HomeMy WebLinkAbout20210491 Ver 1_Pre-Filing Meeting Request_20210303DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210491 Version * 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 3/3/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jesse Byrd jbyrd@ljbinc.com City of Statesville Columbia Street Culvert Repair and Extension Project City of Statesville Iredell Street Address Columbia Street between Grove Road and Hill Street Address Line 2 (Coordinates: 35.774126, -80.904132) City State / Rovince / Region Statesville NC Fbstal / Zip Code Country 2867 U.S. Is this a transportation project?* r Yes ( No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fl Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * The City of Statesville is proposing to repair and extend an existing culvert that runs under Columbia Street in the City of Statesville. Statesville is proposing to flatten the near vertical embankment slopes to an approximately 3:1 slope immediately north and south of Columbia Street, extend the existing culvert by approximately 28 LF downstream and by 20 linear feet upstream, and install inlet protection against ongoing scour upstream. Repairs on the downstream end of the culvert would include installing a drop manhole structure at the existing culvert and extending the culvert downstream at grade. Alluvial soils related to ongoing erosion would be removed from the construction area as necessary and the culvert end -wall would be repaired or replaced. The preliminary design set has been attached to this Pre -Filing Meeting Request. The 60-inch culvert proposed for repair and extension conveys surface water within an unnamed tributary that runs under Columbia Street to Third Creek located downstream to the south. The City of Statesville anticipates on submitting a pre -construction notification to the U.S. Army Corps District Engineer and NC DEQ Division of Water Resources prior to commencing with culvert repair. Please give a couple of dates you are available for a meeting. 3/23/2021 3/30/2021 Please attach the documentation you would like to have the meeting about. Colombia Street and Hill Street_NWl.pdf ColumbiaSt_Plans_2021-01-05.pdf pdf only 1.11MB 7.77MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 3Ze e og. . Submittal Date 3/3/2021 Colombia and Hill Street Culvert U.S. Fish and Wildlife Service, National Standards and Support Team,wetlands_team@fws.gov Wetlands Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine February 23, 2021 0 0.25 0.50.125 mi 0 0.4 0.80.2 km 1:1 5,764 This page was produced by the NWI mapperNational Wetlands Inventory (NWI) This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site. SHEET INDEX SHEET DESCRIPTION 1.0 COVER SHEET & VICINITY MAP EROSION & SEDIMENT CONTROL PLAN DETAIL SHEET (1 OF 3) 1.1 NOTES 3.0 4.0 5.0 5.1 DETAIL SHEET (2 OF 3) DETAIL SHEET (3 OF 3)5.2 PLAN & PROFILE EXISTING CONDITIONS2.0 CITY OF STATESVILLE COLUMBIA STREET CULVERT REPAIR AND EXTENSION CITY PROJECT NO. LJB PROJECT NO. 0118823A JANUARY 2021 PRELIMINARY DESIGN SET ^ PROJECT LOCATION MB COVER SHEET, VICINITY MAP, & SHEET INDEX 1.0 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION BEFORE YOU DIG! CONTACT ONE-CALL CENTER 1-800-632-4949 OR 811 GENERAL NOTES: 1.