Loading...
HomeMy WebLinkAbout20120118 Ver 1_More Info Requested_20121019Strickland, Bev From: Homewood, Sue Sent: Friday, October 19, 2012 1:46 PM To: Aden Stoltzfus Cc: Strickland, Bev; Dennison, Laurie Subject: RE: Triad Baptist Church Aden, I received the stormwater plans. If you haven't already done so, please send a 2" copy to our office in Raleigh, and send an electronic copy to Bev Strickland (cc'd on this email) if possible. Be sure to reference DWQ 12 -0118 when you send the plans over. Thanks. Sue Homewood NC DENR Winston -Salem Regional Office Division of Water Quality 585 Waughtown Street Winston - Salem, NC 27107 Voice: (336) 771 -4964 FAX: (336) 771 -4630 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Aden Stoltzfus [ mai Ito: astoltzfus22(a)gmail.com] Sent: Wednesday, October 17, 2012 3:53 PM To: Homewood, Sue Subject: RE: Triad Baptist Church Sue, I am sending plans and calculations approved by the Town of Kernersville to your office. Please note that Town of Kernersville will not issue a formal approval on letterhead until the pond surety is posted. This is the only item remaining. I will forward the approval letter as soon as this is received. Ana laramillo with the Town of Kernersville has been our direct contact with the Town if you have any questions with regards to the approval process. The limits of disturbance in accordance with the permit and approved erosion control plan have been flagged in the field. We are scheduling a pre- construction meeting for Monday, October 22nd at 8:30 AM in case you are available and wish to come. Please note that during the initial stage of construction the creek will not be disturbed until we receive confirmation from your office or another pre- construction meeting as applicable. If your schedule allows, please advise if you could make the meeting on Monday or advise of another time to meet for another construction meeting. Please call me at (336) 908 -1371 with any questions. Aden R. Stoltzfus, PE SEI- Stoltzfus Engineering, Inc. Civil Consulting Engineers 1009 Lisa Run Drive Kernersville, NC 27284 Cell: (336) 908 -1371 astoltzfus22 @gmail.com From: Homewood, Sue [ mailto:sue.homewood@ncdenr.gov] Sent: Tuesday, September 11, 2012 9:18 AM To: Aden Stoltzfus Subject: RE: Triad Baptist Church Once Kernersville has approved the stormwater plan then you'll need to send it to us, BEFORE the impacts occur at the project. Thanks for checking. Sue Homewood NC DENR Winston -Salem Regional Office Division of Water Quality 585 Waughtown Street Winston - Salem, NC 27107 Voice: (336) 771 -4964 FAX: (336) 771 -4630 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties.