Loading...
HomeMy WebLinkAboutGW1-2021-01083_Well Construction - GW1_20210210 �a WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: I.Well Contractor Information: Joseph Bailey 14.WATERZONES FROM TO DESCRW x weh ro Comrecr Name a D. a 3271-A 9 " G fL Sin•U r4 C VIC 2Me NC Well Contractor Certification Number IS.OUTERCASING for Aal4-rase4w OA I.iNER sfa A B & K Well Drilling Inc FROM TO DIAMETEK lean-w .CS MATERIAL p ft. ��oZ a 6 114 m SDR-21 IPVC Company Name ,/ I&INNER CASING OR'TBBINsa -- N� FROM TO DIAMETER THICKNESS MATERIAL con 2,Well Construction Permit#: R ft. in. Lin all avvlicnb/e..ri/omunvrrimi permitt li.e.L'fC.Cmmrv.Srore.✓nrmnce,rmJ t it. a 3.Well Use(check well use): 17,SCREEN n. Wal r Supply Well: FROM TO DIAMETER SLOTSIZE THICKNESS MATERIAL gricultural Municipal/Public It. f ft.. in. ❑G/eothenmal(Heating/Cooling Supply) MResidential Water Supply(single) fL h s. i Rtndus[rial/eommacial ❑Residential Water Supply(shared) I&GROUT -`- ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD dv ANOUNT ❑Imi anon p IL 20 it. Bentonite Pour Non-Water Supply Well: ❑Monitoring ❑Recovery fL IL Injection Well: fL ft. ❑Aquifer Recharge ❑Groundwater Rcincdianon 19.g,Wp/GRAVEI,PAfK MATEp1Al. EMPIACF.MENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier mom fL TO It. OAquifer Test ❑Stormwater Drainage R ❑Experimental Technology ❑Subsidence Control _ OGeothermal(Closed Loop) ❑Tracer 2o:DRQ.1�'1GIAG(ati adbGevalabxrotr FROM TO D TION(sabr,hareeess,rwpr^ta a,,es.)OGwthermal(Hcaling Cooling Rcmm) ❑Odtcr(cxplainundcr#21 Remarks) O fc fL / 4.Date Well(s)Completed: //9 err WeII ID# 0 IL rL kIn IL on:5a.Well Sh. rL ,�ni5 �Oa/ < i ,)ft. +t. n Facility/Owner Namc FamlirylDs(fapp1mablc) (/ le77e d,, fL f IL ft Physical Ad s, ry.and Zip /fin County Parcel ldcmifieaum No.(PTN) f 5b.Latitude and longitude in degrees/minutesbcconds or decimal degrees: gtj . eon ( mvT� o d e TIi � (if well field,one la✓long is suf ici at) 22.Certification: N W stare of C i and all Contra mr Dam 6.Is(are)[he well(s): ,moment or OTemporary p eiR^mg,his/orm./hereks 716 rhar the ur/l/d u'as(were)consrnrned in aorordmn-e wish /' 15.1 h'CAC 02C 0100 ar 15A NCAC 02C 0200 Weil Cmrrnvcnaa Standards and rhar a cop, Jf Is this irepair to an neat wellting ❑Yes m d njrnis.e,rd/ms bee^prm',ded..the w,11 awtmr. /jnc�r is a repair,fill our bin.+�well rommrorinn information and esplain the nave of de repmr under=21 remark,section or on the back of tbir form 23.Site diagram or additional well details: You may use the back of this page to provide additional well construction info 8.For Geoprobe(DPT or Closed-Loop Geothermal Wells he s ^ cid'Sce Ovd in Remarks Box).You may also attach additional pages if necessary. conm stctioq only I GW-1 is needed. Indicate TOTAL NUMB ells / c.s� 4.SUBMITTAL INSTRUCTIONS drilled. 9.Total well depth below land surface: (it') Submit this GW-1 within 30 days of well completion per the following: Far mrdriple wells to,all depdrs rjdp rem(r=amvle-3@20n and 2910a) 40 24a. For All Wells: Original form to Division of Water Resources (DWR), 10,Static water level below top of casing: (TO Information Processing Unit,1617 MSC,Raleigh,NC 2 7699-161 7 f/wmer level it aburc rasing.use 6 1/18 24b. For Injection Wells:Copy to DWR,Underground Injection Control (TUC) 11.Borehole diameter (m-) Program, 1636 MSC,Raleigh.NC 27699-1636 (i Well construction method: a Air Rotary 24c.Forwater Supply d Op -Loop G othermal Return Wells:Copy to the 1 i.e.auger,rotary,cable,direct push,etc ty.) coun environmental health department of the county whore installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells pod a over 100 000 Grp:Copy to DWR,CCPCUA 13a.Yield(fpm) Method of test: Air Lift Permit Program,1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: or. Tabs Amount: 1 112 Lbs Rcvisnib6-2018 Fona GW-1 None Carolina Dcpanment of Environmcnml Quality-Division ofwarcr Rreourcc