HomeMy WebLinkAbout20210644 Ver 1_Pre-Filing Acknowledgement Email_20210330Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, March 30, 2021 3:50 PM
To: Allen, Yates
Cc: Mitchell, Robert K
Subject: Pre -Filing Meeting Request Acknowledgement - NC 208 road improvements -
20210644 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for NC 208 road improvements that you submitted on (date). The ID number for that project is
20210644, Version 1.
Reviewer Contact Information:
Reviewer: Robert Mitchell
Reviewer Email: kevin.mitchell@ncdenr.gov
Reviewing Office: Asheville Regional Office - (828) 296-4500
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210644
Version *
1
Asheville Regional Office - (828) 296-4500
Kevin Mitchell
Pre -Filing Meeting Request submitted 3/25/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Is this a transportation project?*
Yates Allen
ryallen@ncdot.gov
NC 208 road improvements
NC DOT
Madison
Street Address
55 Orange St
Address Line 2
City State / Rovince / Region
Asheville NC
Fbstal / Zip Code Country
28801 USA
a Yes r No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes a No
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below.*
Project is increase safety along a section of NC 208 in Madison
County by adding guardrail and paved width (approximately 2 feet)
where possible. Project would require existing crosspipes to be
replaced and/or lengthened in several locations.
Please give a couple of dates you are available for a meeting.
4/14/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Y,441Igpf
Submittal Date 3/25/2021