Loading...
HomeMy WebLinkAbout20120980 Ver 1_401 Application_20121012PIEDMONT Q P, ,,, CONSERVATION COUNCIL, INC. Leveraging people and resources for innovative community projects September 20, 2012 Re: PCN Section 404 Permit/401 Water Quality Certification 2 i 2 0980 Please find the following documents for your review on behalf of Piedmont Conservation Council for the Lassiter Mill Dam Removal project: 1. Pre - Construction Notification Form 2. Agent Authorization Form 3. Lassiter Mill Dam NEPA documentation, NOAA 4. NC Dept. of Cultural Resources State Historic Preservation Office memo 5. Lassiter Mill Dam Flood Map 6. Aerial/Parcel Map 7. Full Dam Removal Plans Set If there are any necessary items missing from this submission or any additional questions please do not hesitate to contact me at the following: Jacob Leech, Project Manager — Piedmont Conservation Council (919) 300 -1628 — office (540) 784 -3769 — cell Piedmont Conservation Council 721 Foster St. Room 228 Durham, NC 27701 i acobleech gpiedmontconservation.org Our partners at USFWS for this project can be contacted through: Laura Fogo Fish and Wildlife Biologist 910 -695 -3323 ext 4 Sincerely, Jacob Leech Piedmont Conservation Council, Inc. D OCT 2 5 2012 DENR - W,g'rER tjURll etland,a t c....`.. TY 721 Foster St, Rm 228; Durham NC 27701 1 (919) 560 -0560 1 www.piedmontconservation.org W A TF9QG O "C 20120980 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification C Form A. Appficant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit C1 Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 27 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. [:] yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? []Yes ® No 2. Project Informatlon 2a. Name of project: Lassiter Mill Dam Removal 2b. County: Randoph 2c. Nearest municipality / town: New Hope 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Amy Grissom, LLC 3b. Deed Book and Page No. 001865/00527 3c. Responsible Party (for LLC if applicable): Amy Grissom 3d. Street address: 421 hempstead Place IN 19 al§fl 3e. City, state, zip: Charlotte, NC 28207 IYU 11_� U IN 3f. Telephone no.: 704- 379 -7585 3g. Fax no.: 3h. Email address: gdssomas @yahoo.com Wet1anR - WA Ft Page 1 of 15 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (If different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: 501(c)(3) 4b. Name: Alex Ashton 4c. Business name (if applicable): Piedmont Conservation Council, Inc. 4d. Street address: 721 Foster St 4e. City, state, zip: Durham, NC 27701 4f. Telephone no.: 919 - 300 -1628 4g. Fax no.: 919 - 560 -0560 4h. Email address: jacobleech @piedmontconservation.org 5. Agent/Consultant Information (If applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 15 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7616018703 1b. Site coordinates (in decimal degrees): Latitude: 35.564 Longitude: - 79.973 (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: 8.6 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Uwharrie River 2b. Water Quality Classification of nearest receiving water: Uwharrie River Class B Waters 2c. River basin: Pee Dee basin Page 3 of 15 PCN Form —Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site vicinity and land use /ownership The Lassiter Mill Dam is a 205-ft long /12 -ft high intact rock and concrete dam on the Uwharrie River in Randolph County, NC. The dam and surrounding land is privately owned by Ruth Ann and Amy Grissom, who are fully supportive of this project to remove the dam. They own the parcel of land that surrounds the dam and includes land on either side of the river (see parcel map attached). Land use in the vicinity of the project is agricultural and rural residential. The dam is a complete barrier to aquatic species movement and migration. It also creates a 3+ mile long impoundment in the river, which has degraded habitat in that reach, altered hydrology, impacted water quality (low DO), and blocked sediment transport. Details of the dam and affected river The dam is comprised of a 160 foot long spillway, a northern abutment, and a foundation of a former mill structure acting as its southern abutment. The dam appears to have been constructed by backfilling forms with the local riverbed cobbles and a slurry of concrete. There is no evidence of reinforcement in the spillway structure. A 300 foot long earthen raceway circumvents the southern side of the spillway, and flows through the mill structure's foundation. The banks of the raceway show signs of significant lateral erosion. The spillway has a breach along its southern side extending a few feet below the spillway crest. During low- moderate flow, the full river flow circumvents the dam crest by way of the raceway and breach in the spillway, therefore the crest of the spillway is dry and easy to access. The dam is in poor condition. A significant scour hole exists directly downstream of the dam, likely due in part to excavation of river stone during the dam's construction as well as scour from the flow when it goes over the crest of the spillway. The downstream river channel is approximately 160 feet wide, narrowing to 100 feet wide approximately 300 feet downstream of the dam. Cross sections of the downstream channel are included on the engineering plans (see "Final Engineering Plans" attached). The riverbed's slope is approximately 1.6% and is lined with large boulders and cobbles embedded in gravel. Large boulders and bedrock outcrops are visible throughout the downstream end of the depositional bar. The upstream channel is approximately 110 feet and is highly uniform in shape. The channel cross section is consistently trapezoidal in shape with a solid cobble substrate with pockets of gravel. An ADCP bathymetric survey demonstrated that the majority upstream channel bed is below the grade of the downstream depositional bar, extending upstream at an approximate slope of 0.04% through the impoundment. Sediment analysis and streambanks The streambanks around the dam are well vegetated but show signs of historic bank failures. The stream banks along the impoundment are near vertical with a consistent wedge of clay deposited at the toe of the bank along the entire impoundment length, deposited from former stream bank failures. Evidence of active and historic stream bank failures are evident along almost 100% of the impoundment, as well as upstream and downstream, and appear to be a natural stream bank condition for this river system. Sediment probing and ADCP measurements were completed to determine the spatial distribution of impounded sediment and bathymetry of the impoundment. Probing demonstrated that impounded sediments were largely absent upstream of the dam. Isolated small pockets of sediment were encountered on the downstream side of isolated boulders and woody debris as well as one deposit of Gay approximately 1 -foot wide found near the dam. Collectively, these isolated pockets of sediment were inconsequential and too small to quantify. The only sediment within the impoundment, which could potentially be mobilized post dam removal, was limited to a 5-6 foot wide wedge of clay along each bank, resulting from historic and ongoing bank failures. This wedge of clay along the toe of each bank is not a depositional feature resulting from the dam and is therefore not considered impounded sediment. In fact there was evidence along non - impounded reaches of the Uwharrie River that this wedge of Gay at the toe of the bank is a natural and common depositional feature of this river system. All sediment probes taken within the central reach of the river channel confirmed that no impounded sediment has accumulated behind the dam (see "Final Sediment Management Plan and Engineering Design Report" attached). In addition, USFWS staff completed an initial sediment contaminant evaluation that included database review and on -site reconnaissance; this evaluation identified no issues of concern, and confirmed the lack of impounded sediment. 13b. List the total estimated acreage of all existing wetlands on the property: I 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: The property includes approximately 1290 feet of the Uwharrie River and no tributary streams. The length of the impoundment created by the dam is estimated to extend over 3 miles upstream. Page 4 of 15 PCN Form — Version 1.3 December 10, 2008 Version 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to fully remove the Lassiter Mill Dam and associated powerhouse in order to restore the Uwharrie River to a more natural, free - flowing state. Ecological benefits (purposes) of removing the dam are: • Re- establishing American shad, American eel and other diadromous fish spawning access and habitat use to an additional 14.6 river miles and 174 additional miles of perennial streams. • Re- establishing habitat connectivity for a number of rare aquatic and resident species. • Restoring lotic stream habitat, hydrology, water quality and sediment transport in the 3+ mile impoundment created by the dam. In addition to ecological restoration, removing the dam will alleviate a serious public safety hazard for those using the river for recreation (then: is no safe portage around the dam, and the dam creates a dangerous hydraulic in high flow conditions). It will also eliminate the danger of dam failure, which could result in flooding or injury to people downstream. Page 5 of 15 PCN Form — Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: Engineering Design A geomorphic field assessment was conducted In November 2011 to investigate impounded sediment depths, substrate character above and below the dam, the current conditions of the riverbanks, an assessment of bank stability post removal, the dam condition and character, the tailrace, construction access routes, critical infrastructure that could be impacted, and the proposed survey extent. Methods and results of this assessment are presented in the "Final Sediment Management Plan and Engineering Design Report" attached and summarized in Section 3a above. A topographic and bathymetric survey was completed in January 2012. The survey included locating any infrastructure (e.g. mill structures, utilities, etc.) that may be impacted by the project, collecting spot elevations of the dam, generating one -foot contours of the project area, and measuring cross - sections. Information from the survey and field assessment was used to develop engineering design plans. The plan set includes existing conditions, construction sequence, proposed conditions, river cross sections and profile, and soil erosion and sediment control details. Construction Sequence The construction sequence was developed to limit site disturbance, provide easy access, and remove the dam in the simplest way possible. The dam will be accessed by heavy equipment (excavator- trackhoe, dump truck) during a period of low flow from just downstream of the remnant mill structure, utilizing a piped crossing over the raceway. The access road will then continue across the depositional bar below the dam's scour hole to the northern side of the depositional bar, where a bypass channel will be cut through the depositional bar. The far side of the dam will then slowly be breached from top to bottom, redirecting much of the river's flow along the northern side of the downstream channel. The dam will then be removed from north to south in manageable sections that will be buried in the former mill race and the deep scour hole beneath the dam. The former mill foundation will be demolished in place and the former mill race will be filled with concrete from the dam and buried with soil from the adjacent earthen mound. If necessary, clean fill and topsoil will be imported to attain final grades. Pipes from the temporary raceway crossing will be removed offsite; remaining material will be placed in the fill zone of the mill raceway. The access road will be removed once the contractor has successfully worked his way off the site from north to south and has removed the dam, filled in the raceway, and regraded the southern streambank in the area of the raceway. The site will then be seeded and planted with native species as needed to reestablish a vegetated streambank, including planting of saplings to replace mature trees that are lost. Impacts Due to the lack of impounded sediment within the Impoundment for the Lassiter Mill Dam, no impacts from sediment mobilization are anticipated. Therefore, no dredging, excavation or relocation of sediment has been included as part of the dam removal design. Three natural bedrock features located at 0.5, 1.25 and 2.0 miles upstream of the dam will serve as significant controls on vertical channel adjustment following dam removal, so channel erosion (ie, headcutting) will not be an issue. The only anticipated impact of dam removal will be the increased likelihood of stream bank failures within the first mile of the impoundment for a transitional period of time, until the banks re- equilibrate with the river and stabilize. This would lead to more woody debris being added to the river during this transitional period. However, bank failures are a common and natural process within the Uwharrie River, and will continue with or without the removal of the dam. Stabilization of the streambanks along the impoundment by cutting them back and re- planting is not proposed due to the extensive length of streambank failure along the impoundment, the fact that this failure occurs both upstream and downstream of the dam (and therefore is not caused by the dam), and the intrusive nature of this type of modification at that scale. No infrastructure was identified that will be impacted by dam removal within the upstream reach. Monitoring Pre - removal fish and mussel surveys have been conducted upstream and downstream of the dam to determine species richness and relative abundance. Project partners are committed to completing post - removal biological surveys as well. Page 6 of 15 PCN Form — Version 1.3 December 10, 2008 Version 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Previous site visits by partnering agencies have shown no upstream wetlands. ❑ Yes ❑ No ® Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. S. