Loading...
HomeMy WebLinkAbout20120896 Ver 1_Approval Letter_20121030 (2)A &= NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Charles Wakild, P.E. Director October 30, 2012 North Carolina Wildlife Resources Commission Mr. Thomas T. Covington 1720 Mail Service Center Raleigh, NC 27699 -1720 Dee Freeman Secretary DWQ Project # 12 -0896 Craven County Subject Property: NCWRC, Cowpen Landing Boat Ramp Neuse River Basin, Neuse River [NEU 08, 27 -(85); NSW, C, Sw] Approval of 401 Water Quality Certification (GC3900) and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions Dear Mr. Covington: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.065 acres of waters by fill, 0.025 acres of impacts from shading, and 0.02 acres of 404 wetlands and for the purpose of boat ramp improvements by constructing 2 boat ramps with vinyl bulkheads, staging dock, and floating fishing pier with vinyl bulkhead at the subject property, as described within your CAMA Major application dated September 24, 2012 and received by the N.C. Division of Water Quality (DWQ) on October 1, 2012. The impacts described in your application are covered by General Water Quality Certification Number(s) 3900 (GC3900). This Certification(s) is issued in conjunction with the CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233 as a result of construction activities. In addition, you should obtain or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to North Carolina Division of Water Quality Internet: www newaterquality.ore 943 Washington Square Mall Phone: 252- 946 -6481 One Washington, NC 27889 FAX 252- 946 -9215 NorthCarolina An Equal Opportunity /Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Naturally NCWRC, Cowpen Landing Boat Ramp October 30, 2012 Page 2 of 3 waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us anew application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight /Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3641. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. Amount Approved (Units) Plan Location or Reference Stream (feet) 404 /CAMA Wetlands 0.02 (acres) fill Plan Drawings SD -1.0 to 8.1 Waters 0.065 (acres) fill 0.025 (acres) shading " " " " Buffers (square ft.) 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight /Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3641. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. NCWRC, Cowpen Landing Boat Ramp October 30, 2012 Page 3 of 3 If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252- 948 -3940 or Karen Higgins of the Wetland, Buffer, Stormwater, Compliance and Permitting (Webscape) Unit at 919 - 807 -6360. Sincerely, ao-�C- azt� For Charles Wakild, P.E. Enclosures: Certificate of Completion GC 3900 cc: William Wescott, Corps of Engineers, Washington Field Office DWQ Webscape Unit DCM, Doug Huggett, Morehead Office DCM, Brad Connell DLR, WaRO File copy File: 12-0896