Loading...
HomeMy WebLinkAbout20120632 Ver 1_Approval Letter_20121026NC ®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, P E Dee Freeman Governor Director Secretary October 26, 2012 Mr. Rolf Pippert Unimin Corporation PO Box 588 7638 HWY 226 South Spruce Pine, NC 28777 Re: West School House Mine, Avery County DWQ #20120632; USACE Action ID. No. SAW- 2011 -07162 Ut to Brushy Creek [040306, 7 -2 -29, C, TR] APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Pippert: Attached hereto is a copy of Certification No. 3944 issued to Mr. Rolf Pippert and Unimin Corporation, dated October 26, 2012. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited-to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non - discharge and Water Supply Watershed regulations. You can contest this Certification as provided in Articles 3 and 4 of G.S. 150B by filing a written petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) calendar days of receipt of this Certification. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed, provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699 -6714, Telephone: (919) 431 -3000, Fax: (919) 431 -3100. A copy of the petition must also be served on DENR as follows: Mr. William Cary, General Counsel, Department of Environment and Natural Resources, 1601 Mail Service Center, Raleigh, NC 27699 -1601. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) calendar days following receipt of the modified Certification. Unless a petition is filed as described above, this Certification shall be final and binding. bvetian(is, Buffers, Stormwat =i Compliance and Permitting Umt (b' e3SCaPe) 1'i �n dal �-nvire Gentei Rd' ='�'�, Nr. J ('n ro!!, �- 27,69--i "5p , PLc ^e ' i', `07 03001 FA P 9 3, .'1 i•I nmpel lit,p portal ncaenr q. s t i Eq, ial Orpor,un;`y � Affiiwo'we 4rri on E,nl,1c,Pj j Mr. Rolf Pippert and Unimin Corporation 00 Page 2 of 6 October 26, 2012 if we can be of further assistance, please contact Karen Higgins at 919 - 807 -6360. Sincerely, 4 ,n C arles Wakild, CW /kah /ijm Attachments: Certificate of Completion NCDWQ 401 WQC Summary of Permanent Impacts and Mitigation Requirements cc: Jeff Garnett, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 USACE Asheville Regulatory Field Office Linda Wiggs, DWQ Asheville Regional Office DLR, Asheville Regional Office Rebekah Newton, CEC, Inc., 224 South Grove Street, Suite F, Hendersonville, NC 28792 File Copy Filename: 20120632 WestSchoolHouseMine (Ave ry)401_IC Mr. Rolf Pippert and Unimin Corporation Page 3 of 6 October 26, 2012 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92 -500 and 95 -217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500, to Mr. Rolf Pippert and Unimin Corporation, who have permission to fill or otherwise impact 0.01acres of 404 /wetland and 1,376 linear feet of stream associated with expansion of the West School House Mine which is located northeast of downtown Spruce Pine, north of Brushy Creek Road, Avery County, North Carolina, pursuant to an application dated June 6, 2012, and received by the DWQ on June 28, 2012, with additional information received on September 28, 2012, and by Public Notice issued by the USACE on June 26, 2012, and received by the DWQ on June 26, 2012. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92 -500 and PL 95 -217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts to wetlands, streams, and /or buffers, are approved including incidental impacts: Type of Impact Amount Approved (Units) Plan Location or Reference 404 /Wetlands — riparian 0.01 (acres) Application and Public Notice Stream 1,376 (linear feet) Application and Public Notice Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: Mr. Rolf Pippert and Unimin Corporation " Page 4 of 6 October 26, 2012 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and /or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404 /401Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; Continuing Compliance: Mr. Rolf Pippert and Unimin Corporation shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Rolf Pippert and Unimin Corporation, and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Rolf Pippert and Unimin Corporation in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; Mr. Rolf Pippert and Unimin Corporation Page 5 of 6 October 26, 2012 7. Mitigation: Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Stream Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DIVISION to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR — Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 716 -1921 if you have any questions concerning payment into a restoration fund. You have 120 days from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Stream Restoration Fund to meet the following compensatory mitigation requirement: Type of Impact Compensatory Mitigation River and Sub -basin Required Number Stream 1,376 (linear feet) French Broad /06010108 8. Construction Stormwater Permit NCG010000 An NPDES Construction Stormwater Permit is required for construction projects that disturb one (1) or more acres of land. This Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self- monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCG010000), inspection log sheets, and other information may be found at http: / /portal.ncdenr.org /web /wq /ws /su /npdessw #tab -w . Re- opener Clause Mr. Rolf Pippert and Unimin Corporation, and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. Mr. Rolf Pippert and Unimin Corporation, shall require its contractors (and /or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and /or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 02H.0507(d). Before modifying the certification, DWQ shall notify Mr. Rolf Pippert and Unimin Corporation, and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H.0504. Any new or revised conditions shall be provided to Mr. Rolf Pippert and Unimin Corporation, in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. Mr. Rolf Pippert and Unimin Corporation Page 6 of 6 October 26, 2012 10. Turbidity The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B.0211 (k). 11. Flow The UT to Brushy Creek, downstream of the impact, shall be visually monitored by Unimin for loss of hydraulic function /flow and to determine if the stream continues to provide aquatic life propagation and biological integrity per required in 15 A NCAC 2B. 0211(1). Visual and photographic monitoring of the UT below the impacts shall begin immediately and continue throughout the project during the months of June, July and August. Annual reports of the visual and photographic documentation shall be submitted to the Asheville Regional Office on November 1 of each year. 12. Temperature The temperature shall not exceed 20 degrees C (68 degrees F) 15 A NCAC 213.0211(j) 13. The DWQ Asheville Regional Office shall be contacted 72 hours prior to start of construction. 14. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe), North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This the 26th day of October 2012 DIVISION OF WATER QUALITY l� h rles Wakild, P.E. 3944 CW /kah /ijm