Loading...
HomeMy WebLinkAboutNC0021211_authorization to construct_19991217• * !' ATA NCDENR JAMES B. HUNT JR. GOVERNOR WAYNE MCDEVJTT SECRETARY KERR T. STEVENS. DIRECTOR T _ NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES December 17, 1999 Mr. J. Christopher Rollins Administrative and Development Director City of Graham 201 South Main Street, PO Drawer 357 Graham, North Carolina 27253 SUBJECT: Dear Mr. Rollins: DIVISION OF WATER QUALITY City of Graham Permit No. NC0021211 Authorization to Construct Wastewater Treatment Facility Project No. CS370563-03 Alamance County A letter of request for Authorization to Construct was received September 21, 1999 by the Division of Water Quality, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 3.5 MGD Graham Wastewater Treatment Plant, with discharge of treated wastewater into Haw River in the Cape Fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: An influent structure with mechanical bar screens, grit tank, grit classifier, a 220 gpm horizontal vortex grit pump and Parshall flume; an influent pumping station with four submersible 3250 gpm pumps and emergency generator; two 70-foot diameter primary settling tanks; primary sludge pumping station with three 335 gpm horizontal vortex pumps; three scum pump stations each to include a 200 gpm vertical chopper pump; four splitter boxes; piping modifications to convert the existing two -stage aeration system to a single -stage system; aeration basin modifications; modifications to two RAS pump stations; an effluent Parshall flume; digester modifications, to include two 600 gpm progressing cavity sludge pumps and a 1000 scfm centrifugal blower; a sludge thickener building to include a rotary drum thicker and 150 gpm progressing cavity sludge pump, modifications to the 0.75 MG sludge storage tank and the 0.75 MG sludge CONSTRUCTION GRANTS & LOANS SECTION 1633 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1633 PHONE 919-733-6900 FAX 919-715-6229 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10 POST -CONSUMER PAPER digestion tank No. 3, to include three 1000 gpm vertical chopper sludge recirculation pumps; demolition of a portion of the existing sludge drying beds; alum storage; alum feed system; pump modifications; telemetry and supervisory control and data acquisition (SCADA) system for the wastewater treatment plant and remote sites yard piping; site work and all appurtenances. The Permittee shall employ a State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0021211 issued February 12, 1996, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021211. When funding is desired, construction should not proceed until the Authorization -to - Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a Engineer's Certification (attached) must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 2 Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of Title 15A, Chapter 8A, .0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G.S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 3 One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. Sincerely, Kerr T. Stevens Director Attachment to all KOP:nw cc: Feinkbeiner, Pettis & Strout, Inc. (Greensboro, Attn: David Hamilton, P.E.) Mr. Dennis Ramsey DWQ Winston-Salem Regional Office Ms. Amy Simes Ms. Valerie Lancaster Mr. Ken Pohlig, P.E. Technical Assistance and Certification Unit Have Goodrich DMU SRF 4