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. if yes, explain in detail according to "help tile" instructions. 6. Future Project Plans 6a. is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 7 of 15 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): 0 Wetlands 0 Streams - tributaries 0 Buffers 0 Open Waters 0 Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 0 P 0 T 0 Yes 0 Corps ❑ No 0 DWQ W2 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ W3 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ W4 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ W5 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ W6 0 P 0 T 0 Yes 0 Corps 0 No 0 DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 0 P ®T 0 PER 0 Corps 0 INT 0 DWQ S2 0 P 0 T 0 PER 0 Corps ❑ INT 0 DWQ S3 []POT 0 PER 0 Corps 0 INT 0 DWQ S4 0 P 0 T 0 PER 0 Corps 0 INT 0 DWQ S5 0 P 0 T ❑ PER 0 Corps 0 INT 0 DWQ S6 0 P 0 T 0 PER 0 Corps 0 INT 0 DWQ 3h. Total stream and tributary impacts 31. Comments: Page 8 of 15 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑ P ®T Uwharrie River Stream Crossing (piped) over river 0.05 raceway and depositional bar 02 ❑PC] T Fill - re- grading will occur to fill 03 ®P ❑ T Uwharrie River scour hole; raceway will be filled river 0.20 after demolition of old mill. 04 ❑PQT i I 4L Total open water impacts 0.25 4g. Comments: S. Pond or Lake Construction If Pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c, 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 9 of 15 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑Tar- Pamlico ❑Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number – Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? B1 ❑P ❑T ❑Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h. Total buffer Impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Pre - removal fish and mussel surveys have been conducted upstream and downstream of the dam to ensure that sensitive or rare species would not be impacted by removal. Impounded sediment and stream banks were also carefully assessed as described above. The project was designed to limit the construction footprint of the project, as well as the amount of time construction equipment is in the river. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction will occur during times of low flow to limit impact to the river. The access road will use part of the existing road, and removal of trees will be limited to what is absolutely necessary (and those removed replaced with saplings). The access road will use a temporary piped crossing and rip-rap to cross the raceway to help keep equipment out of the stream flow until it can be re- directed back to the main channel. Breaching of the dam will occur slowly from the top of the dam working down to limit turbidity in the river. By filling in the upper raceway with remnants of the dam and covering/grading/reseeding that area, the river will be directed back to the main channel and that area will become stabilized where it is currently eroding. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this ❑ payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type —70uantlty Page 10 of 15 PCN Form – Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete If Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool []cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non- riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 6. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 11 of 15 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: This project will not result in an increase in impervious surface or stormwater runoff. The access road that will be installed to get to the dam is temporary and will be removed upon completion of the project. Applicable stormwater and erosion control standards and specifications are included in the engineering plans on Sheets 6 and 7 of the Final Engineering Plans. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase 11 3b. Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HOW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stor nwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 12 of 15 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter.) Comments: refer to attached 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Weiland Rules (15A NCAC 2H .1300), DWQ Surface Water or Weiland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 13 of 15 PCN Form — Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Data and consultation by NC Wildlife Resources Commission, NC Natural Heritage Program and US Fish and Wildlife Service. The USFWS, NC WRC and NC NHP have all been partners on the planning and data - gathering for this project, and determination of impacts. They have helped conduct pre - removal surveys to characterize the fish and mussel communities and habitat both upstream and downstream of the dam, and have been consulted on the potential distribution of listed species. All project partners agree this project will be a net positive that will benefit habitat and aquatic populations in the river. S. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Data and consultation by NC Wildlife Resources Commission, NC Natural Heritage Program and US Fish and Wildlife Service. The USFWS, NC WRC and NC NHP have all been partners on the planning and data - gathering for this project, and determination of impacts. They have helped conduct pre - removal surveys to characterize the fish and mussel communities and habitat both upstream and downstream of the dam. All project partners agree this project will be a net positive that will benefit habitat and aquatic populations in the river. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation 0 Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office (see letter of concurrence of no impact, attached), consultation with Randolph County Historic Preservation Commission, and local knowledge. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The upstream floodplain is approximately 20 feet above the riverbed. Because the dam removal will result in lowering the water surface elevation along the section of river that is currently impounded, and will not appreciably increase the water surface elevation downstream (because the dam is run of river, and does not provide water storage), the dam removal will not have impacts on flooding. Randolph County Soil and Water Conservation District and Randolph County Planning Department confirmed that the project was not anticipated to impact floodplains and no coordination was needed to meet FEMA requirements. 8c. What source(s) did you use to make the floodplain determination? FEMA floodplain maps, one -foot topographic survey of the project site, and field investigation by hydrology /hydraulic engineers. Page 14 of 15 PCN Form —Version 1.3 December 10, 2008 Version Met Applicant/Agent's Printed Name Applicant/Agent's Signature (Agents signature is valid only if an authorization letter from the applicant k/07/2 Date Page 14 of 14 PCN Form — Version 1.3 December 10, 2008 Version Agent Authorization Form Property Legal Description: Parcel ID: 7616018703 Lot No. R1143;N Latitude: 35.564 Longitude: - 79.973 Street Address: 0 High Pine Church Road Randolph, NC 27205 Please Print: Property Owner: The undersigned, registered property owner of the above noted property, do hereby authorize &e-I V ,� , of 1 to act on my behalf and take all actions necessary for the processing, issuance, and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address: -4 2 ( -►-le,K,5� PI. C 4*r4 &IC,. 29'lo-7 Telephone: �`f 7i � `1 -7 5 � We hereby certify that the above information submitted in this application is true and accurate to the best of our knowledge. Please Sign: Any Grisso Property Owner Date: X 2 Alex Ashton Chair, Piedmont Conservation Council Date: k1a ZZ � a UNITED STATES OEPAF9TMENT OF COMMERCE National Oceanic and Atmoppherlo Adminletretion NATIONAL MARINE FISHERIES SERVICE a 0, Silver Spring. MD 20910 JUN'- 12011 MEMORANDUM FOR: The NOAA Community -based Restoration Program Record FROM: �(Christopher D. Doley � fto Z) Director, NOAA Restoration Center SUBJECT: American Rivers FY2011, Explanation of Inclusion of Projects under the Community -based Restoration Program Programmatic Environmental Assessment and Supplement (PEA/SPEA) and Finding of No Significant Impact (FONSI) The Community -based Restoration Program, under the authority of the Fish and Wildlife Coordination Act, 16 U.S.C. 661, as amended by the Reorganization Plan No. 4 of 1970, and the Magnuson- Stevens Fishery Conservation and Management Reauthorization Act of 2006, is proposing to fund eight restoration activities through our partnership with American Rivers that are not anticipated to have any significant environmental effect. After reviewing the proposed project, we have determined that the proposed actions described below fall within the scope and effect of activities analyzed in the February 6, 2002 Programmatic Environmental Assessment (PEA) for the Community -based Restoration Program Implementation Plan and the June 23, 2006 Supplement (SPEA). Further, following application of the criteria used to determine the significance of potential environmental impacts, in accordance with NOAA Administrative Order 216 -6, Commerce Department Administrative Order 216 -6, and the Council on Environmental Quality Implementing Regulations for the National Environmental Policy Act, we have concluded that the proposed actions would not have a significant effect, individually or cumulatively, on the human environment and, therefore, an environmental impact statement will not be prepared. Pertinent project Information Stearns Dam Removal Design, OR The Stearns Dam Removal Design project, undertaken by the Crooked River Watershed Council, will develop designs to provide passage for ESA - listed steelhead and other aquatic species to over 70 miles of fisheries habitat in the Crooked River, McKay Creek, and Ochoco Creek, all within the Deschutes River Basin in Central Oregon. Any short -term minor adverse impacts of survey work, data collection, or other activities associated with design development will be mitigated through Best Management Practices. This proposal has been assessed for significant effects, and the proposed activities, including any related educational or administrative actions, have been found to fall under the CRP PEA and SPEA. The project will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is covered under the associated FONSIs. ® Printed on Recycled Paper 0-g"° A� m Lassiter Mill Dam Removal Design, NC The Lassiter Mill Dam Removal project, undertaken by The Piedmont Conservation Council, will develop design plans for the removal of the Lassiter Mill Dam on the Uwharrie River in Randolph County, NC. Any short -term minor adverse impacts of survey work, data collection, or other activities associated with design development will be mitigated through Best Management Practices. This proposal has been assessed for significant effects, and the proposed activities, including any related educational or administrative actions, have been found to fall under the CRP PEA and SPEA. The project will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is covered under the associated FONSIs. Little Lehigh Creek Dam Removal Design, PA The Little Lehigh Creek Dam Removals, undertaken by the Wildlands Conservancy, will involve data collection, field surveying and mapping, a sediment analysis, hydrology and hydraulics study, coordination with Regulatory /Approval entities, public meetings, preparation of preliminary plans, and completion of final plans and permit applications. These dams — the Martin Luther King Dam, Robin Hood Bridge Dam, and the Trout Hatchery Dam, are