HomeMy WebLinkAboutNCC200851_NOT Closeout Documents_20210330North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Roslin Farms West, Section 3, Part
County: Cumberland Project: 1 - Lots 195 & 216 River basin: Lumber
Person financially responsible: Caviness and Cates Building and Development, Project #: CUMBE-2020-091
Inc. - Patrick Raynor, CFO NCC200851
Address: 639 Executive Place, Suite 400, Fayetteville, NC 28305
1. Project Location: Hunters Den Road, Rockfish
Pictures: No
2. Weather and soil conditions: Dry, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: November 18, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: November 16, 2020 Time arriving on site: 1:20 PM Time leaving site: 1:30 PM
cc: