Loading...
HomeMy WebLinkAbout780085_30 Day POA_20210403PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FAC1LITiES Facility Number: 78-85 County: Robeson Facility Name: Farm 3094 Certified Operator Name: Lee Matthews Operator Number: AWA990008 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 30943B 30943A Spillway(Y or N): Level(inches): 20 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section 111 tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown, LLC Facility Owner/Manager (print) M Facility Owner/Manager (signature) Phone: Date: 910-293-3434 4/3/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: 30943B 30943A n.lines1+2+3+4+5+6= line m = 4014.3 Ib PAN line m = 2327.6 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 6341.9 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN RIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 30943 1 Bermuda 4.64 64.79 300.6 March -Sept 30943 2 Bermuda 1.97 69.97 137.8 March -Sept 30943 7 Bermuda 1.52 133.41 202.8 March -Sept 30943 8 Bermuda 4.15 194.27 806.2 March -Sept 30943 9 Bermuda 2.77 299.00 828.2 March -Sept 30943 3A Corn 5.75 114.60 659.0 Feb15-June 30943 3B Corn 5.77 114.60 661.2 Feb15-June 30943 4A Corn 4.74 120.00 568.8 Feb15-June 30943 4B Corn 5.00 91.81 459.1 Feb15-June 30943 5A Corn 4.23 120.00 507.6 Feb15-June 30943 5B Corn 4.75 120.00 570.0 Feb15-June 30943 6Ar Corn 4.51 120.00 541.2 Feb15-June 30943 6B Corn 4.46 114.60 511.1 Feb15-June State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE 6753.7 Ib. PAN w. Total PAN to be land applied (line n from section II) = 6341.9 Ib. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) y. Overall PAN balance (w - x) = 6753.7 Ib. PAN -412 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 30943B 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # t 8000 certified herd # 20.0 27.6 inches inches 7.6 inches 270000 ft2 1279080 gallons 180 269519 8000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j_ excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/3/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 269519 fta 157500 ft3 ft3 748350 gallons 1.98 Ibs/1000 gal. 4014.3 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): [30943A 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 8000 certified herd # 16.0 19.8 inches inches 3.8 inches 225000 ft2 532950 gallons 180 263743 8000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/3/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 263743 ft3 1312501 ft3 492425 gallons 2.27 Ibs/1000 gal. 2327.6 lbs. PAN PoA (30 Day) 2/21/00