HomeMy WebLinkAbout20110547 Ver 1_Certification of Completion_20121019 f
Certificate of Completion
DWQ Project No k- QS L 1 County U`�W criliQ o/4,4. a20I
q
Applicant c.00� ro,� �/ry
Project Name se
tfycy
Date of Issuance of 401 Water Quality Certification c.\ _
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules
and any subsequent modifications the applicant is required to return this certificate to the
401/Wetlands Unit North Carolina Division of Water Quality 1621 Mail Service Center Raleigh
NC 27699 1621 This form may be returned to DWQ by the applicant the applicant s authorized
agent or the project engineer It is not necessary to send certificates from all of these
Applicant's Certification
I S(`�`' E6� 0v b hereby state that to the best of my abilities due care and
diligence ■ t used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules the approved plans and specifications and other supporting materials
Signature 10 Date `,\ 0 C aO 12-
Agent's Certification
I hereby state that, to the best of my abilities due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules the approved plans and specifications and other supporting materials
Signature Date
If this project was designed by a Certified Professional
I as a duly registered Professional
(i e Engineer Landscape Architect Surveyor etc ) in the State of North Carolina having been
authorized to observe (periodically weekly full time)the construction of the project for the
Permittee hereby state that to the best of my abilities due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans
and specifications and other supporting materials
Signature Registration No Date