considered tun -of- the -river dams and the first barriers to migratory fish within the Little Lehigh Creek. Feasibility .analysis for fish passage is currently being conducted on two downstream dams. The primary goal of the overall Little Lehigh Creek Dam Removals is to restore anadromous fish to the Little Lehigh Creek, specifically the American Eel, Alewife and Blueback Herring. Once fully implemented, the dam removals will result in restoring fish passage and enhance approximately 8 miles of prime spawning, nursery and growth habitat for anadromous fish species. Any short-term minor adverse impacts will be mitigated for through Best Management Practices. This project has been assessed for significant effects and has been found to fall under CRP PEA and SPEA. The project will have no significant individual or cumulative effects on the environment as documents on the CRP's NEPA checklist and is covered under the associated FONSIs. Raritan River Headgates Dam Anadromous Fish Restoration Feasibility Project, NJ The Raritan River Headgates Dam Anadromous Fish Restoration Project, undertaken by the New Jersey Department of Environmental Protection ( NJDEP), will begin a phased approach to fish passage, beginning with a feasibility study. The project's feasibility phase will include engineer's feasibility study to examine fish passage alternatives including fish ladder, by -pass channel (nature -like fishway), rock ramp and the notching or full removal of the Headgates Dam. The feasibility phase will generate the necessary engineer's reports to address each of the alternatives and will conclude with a recommendation for action. NJDEP will collect topographic information, conduct a preliminary hydrology study, conduct a sediment analysis, assess potential wetland impacts, and research potential cultural/historic resource impacts. The feasibility phase has been assessed for significant effects, and has been found to fall under the CRP PEA and SPEA. This phase will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is covered under the associated FONSIs. Millstone River Anadromous Fish Restoration Project, NJ The Millstone River Anadromous Fish Restoration Project, undertaken by The Stony Brook Millstone Watershed Association (SBMWA), will act on the recommendations of the feasibility study and will carry out the engineering design for the removal of the Blackwell Mills dam, one of the existing two blockages on the lower Millstone River. The design phase will generate the necessary engineering reports, drawings and documents for the removal of the dam. In the design phase SBMWA will collect additional information regarding the constructed materials of the dam. They will assess in stream and side slope stability and grading and collect all needed topographic information above and below the dam. Any remaining uncertainties not addressed in the feasibility report will be addressed here including those pertaining to hydrological conditions and flooding issues, sediment deposit issues, wetland impacts above and below the dam; historic preservation; coordination with the state historic preservation office. The design phase has been assessed for significant effects, and has been found to fall under the CRP PEA and SPEA. This phase will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is covered under the associated FONSIs. Tidmarsh Dam Removal Engineering and Permitting, MA The Tidmarsh Dam Removal Engineering and Permitting project, undertaken by the MA Division of Ecological Restoration, will carry out the engineering and permitting work for removing two small dams on Beaver Brook in Plymouth, MA in order to provide unobstructed fish passage and to restore other riverine aquatic functions and values. The project will result in a set of final plans and permits that will be used to remove these two dams. The funding does not support any construction at the site. This project has been assessed for significant effects, and has been found to fall under the CRP Programmatic Environmental Assessment. The project will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is covered under the CRP Programmatic Environmental Assessment and FONSI. Future construction related funding would require an additional NEPA assessment. Bunker Pond Dam Removal Project, NH The NOAA Restoration Center in partnership with American Rivers will provide funding to the NH Department of Environmental Services to undertake the construction phase to remove the Bunker Pond Dam located on the Lamprey River in Epping, New Hampshire. The project will result in the actual removal of the Bunker Pond dam, providing unobstructed fish passage and to restore other riverine aquatic functions and values for 27 miles of main stem liver until the next obstruction. The project has undertaken the full breadth of environmental compliance. The project development, monitoring, management and construction have been assessed for significant effects, and has been found to fall under the CRP Programmatic Environmental Assessment and Supplement PEA. The project will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is consequently covered under the CRP Programmatic Environmental Assessment and FONSI. Shoreys Brook Dam Removal Project, ME The NOAA Restoration Center in partnership with American Rivets will provide funding to the Great Works Land Trust to undertake the construction phase to remove the Shorey Brook Dam located on Shorey Brook in South Berwick, Maine. The project will result in the actual removal of the Shorey Brook dam, providing unobstructed fish passage and to restore other riverine aquatic functions and values for approximately 4.3 miles of main stem river until the next obstruction. The project has undertaken the full breadth of environmental compliance. The project development, monitoring, management and construction have been assessed for significant effects, and have been found to fall under the CRP Programmatic Environmental Assessment and Supplement PEA. The project will have no significant individual or cumulative effects on the environment as documented on the CRP's NEPA checklist, and is consequently covered under the CRP Programmatic Environmental Assessment and FONSI. North Carolina Department of Cultural Resources State Historic Preservation Office Ramona M. Banos, Adnntustrator Beverly Eaves Perdue, Governor Linda A. Carlisle, Secretary Jeffrey J Crow, Deputy Secretary June 19, 2012 Stephanie Grant Piedmont Conservation Council 721 Foster Street, Suite 228 Durham, NC 27701 Re: Proposed Removal of Lassiter NO Dam, Randolph County, ER 12 -0850 Dear Ms. Grant: Thank you for your letter of May 22, 2012, concerning the above project. Office of Archives and History Division of Histoncal Resources David Brook, Director Lassister's Mill was placed on the State Study List, a preliminary step in the review of a potential nomination to the National Register of Historic Places, in 2004. However, as detailed in your letter and shown in the accompanying photographs, the mill was destroyed during a storm in March 2011. Although the mill dam remains intact, the site is no longer eligible for listing in the National Register. Accordingly, the proposed project will have no flea on historic properties. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill- Earley, environmental review coordinator, at 919- 807 -6579. In all future communication concerning this project, please cite the above - referenced tracking number. Sincerely, C1� AkdLa k� 6;3/Ramona M. Bartos cc: Hal Johnson, Randolph County HLPC, hc,johnson e,co.randolph.nc.us Location 109 East Jones Street, Raleigh NC 27601 Mailing Address 4617 Mail Service Center, Raleigh NC 27699 -4617 Telephone /Fax (919) 807- 6570/807 -6599 Randolph County, NC - Printable Parcel Map The data collection used to produce this media was last updated on 4/912010 @ 11:33:31 AM EST. Parcel ID NW 17616018703 owner Name JAMY GRISSOM LLC awnei Address 421 HEMPSTEAD PL wnei City 'St�Zip CHARLOTTE, NC 28207 openy Description L R1143;N �1. Y ` ; name: P:\lzlj\iroiects\iziiUUI\UAU\bHEt I51SH rloaea on: dui z4, zuTz - T GENERAL NOTES: 1. ALL ELEVATIONS AND QUANTITIES ARE BASED ON INSOU CONDITIONS AT THE TIME THE FIELDWORK WAS CONDUCTED FOR THIS PROJECT. ONCE DISTURBED, MATERIAL CONDITIONS CAN VARY SIGNIFICANTLY. 2. THE APPROVAL AND USE OF THESE PLANS ARE FOR THE PROJECT APPLICANT AS DEPICTED ON THE SHEET. THIS PLAN IS NOT TO BE UTILIZED IN THE PREPARATION OF ANY OTHER PROJECTS. 3. AS FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO PROPOSED TOPOGRAPHIC ELEVATIONS AND FACILITY LOCATIONS. THESE PUNS ARE NOT TO BE UTILIZED AS AS- BLAUS. 4. THESE PLANS ARE NOT TO BE UTILIZED FOR CONSTRUCTION. UNTIL ALL REQUIRED LOCAL STATE, AND FEDERAL PERMITS ARE OBTAINED. 5. ALL PROPOSED CONSTRUCTION MUST BE SUPERVISED BY A PROFESSIONAL ENGINEER, LICENSED IN THE STATE OF CONNECTICUT OR BY A QUALIFIED ENGINEERING TECHNICIAN OR GEOMORPHOLOGIST UNDER RESPONSIBLE CHARGE OF THE PROFESSIONAL ENGINEER. CONSTRUCTION NOTES: I. SOLL. ROCK, OR OTHER MATERIALS TO BE UTILIZED FOR FILLING OR BACKFILLING SHALL BE APPROVED BY A QUALIFIED ENGINEER. 2. ALL MATERIALS SHALL CONFORM TO THE LATEST AMERICAN STANDARDS FOR TESTING AND MATERIALS SPECIFICATIONS (ASTM). 3. PROXIMITY OF STOCKPILES TO THE EDGE OF EXCAVATIONS SHALL BE SUCH THAT THE INFLUENCE OF THE STOCKPILE SURCHARGE ON THE MODIFIED OR EXISTING SLOPE IS REDUCED. WHERE POSSIBLE. STOCKPILES WILL BE PLACED AT A DISTANCE FROM THE EDGE Of EXCAVATION EQUAL TO (OR GREATER THAN) THE HEIGHT OF THE EDGE. 4. UTILITIES SHALL BE LOCATED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 5. NECESSARY PRECAUTIONS SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SERVICES AND MAINS. ANY DAMAGE TO EXISTING SERVICES OR MAINS SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTOR'S OWN EXPENSE. 6. EXCAVATIONS AND STOCKPILES IN NO WAY SHALL HAVE SLOPES STEEPER THAN 2:1. 7. THE CONTRACTOR SHALL NOTE THAT IN THE CASE OF A DISCREPANCY BETWEEN THE SCALED AND THE FIGURED DIMENSIONS SHOWN ON THESE PLANS, THE FIGURED DIMENSIONS SHALL APPLY. B. R SHALL BE DISTINCTLY UNDERSTOOD THAT FAILURE TO MENTION SPECIFICALLY ANY WORK THAT WOULD NORMALLY BE REQUIRED TO COMPLETE THE PROJECT, SHALL NOT RELIEVE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THAT WORK. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND REPLACEMENT OF ROADS, CURBS, FENCES. SIGNS, STRUCTURES, VEGETATION, IRRIGATION, LANDSCAPING COMPONENTS, AND ANY OTHER PROPERTY ITEMS THAT ARE REMOVED OR DAMAGED FOR THE PURPOSES OF THE PROJECT LOGISTICS AND ACCIDENTS. CONSTRUCTION SAFETY AND SECURITY: I. ALL CONSTRUCTION SHALL ADHERE TO OSHA STANDARDS AND REGULATIONS. Mobilization & Demobilization LS. 1 Silt Fence Water Control (Including D inns) LF. L5. 450 " 1 Canstruwon Entmnoe installation &removal) LS. 1 Construamn Access Roads (al Iowa cc) S.V. 50 Temporary Stream Crossing LS. 1 Construction Safe Fence and Tree Protection allowance) L.F. 745 Ezistin Dam Removal C.Y. 500 1,isI n Abutment Removal C.Y. 40 Existln MII Race Control Structure Removal C.Y. 150 E— vation stream substrate, soil) C Y. 310 Place Select Fill (Ex aced Material(mmmte, stream substrate, sdl)) C.Y. 11000 Finish Grade S.V. 3,000 Import and Place Top Soil C.Y. 280 Planted Tmes L.S. 16 Permanent Seed Mix LBS./PLS. 13 Erosion Control Matting S.Y. Z00 FINAL ENGINEERING PLANS LASSITER MILL DAM REMOVAL UWHARRIE RIVER NEW HOPE TOWNSHIP COUNTY OF RANDOLPH, NORTH CAROLINA PROJECT SITE LOCATION SCALEAERIAL PHOTOGRAPH SCALE SHEET INDEX: SHEET 1 - TITLE SHEET SHEET 2 - EXISTING CONDITIONS PLAN SHEET 3 - CONSTRUCTION AND SOIL EROSION AND SEDIMENT CONTROL PLAN SHEET 4 - PROPOSED CONDITIONS PLAN SHEET 5 - CROSS SECTIONS AND PROFILE SHEET 6 - SOIL EROSION AND SEDIMENT CONTROL DETAILS SHEET 7 - SOIL EROSION AND SEDIMENT CONTROL NOTES %21 PROJECT VICINTTY SCAL � t =2,000' ].5 MItIUTE SFRIES USGS QUADRANGLE FOR RANDOLPH, NORTH CAROLINA PROJECT APPLICANT: PIEDMONT CONSERVATION COUNCIL 721 FOSTER STREET, SUITE 228 DURHAM, NC 27701 � Ck�CLg WE DD OCT 2 5 2012 _DENR - -WRT�R QUALITY CALL BEFORE YOU DIG! NORTH CAROLINA LAW REQUIRES MINIMUM 2 WORKING DAYS NOTICE PRIOR TO EXCAVATION — STOP CALL NORTH CAROLINA ONE -CALL CENTER REFERENCE NC G.A. SECTION I, CHAPTER 87, ARTICLE 5 ®1- 800 - 632 -4949 I PROJECT NOTES I 1. TOPOGRAPHIC SURVEY INFORMATION OBTAINED FROM JEFFREY L. CASON, PLS, DENTON. NC. JANUARY 18. 2012. 2. HORIZONTAL DATUM IS NORTH AMERICAN DATUM Of 1983 (NAD83). FEET. VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). FEET. REVISIONS STATE OF NORTH CAROLINA CERTIFICATE OF AUTH. NO.: 201106700411 -1 MARY L. PAIST - GOLDMAN Professional Engineer NC Lic. No. 037626 DATE 711 SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGOES, NEW JERSEY 08551 PHONE. 908.237.5660 FAX. 908.237.5666 WW W. PRINCETONHYDRO. COIN PROJECT NAME /LOCATION: LASSITER MILL DAM REMOVAL UWHARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: TITLE SHEET OA 01/20/2012 1213.001 c AS SHOWN LC JH SHEET NO 1 7 OF 7rawing name: P:\ 1213 \Projects \1213001 \GAD \SHEETS \SHEE IUZ-EXI5I ING_GUNUI I IUNS.Owg PIOTteo on: dun uc, a Ic - o.oupm x CALL BEFORE YOU DIG! NORTH CAROLINA LAW REQUIRES MINIMUM 2 WORKING DAYS NOTICE _ PRIOR TO EXCAVATION - STOP CALL v- " - \ \ //\ / / ' 3 / >JA'4` NORTH CAROLINA ONE CENTER EFEREN SECTION I. CHAPTER 87, ARTICLE R cE NC G.A. AR 3 ® 1- 800 - 632 -4949 EXISTING EDGE OF WATER DEPICTED UNDER LOW FLOW CONDRK)NS. l� / - -- - _ \� - OLD CONCRETE PAD \V // / / ' // /. BOULDER /COBBLE / — - _ - _ / / / /'. / / ONLY EXPOSED UNDER LOW /' ( ! _ ` - \ - _ AND WINGWALLS ._ ♦ / ! / / PROJECT NOTES FLOW CONDITIONS (TYP.1 /' / /// / // - I. TOPOGRAPHIC SURVEY INFORMATION OBTAINED • / _- \ \ _. _ _ \ ' . �/ FROM JEFFREY L CA60N, PLS, DENTON, NC. JANUARY _ \ .^'f. / J ♦ _ - /lll / / 18.2012. ' 3TYr i - / // \ \ - - -- - `1 - -36 \ \ / / / / _ / / 2 HORIZONTAL DATUM IS NORTH AMERICAN DATUM A / / ry �c•R Sr..- /� - / OF 1983 (NAD83). FEET. VERTICAL DATUM IS NORTH �L\ AMERICAN VERTICAL DATUM OF 1988 (NAVD881, FEET. DOW 35T' NSTREAM AREA IS COMPOSED OF \ ;366 ` MAINLYCOBBLES AND BOULDERS. - \ / / /-,o* i J ELEVATIONS REFLECT BASE ELEVATIONS. SPOT ELEVATIONS OF STONES AND BOULDERS COULD BE 0-2' +HIGHER THAN CONTOUR Y BOUNDARY LINE (TYP.) / I / 9 +00 '0'OO i J� � °'� � � \ �.' < -'. -." � r • -.:. ',` SCOUR POOL � CONCRETE DAM WITH LARGE 1 AGGREGATE STONE / - - / 1. DOWNSTREAM FACE AT 1:3 SLOPE / UPSTREAM FLAT AREAS ARE COMPR6ED TOP = 370.5' / OF MAINLY GRAVEL AND COBBLES. 00 L '\ /I I \ \ - _ i' SIDE SLOPES ARE SEDIMENT AND CLAY. _ AREAS OF LARGE BOULDERS - / ♦ \" _ \ DATE DESCRIPTION - ` , AN \\ REVISIONS DlOR BEDROCK (TYP.) 1; _;6� - - i � \�6 \ \ i STATE OF NORTH CAROLINA CERTIFICATE OF _ RUTH. NO.: 201106700411 -1 -36'­ - ' �- -- - -- _- _- -_' - = -` =366- Set --==- \_\ � -- �` -36? -� �1�1)lr �Mi61 ar. I ILII , , '\ \ \ "�� MARY L. PAIST -GOL MAN - -- -- ,i64 Cam- - - - / - - - - - - - - NC Llc No 037626 ' _ /' PmfessionalEngineer -_ - -. _37'1 - � _ \ - J - / DATE - - RACEWAY FLAT AREAS COMPRISED _ - - �\ -� - �� WOOD AND BLOC \\ I _ -__- _ /'�� -� K OF MAINLY GRAVEL AND COBBLES. ��'i' ff8=-- /� \RETARDING WALL - - _ _ _ SIDE SLOPES ARE SEDIMENT AND CLAY _RACEWAY CONVEY ENTIRE �� i� - -3w �7- _ - _ - \ 4 - _ - - _ \ _ J7a, FLOW AT LOW FLOW _ m COLUMNS EXISTING CONTOURS I ' / �_.' ' ' / / I / / " T \ \ SCIENTISTS AND ENGINEERS (TYP.) -- _ _ J / / // _ t r ' EXISTING GRIST 1 / +/ 7678?J1J99 Am GRISSOM 1108 OLD YORK ROAD, SUITE 1 - MILL REMNANT \ \ 08..'945 PG 00147 P.O. BOX 720 - - - - -_ ys / rJl / //! / I / I \ \ P.8 too RINGOES, NEW JERSEY 08551 - \ CHAIN -LINK FENCE / \ \ PHONE. 908.237.5660 EXISTING ITYP.) / - \ FAX. 908.237.5666 D WOO INE \\ / ,'-- \\ WWW.PRINCETONHYDRO.COM (TYP.)_ 1 I PROJECT NAME /LOCATION: j LASSITER MILL DAM REMOVAL UWHARRIE RIVER PZZZ NEW HOPE TOWNSHIP \ \ / I ' //- - - - _-_ - _ _ -- RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: EXISTING CONDITIONS PLAN 01 /20/2012 MIT 1213.001 BY LC 7816112JG7 JH i 7B9B AND DUNCN RD GRAPHIC SCALE SHEET NO. ASHWOWO, NC 27205 Emoomima FEEi WE 91E PG. 37 0 5 W 15 20 40 w w SCALE: I' =20' 2 OF Jrawing name: P: \1213\ Projects \1213001\ CAD\ SHEETS \SHEET03- CONSTRUCTION_E &S.dwg Plotte0on: Jul 24, 2072- 4:UUpm CALL BEFORE YOU DIG! - - - - - - INITIAL TEMPORARY DIVERSION CHANNEL TO - BE EXCAVATED THROUGH DOWNSTREAM = NORTH CAROLINA LAW REQUIRES \ BOULDER /COBBLE BAR, TODNERTREAM -'/ \� \ / // / / / // / MINIMUM 2 WORKING DAYS NOTICE \ \ - '- \�� \ \ „ / \// / / / / PRIOR TO EXCAVATION - STOP CALL \ - - - -- - AFTER INITIAL DAM BREACH - -- - _ \ \ v (REFER TO CONSTRUCTION SEQUENCES J NORTH CAROLINA ONE -CALL CENTER PORTION OF BOULDER /COBBLE BAR - - ` STEP 12 ON THIS SHEET AND DETAIL D ON SHEET 6 O 7) ,57Y ' \ �' / / \ / / /' / / REFERENCE INC G.A. SECTION 1. CHAPTER 87. ARTICLE 3 TO BE PLACED IN SCOUR HOLE FOR - EXISTING EDGE OF CONSTRLK70N ACCESS � \\ 37r' -\ \ \ / / / / WATER DEPICTED UNDER (REFER TO CONSTRUCTION SEQUENCE / i . • / / ( ® 1- 800 -632 -4949 LOW FLOW CONDITONS. STEP i2 ON TN6 SHE[71 = = _- - - _ - ' - \ \ - _ \ \ / / AREA TO BE PERMANENTLY STABILIZED WRH BOULDER /COBBLE 11,/ - - -- - \��- - - - \\ `'\ �\ \�,/ EROSION CONTROL MATTING -200 S.Y. / / r / // /' PROJECT NOTES ONLY EXPOSED UNDER LOW 1 / - \ - - " - - - _ \ \ \ REFER TO DETAIL G ON SHEET 6 O 7) FLOW CONDITIONS (TYP.) - I. TOPOGRAPHIC SURVEY INFORMATKNI OBTAINED FROM JEFFREY L. CAISON, PLS, DENTON. NC. JANUARY 1a. 2012. 2. HORIZONTAL DATUM 6 NORTH AMERICAN DATUM - OF 1983 (NAD83). FEET. VERTICAL DATUM 5 NORTH EN TIRE DAM AND ABUTMENT TO BE / / W / - \ / i AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET. REMOVED FROM NORTH / SOUTH / / \�, / J / REFER TO CONSTRUCTION SEQUENCE STEP I3 ON THIS SHEET) / -� V !% 362 �1 �A / I v\ Itr I / / -\ `- 1 -- aez DESCRIPTION REVISIONS r _ *61- ' �5- / \1_ - _ _ \� STATE OF NORTH CAROLINA CERTIFICATE OF .. x I - - -366- - \ / _ Wiz- -.._. _ _.\ _. _ _ - �,.+s• - "' -_ - - - - - - -- -- --- ___ _:� / ��.: _ ,5 s ��T: `l�r ' �)/ �\ \ \\ '�.5. MARY LDMA AUTH NO.: 201108700411 I - - - - - _ -368- - - -. - _ _ _ v � ��e � � 1 rroPAIS En�GO - - - -- - -- aJo-- - - - - -- - - ---- IA' NC Lic. No. 037626 \..`' -� - -___ - ` "J% -` "- '~11- �4 % - -___ •L � _ _ '� �/ �• \ \ \ \ \ FORMER TO BE BLOCKED DAM N(REFER O CONSTRUCTION SEQUENCE \ STEP #3 ON THIS SHEET) - -.i81 - -- \ - -- SILT FENCE +I H � � � m 7616212399 AMY GR 00 A D81945 PO 147 P.B. l00 PC 64 \ 6! // / // II TEMPORARY STREAM CROSSING AS PER DETAIL F, SHEET 6 OF 7. \ ACCESS ROAD STONE TO BE RELOCATED AND USED AS FILL \'- / r' / / FOR RACEWAY AT COMPLETION OF IN-STREAM WORK (REFER TO CON STRUCTION SEQUENCE STEPS L2 AND #4 ON THIS SHEET) EXSTING ACCESS DRIVE TO BE NAPROVED AS \ iI -1// I/ l/ / J �\ ' / I __ FORMER RACEWAY CONTROL STRUCTURE NECESSARY FOR CONSTRUCTION ACCESS (TYP.) \ �6 1/ l ( I LIMIT OF DISTURBANCE / \ `T / / // II I TO BE ACCESSED FROM MILL RACE /! 40,000 SQ. H. (M.) , - \ / / I (REFER TO CONSTRUCTION SEQUENCE (REFER TO CONSTRICTION SEQUENCE 1 ,l l l f / I / _ . - \ _ Q.3 - / (_, \ 1 ) STEP #4 ON THIS SHEET) STEP #I ON THIS SHEET) + + + + + ++ / DURATION 'FOR LASSITER MILL DAM REMOVAL + 1 UWHARRIE RIVER DAYS: ME TO LACK OF IMPOUNDED SEDIMENTS, DOWNSTREAM REACHES SEDIMENT MANAGEMENT CLEARING OF MATURE TREES SHALL BE AVOIDED AS MUCH AS I + + + + + ++ 6- / . \/ I �/ ( ( / / / / / ' / / IMPOUNDED SEDIMENT MANAGEMENT PRACTICABLE. ANY MATURE TREES (10' DIAMETER OR GREATER) THAT ARE REMOVED FOR CONSTRUCTION ACCESS OR STAGING SHALL BE I + + + + MEASURES ARE PROPOSED REPLACE. 11:1) WITH PLANTED NATIVE TREES AS SPECIFIED ON + + + I ++ + // DETAIL H IPLANT SPECIES LIST) AND DETAIL I, SHEET 6 Of 7. + + ++ 1 = / I LOW FLOW CONDTIONS AND OUTSIDE _ ++ + IB + n� OF FISH RESTRICTION WINDOW " 1 y i I / SEDIMENTATION CONTROL MEASURES, INCLUDING STABILIZED CONSTRUCTION + + i ACCESS AND CONSTRUCTION FENCING. II + + 2 BUILD ACCESS ROAD AND RACEWAY STABILIZED CONSTRUCTION ENTRANCE(TYP" TO CONSTRUCTION SEQUENCE p 7t !! �I �+i j (/ 599 (REFER //I // // + + ( •/ - -/ CROSSING AS NEEDED TO CROSS STEP# I ON THIS SHEET)• / / , + I , / / , / 7618712307 ACCESS B STAGING +++l ( / / ' , / / /' / ( 1 / Af-Y S DUNE, ..R AND GRAPHIC SCALE p / w I 1 r / / .1 I ( 1 1 1 + / / 1 ( / 1 I I \/ 1 I I( 1 SANDRA DUNE 7698 HIGH PINE CH RD - FEET 0 5 10 15 20 NJ 1 I / O� ) I I 1 ASYEBORO, NC 27205 W.B. 91f PC J7 SCALE: 1 " =20' MATERIAL AS NECESSARY GAM AS TO ACCESS TO BASE OF DAM. . 3 MACHINERY, REMOVE CONCRETE ABUTMENT/PAD AND NOTCH DAM ON DEMO RNER RIGHT SIDE AND DEMOLISH FROM DAM DEMOLITION DATE I 1 1 Nn I 1 I SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGOES, NEW JERSEY 08551 PHONE. 908.237.5660 FAX. 908.237.5666 W W W.PRINCETONHYDRO. COM PROJECT NAME /LOCATION: LASSITER MILL DAM REMOVAL UWHARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: CONSTRUCTION AND SOIL EROSION AND SEDIMENT CONTROL PLANS 01/20/2012 PROJECT NO. 1213.001 AS SHOWN DRAWN BY LC JH SHEET NO. 3 7 OF CONST�UC'IgN 3IKGU9/CB DURATION 'FOR LASSITER MILL DAM REMOVAL WORK UWHARRIE RIVER DAYS: ME TO LACK OF IMPOUNDED SEDIMENTS, DOWNSTREAM REACHES SEDIMENT MANAGEMENT WILL NO TBENEGATLVFLYIMPACTEDpY DAM REMOVAL NO SPECIAL IMPOUNDED SEDIMENT MANAGEMENT MEASURES ARE PROPOSED ALL INSTREAM CONSTRUCTION ACTIVITIES SHALL TAKE PLACE DURING LOW FLOW CONDTIONS AND OUTSIDE _ OF FISH RESTRICTION WINDOW SIZE PREPARATION I INSTALL ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING STABILIZED CONSTRUCTION 3 ACCESS AND CONSTRUCTION FENCING. 2 BUILD ACCESS ROAD AND RACEWAY CROSSING AS NEEDED TO CROSS FORMER MILL RACEWAY. INSTALL PIPE CROSSING AS NEEDED TO CROSS FORMER RACEWAY AND ACCESS MAIN ACCESS B STAGING CHANNEL, EXCAVATE TEMPORARY DIVERSION CHANNE THROUGH COERCE 5 BARON RIGHT SIDECONVEY FLOW$ DURING DAM OEM OUER BAR RELOCATE BAR MATERIAL AS NECESSARY GAM AS TO ACCESS TO BASE OF DAM. . 3 MACHINERY, REMOVE CONCRETE ABUTMENT/PAD AND NOTCH DAM ON DEMO RNER RIGHT SIDE AND DEMOLISH FROM DAM DEMOLITION NORTH TO SOUTH IN MANAGEABLE SECTIONS )MIN. OF 2 FEET BELOW GRADE 5 DIRECTED ENGINEER). REMOVE FULL F UE DAM FU OF DAN. FRAGMENTS IL FRl IN SCOUR HOLE AND FRAGMENTS SC IN MRMER 4 ACCESS FORMER MILL RACE FROM MAIN CHANNEL DEMOLISH MILL FOUNDATION AND BURY CONCRETE IN PLACE. MC FILL INLET OF FORMER MIL RACE TO ELEVATION 375' INAVOW1 WITH DAM MATERIAL AND CREATED EVEN GRADE REGRADE ME MOUNDED EARTHEN AREA Fill AND GRADE FORMER TO ME NORTH OF ME RACEWAY 5 MILLRACE UPSTREAM OF THE DAM. IMPORT CLEAN FILL AND TOPSOIL AS NECESSARY TO FINISH RILING AND GRADING OF THE UPPER PORTION OF ME RACEWAY. BURY ALL CONCRETE. NO CONCRETE SHOULD BE LEE EXPOSED. SEED AND STABILIZED &I DISTURBED AREAS WIN EROSION CONTROL MATING. 5 ONLY REMOVE PIPES IN TEMPORARY CROSSING FROM RACEWAY. PLACE REMAINING MATERIAL USED FOR ACCESS ROAD WITHIN THE FILL ZONE OF DEMOBILIZATION ME RACEWAY. REMOVE TEMPORARY 3 EROSION AND SEDIMENTATION CONTROL MEASURES. RESTORE ALL DISMRBED AREAS TO ORIGINAL PRECONSIRUCTION CONDITIONS. TOTAL DAYS: 121 DATE I 1 1 Nn I 1 I SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGOES, NEW JERSEY 08551 PHONE. 908.237.5660 FAX. 908.237.5666 W W W.PRINCETONHYDRO. COM PROJECT NAME /LOCATION: LASSITER MILL DAM REMOVAL UWHARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: CONSTRUCTION AND SOIL EROSION AND SEDIMENT CONTROL PLANS 01/20/2012 PROJECT NO. 1213.001 AS SHOWN DRAWN BY LC JH SHEET NO. 3 7 OF urawmg name: •: \i Zl3 \YToleCts \12i JUUT\ GAU\ SHttIS\ 5Ht:hIU4_NHUH06LJ_GUNUITIONSAwg PlotteOOn: JUI24, ZUle- s:0VPm / U o i / / CALL BEFORE YOU DIG! 0o I /jr / - / NORTH CAROLINA LAW REQUIRES MINIMUM IOR TO EXCAAV DAY TI AT10N STOP PR CALL NORTH CAROLINA ONE -CALL CENTER REFERENCE NC G.A. SECTION I, CHAPTER 87, ARTICLE 3 ® 1 -500- 632 -4949 PROJECT NOTES I. TOPOGRAPHIC SURVEY INFORMATION OBTAINED FROM JEFFREY L. CA60N, PLS, DENTON, NC, JANUARY 18.2012. 2. HORIZONTAL DATUM 6 NORTH AMERICAN DATUM OF 1983 (NADB3), FEET. VERTICAL DATUM 6 NORTH / / / __ _ ` / ' '' \ `• \ / ' / / � -� - / I 1 AMERICAN VERTICAL DATUM OF 1968 (NAVD88), FEET. EXISTING EDGE OF WATER DEPICTED UNDER LOW FLOW CONDITIONS. 11 BOULDER /COBBLE \ \ UPPER PORTION Of BOULDER /COBBLE BAR ONLY EXPOSED UNDER LOW \\ \ \ - , TO BE REGRADED INTO SCO FLOW CONDITIONS (TYP.) - \ _ _ 7�r_�� ANTICIPATED EDGE T/ - \ I I \ / I OF WATER / / CROSS - SECTION /I/ .i /- / ((E} _ Vo I \ / - y �„ /��' :vim- ,+-r \♦ rL ♦♦ :. 012 ♦ ♦ ♦♦ + °° � / // / I � / �363- / 9 +005. , /^I _ f I ♦, // / DATE REVISIONS DESCRIPTION 1 ♦ -./ \ �„ / '�+ 3el s \ / i/ STATE O NORTH CAROLINA CERTIFICATE OF ♦ - °' { x -\ / / AUTH. NO.: 201106700411 -1 ! P ,I � 1 l A T)X/ i T A i[TT �/1T Tl l A IT +00 /1 /I I - � A \ 1 1 I - - Vii NC Lic. NO.037626 \ I 1 �, 1 i / .� 1 l / / -i %]�_ DATE _,-.u_ - -- ?`.,: T5 }s�36�z— 1111 -�_ 1 111 abs- SCIENTISTS D ENGINEERS ---- - - - - -- - -/ -' - -- -- - 370- - - -- - - ••1 I� _.s'-a >>" \ I PROPOSEDGRADE 5 AN ENG - -' - \\ , /� 7 i�\ �\ 1 1106 OLD YORK ROAD, SUITE 1 5 � _ (rrP.) P.O. BOX 720 RINGOES, NEW JERSEY 08551 PHONE. 908.237.5660 - r `372 1 - =_`` __- -_��.� / / \ \� r FAX. 908237.5666 � WWW.PRINCETONHYDRO.COM e — / / \\ \ \ OF DAM TO BE REMOVED APPROX. 160 LF.I _ - I \ _ FR G LENGTH 1 EN INTO MANAGEABLE PIECES D50=2 FT.) NAME /LO - _ _ _ ,\ AND PLACED IN FORMER MILL RACE AND SCOUR HO ( PROX 650 1 V A ME iS TO BE BROKEN ( PROJECT CATION _ _, _ LASS ER MILL DAM REMOVAL — —,rs =— \\ \ `\ \ \� UWHARRIERIVER _ — I /�\ 1 ANYMATURE TREES (10"DIAMETEROR / - - - - -' /I _ --gam -38� --� \ \ \ \ \ NEW HOPE TOWNSHIP _ - - - - - - -- GREATER I THAT ARE REMOVED FOR _ / �/ �' - �39 - - \ \ �,, '� - -- __ -1 CONSTRUCTION ACCESS OR STAGING SHALL /' �// /% %- - ' \\ '.� \ \ \\,,, \` MILLRACE NS. CLEAN FILL AND TO RANDOLPH COUNTY, NORTH CAROLINA � - -- TB3- -- \ DAM REMAINS. CLEAN FRL AND TOPSOIL TO BE REPLACED (1:11 WITH PLANTED NATIVE ' / � / / / % / / � - '�' / � � _ � 6- _3B� _ r �> %: • \ \ \ \ \ °t � \ ` BE IMPORTED AS NECESSARY TO BURY REMNANT TREES AS SPECIFIED ON DETAIL H (PLANT / / / / /' 388-y� _ - / - / \ \ \ \ \ \ \ MATERIALS. NO CONCRETE SHALL BE EXPOSED DRAWING NAME: SPECIES LIST) AND DETAIL I. SHEET 6 O 7. / - _ / /' /' // / _ \ \ w \ \ UNDER RESTORED CONDITIONS. PROPOSED CONDITIONS PLAN RACEWAY DOWNSTREAMOf STRUCTURE TO BE REGRADED �_�/ I WITH TEMPORARY STREAM \ J(((/ _ /I/ / CROSSING MATERIAL _ 1 Ja0.\ I ``` •JIIIII / - -1 // %/ / / -- \\ 01/20/2012 MI NO, 13.001 /i 1 AS HCWN DRAWN / / I / LIMIT OF DISTURBANCE 1 / /; 1 I I ___ u / l / ll l I / 40,000 SO. FT. (TYP.) J - \ / \ \ f II I FORMER RACEWAY CONTROL STRUCTURE JH TO BE DEMOLISHED /CRUSHED AND LEFT SHEET AS BACKFILL IN FORMER MILL RACE. GRAPHIC SCALE NO. I / / FEET 0 s to Is W 40 a w � 4 7 // / i/ ' \ SCALE: 1=20' OF name: pLL 4 w Ed 370 9M D.1T17M ELEV n ILl3UUl PIOTIea on: JUI L4, LD IC - L: I 3B,9 380 375 370 365 360 355 350 0+00 0+50 1+00 1 40 2+00 2 +50 3+00 3+50 1+00 STATION (FT) %q1 CROSS SECTION A-A' (STATION 7 +50) O L = VERTICAL 1'+ 10 FILL TO BE USED EXISTING GRADE TYP.) I ! IN MILL RACE ! - !7 _ APPROX. WSEL 362.50 �_ (AT TIME Of SURVEY) - I , (AT TIME OF SURVEY) APPRO . . WSEL 370.50 (AT TIME OF SURVEY) \ 1 i 1 373 � -_ I EXISTING GRADE DE 375 = — c - v - -- - I l 3B,9 380 375 370 365 360 355 350 0+00 0+50 1+00 1 40 2+00 2 +50 3+00 3+50 1+00 STATION (FT) %q1 CROSS SECTION A-A' (STATION 7 +50) O L = VERTICAL 1'+ 10 FILL TO BE USED ! IN MILL RACE ! - APPROX. WSEL 370.50 -_- (AT TIME OF SURVEY) APPRO . . WSEL 370.50 (AT TIME OF SURVEY) A _. __- -. i . _._ 373 � -_ I EXISTING GRADE DE 375 = — c - v - -- - EXISTING GRADE (TYP.) - " . ANTICIPATED w 1 —... ; _.._... 365 MILLRACETO T - T- ........ 360 BE REGRADED 'PROPOSED GRADE I :.. m•P.) ISO 0+00 0 +50 1+00 1 +50 2+00 2 +50 ANTIC ATED r +50 355 WSEL 362.501, 350 0+50 1+00 1 +50 2+00 2+50 3+00 3 +50 STATION (FT) CROSS N D-D' (STATION 10+30) TILT HORIZONTAL i' • SD VERTICAL 1"= IC X -SEC. A -A' t 4 W 300- L- -.. c 1 ; i LL - i -_ ANTICIPATED ----- 375 z 37 - I 50 -- __- _ 0 O I F 1 W 370- _- 370 — - — —� — EXIST) RIG GRADE \ ; �P' 365 js� -- OR BE REGRAD 355 PROPOSED (TYP. MILL RACE TO j , BE REGRADED SCOUR HOLE ED 350 0+00 0+5D 1+00 1 +50 2+00 2+50 3+00 3+50 STATION (FT) �1 CROSS SECTION B-B' (STATION 9+80) VERTICAL: I' • 10' I APPROX. WSEL 370.50 (AT TIME OF SURVEY) �>_. 180- A _. __- -. ____ . _._ 373 � -_ I EXISTING GRADE DE 111 I — — 1 i - " . ANTICIPATED _.._... _....._ WSEL362.50 I 35: I 35C ISO 0+00 0 +50 1+00 1 +50 2+00 2 +50 3+00 3 +50 STATION (FT) (E1 CROSS SECTON -E' ISTATION 13 +501 HORQ AL.lTSO VBnICAL I "• IO % -SEC. C-C' X -SEC. 8-8' I X -SEC. O -D' EXISTING CONCRETE DAM 390 EXISTING GRIST MILL REMNANT FILL VERTICAL EXTENT TO \\ TO BE DEMOLISHED /CRUSHED BE REMOVED. AND LEFT IN PLACE - _ . ..... ........ - __.. -. 385 `\ APPROX. WSEL 370.50 `\ (AT TIME OF SURVEY) 380 \ c -- 375- ___ ' -. _ —_ _ -.... 370- �AMICIPATEO I EXISTING GRADE 370 Zj WSEL 362.50 ` �') 0 i..... - ....... ... _....._.. 365 1 3 h- CONCRETE ABUTMENT 360 PROPOSED GRA 1 TO BE REMOVED (TYR.) 35r � - - - -� _ -- 350 0 +00 0 +50 1+00 1 +50 2+00 2+50 3+00 3+50 STATION (FT) %C1 CROSS SECTION CL' (STATION 10+05) HORIZONTAL I'=50' VERTICAL: I ": 10 20 GRAPHIC SCALE 10 H: I"= 50' e V. t• =1D' 6 4 0 FEET 0 10 20 30 c 50 100 X -SEC. E -E' 6+50 7M0 7.50 9+00 6+50 9+00 9+50 10+00 10+50 STATION (FTI 11+00 11 +50 12+00 12 +50 13+00 13 +50 (1/ STREAM PROFILE �/ HORIZONTAL I " =30' VERTICAL: I" = 3' 370 365 it z O 360 350 CALL BEFORE YOU DIG! NORTH CAROLINA LAW REQUIRES MINIMUM 2 WORKING DAYS NOTICE PRIOR TO EXCAVATION - STOP CALL NORTH CAROLINA ONE -CALL CENTER REFERENCE NC G.A. SECTION I. CHAPTER 87, ARTICLE 3 ® 1- 800 - 632 -4949 PROJECT NOTES 1. TOPOGRAPHIC SURVEY INFORMATION OBTAINED FROM JEFFREY L. CAISON, PLS, DEMON. NC, JANUARY 18, 2012. 2. HORIZONTAL DATUM 6 NORTH AMERICAN DATUM OF 1983 (NAD83). FEET. VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET. REVISIONS STATE OF NORTH CAROLINA CERTIFICATE OF AUTH. NO.: 201106700411 -1 MARY L. PAIST- GOLDMAN Professional Engineer NC Lic. No. 037626 DATE PN ( 1 I ! I SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGOES, NEW JERSEY 08551 PHONE. 908.237.5660 FAX. 908.237.5666 W W W. PRIN CE T ONHYD R O. C OM PROJECT NAME /LOCATION. LASSITER MILL DAM REMOVAL U W HARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA 6 DRAWING NAME: GRAPHIC SCALE CROSS — SECTIONS AND PROFILE H: 1"= 30' V. i"=3' A 01/20/2012 0 SET 1213.001 0 10 M w w SCALE AS SHOWN LC JH SHEET NO. 5 7 OF rA IA 3 O 12 MNLMUM OR FULL WIDTH AS REQUIRED 23 NCH CLEAN APPROXIMATE RATE SPECIES NAME LESS PURE LIVE SEEO/ACf WASHED STONE THICKNESS - 6 IN. MM. "-7 FACU CHASM4NTHIUM LA TIFOLIUM �J GEOTENTILE SECTION A -A MAINTENANCE NOTES: MAINT AIN GRAVEL PAD N A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE THE MAY REQUIRE PERIODIC TOPORESSING WITH 24NCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN R OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED. OR TRACKED ONTO PUBLIC ROAD. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT iO SCALE rIUUeO UII. JUI L9, NT L - 4:U I PLUIIL CONSTRUCTION SAFETY FENCE 4' MIN. HEIGHT OR APPROVED EQUAL HOPE BYPASS PPE OR --- �/ 11 �I'� APPROVED EQUAL /I RYPI PLAN VIEW PIPE SITE WILL BE DEPENDANT ON ROWS AT THE TIME OF CONSTRUCTION AND CAN BE DETERMINED BY THE CONTRACTOR NC DOT tl50R tl5D BASED ON NB EQUIPMENT NEED FOR THE CROSSNG WASHED STONE MR) CLASS B EROSION STONE '**\— RYP) MN 1'� STREAM BOTTOM TEMPORARY CULVERTS AS NEEDED (TYPI CROSS SECTION VIEW NOTE: I. SUE OF BYPASS PIPES TO BE FIELD VERIFIED AT TIME OF CONSTRUCTION. TEMPORARY STREAM CROSSING ..'y O SCALE NOTE 1. TO BE INSTALLED ON ALLTREES MARKED BY ENGINEER. CLIENT, AND /OR PROPERTY OWNER. 2 TO PREVENT GENERAL MECHANICAL DAMAGE TO TREES INSTALL TREE PROTECTION AS INDICATED N DETAIL. 3 TREE SHOULD BE CLEARLY MARKED TO BE RERUN OR TO BE REMOVED. 4. TREE PROTECTION FENCE SHOULD BE A BRIGHT. TALL. CONSTRUCTION SAFETY FENCE. S. MONITORED WEEKLY AND REPAIRED OR REPLACED AS NEEDED. 6. THE TREE PROTECTION ZONE SHOULD ENCIRCLES A RADU6 OF AT LEAST 1.25 FED OF PROTECTED AREA FOR EVERY INCH OF TRUNK DIAMETER. I.E. A TREE W RH A TRUNK OIAMETER Of 12 NCHES REQUIRE A PROTECTED RADIUS OF AT LEAST 15 FED AND IDEALLY 30 RR. TREE PROTECTION DETAIL OR APPROVED EQUAL MOT TO SCALE cry - -� «ran 1 PERMANENT SEED MIX TO SE SOWN IN ALL DISTURBED AREAS -OCAI—=D OUSIDE THE LIMIT OPEN WATER. NOTE: STOCKPILE SHALL BE COVERED ENTIRELY BY AN ANCHORED PLASTIC COVER. UPON PRIOR APPROVAL FROM ENGINEER: SILT FENCING MAY BE SUBSIITUTED FOR STRAW BALE, AND TEMPORARY SEEDING OF STOCKPILE MAY BE SUBSTITUTED FOR PLASTIC COVERING. [C '\ STOCKPILE CONTROL DETAIL NOi TO SCALE NOTE I. A SYNTHETIC FILTER FA BRIO OF AT LEAST 95% BY WEIGHT OF POLYGLEANS OR POLYESTER CERTHED BY THE MANUFACTURER N CONFORMANCE WITH THE REQUIREMENTS OF ASTM 1,161 SHOULD BE USED. 2 SYMMUIC FILTER FABRICSHOULD COWAN ULTRAVR)LD RAY NKIWORS AND UAMIZERSTO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE '6 RANGE OF 0 TO I2 . 3 SEDIMENT FENCE POSTS SHOULD BE 1.33 U /UNEAR FEET STET W M A MINLMUM LENGTH OF 5 FEET. THE STEEL POSTS SHOULD HAVE PROJECTIONS TO FACILITATE FASTENING OF FABRIC. l WIRE FENCE SHOULD BE MINIMUM 14 GAUGE AND A MAWUM MESH SPACING OF 6 NCNB. S THE HEIGHT OF THE SEDIMENT PENCE SHOULD NOT EXCEED 24 INCHES ABOVE GROUND SURFACE 6. FENCE POSTS FOR WIRE MESH FENCE SHOULD BE SPACED A MAXIMUM OF 8 FED APART. SUPPORT POSTS SHOULD BE DPNEN SECURELY INTO THE GROUND A MNIMUM OF 24 NCHE. I. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING SHOULD BE FASTENED DIRECTLY TO THE POSTS WITH SO POUND TENSILE STRENGTH WIRE OR PLASTIC ZP DES a 121NCHB OF FABRIC SHOULD BE BURIED N A WIDE BY W DEEP TRENCH AND COMPACTED. 9. INS PECT SEDDE NT FENCE AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL REPAIR AND REPLACE COLLAPSE TEAR, DECOMPOSE FENCE IMMEDIATELY. REMOVE SEDIMENT DEPOSITS. SEDIMENT FENCE DETAIL AT 27,000 SQUARE FEET BOTANICAL NAME APPROXIMATE RATE SPECIES NAME LESS PURE LIVE SEEO/ACf INDICATOR STATUS SCMZACHYRIU141SCOPARIUM, ALDOUS LITTLE BLUE STEM 'A' -DOUS' 5 FACU CHASM4NTHIUM LA TIFOLIUM RIVER OATS e'I-'� t. r I iTi I R r N. Y ♦ I t. I I v I I r F 1• I• 1� 4 1I v� {k ,g . U-34 K Y .�.PTI - �/ Sl- rY'�,, r 7'R - TT ♦ • IY 13I IrI "Fiig�,,.. F I Y Y I S• 1•• .III:. W �'S �ry i?�►:.'..�.s�s:�e;IG 21GZAG SPIDER WORT, VA ECOTYPE P. Rft fc�!:is'sa33 • VIII' r,�:�:. t.t..: HOPE BYPASS PPE OR --- �/ 11 �I'� APPROVED EQUAL /I RYPI PLAN VIEW PIPE SITE WILL BE DEPENDANT ON ROWS AT THE TIME OF CONSTRUCTION AND CAN BE DETERMINED BY THE CONTRACTOR NC DOT tl50R tl5D BASED ON NB EQUIPMENT NEED FOR THE CROSSNG WASHED STONE MR) CLASS B EROSION STONE '**\— RYP) MN 1'� STREAM BOTTOM TEMPORARY CULVERTS AS NEEDED (TYPI CROSS SECTION VIEW NOTE: I. SUE OF BYPASS PIPES TO BE FIELD VERIFIED AT TIME OF CONSTRUCTION. TEMPORARY STREAM CROSSING ..'y O SCALE NOTE 1. TO BE INSTALLED ON ALLTREES MARKED BY ENGINEER. CLIENT, AND /OR PROPERTY OWNER. 2 TO PREVENT GENERAL MECHANICAL DAMAGE TO TREES INSTALL TREE PROTECTION AS INDICATED N DETAIL. 3 TREE SHOULD BE CLEARLY MARKED TO BE RERUN OR TO BE REMOVED. 4. TREE PROTECTION FENCE SHOULD BE A BRIGHT. TALL. CONSTRUCTION SAFETY FENCE. S. MONITORED WEEKLY AND REPAIRED OR REPLACED AS NEEDED. 6. THE TREE PROTECTION ZONE SHOULD ENCIRCLES A RADU6 OF AT LEAST 1.25 FED OF PROTECTED AREA FOR EVERY INCH OF TRUNK DIAMETER. I.E. A TREE W RH A TRUNK OIAMETER Of 12 NCHES REQUIRE A PROTECTED RADIUS OF AT LEAST 15 FED AND IDEALLY 30 RR. TREE PROTECTION DETAIL OR APPROVED EQUAL MOT TO SCALE cry - -� «ran 1 PERMANENT SEED MIX TO SE SOWN IN ALL DISTURBED AREAS -OCAI—=D OUSIDE THE LIMIT OPEN WATER. NOTE: STOCKPILE SHALL BE COVERED ENTIRELY BY AN ANCHORED PLASTIC COVER. UPON PRIOR APPROVAL FROM ENGINEER: SILT FENCING MAY BE SUBSIITUTED FOR STRAW BALE, AND TEMPORARY SEEDING OF STOCKPILE MAY BE SUBSTITUTED FOR PLASTIC COVERING. [C '\ STOCKPILE CONTROL DETAIL NOi TO SCALE NOTE I. A SYNTHETIC FILTER FA BRIO OF AT LEAST 95% BY WEIGHT OF POLYGLEANS OR POLYESTER CERTHED BY THE MANUFACTURER N CONFORMANCE WITH THE REQUIREMENTS OF ASTM 1,161 SHOULD BE USED. 2 SYMMUIC FILTER FABRICSHOULD COWAN ULTRAVR)LD RAY NKIWORS AND UAMIZERSTO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE '6 RANGE OF 0 TO I2 . 3 SEDIMENT FENCE POSTS SHOULD BE 1.33 U /UNEAR FEET STET W M A MINLMUM LENGTH OF 5 FEET. THE STEEL POSTS SHOULD HAVE PROJECTIONS TO FACILITATE FASTENING OF FABRIC. l WIRE FENCE SHOULD BE MINIMUM 14 GAUGE AND A MAWUM MESH SPACING OF 6 NCNB. S THE HEIGHT OF THE SEDIMENT PENCE SHOULD NOT EXCEED 24 INCHES ABOVE GROUND SURFACE 6. FENCE POSTS FOR WIRE MESH FENCE SHOULD BE SPACED A MAXIMUM OF 8 FED APART. SUPPORT POSTS SHOULD BE DPNEN SECURELY INTO THE GROUND A MNIMUM OF 24 NCHE. I. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING SHOULD BE FASTENED DIRECTLY TO THE POSTS WITH SO POUND TENSILE STRENGTH WIRE OR PLASTIC ZP DES a 121NCHB OF FABRIC SHOULD BE BURIED N A WIDE BY W DEEP TRENCH AND COMPACTED. 9. INS PECT SEDDE NT FENCE AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL REPAIR AND REPLACE COLLAPSE TEAR, DECOMPOSE FENCE IMMEDIATELY. REMOVE SEDIMENT DEPOSITS. SEDIMENT FENCE DETAIL AT 27,000 SQUARE FEET BOTANICAL NAME APPROXIMATE RATE SPECIES NAME LESS PURE LIVE SEEO/ACf INDICATOR STATUS SCMZACHYRIU141SCOPARIUM, ALDOUS LITTLE BLUE STEM 'A' -DOUS' 5 FACU CHASM4NTHIUM LA TIFOLIUM RIVER OATS 3 SORGHASTRUMNLTANS,NC ECOTYPE NDANGRASS, NC ECOTYPE 4 FACU ELYAUS VIRGINICUS, SUTHERWIC ECOTYPE VRGNAI WILD RYE "SUTHER" -NC ECOTYPE 2 FAC ANDROPOGON GERARDII, SUTHERPEIDMONT NC ECOTYPE BIG BLUESTEM "SUTHER"71EDMENTNC ECOTYPE 1 FAC TRADESCANDA SUBASPERA. VA ECOTYPE 21GZAG SPIDER WORT, VA ECOTYPE 1 NI TRIDENS FLAVUS, SUTHER' ?IEDABONT NC ECOTYPE PURPLETOP"SUTHERPEIDMENTNC ECOTYPE 1 FACU CHAA44ECRISTA FASGCULATA (CASSIA F.A PA ECOTYPE PARTDGE PEA, PA ECOTYPE _ 1 0.6 NI MPTISIA ALBESCENS, NC ECOTYPE SPKE WILD INDIGO, NC ECOTYPE RUDBECKIA HIRTA, COASTAL PLAIN NC ECOTYPE BLACKEYED SUSAN. COASTAL PUN NC ECOTYPE 0.6 FACU ERAGROSTIS SPECTABILIS, VA ECOTYPE PURPLE LOVEGRASS, VA ECOTYPE 0.4 IFACU AIONARDA FISTULOSA IWILD BERGAMOT OA FACU- TREE SPECIES TO BE PLANTED IN PLACE OF ANY MATURE TREES (- 10" DIAMETER) THAT ARE REWVED FOR CONSTRUCTION ACCESS OR STAGING ESTIMATED 16 TREES (ASSUMING 20 FEET ON CENTER OVER 5.290 SQUARE FEET) 2- GALLON (MINIMUM) CONTAINERS ■ NORTH AMERICAN GREEN EROSroN ca+r ILL )H cwmle.e SOLUTTIONS "°.�..noyeen.Rwwm STAPLE PATTERN GUIDE 6.67' (2.03 M) WIDE ROLLS I .II� �4u4 fi »iWS�mM� COARSE AGGREGATE (TYP.) I �- IB'ABN. 91YPICAl NOTES: 1. GRAVEL SHOULD BE USED TO FORM DIVERSION DIKE WHERE VEHICLE CROSSING B REQUIRED. 2. DIVERSION CONSTRUCTED FOR LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOON AS THEY ARE CONSTRUCTED. 3.I14SPECT TEMPORARY DIVERSON ONCE WEEK AND AFTER EVERY RAINFALL 0. IMMEDIATELY REMOVE SEDIMENT FROM THE ROW AREA AND REPAIR DIVERSION RIDGE WHEN NECESSARY. �1 TEMPORARY NOT TO SCALE DIVERSION DELIMIT SLOPE INSTALLATION TOPOFCHANNEL 1. PREPARE SOIL BEFORE INSTALLING ROLLED NAG SC15O EROSION CONTROL MATTING 2BEGNATTHETOPOFWADPEBYANCHORINGTHENAGSCI50MR ONCON LMMTNGINAe(ISCAy DEEPXe(15CMI WIMTRWCHWRH APPROXIMATELY 17 I3 mI OF NAG SCIW EROSION CONTROL MATTING EXTENDED MOND THE UP-SLOPE PORTION OF METRENCH. ANCNORTHENAGSCI50 EROSION CONTROL MATTING WITH A ROW OF STAPLE APPROXIMATELY IT 130 CM) APART N THE BOTTOM OFMIE TRENCH. BACKFLL AND COMPACT THE TRENCH ADERSTARING. APPLY SEED TO COMPACTED SOIL AND FOLD REMANNG IT (30 CM) PORTION OF NAG SCI SO EROSION CONTROL MATING BACK OVER SEED AND COMPACTED SOIL SECURE NAG SCI 50 EROSION CONTROL MATTING OVER COMPACTED SOIL WITH A ROW OF STARES/STAKES SPACED APPROXIMATELY IT (30 CM) APART ACROSS THE WIDTH Of THE NAG SC150 EROSION CONTROL MUTING. I ROLL THE NAG SCIM EROSION CONTROL MATTNG (A.) DOWN OR (B.) HORUOWALLY ACROSS THE SLOPE. NAG SCI W ERMON CONTROL MUTING WILL UNROLL WITH APPROPRIATESDE AGAINST THE SOIL SURFACE ALL NAG SCI M EROSION CONTROL MATTING MUST BE SECURELY FASTENED IO SOL SURFACE BY PLACING STAPLES TM N APPROPRIATE LOCATIONS AS SHOWN N THESTAPLE PATTERN GUIDE BROW. WHEN USING THE DOT SYSTEM , STAPLE SHOULD SE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE STAPLE PATTERN SHOWN BROW. 4. THE EDGES OF PARALLEL NAG SC) 30 EROSION CONTROL MATING MIST BE STAPLED WITH APPFOI —ATELY T -S (5 CM -125 CM) OVERLAP. S. CONSECUTIVE NAG SCIW EROSION CONTROL MATTING SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE WITH AN APPROXIMATE T ITS CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA. APPROXIMATELY I (30 CIA I APART ACROSS ENTIRE NAG SCISO EROSION CONTROL MATTING WIDTH. NOTE: N LOOSE SOIL CONDITIONS. THE USE OF STAKE LENGTHS GREATER THAN a 115 CMI MAY BE NECESSARY TO PROPERLY SECURE THE NAG SCI SO EROSION CONTROL MATTING. &ATNEMUTT OFTHESLOPE. ANCMORNGTHENAGSCIWEROSIONCONTROLWUING WAS'(ISCM) DEEPXC (15CMI WDETRENCHWM APPROXIMATELY IT (3DCmI OF NAG SCI 50 EROSION CONTROL MATING EXTENDED BEYOND THE DOWN-SLOPE PORTION OF THE TRENCH. D. BIODEGRADABLE NOSTAKE OR APPROVED EQUAL TO BE USED 3' TO S MOUND OF MULCH (TYP.) IF SPECIFIED FEPTILUER TABLET (TYP.) PSPECNED �1 EROSION CONTROL MATTING DETAIL N I A V i(SLIAAL NOTTOSCALE KEEP MULCH AWAY FROM ROOT COLLAR OR STEVE (TYPJ TOP OF BALL OR CONTAINER EVEN WITH FINISHED GRADE (TYP.I PROVIDE WIDER HOLE IF 7SCIL S COMPACTED ITYP.) BOTANICAL NAME I I , I\ '% 1/ ACER RUBRUM RED MAPLE 4 1 BETULA NIGRA RIVER BIION d OUERCUS FALCATA /OUERCUS COCGNEA SOUTHERN RED OAK /SCARLET OAK 4 FRAXINI/S PENNSYLVANICA GREEN ASH 4 GOOD NATIVE SOIL OR TOPSOIL (TYP.1 IF GROWN MATERIALS: CONTAINER REMOVE ROOT MASS FROM CONTAINER, KEEPING NOTE: I. SEEDTOBE APPLIED TO ALL DISTURBED AREAS OUTSIDE THE PROPOSED LIMIT OFSTATE OPEN WATER. 2. AREAS TO BE SEEDS SHALL HAVE A MNIMUM OF 6 INCHES OF TOPSOIL PACED AND GRADED PRIOR TO PLANTING, PLANT SPECIES LET ROOTBALL ON UNDISTURBED SOIL ITYP.) SOB INTACT. SEPARATE ROOTS FROM ROOT MASS TO PREVENT GIRDLING. S ALL AREAS fO BE SEEDED SHALL HAVE STRAW INSTALLED EXCEPT WHERE EROSION CONTROL MATTING B SPECKED. IF BALLED AND BURLAP WRAPPED MATERIALS: 4. SEEDTOBECHECKED FOR PURRYTO ENSURE O S WEED FREE AND ARE NO NOXIOUS WEEDS WITMINTHE MIX. REMOVEALL ROPING OR WIRE CAGING FROM 5. CLEAN WHEAT STRAW FOR MULCH SHALL BE USED. ROOT Mll AND REMOVE BURLAP FROM TOP 2/3 Lc�)BALL/BURLAP AND CONTAINER MATERIAL PLANTING DETAIL OF ROOT BALL, KEEPING ROOT MASS INTACT. \/ MOTTO SCALE DEPOSE OF ALL REMOVED MATERIALS Off SITE. SEPARATE ROOTS FROM ROOT MASS TO PREVENT GROUND. CALL BEFORE YOU DIG! NORTH CAROLINA LAW REQUIRES MINIMUM 2 WORKING DAYS NOTICE PRIOR TO EXCAVATION — STOP CALL NORTH CAROLINA ONE -CALL CENTER REFERENCE NC G.A. SECTION I, CHAPTER 87. ARTICLE 3 ®1 -800- 632 -4949 PROJECT NOTES 1. TOPOGRAPHIC SURVEY INFORMATION OBTAINED FROM JEFFREY L. CAISON. PLS, DENTON, NC, JANUARY 18. 2012. 2. HORIZONTAL DATUM IS NORTH AMERICAN DATUM OF 1983 (NADB3), FEET. VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD881, FEET. REVISIONS STATE OF NORTH CAROLINA CERTIFICATE OF ATJTH. NO.: 201106700411 -1 MARY L. PAIST - GOLDMAN Professional Engineer NC Lic. No. 037626 DATE SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGOES, NEW JERSEY 08551 PHONE. 908.237.5660 FAX. 908.237.5666 WWW.PRINCETONRYDRO. COM PROJECT NAME/LOCATION: LASSITER MILL DAM REMOVAL U W HARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: SOIL EROSION AND SEDIMENT CONTROL DETAIL D 01/20/2012 1213.001 AS SHOWN DRAWN BY LC CHECEND BY JH SHEET NO. 6 7 OF • TEMPORARY SEEDING: AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009" SECTION 6.10 DEHNBION: PLANTING RAPIDGMINNG ANNUAL GRASSES. SMALL GRAINS, OR LEGUMESTO PROVIDE WMAL. TEMPORARY COVER FOR EROSION CONTROL ON DISTURBED AREAS. 2 PURPOSE: TOY MWRARII.Y STABILIZE DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 21 CALENDAR DAYS. TEMPORARY SEEDING CONTROLS RUNOFF AND EROSION UNTIL PERMANENT VEGETATION OR OTHER EROSION CONTROL MEASURES ARE ESTABLISHED. N ADDITION. IT PROVIDES RESCUE FOR SOB PROTECTION AND SEEDBED PREPARATION. AND REDUCES PROBLEMS OF MUD AND DUST PRODUCTION FROM BARE SOB SURFACES DURING CONSTRUCTION. ] CONDITONSWHERE PRACTICEAPPUES: ON ANY CLEARED, UNVEGRATED, OR SPARSELY VEGETATED SOB SURFACE WHERE VEGEATrvE COVER 6 NEEDED FOR LESS THAN 1 YEAR. APPLICATIONS OF THIS PRACTICE MAY INCLUDE DNERSK)NS. DAMS, TEMPORARY SEDIMENT BASINS, TEMPORARY ROAD, AND IORSOI SIOCKPBES. 4. SPECIFICATIONS: COFARM GRADING BEFORE PREPARING SEEDBEDS AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS DIKE. WATERWAYS, AND BASINS. AND MINIMIZE STEEP SLOPE. IF SOILS ARE COMPACTED DURING GRADNG, LOOSEN SOBS TO A DEPTH OF" INCHES USING RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARATIO N: GOOD SEEDBED PREPARATION 6 MWTNL TO SUCCESSFUL PLANT MABL6HMENT. A GOOD SEEDBED 6 WELL-PULVERIZED. LOOSE, AND UNIFORM WHERE HYDROSEEDING METHODS ARE USED. SURFACES MAY BE LEFT WITH AN IRREGULAR SURFACE OF URGE CLODS AND STONES. UMNG-APPLY LIME ACCORDING TO SOL TBT RECOMMENDATIONS F THIS PH IACIDRYI OF ME SOL 6 NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF I TO I I /2 TONS/ACRE ON COARSE-TIXTURED SOILS AND"TONS /ACRE ON FINE TEXT WED SOLS. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP -INCHES OF SOTS. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED, FEMWER -APPLY A I W O-10 GRADE FERTILIZER AT 7UDI,000 LBJACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED IMO THE TOP 4 INCHES OF SOIL. IF A MDRAULK SEEDER IS USED, DO NOT Mk SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. SURFACE ROUGHENING-IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE. ADDITIONAL ROUGHENNG MAY NOT BE MQURM, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN 9 PRIOR TO SEEDING BY DISKNG, RAKNG. HARROWING. OR OMER SUITABLE METHODS. GROOVE OR FURROW ROPE STEEPER THAN II ON ME CONTOUR BEFORE SEEKING. PLANTSRECTION: SELECT APPROPRIATE SPECIES OR SPECIES MIXTURE ROM TABLE BROW FOR THE SELECTED APPLICATION. USE SECURELY TACKED MULCH AS NECESSARY. SEEDING: EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST). DRILL, CULTPACKER SEEDER, OR HMMSEEDER. TAESEEDNG RATESGIV EN N TABLES BELOW. BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING 6 NOT RECOMMENDED DUE TO DIFFICULTY N ACHIEVING UNIFORM DISTRIBUTION. SMALL GRAINS SHOULD BE PUNTED NO MORE THAN I INCH DEEP, AND GRASSES AND LEGUMES IN NO MORE THAN In NCH DEEP. BROADCAST SEED MAST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LOWLY FIRAMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTW B SHOULD INCLUDE A WOOD FIBER ICELULOSEI MULCH. MULCHING THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLIBHMENT UNDER NORMAL CONDITIONS. AND IS ESSENTIAL TO SEEKING SUCCESS UNDER HARSH SITE CONDITIONS. HARSH SITE CONDITIONS INCLUDE: • SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USEI; • SLOPES STEEPER THAN 31: • IXCEMIV LY HOT OR DRY WEATHER: • ADVERSE SOILS (SHALLOW, ROCKY. OR HIGH IN CLAY OR SANDY; AND • AREAS REC RING CONCENTRATED FLOW. F THE AREA TO BE MULCHED S SUBJECT TO CONCENTRATED W ATERROW, SUCH AS N CHANNELS. MULCH SHOULD BE ANCHORED WITH WIND. .. MANTENANCE RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE 6 POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE DO HOT MOW. PROTECT ROM TRAHK AS MUCH AS POSSIBLE. EMFAORAPY SIBECNG MIXTURE FOR.. WINTER AND EARLY ,fgM4G'. Yt 1ceAN MFF IAA _ R.mO WACN ctalo uI1RN �w.iIaHF A•q rt6W Ce[Ip1A6 oNeNW. IKMLAYI EMPORARYM@DNG MIXTURE FOR WA4AEE =OPAKIn Bue e"K° TEMPORARY 3FEDMG MIXTURE POTS FAIL AR NID/Atylq vrt IT-vAN sIKAI.Hic.AH 41 In[p Af AALLC�x�M[:IgRNG�N- OsN HEMlY IMACef F04FLMNOFl1�4Ho KUNMM IAMOURA44q LFVLOLZA N AR reeewn tt mottea on: Jun U4, 2U12 - MULCHING: AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE I, 2006, LAST REVISED MARCH 2009" SECTION 6.14 I. DEFINITION: APPLICATION OF A PROTECTIVE BLANKET OF STRAW OR OTHER PUNT RESIDUE, GRAVEL, OR SYNTHETIC MATERIAL TO THE SOIL SURFACE 2 PURPOSE TO PROTECT THE SOB SURFACE FROM THE FORCES OF RAINDROP, IMPACT, AND OVERLAND ROW. MULCH FOSTERS THE GROWTH OF VEGETATION, REDUCES EVAPORATION, INSULATES THE SOIL AND SUPPRESSES WEED GROWTH. MULCH 5 FREQUENTLY MED TO ACCENT LANDSCAPE PLANTINGS. 3 CONDITIONS WHERE PRACTICE APP1JM MULCH TEMPORARY OR PERMANENT SEEONGS IMMEDIA TELY. AREAS THAT CANNOT BE SEEDED BECAUSE OF THE SEASON SHOULD BE MULCHED70 PROVIDE TEMPORARY PROTECTION OF II SOB SURFACE. MEAN ORGANIC MULCH N MIS CASE IBM NOT WOOD MERI, AND SEED THE AREA AS SOON AS POSSIBLE. MULCH AROUND PLANTINGS OF TREE, SHRUBS, OR GROUND COVERS TO STABILIZE ME SOIL BETWEEN PLANTS. A PLANNING CONSIDERATIONS: SURFACE MULCH 6 THE MOST EFFECTIVE, PRACTICAL MEANS OF CONTROLLING RUNOFF AND EROSION ON DISTURBED LAND PRIOR TO VEGETATION ESTABLISHMENT. MULCH REDUCES SOTS M10ST)RE LOSS BY EVA PORAUOR PREVENTS CRUSTING AND SEALING OF THE SOIL SURFACE, MODERATE SOL TEMPERATURES, PROVIDES A SUITABLE MICROCLIMATE FOR SEED GERMINATION, AND FOY NCRMSE ME INFILTRATION RATE OF THE SOIL. ORGANIC MULCHES SUCH AS STRAW, WOOD CHIPS, AND SHREDDED BARK HAVE BEEN FOUND TO BE ME MOR EFRCINE. DO NOT LOSE MATERIALS WHICH MAY BE SOURCES OF COMPERIG W EED AND GRASS SEEDS. DECOMPOSITION OF SOME WOOD PRODUCTS CAN TIE UP SIGNIFICANT AMOUNTS OF SOL NIT ROGEN. MAKING R NECESSARY TO MODIFY FERTILIZATION RATES, OR ADD FERTILIZER WITH THE MULCH. ORGANIC MULCHES STRAW MULCH MOST COMMONLY USED N CONJUNCTION WITH SEEDING. THE STRAW SHOULD BE FROM WHEAT OR OATS I "SMALL GRAINS "I, AND MAY BE SPREAD BY HAND OR WITH MULCH BLOWER. MAW MAY BE LOST 70 WIND AND MAST BE TACKED DOWN. WOOD CHIPS ARE SUITABLE FOR AREAS THAT WILL NOT BE CLOSELY MOWED. AND AROUND ORNAMENTAL PLANTHGS. CHIPS DO HOT REQUIRE TACKING. BECAME THEY DECOMPOSE SLOWLY, THEY ARMY BE TREATED WON 12 POUNDS OF NITROGEN PER TON 70 PREVENT NUTRIENT DEFICIENCY IN PLANTS. BARK CHIPS AND SHREDDED BARK ARE BY- PRODUCTS OF TIMBER PROCESSING OFTEN MW N LANDSCAPE PLANTINGS. BARK 6 SUITANE MULCH FOR AREAS PUNTED TO GRASSES AND NOT CLOSELY MOWED. R MAY BE APPLIED BY HAND OR WIN A MULCH BLOWER. BARK DOE NOT REQUIRE ADDITIONAL NITROGEN FERTILIZER. WOOD FIBER 6 SHORT CELLULOSE FIBERS APRIED AS A SLURRY IN HYDROSEEDING OPERATIONS. WOOD FIBER DOES NOT REQUIRE TACKING. TACKING AGENTS OR SOIL BINDERS CAN BE ADDED TO THE SLURRY IF NEEDED. WOOD FIBER HYDROSEEDER NURRES MAY BE USED 10 TACK STRAW MULCH ON STEEP SLOBS, CRITICAL AREAS. AND WHERE HARSH CLIMATIC CONDITIONS EXIST. CHEMICAL MULCHES AND 508 BINDERS: PIETRO IS VERY EFFECTIVE IN HOLDING MULCH IN PLACE ON WATERWAYS AND SLOPES BEFORE GRASSE BECOME ESTABLISHED. MATS PROMOTE SEEDLING GROWTH IN THE SAME WAY AS ORGANIC MULCHES. THEY ARE USEFUL FOR ESTABLISHING GRASS N CHANNELS AND WATERWAYS. A WIDE VARIETY OF SYNTHETIC AND ORGANIC MATERIALS ARE AVAILABLE. FIBERGLASS ROVIN G CONSISTS OF COWNWM STRANDS OF FIBERGLASS W HKH. W HEN BLOWN ONTO THE SOIL SURFACE FROM A SPECIAL COMPRESSED AIR EJECTOR, FORM A MAY OF GLASS FIBERS. THIS AML MUST THEN BE LACKED DOWN WIN ASPHALT. 5. CO NSTRUCTONSPECNCATIONS: COMPLETE GRADNG BEFORE MULCHING, INSTALL SEDIMENT CONTROL PRACTICES. AND PREPARE SEEDBED. APPLY SEED BEFORE MULCHING EXCEPT N THE FOLLOWING CASES • SEED IS APPLIED AS PAN OF A HYDROSEEMR SLURRY CONTANNG WOOD FIBER MULCH. • A HYDROSEEDER SLURRY 6 APPLIED OVER STRAW. APPL CAOCN OF ORCAMC MULCH: SPREAD MULCH UNIFORMLY BY HAND OP WITH A MULCH BLOWER. WHEN SPREADNGS STRAW MULCH BY HAND, DIVIDE ME AREA TO BE MULCHED INTO SECTIONS OF APPROXIMATELY 1.000 R2 AND PLACE 7DW LB OF STRAW ( 1 112 TO 2 BALES) N EACH SECTION TO FACILITATE UNIFORM DISTINSWON. AFTER SPREADING MULCH. NO MORE THAN 23A OF ME GROUND SURFACE SHOULD BE VISIBLE. IN HYDROSEEDING OPERATIONS A GREEN DYE SHOULD U ADDED TO THE SLURRY TO ASSURE UNIFORM APPLICATION. ANCHORING ORGANIC MULCH: STRAWMULCHM BEANCHOREDIMMEDIATELYAFTERSPREADNG .MEFOLLOWNGMETHODSOF ANCHORING MULCH MAY BE NOSED: MULCH ANCHORING TOOL -A TRACTOR-0RA W N BAPLE MENT DESIGNED TO PUNCH MULCH IMO THE SOIL A MULCH ANCHORING TOOL PROVIDES MAXIMUM EROSION CONTROL WITH STRAW. A REGULAR FARM D6L WEIGHIED AND SE NEARLY STRAIGHT, MAY SUBSTITUTE THE DISK SHOULD NOT BE SHARP ENOUGH TO CUT ME STRAW. THESE METHODS ARE LIMITED TO SLOPES NO STEEPER THAN 3:1. WHERE EQUIPMENT CAN OPERATE SAFELY. LIQUID MULCH ENDERS - APPLICATION OF LIQUID MULCH ENDERS AND TACKIFIERS SHOULD BE HEAVIER AT THE EDGES OF AREAS AND AT CRESTS Of RIDGE AND BANKS TO RESIST WIND. BINDER SHOULD SE APPLIED UNIFORMLY TO THE ENTIRE AREA. BINDERS MAY BE APPLIED AFTER MULCH 6 SPREAD. OR MAY BE SPRAYED INTO THE MULCH AS IT 6 BEING BLOWN ONTO THE SOU. APPLYING STRAW AND ENDER TOGETHER 6THE MOST EFFECTIVE METHOD. LIQUID BINDERS MAY INCLUDE ASPHALT AND AN ARRAY Of COMMERCIALLY AVAILABLE SYNTHETIC BINDERS. EMLASIRW ASPHALT 6 THE MOST COMMONLY USED MULCH BNDER. ANY TYPE RAN ENOUGH TO BE BLOW N FROM SPRAY EQUIPMENT IS SATISFACTORY. ASPHALT 5 CLASSFED ACCORDING TO ME TIME 9 TAKES TO CURE. RAPID SETTING IRS OR CRS DESIGNATION) IS FORMULATED FOR CURING IN LESS MAN N HOURS. EVEN DURING PERIODS OF HIGH HUMIDITY: IT IS BEST USED IN SPRING AND FALL. MEDIUM SETTING (MS OR CMS) 6 FORMULATED FOR CURING WITHIN 24 TO 48 HOURS. AND SLOW SETTING MSS OR CSS) 6 FORMULATED FOR USE DURING HOT, DRY WEATHER, MCIURNG 48 HOURS OR MORE CURING TRALAIRY ASPHALT AT 0.10 GALLONS PER SQUARE YARD (10 GAUI 1100 R2). HEAVER APPLICATIONS CAME DRAW TO 'PERCH OVER FELLS. N MARTC AREAS, UNCURED ASPHALT CAN BE PICKED UP ON SHOES AND CAUSE DAMAGE TO RUGS, CLOTHING EC. USE TYPES RS OR CRS TO MINIMIZE SUCH PROBLEMS. AWICH NETYING6-A LIGHTWEIGHT PLASTC, COTTON, JUTE, W IRE OR PAPER NETS MAY BE STAPLED OVER THE MULCH ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. PEG AND TWINE -ILLS METHOD 6 FEASIBLE ONLY N SMALL AREAS WHERE OTHER MEINODS CANNOT BE USED BECAUSE B 6 LABOR- NTENSNE DRNE 610 NCH WOODEN FIGS TO W ITHIN 31NCHE OF THE SOK SURFACE EVERY 4 FED IN All DIRECTIONS. STAKES MAY BE DRIVEN BEFORE OR AFTER STRAW 6 SPREAD. SECURE MULCH BY STRETCHING TW NE BETWEEN PEGS N A CRISS-CROSS -W ITHIN -A- SQUARE PATTERN. TURN TWINE TWO OR MORE LIMES AROUND EACH PEG. MINE MAY BE TIGHTENED OVER ME MULCH BY DROVING PEGS FURTHER IMO THE GROUND. VECEATIDN�RYE (GRAN) MAY BE JIBED TO ANCHOR MULCH N FALL PLANTINGS, R NTINGS, AND GMAN MILLET N SPRING. BROADCAST AT 15 LB/ACRE BEFORE APPLYING MULCH. CAFMKAL MULCHES: CHEMICAL MULCHES MAY BE EFFECTIVE FOR SOIL STABILIZATION DOSED BETWEEN MAY I AND JUNE 15, OR SEPT. 15 AND OCT. 15, PROVIDED THAT THEY ARE USED ON SLOPES NO STEEPER THAN 4:. AND THAT PROPER SEEDBED PREPARATION HAS BEEN ACCOMPLISHED. INCLUDING SURFACE ROUGHENING W HERE REQUIRED. CHEMICAL MULCHES MAYBE USED TO BIND OTHER MULCHES, OR W ITH WOOD FIBER IN A HYDROSEEDED SLURRY AT ANYTIME FOLLOW ME MANUFACTURER'S RECOMMENDATIONS FOR APPLICATION. MERGLASSROVNG: FIBERGLASS ROVING I " ROVING' I IS WOUND INTO A CYLINDRICAL PACKAGE SO THAT IT CAN BE COMNUOUSLY WITHDRAWN FROM THE CENTER USING A COMPRESSED AIR EJECTOR. ROVNG EXPANDS INTO A MAY OF GLASS FIBERS AS 9 CONTACTS THE SOL SURFACE. IT 6 OFTEN USED OVER A STRAW MULCH, BUT MUST SILL BE TACKED WON ASPHALT. SPREAD ROVING UNIFORMLY OVER ME AREA AT A RATE OF 0.25 TO MM 1.11"M ANCHOR WIN ASPHALT IMMEDIATELY ARK APPLICATION, AT A RATE OF 0.25 TO MW GA VYD2 AS A CHANNEL LNING, AND AT OTHER SITES OF CONCENTRATED FLOW, THE ROVING MAY MUST BE FURTHER ANCHORED TO PREVENT UNDERMINING. IT MAY BE SECURED WITH STAKES PLACED AT INTERVALS NO GREATER THAN 10 FEET ALONG THE DRANAGEWAY, AND RANDOMLY THROUGHOUT IM WON, BUT NOT MORE THAN 10 FEE APART. AS AN OPTION TO STAKING. ME ROVING CAN BE BORED TO A DEPTH OF 5 NCHE AT THE UPGRADE END AND AT FJTERVAB OF W FEE ALONG 111E LENGTH OF THE CHANNEL NETS AND MATS' NETS ALONE WILL PROVIDE LOTLE M06TURE CONSERVATION BENEFITS AND LIMITED EROSION PROTECTION. THEREFORE. THEY NEED TO BE USED N CONIUNCTION WITH AN ORGANIC MULCH SUCH AS STRAW. EXCEPT WHEN WOOD FIBER SLURRY IS USED, NETTING SHOULD ALWAYS BE NSTALLED OVER THE MULCH. WOOD HOER MAYBE SPRAYED ON TOP OF AN INSTALLED NR. MAM. INCLUDING 'EXCELSIOR " (WOOD FIBER) BLANKETS, ARE CONSIDERED PROTECTIVE MULCHES AND MAY BE USED ALONE AND ON ERODIBLE SOILS AND DURING ALL TIMES OF THE YEAR. PLACE THE MATTING N FIRM CONTACT WITH ME SOL, AND STAPLE SEC URELY. MAINTENANCE: INSPECT ALL MULCHES PERIODICALLY AND AFTER RAINSTORMS TO CHECK FOR EROSION, DISLOCATION OR FAILURE WHERE EROSION 6 OBSERVED, APPLY ADDITIONAL MULCH. F WASHIOW OCCURS, REPAIR ME SLOPE GRADE, RESEED AND REINSTALL MULCH. CONTINUE NSPECTONS UNIT VEGETATION 6 FIRMLY ESTABIUMM. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT (REFER TO DETAIL A): AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009" SECTION 6.06 1. DEFINITION: A GRAVELED AREA OR PAD LOCATED AT POINTS WHERE VEHICLE ENTER AND LEAVE A CONJUUCTION SITE. 2. PURPOSE TO PROVIDE A BUFFER AREA WHIM VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID TRANSPORTING R ONTO PUBLIC ROADS, TO CONTROL EROSION FROM SURFACE RUNOR,AND TO HELP CONTROL DUST. I CONDITIONS WHERE PRACTICE APPLES AGGREGATE SUE: LOSE 2 -3 NCH WASHED STONE DIMENSIONS OF GRAVEL PAD: THICKNESS: 6 NCNB MINIMUM WIDTH: 12 -FEE MNIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER 6 GREATER LENGTH: 5DREF MINIMUM LOCATKI �OCAIE CONSTRUCTION ENTRANCES AND EXITS IO"SEDIMENT FROM LEAVING ME SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLE. AVOID STEEP GRADES, AND ENTRANCES AT CURVES N PUBLIC ROADS. WAS CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABLVED WITH CRUSHED STONE THAT MANS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE 4. CONSTRUCTION SPECIFICATIONS: I. CLEAR THE ENTRANCE AND IXTTARM OF ALL VEGETATION, ROOMS AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADER. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON ME PLANS, AND SMOOTH R. I PROVIDE DRAINAGE TO CARRY WATER 10 A SEDIMENT TRAP OR OTHER SUITABLE OUTLR. 4. USE GEOTEXTLE FABRICS BECAUSE THEY IMPROVE STABILITY OF ME FOUNDATION N LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. 5. MAN CHANCE MANTAIN THE GRAVEL PAD N A CONDITION TO PREVENT MUD OR SEDIMENT ROM LEA VNG ME CONSTRUCTION SITE THIS MAY REQURE PERIODC TOPDRESSING W ITH 2- NCH STONE. AFTER EACH RAINFALL. INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE All OBJECTIONABLE MATERIALS SKLEO. WAVED, OR TRACKED ONTO PUBLIC ROADWAYS, TREE PROTECTION (REFER TO DETAIL B): AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009" SECTION 6 -05 I. DEFINITION: PRACTICES TO PRESERVE AND PROTECT DESIRABLE TRES FROM DAMAGE DURING PROJECT OEVROPMENT. 2. PURPOSE: TO PRESERVE AND PROTECT TREES THAT HAVE PRESENT OR FUTURE VALUE FORMER USE N PROTECTION FROM EROSION, FOR THEIR LANDSCAPE AND AESTHETIC VALUE, OR TOR OTHER ENVIRONMENTAL BENEFITS. 3. CONDITIONS WHERE PRACTICE APPLIES: ON DEVELOPMENT SITE CONTAINING TREES OR STANDS OF TREES 4. DESIGN CRITERIA: • LEAVE CRITICAL AREAS ISUCH AS FLOOD RAMS. STEEP SLOPES AND WETLANDS) WITH DESIRABLE TREES IN THEN NATURAL CONDITION OR ONLY PARTIALLY CLEARED. • LOCATE ROADWAYS, STORAGE AREAS, AND PARKING PADS AWAY FROM VALUABLE TREE STANDS. FOLLOW NATURAL CONTOURS. WHERE FEASIBLE. TO MINIMIZE CUTTING AND FRLNG N THE VCINOY OF TREE. • SELECT TRES 70 BE PRESERVED BEFORE SING ROAD$, BUILDINGS, OR OTHER STRUCTURE. • MINIMIZE TRENCHING N AREAS WITH TREES. PLACE SEVERAL UTILITIES IN THE SAME TRENCH. • DESIGNATE GROUPS OF TREES AND INDIVIDUAL TREES TO BE SAVED ON THE EROSION AND SEDIMENTATION CONTROL PLAN. • DO NOT EXCAVATE. TRAVERSE. OR FELL CLOSER THAN THE DRIP LNE. OR PERIMETER OF THE CANOPY, OF TREES TO BE SAVED. S CONSTRUCTION SPECF1CAMNS: A. ERECT TREE PROTECTION ZONE FENCES. REMCT ACCESS TO WEE PROTECION IONES WITH TALL, BRIGHT. PROTECTIVE FENCNG. MOST FENCING 6INEXPENSIVE AND DURABLE ENOUGH TO LAST THROUGHOUT MOST CONSTRUCTION PROJECTS. TEMPORARY TREE PROTECTION FENCNG SHOULD BE ERECTED BEFORE CLEARING, DELIVERIES AND OTHER CONSTRUCTION ACTIVITIES BEGIN ON ME SELF. B. PROHIBIT OR RESTRICT ACCESS TO FREE PROTECTION ZONE. ALL ONSITE WORKERS SHOULD BE AWARE OF THE TREE PROTECTION ZONES AND THE RESTRICTIONS ON ACTIVITIES WITHIN THE ZONES. - USE THESE TREE PROTECTION ZONE GUIDELINES FOR THE BEST EFFECT: • POST -KEEP OUT" SIGNS ON ALL SIDES Of FENCING. DO NOT STORE CONSTRUCTION EQUIPMENT OR MATERW LS N TREE PROTECTION ZONES. • PROHIBIT CONSTRUCTION ACTIVITIES NEAR ME MOST VALUABLE TREES. AND OBSTRUCT ACTNFIB AROUND OTHERS. • ASSESS CREW AND CONTRACTOR PENALTIES, F NECESSARY, TO KEEP ME FREE PROTECTION ZONE INTACT. C. MONITOR TREES. VIGILANCE 6 REQUIRED TO PROTECT MEB ON CONSTRUCTION SITES. ME A TREE PROFESSIONAL OR TRAIN YOUR STAR TO MONITOR TREE HEALTH DURING AND AFTER CONSTRUCTION ON A REGULAR. FREQUENT BASS. WATCH FOR SONS OF TREE STRESS, SUCH AS DEBACK. LEAF LOSS. OR GENERAL DECLINE IN TREE HEALTH OR APPEARANCE. D. MONITOR TREE PROTECTION ZONE FENCES. ASSX f A CREW MEMBER FOR WEEKLY RESPONSIBILITY OF CHECKING THE INTEGRITY OF TREE PROTECTION ZONE FENCE, REPAIR AND REPLACE TREE PROTECTION ZONE FENCNG AS NEEDED. E OPTIMIZE TREE HEALTH. AMON A TRAINED CREW MEMBER OR HIRE A PROFESSIONAL TO COMPLETE REGULAR TREE MAINTENANCE TASKS, INCLUDING WATERING, FERTILIZATION, AND MULCHING TO PROTECT TREE ROOMS. CONSULT A TREE PROMMOC NAL FOR ADVICE ON THESE PRACTICES IF NEEDED. SVRVNAL OF PROTECTED TREES WILL INCREASE IF THESE PRACTICES CONTINUE DURING CONSTRUCTION. HEALTHY TREES REQUIRE UNDISTURBED HEALTHY SOIB. DO NOT CAUSE INJURES TO TRES AND ROOTS, DO NOT CHANGE ME SOX. GRADE, DRA NAGE, OR AERATION W ITH OW PROTECTING PRORITY TREES. b. MAINTENANCE: • REMOVE TREE PROTECTION ZONE FENCES. • PRUNE ANY DAMAGED TREES. M SPITE OF PRECAUTONS, SOME DAMAGE TO PROTECTED TRES MAY OCCUR. N SUCH CASES, REPAIR ANY DAMAGE TO THE CROWN, TRUNK. OR ROOT SYSTEM IMMEDIATELY, • REPAIR ROOK BY CUTTING OR ME DAMAGED AREAS AND PAINTING META WITH TREE PANT. SPREAD PEAT MOSS OR MOST TOFSOL OVER EXPOSED ROOTS. • REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED ARM AS SHOWN N FIGURE 6050. TAPER THE CUE TO PROVIDE DRAINAGE, AND PAINT WITH TREE PANT, • CUT OR ALL DAMAGED TREE LLMI S ABOVE ME TREE COLLAR AT THE TRUNK OR MAIN BRANCH. LOS E THREE SEPARATE CUTS AS SHOWN N FIGURE 6JMD TO AVOID PEELING BARK FROM HEALTHY AREAS OF THE TREE • CONTINUE MAINTENANCE CARE. PAY SPECIAL ATTENTION TO ANY STRESSED, DISEASED, OR INSECT - INFESTED TREE. REDUCE TREE STRESS CM6ED BY UNINTENDED CONSTRUCTION DAMAGE BY OPTIMIZING PLANT CARE WIN WATER, MULCH, AND FERTILIZER WHERE APPROPRIATE. CONSULT YOUR TREE EXPERT F NEEDED. • INFORM THE PROPERTY OWNER ABOUT THE MMSURES EMPLOYED DURING CONSTRUCTON. WHY THOSE MEASURES WERE TAKEN, AND HOW THE EFFORT CAN BE CONTINUED. SEDIMENT FENCE (REFER TO DETAIL G): AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009" SECTION 6.62 1. TEMPO AR RARY SEDIMENT CONTROL MEASURE CONSISTING OF FABRIC BORED At THE BOTTOM STRETCHED. AND SUPPORTED BY POSTS. 2. PURPOSE: TO RETAIN SEDIMEH7 FROM SMALL DISTURBED AREAS BY REDUCING THE VELOCITY OF SHEET ROWS TO ALLOW SEDIMENT DEPOSITION. 3. CONDITIONS WHERE PRACTICE APPLIES: WHERE RUNOFF CAN BE STORED BEHIND THE SEDIMENT PENCE W UHOUT DAMAGING ME FENCE OR ME SUBMERGED AREA BEHIND THE FENCE SEDIMENT FENCE SHOULD BE PLACED ALONG TOPOGRAPHIC ELEVATION CONTOURS. WHERE IT CAN INTERCEPT STORMWATER WHICH THAT 6 N DISPERSED SHEET ROW. SEDIMENT FENCE SHOULD NOT HE USED BELOW GRADED SLOPE GREATER THAN 10 FEE IN HEIGHT. 4. DESIG N CRITERIA: -FENCE STABLE FOR THE IDYEAR PEAK STORM RUNOFF. -DEPTH OF IMPOUNDED WATER DOB NOT EXCEED I S FEE AT ANY PONT ALONG ME FENCE. -THE DESIGN LIFE OF A SYNTHETIC SEDIMENT FENCE OS MINIMUM OF 6 MONTHS. 5. CONSTRUCTION SPECIFICATIONS: A. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 959L BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH 6 CERIIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6161. B. $YNMEICFITERFABRIC SHOULD COWAN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LEE M A TEMPERATURE RANGE OF 0 TO I SOIF. C. THE POSTS FOR SEDIMENT FENCES ARE 1.33 LBAINEAR R STEEL WITH A MINIMUM LENGTH OF 5 FEE. THE STEEL POSTS ARE TO HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. D. USE WIFE FENCE WITH A MNWUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES FOR REINFORCEMENT OF STANDARD STRENGTH FLIER FABRIC. 6. CONSTRUCTION: A. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. B. THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 NCHB ABOVE THE GROUND SURFACE. C. CONSTRUCT THE INTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JONTS ARE NECESSARY, SURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORt POST W ITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. D. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM Of THE TRENCH. FASTEN THE WIRE REINFORCEMENT, MEN FABRIC ON THE UPSLOPE SIDE OF THE RICE POST. WIRE OR PLASTIC ZIP TIE SHOULD HAVE MINIMUM SO POUND TENSILE STRENGTH. E. WHENAW1MMESHSUPPORTFENCEEMM .SPACEPOSTSAMAXIMUMOFBRRAPART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF N INCHES. F. EXTRA STRENGTH FILLER FABRIC WITH 6 FEE POST SPACING DOB NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP LIB SHOULD HAVE MINIMUM SO POUND TENSILE STRENGTH. G. EXCAVATE A TRENCH APPROXIMATELY 4INCHES WOE AND 81NCHES DEEP ALONG THE PROPOSED LNE OF POSTS AND UPSLOPE FROM THE BARBER. K PUCE 12 NCHES OF THE FABRC ALONG THE BOTTOM AND SIDE OF THE TRENCH. L BACKFLL ME TRENCH WIN SON. PLACED OVER ME FILTER FABRIC AND COMPACT. J. DO NOT ATTACH FILLER FABRIC 10IXISTING TREES. 7. INSTALLATION SPECIFICATIONS: I. ME BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE Of THE FENCE 2. INSTALL POSTS 4 FEET APART N CRITICAL AREAS AND 6FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 RE DEEP ON THE DOWNSTREAM SIDE SIDE OF ME SLl FENCE. AND AS CLOSE AS POSSIBLE TO ME FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH ME NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP B. WIN OF THE FABRIC, ATTACH EACH TIE DIAGONALLY 45 DEGREE THROUGH THE FABRIC. WIN EACH PUNCTURE AT N LEAST I NCH VHTENE T APART. EACH G SHOULD BE POSRKMEp TO TANG ON A POST NIPPLE WHEN TOWERED TO PREVENT SAGGING. Q WRAP APPROX V. ATELY6NCNB OF FABRIC AROUND THE END POSTS AND SECURE WITH E. J. NO MORE THAN 24 RICHES OF HEC FED FABRIC 6 ALLOWED CORRECTED F R AN GROUND LEVEL B. THE INSTALLATION SHOULD BE CHECKED AND CORRKTED FORAM DEVIATION BEFORE COMPACTION. & MAINTENANCE I. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2 SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE. TEAR, DECOMPOSE OR BECOME INEFFECTIVE. REPLACE R PROMPTLY. J. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAN AND TO REDUCE PRESSURE ON ME PENCE. TAKE CARE TO AVOID MNDERMIF WG THE FENCE DURING CLEANOW. 4, REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT CROWS AND BRING ME ARM TO GRADE AND STABBUE IT AFTER THE CONTRIBUMWG DRAINAGE ARM HAS BEEN PROPERLY STABILIZED. TEMPORARY DIVERSION (REFER TO DETAIL E): AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009" SECTION 6.20 I. DEFINITION: TEMPORARY RIDGE OR EXCAVATED CHANNEL OR COMBINATION RIDGE AND CHANNEL CONSTRUCTED ACROSS SLOPING LAND ON A PREDETERMINED GRADE 2 PURPOSE TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF. AND TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS, 3. CONDITIONS WHERE PRACTICE APPLE: • ABOVE DISTURBED EXISTING SLOPES, AND ABOVE CUT OR FILL SLOPES 10 PREVENT RUNOFF OVER MESLOPE: • ACROSS UNPROTECTED SLOPS, AS SLOPE BREAKS. TO REDUCE SLOPE LENGTH: • BELOW SLOPE TO ONERT EXCESS RUNOFF TO STABILVED OUTLETS: • WHERE NEEDED TO COVERT SEDWENTiADEN WATER TO SEDIMENT TRAPS: • AT OR NEAR ME PERIMETER OF THE CONSTRUCTION AREA 10 KEEP SEDIMENT FROM LEAVING ME SITE; AND -A VE DISTURBED AREAS BEFORE STABILIZATION TO PREVENT EROSION. AND MANTAIN ACCEPTABLE W ORKNG CONDITIONS. • TEMPORARY DIVERSIONS MAY ALSO SERVE AS SEDIMENT TRAPS WNW THIS SITE HAS BEEN OVER EXCAVATED ON A FLAT GRADE. THEY MAY ALSO BE USED N CONJUNCTION WITH A SEDIMENT PENCE. 4. PLANNING CONSIDERATIONS: A. PLAN TEMPORARY DIVERSIONS TO FUNCTION I YEAR OR MORE. OR THEY MAY BE CONSTRUCTED ANEW AT THE END OF EACH DAY'S GRADNG OPERATION TO PROTECT NEW FILL DNERSONS MAT ARE 10 SERVE LONGER THAN 30 WORKING DAYS SHOULD BE SEEDED AND MULCHED AS SOON AS THEY ARE CONSTRUCTED TO PRESERVE DKE HEIGHT AND REDUCE MA NTENANCE. B. W HERE DESIGN VELOCITIES EXCEED 2 RISEC, A CHANNEL LINER 6 USUALLY NECESSARY TO PREVENT EROSION. C. TEMPORARY DIVERSIONS MAY SERVE AS N4'LACE SEDIMENT TRAPS IF OVEREKCAVATED 1 TO 2 FEET AND PLACED ON A NEARLY FLAT GRADE ME DIE SERVES TO DIVERT WATER AS ME STAGE INCREASES. A COMBINATION SILT FENCE AND CHANNE IN WHICH FILL FROM ME CHANNR 6 USED TO STABILIZE THE FENCE CAN TRAP SEDIMENT AND DIVERT RUNOFF SRAUITANEOUSLY. 5. CONSTRUCTIONSPECECATIONS: 1. REMOVE AND PROPERLY DEPOSE OF ALL TREE, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL 2 ENSURE THAT THE MNUNJM CONSTRUCTED CROSS SECTION MEETS ALL DEIGN REQUIREMENT` 3. ENSURE THAT THE TOP OF ME DIKE 6 NOT LOWER AT ANY POINT MAN THE DESIGN ELEVATION PLUS THE SPEC RED SETTLEMENT. L PROVIDE SUFFIC IENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING A NO CLEANOW 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION. UNLESS R WILL REMAIN IN PLACE LESS THAN W WORKING DAYS, 6. INSPECT TEMPORARY DNERSONS ONCE A WEEK AND AFTER EVERY RANFALL IMMEDIATELY REMOVE SEDIMENT FROM ME ROW ARM AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED 6 PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNELTO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE B. TEMPORARY STREAM CROSSING (REFER TO DETAIL F): AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009" SECTION 6.70 1. DEFINITION: BRIDGE, FORD OR TEMPORARY STRUCTURE INSTALLED ACROSS A STREAM OR WATERCOURSE FOR SHORT-TERM USE BY CONSTRUCTION VEHCLB OR HEAVY EQUIPMENT. 2 PURPOSE TO PROVIDE A M W FOR CONSTRUCTION VMCLB TO CROSS STREAMS OR WANE OURSB WITHOUT MOVING SEDIMENT INTO STREAMS, DAMAGING THE STRFAMBED OR CHANNEL, OR CAUSING FLOODING. 3. CONDITIONS WHERE PRACTICE APPLIES: WHERE HEAVY EQUIPMENT MUST HE MOVED FROM ONE SIDE OF A STREAM CHANNEL TO ANOTHER, OR WHERE LGHTGMY CONSTRUCTION VEHICLES MUST CROSS THE STREAM CHANNEL FREQUENTLY FOR A SHORT PERIOD OF TIME. 4. DESIGN CRITERIA: A. THE ANTICIPATED LFE OF A TEMPORARY STREAM CROSSING STRUCTURE S USUALLY CONSIDERED TO BE I YEAR OR LESS REMOVE THE STRUCTURE IMMEDIATELY AFTER IT 6 NO LONGER NEEDED. B. DBGN STRUCTURE TO PASS BANKFULL ROW OR PEAK FLOW WITHOUT OVERIOPPING. ENSURE THAT NO EROSION WILL RESULT. C. ENSURE THAT DESIGN ROW VELOCITY AT THE OWLET OF THE CROSSING STRUCTURE 6 NOWEROSNE FOR THE RECEIVING STREAM CHANNEL. D. PROVIDE PROTECTED OVERFLOW AREA. 5. CONS UCTIONSPECFCATONS: A. KEEP CLEARING AND EXCAVATION OF ME STREAM BANKS AND BED AND APPROACH SECTIONS TO A MINIMUM. B. DIVERT ALL SURFACE WATER FROM THE CONSTRUCTION SITE ONTO UNDISTURBED AREAS ADJOINING THE SCREAM C. KEEP STREAM CROSSINGS AR RIGHT ANGLES TO THE STREAM FLOW. D. ALIGN ROAD APPROACHES WITH THE CENTER LINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FEE RAGE BRIDGE ABUTMENTS AND CULVERT FILLS A MINIMUM OF I FOOT ABOVE ME ADJONNG APPROACH SECTIONS TO PREVENT EROSION FROM SURFACE RUNOFF AND TO ALLOW ROOD ROWS TO PASS AROUND THE STRUCTURE E. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER, INC LUDNG PUNNED OVERFLOW AREAS, W ON RPRAP OR OTHER SUITABLE MEANS IF DESIGN VELOCITY EXCEEDS ME ALLOWABLE FOR THE N -0LACE SOTS. F. ENSURE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO IT$ ORIGINAL CROSSSECTON, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. G. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO ITS ORIGINAL CROSSSECTOK AND SMOOTH AND APPROPRW TRY STABILIZE ALL DISTURBED AREAS. H. ANY IN -MEAM SEDIMENT CONTROL MEASURES MUST BE REMOVED UPON STABILIZATION OF THE AREA. 6. MANTENANCE: INSPECT TEMPORARY STREAM CROMNGS AFTER RUNOFF- PRODUCNG RAMS TO CHECK FOR BLOCKAGE N CHANNEL EROSION OF ABUTMENTS. CHANNEL SCOUR, WRAP DISPLACEMENT, OR PING. MAKE ALL REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE TO ME INSTALLATION. CONSTRUCTION ROAD STABILIZATION (REFER TO DETAIL D): AS REFERENCED FROM "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE I, 2006, LAST REVISED MARCH 2009" SECTION 6.80 I. NT HE OF TEMPORARY CONSTRUCTION TIONP ACCESS ROUTES . OTI SIZE`lEHIL'lE TRANSPORTATION ROUt6, AND CONSTRUCTION PARKING AREAS. 2. PURPOSE TO CONTROL EROSION ON TEMPORARY CONSTRUCTION ROUTS. 1 CONDITIONS WHERE PRACTICE APPLIES: ALL TRA RIC ROUTES FOR TEMPORARY LOSE BY CONSTRUCTION TRAFFK. 4. CONSTRUCTION SPECIFICATIONS: I. CLEAR ROADBEDOFALLVEGEATION, ROOTS. AND OTHER OBJECTIONANEMAIERAL. 2 ENSURE MAT ROAD CONSTRUCTION FOLLOWS THE NATURAL CONTOURS OFTHETERRAN. 3. LOCATE AREAS ON NATURALLY RAT ARMS. KEEP GRADES SUFFICIENT FOR DRANAGE BUT GENERALLY NOT MORE THAN 2 TO SOL 4. PROVIDE SURFACE DMNAGE AND DIVERT EXCESS RUNOFF TO STABLE ARMS BY MING WATER BARS OR TURNOUTS. 5. KEEPCUMAND R1SAT210R RAURFORSAFETYANDSTABMYANDTOFACILVATE ESTABLISHMENT OF VEGETATION AND MAINTENANCE 6 SPREAD A -CH COURSE OF•ABC° CRUSHED STONE EVENLY OVER THE W LL WIDTH OF THE ROAD AND SMOOTH TO AVOID DEPRESSION. 7. WHERE SEEPAGEARMSORSEASONALLYWEAREASMW STBECROSSED,IWTALL SUBSURFACE DRAM OR GEOTEXTLE FABRIC CLOTH BEFORE PLACING THE CRUSHED STONE 8. VEGETATE ALL ROADSIDE DITCHES, CUM. HUS. AND OTHER DISTURBED ARMS OR OTHERWISE APPROPIMMLY STABILIZE AS SOON AS GRADING 5 COMPLETE R. PROVIDEAPPROPR MSEDIMENTCONIROLMEASURBIOPREVEMOfFSOE SEDIMENTATION. 5. MA IMENANCE: INSPECT CONSTRUCTION ROADS PERIODICALLY FOR CONDITION OF SURFACE TOPDRES$ W ITH NEW GAVEL AS NEEDED. CHECK ROAD DITCHES AND OTHER SEEDED ARMS FOR EROSION AND SEDIMENTATION AFTER RUNOFF- PRODUCNG RAMS. MAINTAIN ALL VEGETATION IN A HEALTHY. VIGOROUS CONDITION. SEDUMENT- PRODUCING AREAS SHOULD BE TREATED IMMEDIATELY. DUST CONTROL: AS REFERENCED FROM - EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DATED JUNE 1, 2006, LAST REVISED MARCH 2009` SECTION 6.84 1. DEFINITION: THE CONTROL OF DIRT RESULTING FROM LAND- DISTURSNG ACMI ES. 2. PURPOSE TO PREVENT SURFACE AND AIR MOVEMENT OF DL61 FROM DISTURBED SOL SURFACES THAT MAY CAUSE ORSRE DAMAGE, HEALTH HAZARDS. AND TRAFFIC SAFETY PROBIMR. 3. CO DOOM WHERE PRACTICE APPLIES- ON CONSTRUCTION ROUTES AND OTHER DISTURBED AREAS SUBJECT TO SURFACE DUST MOVEMENT, AND DUST SLOWING WHERE OFFSOE DAMAGE MAY OCCUR IF DUST 6 NOT CONTROLLED. L CONSTRUCTION SPECIFICATIONS: A. VEGRATIVE COVER - FOR DISTURBED AREAS NOT SUBJECT TO TRAFFIC. VEGETATION RROVDE THE MOST PRACTICAL METHOD OF DUST CONTROL B. MULCH INCLUDING GRAVEL MULCH) -MULCH OfFERS A FAST, EFFECTIVE MEANS OF CONTROLLING DUST. C. SPRAY -ON ADHESIVE- SPRAY-0 ADHESIVES FOR USE ON MINERAL SOILS, SEE TABLE BROW. D. CALCIUM CHLORIDE- APPLIED MECHANICAL SPREADER AS LOOSE. DRY GRANULES R RAKE AT A RATE THAT KEEPS THE SURFACE MOIST, BUT NOT SO HK(S11 AS TO CAE WATER POLLUTION OR PUNT DAMAGE. E. SPRINKLING -ME SUE h O BE SPRINKLED UNTIL ADS SURFACE 6 WET. SPRINKLING 6 ESPECIALLY ERECT NE FOR DUST CONTROL ON HAUL ROADS AND OTHER TRAFFIC ROUTES F. STONE- USED TO STABBUE CONSTRUCTION ROAM. G. BARRIERS- BOARD FENCE, WIND FENCE, SEDIMENT FENCE. OR SIMILAR BARRIER TO CONTROL AIR CURRENTS AND NOW W G SOIL. BARRIER TO BE PUCE PERPENDICULAR TO PREVAILING AIR CURRENTS AT INTERVALS ABOUT 15 TIMES THE BARBER HEIGHT. H. TILLAGE- DEEP PLOW URGE OPEN UNDISTURBED ARMS AND BRING CLODS TO THE SURFACE THIS 6 A TEMPORARY EMERGENCY MEASURE THAT CAN BE USED AS SOON AS SOIL BLOWING STARTS, BEGIN FLOWING ON ME W NDW ARD EDGE OF THE SITE. MAINTENANCE MAINTAIN DUST CONTROL MEASURES THROUGH DRY WEATHER PRODS UNIX ALL DISTURBED ARMS HAVE BEEN STABILIZED. CALL BEFORE YOU DIG! NORTH CAROLINA LAW REQUIRES MINIMUM 2 WORKING DAYS NOTICE PRIOR TO EXCAVATION - STOP CALL NORTH CAROLINA ONE -CALL CENTER REFERENCE NC G.A. SECTION I, CHAPTER 87. ARTICLE 3 1- 800 -632 -4949 PROJECT NOTES I. TOPOGRAPHIC SURVEY INFORMATION OBTAINED FROM JEFFREY L CAISON. PLS, DENTON, NC, JANUARY 18, 2012. 2. HORIZONTAL DATUM IS NORTH AMERICAN DATUM OF 1983 (NAD83), FEET. VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET. REVISIONS STATE OF NORTH CAROLINA CERTIFICATE OF AUTH. NO.: 201106700411 -1 MARY L. PAIST - GOLDMAN Professional Engineer NC Lic. No. 037626 DATE PN SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGSIDES, NEW JERSEY 08551 PHONE. 908.237,5660 FAX. 908.237.5666 W W W. P RINCETONHYDRO. C OM PROJECT NAME /LOCATION: LASSITER MILL DAM REMOVAL U W HARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: SOIL EROSION AND SEDIMENT CONTROL NOTES DATE 01/20/2012 PROJECT NO, 1213.001 s AS SHOWN LC JH SHEET NO. 7 7 OF WATER DILUTION TYPEOFNO121E APPLY (GALLONS/ACRE) ANIONIC ASPHALT EMULSION 7:1 COARSESPRAY 1,200 LATEX EMULSION 12.5:1 FINE SPRAY 235 RESIN IN WATER 4:1 FNESPRAY 300 D. CALCIUM CHLORIDE- APPLIED MECHANICAL SPREADER AS LOOSE. DRY GRANULES R RAKE AT A RATE THAT KEEPS THE SURFACE MOIST, BUT NOT SO HK(S11 AS TO CAE WATER POLLUTION OR PUNT DAMAGE. E. SPRINKLING -ME SUE h O BE SPRINKLED UNTIL ADS SURFACE 6 WET. SPRINKLING 6 ESPECIALLY ERECT NE FOR DUST CONTROL ON HAUL ROADS AND OTHER TRAFFIC ROUTES F. STONE- USED TO STABBUE CONSTRUCTION ROAM. G. BARRIERS- BOARD FENCE, WIND FENCE, SEDIMENT FENCE. OR SIMILAR BARRIER TO CONTROL AIR CURRENTS AND NOW W G SOIL. BARRIER TO BE PUCE PERPENDICULAR TO PREVAILING AIR CURRENTS AT INTERVALS ABOUT 15 TIMES THE BARBER HEIGHT. H. TILLAGE- DEEP PLOW URGE OPEN UNDISTURBED ARMS AND BRING CLODS TO THE SURFACE THIS 6 A TEMPORARY EMERGENCY MEASURE THAT CAN BE USED AS SOON AS SOIL BLOWING STARTS, BEGIN FLOWING ON ME W NDW ARD EDGE OF THE SITE. MAINTENANCE MAINTAIN DUST CONTROL MEASURES THROUGH DRY WEATHER PRODS UNIX ALL DISTURBED ARMS HAVE BEEN STABILIZED. CALL BEFORE YOU DIG! NORTH CAROLINA LAW REQUIRES MINIMUM 2 WORKING DAYS NOTICE PRIOR TO EXCAVATION - STOP CALL NORTH CAROLINA ONE -CALL CENTER REFERENCE NC G.A. SECTION I, CHAPTER 87. ARTICLE 3 1- 800 -632 -4949 PROJECT NOTES I. TOPOGRAPHIC SURVEY INFORMATION OBTAINED FROM JEFFREY L CAISON. PLS, DENTON, NC, JANUARY 18, 2012. 2. HORIZONTAL DATUM IS NORTH AMERICAN DATUM OF 1983 (NAD83), FEET. VERTICAL DATUM IS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), FEET. REVISIONS STATE OF NORTH CAROLINA CERTIFICATE OF AUTH. NO.: 201106700411 -1 MARY L. PAIST - GOLDMAN Professional Engineer NC Lic. No. 037626 DATE PN SCIENTISTS AND ENGINEERS 1108 OLD YORK ROAD, SUITE 1 P.O. BOX 720 RINGSIDES, NEW JERSEY 08551 PHONE. 908.237,5660 FAX. 908.237.5666 W W W. P RINCETONHYDRO. C OM PROJECT NAME /LOCATION: LASSITER MILL DAM REMOVAL U W HARRIE RIVER NEW HOPE TOWNSHIP RANDOLPH COUNTY, NORTH CAROLINA DRAWING NAME: SOIL EROSION AND SEDIMENT CONTROL NOTES DATE 01/20/2012 PROJECT NO, 1213.001 s AS SHOWN LC JH SHEET NO. 7 7 OF