Loading...
HomeMy WebLinkAbout20100251 Ver 3_Site Plan_20121016E m N N ci Im Q m Im m Q LTL"- H*4LFZNETT HE*Ak STC)FZRA VVATEFZ NVEST(:)FZS LLC CONSTRUCTION PLANS TOWN OF LILLINGTON HARNETT COUNTY, NORTH CAROLINA JUNE 2012 REVISIONS AS NOTED ON INDIVIDUAL SHEETS SITE INFORMATION PROJECT NAME SKILLED NURSING FACILITY OWNER: HARNETT FORWARD TOGETHER COMMITTEE PO BOX 1270 LILLINGTON, NC 27546 DEVELOPER HARNETT HEALTH INVESTORS LLC 4423 PLEASANT RIDGE ROAD SUITE 301 ROANOKE, VA 24014 540- 774 -7762 CONTACT ANDREW CHESTER DEVELOPMENT COORDINATOR ENGINEER C. T. CLAYTON Sr., P.E., Inc. 46 WEST WASHINGTON STREET COATS, NC 27521 910 -897 -7070 CONTACT C. TYRUS, CLAYTON, Jr., PE SURVEYOR STREAMLINE LAND SURVEYING, INC. 870 NC 55 W COATS, NC 27521 910- 897 -7715 CONTACT ROBERT E. GODWIN, PLS PIN 0650 -79- 1646.000 BUILDING SF : ±45,000 DEED REFERENCE . DEED BK. 2252, PG. 911 CURRENT ZONING . IND LOCATION : LOT No. 4r BRIGHTWATER MAP BOOK 2012, PG. 365 -366 HARNETT COUNTY, NC SEWER SERVICE HARNETT COUNTY WATER SERVICE HARNETT COUNTY DISTURBED AREA 5.5 AC., INCLUDING OFFSITE STOCKPILE AREA UNDISTURBED AREA 61,045 SF (1.40 AC.) IMPERVIOUS AREA 117,212 SF (AC.) = 41.5% TOTAL AREA . 282,361 SF (6.49 AC.) FEMA FLOOD ZONE X (3720064000 J Oct. 3, 2006) TOTAL PARKING . 80 REQUIRED - 81 SHOWN LAND USE CONTINUING CARE INDEX OF DRAWINGS COVER SHEET - EXISTING CONDITIONS EXISTING CONDITIONS SURVEY ................................ ............................... C100 SITE SITEPLAN ........................ ............................... I ..... ....................111.1...... C200 CIVILDETAILS ........................................................ ............................... C201 CIVILDETAILS 2 ...................... ............................... 1111........................... C202 WATER AND SEWER PLAN ........................................ ............................... C300 EROSION AND SEDIMENT CONTROL EROSION AND SEDIMENT CONTROL PLAN PHASE 1 ....... ............................... C400 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 ....... ............................... C401 EROSION AND SEDIMENT CONTROL DETAILS ............... ............................... C402 EROSION AND SEDIMENT CONTROL DETAILS ............... ............................... C403 EROSION AND SEDIMENT CONTROL NOTES ................. ............................... C404 DRAINAGE AREA MAP ............................................. ............................... C405 RUNOFF CALCULATIONS ......................................... ............................... C406 SWALE, SEDIMENT BASIN, AND OUTLET PROTECTION CALCULATIONS ............. C407 STORM WATER AND GRADING GRADING AND DRAINAGE PLAN ................................ ............................... C500 STORM WATER BMP PLAN ....................................... ............................... C501 LANDSCAPING LANDSCAPE PLAN ................................................. ............................... C600 LANDSCAPE DETAILS ............................................. ............................... C601 FOR HCPU UTILITY CONSTURCTION NOTES SEE SHEET C303 ONE CALL CENTER CALL: NORTH CAROLINA ONE CALL CENTER 1- 800 -632 -4949 - AT LEAST 48 HOURS BEFORE DIGGING OR EXCAVATION TO LOCATE ALL EXISTING UTILITIES. C VICINITY MAP - NOT TO SCALE GENERAL SITE AND CONSTRUCTION NOTES: 1. EXISTING UTILITY SERVICES ARE NOT TO BE INTERRUPTED PRIOR TO APPROVAL BY THE PROPERTY OWNER AND ENGINEER. TEMPORARY UTILITY SERVICE SHALL BE AVAILABLE DURING INTERRUPTION. A MINIMUM NOTICE OF 72 HOURS IS REQUIRED PRIOR TO INTERRUPTION. WRITTEN PERMISSION FOR INTERRUPTION MUST BE GIVEN PRIOR TO PROCEEDING. 2. ENGINEER DOES NOT GUARANTEE THE ACCURACY OF UTILITIES SHOWN OR THAT ALL UTILITIES ARE SHOWN, ABOVE OR BELOW THE SURFACE. THE CONTRACTOR IS RESPONSIBLE FOR SUBSURFACE UTILITY LOCATION PRIOR TO CONSTRUCTION TO DETERMINE THE EXISTENCE AND /OR EXACT LOCATIONS, BOTH HORIZONTAL AND VERTICAL. CALL "NC ONE CALL" (1- 800 -632 -4949) AT LEAST 48 HOURS PRIOR TO DIGGING OR EXCAVATION, AND CONTACT INDIVIDUAL UTILITY COMPANIES FOR ASSISTANCE IN LOCATION OF UTILITIES. 3. CONTRACTOR SHALL VERIFY THE LOCATIONS AND SIZES OF ALL EXISTING FEATURES PRIOR TO CONSTRUCTION. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED OF ANY DIFFERENCE(S) FROM THAT SHOWN ON THE DRAWINGS. CONTRACTOR SHALL SUBMIT SCALED DRAWING(S) OF THE DIFFERENCE(S) OR FORMERLY UNKNOWN FEATURE(S) TO THE ENGINEER ALONG WITH A WRITTEN REQUEST FOR FURTHER INSTRUCTION AND DIRECTION. 4. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL REPAIR ANY DAMAGES TO EXISTING UTILITIES RESULTING FROM CONSTRUCTION ACTIVITIES. 6. ANY CONCRETE, ASPHALT, CURB & GUTTER OR OTHER TYPE OF PAVEMENT SHALL BE SAW -CUT AT EXTENT OF REMOVAL PRIOR TO THE REMOVAL. CONCRETE ITEMS SHALL BE SAW -CUT AT THE NEAREST CONTROL JOINT TO THE REMOVAL AREA. 7. CONTRACTOR SHALL COORDINATE ANY REQUIRED WORK, RELOCATION, INSTALLATION, OR REMOVAL OF EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY PRIOR TO THE BEGINNING OF CONSTRUCTION. 8. TIE -INS TO EXISTING PAVEMENT SHALL BE FLUSH AND EVEN. WHEN INSTALLING NEW ASPHALT TO EXISTING SURFACES, EXISTING SURFACES SHALL BE COATED WITH ASPHALT SPRAY TACK. 9. ALL ACCESSIBLE ROUTES FROM HANDICAP PARKING SHALL BE MAINTAINED AT A MAXIMUM SLOPE OF 1" PER 20 LINEAR FEET. CROSS SLOPES ON ACCESSIBLE ROUTES SHALL BE A MAXIMUM OF 1/4" PER LINEAR FOOT. THE CURRENT APPLICABLE ACCESSIBILITY CODE SHALL BE FOLLOWED. 10. COORDINATE INSTALLATION OF ANY REQUIRED FIRE APPARATUS WITH THE LOCAL FIRE MARSHALL, BUILDING CODE INSPECTOR, AND FIRE DEPARTMENT PRIOR TO INSTALLATION TO VERIFY LOCAL REQUIREMENTS. 11. FINE -GRADE AREAS TO DRAIN TO INTENDED DRAINAGE STRUCTURES IN ORDER TO PREVENT ANY STANDING WATER. IF THERE IS ANY QUESTION ON THE COMPLETION OF THE FINAL GRADING, THE CONTRACTOR SHALL CONTACT THE ENGINEER PRIOR TO CONSTRUCTION. I Clarta#, Sri / Fa E, T#,cv CIVIL & ENVIRONMENTAL ENGINEERING 46 WEST WASHINGTON STREET COATS, NORTH CAROLINA 27521 PHONE: 910- 897 -7070 FAX: 910 - 897 -6767 License No. C -2570 www.ctclayton.com FINAL DESIGN NOT RELEASED FOR CONSTRUCTION DESIGNED AEB DmwN AEB CHECKED CTC J r. P�oa. ENC. CTC JR. DAM JUNE 2012 CTC PROD. 173001 DWG FM 173001 MAS.dwg SEAL i a e n 028909 r •� a P.E. •�NG)PiE�E =•� � ems.° DATE 0 sm H W 0 0 c+� ti e-- 113; S N in s 0 M c� U 0 0 t*} i• Ca E a U ar m a- U) M I- a Control Point #3 Mag Nail In sidewalk N: 609598.60 E: 2056022.89 El: 169.216 (NAVD -29) Positional Tolerances: Horizontal = 0.018 Vertical = 0.020 Fire Hydrant NW FLANGE BOLT Elev: 171.76 60 0 60 120 180 GRAPHIC SCALE - FEET SSMH #21 0174.83 CONDITIONS & TOPO SURVEY kDJUSTED TO NAVD -1929) )T 4 — BRIGHTWATER^-, HNOLOGY AND MEDICAL CENTER 0 a N M 00 Q a Z a_ Of C7 U Z FOWARD TOGETHER COMMITTEE MAY 21 , 2012 SURVEY FOR: T. Clayfon,Sr., P.E. SURVEY BY: MLINE LAND SURVEYING Robert E. Godwin, Jr., PLS '0 NC 55 W, Coats, N.C. 27521 910 -897 -7715 Fax: 910- 897 -7284 DRAWING FILE: \0650 \120521 CT_NAVD29.DWG General Notes 1. THIS SHEET (C100) REPRESENTS THE EXISTING CONDITIONS SURVEY PERFORMED AND FURNISHED BY STREAMLINE LAND SURVEYING, INC., 870 NC 55 W, COATS, NC. THE ORIGINAL SIGNED AND SEALED PLAT IS ON FILE IN THE OFFICE OF THE SURVEYOR. C. T. CLAYTON ENGINEERING HAS INCLUDED THIS SHEET AS A PART OF ITS DRAWING SET FOR REFERENCE ONLY AND IN NO WAY ACCEPTS RESPONSIBILITY OR LIABILITY FOR ANY INFORMATION SHOWN ON THIS SHEET (C100). Li d L V) Z d g U r' ti d r B Z o: o: w m In a d' �i w a 4 d Z 0 in w m w m 0 Z 0 W r3 Z D x d Z d a O 4 Z_ wT F of O Z 0 Z. n 9i 9 Z d c a in i d U FM 0 Z 0 rn kn M F w EL E a EL i SS w o d a z cc d No. Revision /issue Date o w M O r 0 Z REFERENC Ln Signature Z FOR REFER :-NCE ONLY ENGINEER NOI RESPONSIBLE Date 6 4i n: kn z >o Clq,�rton, Sr., P.,., I *c. g CIVIL & ENVIRONMENTAL ENGINEERING � H 46 WEST WASHINGTON STREET U COATS, NORTH CAROLINA 27521 PHONE: 914897 -7070 FAX: 910-897-6707 0 License No. C -2570 www.cielayton.com 4 a. HARNETT HEALTH � INVESTORS LLC z C3 0 0 HARNETT COUNTY, NORTH CAROLINA Project No. 173001 File Name: 173001 MAS Designed By: CTC Jr. Drawn By. AEB Checked By: Proj. Eng.: CTC Jr. CTC SheatTitle EXISTING CONDITIONS FROM PROJECT SURVEYOR Date JUNE 2012 sheet C 10 0 Scale AS NOTED N O N C6 'm GENERAL SITE AND ' / CONSTRUCTION NOTES. 