Loading...
HomeMy WebLinkAboutNCC201114_NOT Closeout Documents_20210330North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Roslin Farms West, Section Three, Part County: Cumberland Project: One -Lot 197 River basin: Lumber Person financially responsible: Caviness and Cates Building and Development, Project #: CUMBE-2020-117 Inc. - Patrick Raynor, CFO Address: 639 Executive Place, Suite 400, Fayetteville, NC 28305 NCC201114 1. Project Location: Hunters Den Road, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 18, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: November 16, 2020 Time arriving on site: 1:10 PM Time leaving site: 1:20 PM cc: