HomeMy WebLinkAbout20061804 Ver 4_More Info Received_20121018•N
'w E'� BURDETTE LAND CONSULTING, INC.
10212 Creedmoor Road - Raleigh, North Carolina 27615
Telephone (919) 841 -9977 — Fax (919) 841 -9909
S
October 18, 2012
Mr. Ian McMillan
c/o Wetlands, Buffers, Stormwater Compliance
and Permitting Unit
NC Division of Water Quality
512 N. Salisbury Street
Raleigh, North Carolina 27604
RE: Additional Information Response
Peachtree Phase Two
Clayton, Johnston County, North Carolina
AID #: SAW- 2008 -01712
DWQ Project #: 20061804, V4
BLC Project #: 11362
Dear Mr. McMillan:
��T 18
We received your agency's letter dated October 12, 2012 requesting revisions to the Buffer
Impact Map submitted with the subject project application to improve clarity. Each request is
restated and addressed below. The attached Buffer Impact map has been revised to address the
items listed below.
Please re- submit site plan labeled "Buffer Impact Map " on a full plan sheet at a scale of no
smaller than I " =50' with topographic contours shown.
The attached, revised Buffer Impact Map is a full plan sheet at a scale of 1 " =50'.
2. Please locate all isolated or non - isolated wetlands, streams, and other waters of the State as
overlays on the site plan.
Wetlands and streams present on the site were changed to black lines to distinguish them from
the topographic contours on the attached, revised Buffer Impact Map.
Mr. McMillan
BLC Project #: 11362
October 18, 2012
3. Please enumerate all riparian buffer impacts on the site plan and clearly label impacts
(Buffer Impact 1, etc.).
Buffer Impacts B -1 and B -2 have been labeled on the attached, revised Buffer Impact Map.
4. Please locate all of the protected riparian buffers as overlays on the site plan, clearly
showing Zone 1 and Zone 2.
Revisions to the line colors on the attached, revised Buffer Impact Map have improved the
clarity of the protected riparian buffers including Zone 1 and Zone 2.
Please do not hesitate to call me at (919) 841 -9977 if you have any questions about the
documentation provided.
Sincerely,
Burdette Land Consulting, Inc.
Jennifer A. Burdette
Environmental Specialist
Attachments
Buffer Impact Map — 10/16/12
c: Lennar Carolinas, LLC c/o Doug Radford — JPM South Development
Kevin Varnell — Stocks Engineering, PA
Thomas Brown - USACE
I1 14 1 IIIItIIB/ ... ......... .... ..... . 'k IMPAC"T . ... . .... .. ISTREAM . .... ..... NONBUFFEIRED BUFFER tN& 1445& uj
\\77 II10 lks, IIcell tt14
II_7�5 ZONE 2 �o -E VS D NO IMPA. C t5, P R_ IMPA C 17� -INSTALLE ---HY TO .-BE D ,J9 BORIN G- --76-,,, 73 2 'I I-r, 0 Lj
N
E- ----- 8 II. . . ....... LLJ
\,7LA4YD$ I7 -77 -7/)' 7 IIII1,701i WE -SING Z864 Sq.'Ft---, CROS IMPAC T S 0 A AERIAL:, EWE xi / � / / V� ZONE a R 10 $ 0
HIE -59 0, A tAt( IIs/j/11 -- - ----
H 6�9 . . ...... ..
IIiII68 loft
4'9 - . 11 i I58 IILLA
0.1 .0000001;�� I0 0 66 ------- - ---- -------- IIo< 00 A-46 I167 2 <
10011,
IIIC, II50 6 I_57 62 A c. I----------- IIIII5 I-- -- - ------ 0 E VEL ISP, EC S IANDS
156 Q IL 65 .......... -6 W� IIN-,\PHA Oi A L cdh 7)�Uc to f
_44 23 - --- -- Kf II52 B 6 I64 W IIIII24 - E E I55 EAC AS-E Izol tA c� . 4 I4j 26 5 v 2 IZON v 52( �'T 28 4 ------ CO3
......... II7 29 - tI30, I7 - --- -- ----- IIIII'00' Ic*
J I 4 III�32 III- -- ------- IIJ 1 4 _40 IIIIA II6 7, IA I00
0)
0) OD
tn
7 Iu') j C'4
to
N
Iuj to
IW
uj Ntusl� m
BUFF8R uj ZONE 2 IMPA T C 'g- tl Ioil! --- ------ - tIm B, V IIIItLu
-7 tu')
i co
ZONE 1 uj (o
C-4
IIMPACT ----------- I669 Sq. Ft. ------'-'-'REVISED 1 0-1 6-1 2 I C 41RO, I I4i w
Al ui P� SCALE: Ill 50 8 -3 7 8-1-1-12 0- Z
0 50 100 15 0 IP\E H//, Ft /mp
III