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE MOST RECENT VERSION OF NCDOT 2018 SPECIFICATIONS AND SPECIAL PROVISIONS, AND IN ACCORDANCE WITH APPROVED PLANS BY THE ENGINEER. WHERE CONFLICTS ARISE, THE FINAL AUTHORITY SHALL BE THE CITY. 2.ALL COORDINATES ARE BASED ON NAD 83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD 88. 3.CONSTRUCTION AND/OR DEMOLITION ACTIVITY, INCLUDING LOADING AND UNLOADING OF MATERIAL, IS PROHIBITED BEFORE 7 AM AND AFTER 7 PM MONDAY THROUGH FRIDAY. NO WORK IS PERMITTED ON WEEKENDS OR HOLIDAYS UNLESS PRIOR WRITTEN APPROVAL IS OBTAINED FROM THE CITY. 4.ALL CONTRACTORS SHALL BE PROPERLY LICENSED UNDER NC STATE LAWS GOVERNING THEIR TRADE. 5.CONTRACTOR SHALL VISIT THE SITE, BECOME FAMILIAR WITH ACTUAL CONDITIONS, AND SHALL VERIFY EXISTING CONDITIONS IN THE FIELD. 6.CONTRACTOR HEREBY WARRANTS HIS WORK FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE VILLAGE AGAINST ANY DEFECTS DUE TO FAULTY MATERIALS OR WORKMANSHIP. 7.CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF PUBLIC SAFETY ON THE SITE DURING THE PERIOD OF CONSTRUCTION, INCLUDING WEEKENDS AND HOLIDAYS. 8.CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE CITY FACILITIES. SHOULD DAMAGES OCCUR, THE CONTRACTOR SHALL AT HIS OWN EXPENSE REPAIR IMMEDIATELY TO THE SATISFACTION OF THE CITY AND THE ENGINEER. 9.CONTRACTOR SHALL HOLD HARMLESS THE CITY AND THE ENGINEER FOR DAMAGES, INJURIES, OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY OF THE CONSTRUCTION SITE, INCLUDING BUT NOT LIMITED TO: HIS EQUIPMENT, COMPLETED WORK, STAGED MATERIALS, AND SITE ACCESS BY AUTHORIZED AND UNAUTHORIZED PERSONS. 11.CONTRACTOR SHALL NOT LEAVE ANY EXCAVATION OPEN OR UNPROTECTED DURING NON-WORKING HOURS. THE CONTRACTOR SHALL UTILIZE FENCES, SIGNS, BARRICADES, AND APPROPRIATE MEANS AS NECESSARY TO ENSURE THE SAFETY OF BOTH AUTHORIZED AND UN-AUTHORIZED PERSONS WHO ENTER THE SITE. 12.CONTRACTOR SHALL ENSURE THAT ALL TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 13.CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE PROJECT SITE. 14.CONTRACTOR SHALL ENSURE THAT ALL WORK SHALL BE PERFORMED ACCORDING TO CURRENT OSHA SAFETY REGULATIONS. CONTRACTOR SHALL PROVIDE SAFETY TRAINING CERTIFICATION DOCUMENTATION IF REQUESTED BY THE CITY. 15.CONTRACTOR SHALL COORDINATE WITH THE ENGINEER, THE CITY, AND ADJACENT PROPERTY OWNERS AS REQUIRED FOR WORK ON PRIVATE PROPERTY. 16.CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS SHOWN ON PLANS AND SHALL VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT MODIFICATIONS CAN BE MADE. 17.CONTRACTOR SHALL MAINTAIN A SET OF ANNOTATED DRAWINGS SHOWING ANY FIELD CHANGES TO THE PROJECT. THE CONTRACTOR IS NOT AUTHORIZED TO MAKE FIELD CHANGES WITHOUT THE APPROVAL OF THE ENGINEER. 18.UTILITIES WERE LOCATED BASED ON FIELD MARKINGS PROVIDED BY 811 ONE-CALL. NO SUB-SURFACE LOCATIONS HAVE BEEN PERFORMED. ALL SUB-SURFACE UTILITY LOCATIONS ARE APPROXIMATE. 19.CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFYING APPROPRIATE UTILITY PROVIDER OF ANY CONFLICTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT ANY KNOWN AND UNKNOWN UNDERGROUND FEATURES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING IMMEDIATELY IF UTILITY INFORMATION IS DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN. 20.WITHIN THE WORK AREA, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION AND ELEVATION ADJUSTMENTS OF ANY EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES, ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH WORK SHALL BE COORDINATED WITH THE ENGINEER PRIOR TO PERFORMING ADJUSTMENTS. 21.CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF THE PROJECT FROM EFFECTS OF FLOOD AND STORM EVENTS, INCLUDING BUT NOT LIMITED TO WORK IN PROGRESS, COMPLETED WORK, EQUIPMENT, MATERIALS, UTILITIES, WITHIN THE PROJECT AREA OR AFFECTED BY THE PROJECT OR DAMAGED AS A RESULT OF THE PROJECT. 22.TRAFFIC CONTROL DEVICES, SIGNS, LANE CLOSURES, SIDEWALKS, ETC. SHALL BE INSTALLED IN ACCORDANCE WITH NCDOT STANDARDS. 23.THE CONTRACTOR SHALL BE REQUIRED TO FURNISH, INSTALL, RELOCATE, AND MAINTAIN ALL TRAFFIC CONTROL MEASURES (SIGNS, BARRICADES, ETC.) FOR WORK SITES AS REQUIRED. THE LOCATION AND POSITIONING OF THESE TRAFFIC CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE PLANS AND APPROVED IN FIELD BY THE ENGINEER BEFORE CONSTRUCTION BEGINS. 24.THE CONTRACTOR IS RESPONSIBLE FOR FINAL CLEANUP WHICH SHALL CONSIST OF REMOVING ALL TRASH AND MATERIALS INCIDENTAL TO THE PROJECT AND MOVING THEM OFFSITE. 25.THE TEMPORARY EASEMENT DOCUMENTS SHOWING BOUNDARY BEARINGS AND DISTANCES WILL BE PROVIDED TO THE CONTRACTOR. SUGGESTED PROJECT SEQUENCE 1.INSTALL EROSION CONTROL MEASURES AND PROTECTION FENCING AS SHOWN ON PLANS. 2.SET UP TRAFFIC CONTROL FOR DOWNSTREAM CONSTRUCTION, ADDING GRAVEL AS NEEDED TO BUILD UP AND PROTECT UPSTREAM SHOULDER. 3.INSTALL JUNCTION BOX, DOWNSTREAM PORTION OF PIPE CULVERT EXTENSION, AND CONSTRUCT ENDWALL. 4.PLACE DOWNSTREAM SIDESLOPE EMBANKMENT PER PLANS. 5.REMOVE RIPRAP AND RUBBLE FROM DOWNSTREAM BANK AND RECONSTRUCT PER PLANS. 6.REMOVE ANY SEDIMENT ACCUMULATION DOWNSTREAM OF CULVERT AND CONSTRUCT DOWNSTREAM STREAM STABILIZATION MEASURES. 7.RESET TRAFFIC CONTROL FOR UPSTREAM CONSTRUCTION, ADDING GRAVEL AS NEEDED TO BUILD UP AND PROTECT DOWNSTREAM SHOULDER. 8.INSTALL UPSTREAM PORTION OF PIPE CULVERT EXTENSION AND CONSTRUCT ENDWALL. 9.PLACE UPSTREAM SIDESLOPE EMBANKMENT PER PLANS. 10.REMOVE TRAFFIC CONTROL MEASURES. 11.REMOVE EROSION CONTROL MEASURES AND PROTECTION FENCING. CONTRACTOR TO PROVIDE PROPOSED CONSTRUCTION SCHEDULE AND SEQUENCE TO CITY PRIOR TO COMMENCING PROJECT. NOTES 1.1 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION EXISTING CONDITIONS 2.0 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION 870 875 880 875 880 875 870 880 885 875 880 LIMIT OF DISTURBANCE 0.33 AC (NORTH SIDE) LIMIT OF DISTURBANCE 0.21 AC (SOUTH SIDE) 4 FINISHED GRADE WIRE OR ZIP TIES TO SECURE SAFETY FENCE TO POST STAKES: 66" T-POST DRIVEN 18" BELOW GRADE 48" HIGH DENSITY ORANGE POLYETHYLENE SAFETY FENCE STAKE SPACING 12' ON CENTER TEMPORARY PROTECTION FENCE FILL SL O P E FLOW TEMPORARY SILT FENCE NOTES: 1.FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2.WOVEN FILTER FABRIC TO BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3.STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE. 4.TURN SILT FENCE UP SLOPE AT ENDS. 5.DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6.SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7.DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. 8.INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FENCE. 9.ATTACH THE FABRIC TO EACH POST WITH THREE TIES WITH THE TOP TIE WITHIN 8” OF THE TOP OF THE FABRIC. 10.WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 11.CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. TEMPORARY SILT FENCE MAINTENANCE NOTES: 1.INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2.SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3.REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. WOVEN FILTER FABRIC STEEL POST 8' MAX 2'-0"STEEL POST WOVEN FILTER FABRIC 30" MIN24" FILTER FABRICANCHOR SKIRT 8" MINIMUM TEMPORARY SILT FENCE NOTES:FLOWSEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND PUMP AROUND PUMP BASEFLOW IMPERVIOUS SHEET IMPERVIOUS DIKE 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS AS NEEDED. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. 4. THE PUMP AROUND PUMP SHOULD ADEQUATELY CONVEY FLOWS. 5. PROVIDE STABILIZED OUTLET TO STREAM BANK. FILTER FABRIC FOR DRAINAGE TYPE 2 (NON-WOVEN) SPECIAL STILLING BASIN EXISTING GROUND ROADWAY TEMPORARY FLEXIBLE HOSE SPECIAL STILLING BASIN (SEE DETAIL BELOW) DEWATERING PUMP COFFER DAM SANDBAG/ STONE WORKING AREA TOP OF STREAM BANK 1. INSTALL SPECIAL STILLING BASINS AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS. 4. INSTALL PUMPING APPARATUS AT THE DOWNSTREAM WORK AREA, IF NEEDED, TO DEWATER THE WORK AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER SHALL FLOW INTO THE SPECIAL STILLING BASIN. 5. PERFORM CULVERT REPLACEMENT WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE STILLING BASINS AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 12" MIN. CLASS A STONE FLOW PROVIDE STABILIZED OUTLET TO STREAM BANK TYPICAL PUMP AROUND OPERATIONFROM STREAM SPECIAL STILLING BASIN FOR WATER PUMPED FROM ANY DISTURBED AREA EROSION CONTROL NOTES: 1.THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AND DEVICES ACCORDING TO THE STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY AND APPLICABLE STATE AND LOCAL LAWS AND ORDINANCES, AND PREVENT STANDING WATER WITHIN PROJECT LIMITS. 2.CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO PREVENT SEDIMENT FROM LEAVING SITE. STREETS AND PAVED PARKING AREAS SHALL BE SWEPT REGULARLY TO KEEP THE TRACKED SEDIMENT FROM ENTERING THE STORM DRAINS AND STREAM. 3.CONTRACTOR SHALL INSTALL TEMPORARY EROSION CONTROL DEVICES WITHIN THE PROJECT AREA AS REQUIRED TO CONTROL SEDIMENT TRANSPORT PRIOR TO COMMENCING EARTHWORK. IF ADDITIONAL STAGING/STOCKPILE AREA IS REQUIRED, THE AREA MUST BE APPROVED BY THE CITY AND SILT FENCE MUST BE INSTALLED BEFORE USE. 4.CONTRACTOR SHALL ENSURE THAT DRAINAGE IS DIRECTED INTO TEMPORARY SEDIMENT DEVICES THROUGHOUT THE CONSTRUCTION PERIOD. 5.AS EACH PORTION OF CONSTRUCTION IS COMPLETE, CONTRACTOR SHALL INSTALL PERMANENT STABILIZATION. AT END OF PROJECT, WHEN AUTHORIZED BY THE ENGINEER, CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, INSTALL PERMANENT STABILIZATION, AND RESTORE THE SITE AS SHOWN ON PLANS, OR AS CLOSELY AS POSSIBLE TO ORIGINAL CONDITIONS. 6.CONTRACTOR SHALL PROVIDE SOIL STABILIZATION FOR ALL DISTURBED AREAS BASED ON TIME FRAMES SHOWN ON STABILIZATION TIMEFRAME CHART WITHIN THE SPECIFIED CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. 7.CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCOMMODATION AND MAINTENANCE OF BASE AND STORM FLOWS IN ALL AREAS OF THE PROJECT SITE THROUGHOUT THE CONSTRUCTION PERIOD. SEE TYPICAL PUMP-AROUND DETAIL. 8.CONTRACTOR SHALL INSPECT SITE AFTER EACH RUNOFF PRODUCING RAINFALL AND REPAIR VISIBLE EROSION. CONTRACTOR SHALL REPAIR AND REPLACE EROSION CONTROL DEVICES AS NECESSARY. 9.ALL STREAM WORK SHALL BE PERFORMED IN THE DRY. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO ENSURE THAT SUCH REQUIREMENTS ARE SATISFIED. SEE PUMP AROUND DETAIL 1/3.0. 10.DE-WATERING OF STRUCTURES WITH SEDIMENT-LADEN WATER DIRECTLY TO STREAMS OR STORM DRAINAGE SYSTEM IS PROHIBITED. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO ENSURE THAT SUCH PROHIBITED ACTIVITIES DO NOT OCCUR. 11.PERMANENT GROUND COVER IS REQUIRED ON ALL DISTURBED AREAS OF THE CONTRACT. MULCHING SHALL BE PROVIDED FOR ALL AREAS REQUIRING SEEDING. 12.WHEN VEGETATION IS ESTABLISHED, CONTRACTOR SHALL CALL FOR FINAL SITE INSPECTION BY THE CITY OF STATESVILLE. EROSION & SEDIMENT CONTROL SEQUENCE: 1.INSTALL SILT FENCE AND TEMPORARY CONSTRUCTION FENCE AS NEEDED. 2.INSTALL INLET PROTECTION ON EXISTING INLET AS SHOWN ON PLANS. 3.PERIODICALLY INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES. MAINTAIN, REPAIR, AND REPLACE AS NECESSSARY. PERIODIC INSPECTION SHALL BE DEFINED AS AFTER EACH RAINFALL EVENT (0.5 INCHES PER 24 HOURS) OR WEEKLY, WHICHEVER IS MOST FREQUENT. 4.SAWCUT ROADWAY 5.CONSTRUCT BOX CULVERT AND REQUIRED UTILITY WORK. 6. CONSTRUCT RIPRAP PROTECTION UPSTREAM AND DOWNSTREAM OF CULVERT. 7.GRADE DISTURBED AREAS TO FINISHED GRADE. 8.STABILIZE ALL DISTURBED AREAS AS REQUIRED. 9.REPAIR ROADWAY 10.REMOVE ALL TEMPORARY EROSION CONTROL DEVICES WHEN AREA IS PERMANENTLY STABILIZED AND CONSTRUCTION IS COMPLETE. TEMPORARY SEEDING 1.0 DESCRIPTION THIS WORK SHALL CONSIST OF FURNISHING AND INSTALLING ALL TEMPORARY HERBACEOUS SEED AND MULCH FOR ALL AREAS DISTURBED BY CONSTRUCTION OR AS DIRECTED BY THE ENGINEER. TEMPORARY SEEDING SHALL BE COMPLETED WITHIN 24 HOURS OF COMPLETION OF GRADING ACTIVITIES IN ANY WORK AREA. TEMPORARY SEEDING SHALL NOT BE REQUIRED IN AREAS IMMEDIATELY SEEDED WITH PERMANENT SEED. 2.0 MATERIALS SEED: APPLY THE FOLLOWING VEGETATION AT THE LISTED RATES. ·FALL, WINTER, AND SPRING SEEDING (AUGUST 15-MAY 1): RYE GRAIN 120 LB PER ACRE ·SUMMER SEEDING (MAY 1-AUGUST 15): BROWNTOP MILLET 40 LBS PER ACRE MULCH: APPLY 4,000 LBS./ACRE GRAIN STRAW OR EQUIVALENT COVER. PROVIDE BIODEGRADABLE MATTING IN LIEU OF MULCH ON SLOPES 3:1 OR STEEPER. PERMANENT SEEDING 1.0 DESCRIPTION APPROVED DATES FOR PERMANENT SEEDING ARE SEPTEMBER 1 TO OCTOBER 31 AND FEBRUARY 15 TO APRIL 30. OUTSIDE OF THESE TIME FRAMES, PERMANENT SEEDING CAN ONLY BE DONE WHEN COMBINED WITH TEMPORARY SEED UNDER COIR MATTING OR WITH PRIOR APPROVAL BY THE ENGINEER. 2.0 MATERIALS PERMANENT SEEDING MIXTURE (SPRING) DATES SPECIES RATE (LBS/ACRE) FEBRUARY 15 - APRIL 30 TALL FESCUE 200 NOTE: IF SEEDED AT THIS TIME, RE-SEEDING IN THE FALL WILL BE NECESSARY IF PERMANENT VEGETATIVE COVER IS NOT ADEQUATELY ESTABLISHED. PERMANENT SEEDING MIXTURE (FALL) DATES SPECIES RATE (LBS/ACRE) SEPTEMBER 1 - OCTOBER 31 TALL FESCUE 200 NOTE: COIR MATTING AND MELLOW MARSH RIPARIAN BUFFER MIX, OR ENGINEER-APPROVED ALTERNATIVE, REQUIRED ON STREAMBANKS. MULCH: APPLY 4,000 LBS./ACRE GRAIN STRAW OR EQUIVALENT COVER. PROVIDE BIODEGRADABLE MATTING IN LIEU OF MULCH ON SLOPES 3:1 OR STEEPER. SEE SPECIFICATIONS FOR SEEDING METHODS AND WARRANTY. SITE AREA DESCRIPTION PERIMETER DIKES, SWALES, DITCHES, SLOPES HIGH QUALITY WATER (HQW) ZONES SLOPES GREATER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 STABILIZATION 7 DAYS 7 DAYS 7 DAYS 14 DAYS 14 DAYS TIMEFRAME EXCEPTIONS NONE NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH NONE, EXCEPT FOR PERMIETERS AND HQW ZONES. STABILIZATION TIMEFRAMES EROSION & SEDIMENT CONTROL PLAN 3.0 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION TOTAL DISTURBED AREA = 0.55 AC 870875880875880875870880885875880EXISTING ENWALL TO BE REMOVED PROP STD NCDOT ENDWALL PROP STD NCDOT ENDWALL CLASS 1 RIPRAP CLASS 1 RIPRAP PROP JUNCTION BOX WITH MANHOLE TEMPORARY CONSTRUCTION EASEMENT TEMPORARY CONSTRUCTION EASEMENT CULVERT PROFILE 860 870 880 890 860 870 880 890 0+00 1+00 1+90 PROPOSED 54" RCP PROPOSED 54" RCP PROPOSED GRADE 3:1 SLOPE 2.12% 2.12% 1.00% STA 1+61.21 INV EL 866.68 PROPOSED GRADE 3:1 SLOPE JUNCTION BOXWITH MANHOLESTA 0+70.00TOP EL 879.60INV IN 864.75INV OUT 863.82STA 1+41.21 INV EL 866.26 STA 0+38.00 INV EL 863.50 12" MIN BEDDING STONE WITH NCDOT TYPE 2 GEOFABRIC STD NCDOT ENDWALL STD NCDOT ENDWALL PLAN AND PROFILE 4.0 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION NOTES: 1.SEE SHEETS 5.0-5.2 FOR JUNCTION BOX WITH MANHOLE AND ENDWALL DETAILS. CONTRACTOR HAS THE OPTION OF USING BRICK OR REINFORCE CONCRETE FOR THE JUNCTION BOX AND REINFORCED CONCRETE OT PRECAST CONCRETE FOR THE ENDWALLS. 2.SEE DIVISION 3, NCDOT SPECIFICATIONS FOR PIPE CULVERT INSTALLATION REQUIREMENTS. 3.RIPRAP EROSION PROTECTION UPSTREAM AND DOWNSTREAM OF CULVERT TO BE UNDERLAIN BY NCDOT TYPE 2 GEOTEXTILE FABRIC. 4.SLOPES SHALL BE A MAXIMUM OF 3:1 UNLESS OTHERWISE SHOWN. 5.CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL EROSION CONTROL REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL EROSION CONTROL REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING EROSION CONTROL PLAN APPROVAL FOR OFF-SITE BORROW OR WASTE SOURCES. 6.ALL STREAM WORK IS TO BE PERFORMED IN THE DRY, THE CHANNEL BANKS ARE TO BE STABILIZED PRIOR TO DIVERTING WATER BACK INTO THE STREAM CHANNEL. 7.REMOVE VEGETATION, TOPSOIL, DEBRIS, UNSATISFACTORY SOIL MATERIALS, OBSTRUCTIONS, AND DELETERIOUS MATERIALS FROM GROUND SURFACE PRIOR TO PLACING FILLS. PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SO FILL MATERIAL WILL BOND WITH EXISTING MATERIAL. PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS. 8.UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE FROM IRREGULAR SURFACE CHANGES. MEET COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS INDICATED. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING. 9.GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND OFF-SITE DISPOSAL OF EXCESS TOPSOIL AND OTHER UNSUITABLE MATERIAL. 10.REMOVE EXISTING TREES ONLY AS REQUIRED FOR PROPOSED GRADES. GRADES MAY BE ADJUSTED IN AREAS TO SAVE SPECIMEN TREES. REVIEW AND COORDINATE REMOVAL OF TREES WITH OWNER AND ENGINEER. 11.STABILIZATION IS THE BEST FORM OF EROSION CONTROL. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 14 DAYS OF COMPLETION OF GRADING. ALL REMAINING AREAS ARE TO BE SEEDED AND MULCHED WITHIN 90 DAYS. 12.CONTRACTOR MAY ADJUST PROPOSED GRADES WITH ENGINEER'S APPROVAL TO BALANCE SITE. NO FILL MATERIAL SHALL BE BROUGHT IN FROM OFF-SITE WITHOUT PRIOR APPROVAL BY ENGINEER. NO STRUCTURAL FILL MATERIAL MAY BE REMOVED FROM SITE WITHOUT PRIOR APPROVAL FROM THE OWNER. 13.RIP-RAP APRON STONE IS NOT TO EXTEND ABOVE INVERT OF DRAINAGE PIPES. 14.ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. 15.ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUNDBREAKING. 16.ALL FILL TO BE COMPACTED ACCORDING TO SPECIFICATIONS. 17.CONTRACTOR SHALL PROTECT ALL TREES AND VEGETATION INDICATED TO REMAIN AND SHALL MAINTAIN ALL TREE PROTECTION BARRICADES. 18.THE CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. Feet 0 20 40 Feet 0 20 40 Feet 0 4 8 1" = 4' (VERT) 1" = 20' (HORZ) DETAIL SHEET (1 OF 3)5.0 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION DETAIL SHEET (2 OF 3)5.1 Columbia Street Culvert Repair and ExtensionPO BOX 2294 KERNERSVILLE, NC 27284 OFFICE: (336) 996-9974 NC LICENSE # C-4123 SHEET NO. 0118823A STATESVILLE # JANUARY 2021 PRELIMINARY NOT FOR CONSTRUCTION DETAIL SHEET (3 OF 3)5.2