Loading...
HomeMy WebLinkAbout820355_30 Day POA_202103233/24/2021 Mail - Fontenot, Katie - Outlook FW: [External] 30 Day POA extension for 82-355 Guyton, Steve <steve.guyton@ncdenr.gov> Wed 3/24/2021 12:20 PM To: Fontenot, Katie <katie.fontenot@ncdenr.gov> Cc: Harrison, Diane <diane.harrison@ncdenr.gov> From: James Lamb [mailto:jlamb@prestagefarms.com] Sent: Wednesday, March 24, 2021 11:08 AM To: Guyton, Steve <steve.guyton@ncdenr.gov> Subject: [External] 30 Day POA extension for 82-355 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1 YwAQAAj2JD4k8UAxjPtVN3IS9c... 1/5 3/24/2021 Mail - Fontenot, Katie - Outlook PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-355 County: Sampson Facility Name: P-23 Certified operator Name: Anthony W. Robinson Operator Number: 929092 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 23B Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 3/29/21 Weather permitting. hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Prestage Farms Inc. Phone: 910-592-5771 Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: 3/23/2021 https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAAj2JD4k8UAxjPtVN3IS9c... 2/5 3/24/2021 Mail - Fontenot, Katie - Outlook PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW ❑OWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (ID): 23B 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c112 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2000 certified herd # 18.0 19.0 inches inches 1.0 inches 165528 ft2 103179 gallons 180 211483 2000 days ft3 actual waste produced = current herd # x line g = 211483 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 1 /11 /2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 96558 384024 gallons 0.94 Ibs/1000 gal. 458.0 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 23B line m = Ib PAN line m = 458.0 Ib PAN line m = Ib PAN https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAAj2JD4k8UAxjPtVN3IS9c... 3/5 3/24/2021 4. Structure ID: 5. Structure ID: 6. Structure ID: Mail - Fontenot, Katie - Outlook line m = Ib PAN line m = Ib PAN line m = Ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 458.0 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS ❑URING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. ❑. tract # p. field # q. crop r. acres s. remaining RR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. applicatian windaw1 4598 1A CB -Grazed 3.70 195.00 721.5 MAR-OCT 4598 1 B CB -Grazed 3.50 205.00 717.5 MAR-OCT v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) _ 1439.0 Ib. PAN 458.0 Ib. PAN 1439.0 Ib. PAN -981 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAAj2JD4k8UAxjPtVN31S9c... 4/5 3/24/2021 Mail - Fontenot, Katie - Outlook Self reported to DWR first on 1/5/21. This an extension for another 30 days. James L. Lamb Environment Specialist Prestage Farms, Inc. P.O. Box 438 4651 Taylors Bridge Hwy. Clinton, N.C. 28329 W: 910-596-5814 https://outlook.office365.com/mail/inbox/id/AAQkAGM2NWE3OTJmLThiOWMtNGNINC1 hYTkOLTJIZjMzZDM2ZDU 1YwAQAAj2JD4k8UAxjPtVN3IS9c... 5/5