawson Marshall W Mumford Glenn W Bennett Jay A Subject RE R 3826 Martin Co 4B Meeting Minutes (UNCLASSIFIED) Bill After further review of project R 3826 I have decided to keep the one area in question (Sta 63+00 to 65+50 Lt ) as 3 1 slopes with guardrail We will leave the original CP4A concurrence form as it was signed I wanted to let the team know that I received the project from another design engineer who at CP4A thought it was appropriate to make a commitment of 3 1 slopes in all wetland areas This should still be an appropriate item to include in the CP4A commitments on some projects but then again it may not In the future I plan to better determine what is the appropriate slope guardrail placement and/or clearing limits at each wetland location once the final grade is set and hydraulic recommendations have been made Additional minimization discussions can then take place at CP4B as they relate to those items (slope guardrail and clearing limits) Thanks and please call if you would like to discuss Gary Lovering PE Project Engineer Eastern Region NCDOT Roadway Design (919) 707 6271 Original Message From Biddlecome William J SAW [mailto William J Biddlecome@usace army mil] Sent Thursday October 11 2012 3 47 PM To Clawson Marshall W Ron Lucas (ron lucas@fhwa dot gov) Gary Jordan (gars Iordan @fws goy) Chris Militscher (militscher chrisc epa gov) Wilson Travis W Wainwright David Lovering Gary R Jonathan Henderson Azizi Omar R Richards John E Staley Mark K Merritt John S Rivenbark Chris Harris Philip S Capehart Bob Rice James R (James Rice @hdrinc com) dan baconPusace army mil Chang David S Rivers Vincent N Subject RE R 3826 Martin Co 4B Meeting Minutes (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE All Sorry it s taken so long to get back to everyone on this project concerning the conversation we had at the 4B meeting about 3 1 side slopes with guardrails vs 4 1 without guardrails at wetland WM You can refer to the attachment(Chris M s e mail)for EPA s response on the matter If DOT wishes to proceed with the 4 1 slopes in this area I ask that DOT write up a new 4a concurrence form (addendum to original) removing the commitment for 3 1 side slopes in this wetland area with a short descriptive justification of why DOT wishes to do this If DOT will then send out a PDF copy to the team and whomever wants to sign abstain or whatever can do so I plan on signing if the written justification is reasonable based on safety considerations As I stated at this meeting DOT is going to have to do a better job 1 coordinating earlier on in our Merger 01 process so we aren t continually being asked to reverse decisions and commitments made at the 4a (avoidance and minimization) stage If anyone wants to discuss this with me further please contact me and we II talk Thanks! John Merritt I will wait to hear from you concerning the re verification of the Jurisdictional areas on this project Bill Biddlecome Regulatory Project Manager Washington Regulatory Field Office 2407 West 5th Street Washington North Carolina 27889 (910) 251 4558 william j biddlecome @usace army mil We at the U S Army Corps of Engineers Regulatory Branch are committed to improving service to our customers We would appreciate your feedback on how we are performing our duties Our automated Customer Service Survey is located at http //per2 nwp usace army mil/survey html Thank you for taking the time to visit this site and complete the survey Original Message From Clawson Marshall W [mailto mclawson @ncdot gov] Sent Wednesday August 01 2012 8 20 AM To Ron Lucas(ron lucas @fhwa dot gov) Biddlecome William J SAW Gary Jordan (garyjordan @fws gov) Chris Militscher(militscher chris @epa gov) Wilson Travis W Wainwright David Lovering Gary R Jonathan Henderson Azizi Omar R Richards John E Staley Mark K Merritt John S Rivenbark Chris Harris Philip S Capehart Bob Rice James R (James Rice @hdrinc com) dan bacon @usace army mil Chang David S Rivers Vincent N Subject R 3826 Martin Co 4B Meeting Minutes Please find attached meeting minutes Marshall Clawson PE NCDOT Hydraulics Unit 919 707 6713 Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third parties Classification UNCLASSIFIED Caveats NONE 2