1. EXISTING UTILITY SERVICES ARE NOT TO BE INTERRUPTED PRIOR TO APPROVAL BY THE PROPERTY OWNER AND ENGINEER. TEMPORARY UTILITY SERVICE SHALL BE AVAILABLE DURING INTERRUPTION. A MINIMUM NOTICE OF 72 HOURS IS REQUIRED PRIOR TO INTERRUPTION. WRITTEN PERMISSION FOR INTERRUPTION MUST BE GIVEN PRIOR TO PROCEEDING. 2. ENGINEER DOES NOT GUARANTEE THE ACCURACY OF UTILITIES SHOWN OR THAT ALL UTILITIES ARE SHOWN, ABOVE OR BELOW THE SURFACE. THE CONTRACTOR IS RESPONSIBLE FOR SUBSURFACE UTILITY LOCATION PRIOR TO CONSTRUCTION TO DETERMINE THE EXISTENCE AND /OR EXACT LOCATIONS, BOTH HORIZONTAL AND VERTICAL. CALL "NC ONE CALL" (1 -800 -632 -4949) AT LEAST 48 HOURS PRIOR TO DIGGING OR EXCAVATION, AND CONTACT INDIVIDUAL UTILITY COMPANIES FOR ASSISTANCE IN LOCATION OF UTILITIES. 3. CONTRACTOR SHALL VERIFY THE LOCATIONS AND SIZES OF ALL EXISTING FEATURES PRIOR TO CONSTRUCTION. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED OF ANY DIFFERENCE(S) FROM THAT SHOWN ON THE DRAWINGS. CONTRACTOR SHALL SUBMIT SCALED DRAWING(S) OF THE DIFFERENCE(S) OR FORMERLY UNKNOWN FEATURE(S) TO THE ENGINEER ALONG WITH A WRITTEN REQUEST FOR FURTHER INSTRUCTION AND DIRECTION. 4. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL REPAIR ANY DAMAGES TO EXISTING UTILITIES RESULTING FROM CONSTRUCTION ACTIVITIES. 6, ANY CONCRETE, ASPHALT, CURB & GUTTER OR OTHER TYPE OF PAVEMENT SHALL BE SAW -CUT AT EXTENT OF REMOVAL PRIOR TO THE REMOVAL. CONCRETE ITEMS SHALL BE SAW -CUT AT THE NEAREST CONTROL JOINT TO THE REMOVAL AREA. 7. CONTRACTOR SHALL COORDINATE ANY REQUIRED WORK, RELOCATION, INSTALLATION, OR REMOVAL OF EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY PRIOR TO THE BEGINNING OF CONSTRUCTION. 8. TIE -INS TO EXISTING PAVEMENT SHALL BE FLUSH AND EVEN. WHEN INSTALLING NEW ASPHALT TO EXISTING SURFACES, EXISTING SURFACES SHALL BE COATED WITH ASPHALT SPRAY TACK. 9. ALL ACCESSIBLE ROUTES FROM HANDICAP PARKING SHALL BE MAINTAINED AT A MAXIMUM SLOPE OF 1" PER 20 LINEAR FEET, CROSS SLOPES ON ACCESSIBLE ROUTES SHALL BE A MAXIMUM OF IA" PER LINEAR FOOT. THE CURRENT APPLICABLE ACCESSIBILITY CODE SHALL BE FOLLOWED. 10. COORDINATE INSTALLATION OF ANY REQUIRED FIRE APPARATUS WITH THE LOCAL FIRE MARSHALL, BUILDING CODE INSPECTOR, AND FIRE DEPARTMENT PRIOR TO INSTALLATION TO VERIFY LOCAL REQUIREMENTS, 11. FINE -GRADE AREAS TO DRAIN TO INTENDED DRAINAGE STRUCTURES IN ORDER TO PREVENT ANY STANDING WATER, IF THERE IS ANY QUESTION ON THE COMPLETION OF THE FINAL GRADING, THE CONTRACTOR SHALL CONTACT THE ENGINEER PRIOR TO CONSTRUCTION. macI ' ! ! / / O ' ! ! H NOW OR FORMERLY ARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 LOT No. 5 BRIGHTWATER PHASE 1 MAP BOOK 2012, PAGE 34 MAP BOOK 2010, PAGES 575 -576 MAP BOOK 2010, PAGES 485 -487 MAP BOOK 2010, PAGES 644 -645 PIN 0650 -79- 1646.000 / FC r �Q � Q / PAINTED CROSSWALK THIS CONTRACT / NOW OR FORMERLY � HARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 • >� MAP BOOK 2010, PAGE 575 / MAP BOOK 2010, PAGE 485 PIN 0650 -79- 1646.000 / y NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 PIN 0650 -79- 1646.000 i\ NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 REMAINDER OF LOT No. 4 BRIGHTWATER PHASE 1 MAP BOOK 2012, PAGE 34 MAP BOOK 2010, PAGES 575 -576 MAP BOOK 2010, PAGES 485 -487 MAP BOOK 2010, PAGES 644 -645 PIN 0650 -79- 1646.000 \TRANSFORMER AND GENERATOR ° - -AL 2 r 24" C &G I NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE I DEED BOOK 2252, PAGE 911 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 1 PIN 0650 -79- 1646.000 I !1 ! lVt liz ' •NL W d, W W J• ue J f/ 1 - .,, WETLANDS — NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE ' DEED BOOK 2252, PAGE 911 LOT No. 3 W w BRIGHTWATER PHASE 1 MAP BOOK 2012, PAGE 34 MAP BOOK 2010, PAGES 575 -576 \ w w MAP BOOK 2010, PAGES 485 -487 \ MAP BOOK 2010, PAGES 644 -645 PIN 0650 -79- 1646.000 ll r / 7..' 7> / NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 PIN 0650 -79- 1646.000 GRAPHIC SCALE: 1 " = 40' 0 20 40 80 120 General Notes 1. SEE ARCHITECTURAL PLANS FOR ALL BUILDING DIMENSIONS. 2. SEE SHEET C300 FOR WATER AND SEWER LAYOUT. 3. SEE SHEET C400 FOR EROSION AND SEDIMENT CONTROL PLAN. 4. SEE SHEET C500 FOR STORM WATER AND GRADING PLAN. 5. SEE SHEET C600 FOR LANDSCAPING PLAN. 6. SHADED AREAS OF PAVED PARKING LOT U INDICATE HEAVY DUTY PAVEMENT SECTIONS. W 7. WETLAND LOCATION TAKEN FROM A MAP a PREPARED BY ENOCH ENGINEERS, P.A. TITLED "WETLANDS DELINEATION MAP FOR En BRIGHTWATER TRACT ", DATED 04--22 -2008. FF Q a If ofU W M rn A W Of IL 0 �a z 0 S W m 0 z w o: W z 3- U x rn z 0 9 at U z W 0 Z 0 x 0 cn F_ or 2 c z 0 s U F U O Z 0 U) 13 IL 6 W DENOTES AREA LIGHT — SEE LIGHTING SHEETS (C203, C204, AND C205). 0 0 2 GENERAL CONST. NOTES 0 9 -17 -12 1 DUMPSTER PAD REVISED 9 -17 -12 No. Revision /Issue Date W m veart,ta�tesir�tg� 0K k CARO, 10& o o SEAL 1 Ignetore _ e �i�i4,US+ CL Date Date �I a ti z <=>< C7J 7111 SAI FE-1 Inc. s 14 CIVIL & ENVIRONMENTAL ENGINEERING 46 WEST WASHINGTON STREET ti COATS, NORTH CAROLINA 27521 PHONE: 910 -697 -7070 FAX: 910-897-6787 0 License No. C -2570 vrnw.ddaylon.cwm a °x a HARNETT HEALTH INVESTORS LLC z HARNETT COUNTY, NORTH CAROLINA Project No: 173001 File Name: 173001 MAS Designed By: CTC Jr. Drawn By: AEB Checked By. CTC Jr. Fg.: CTC sheetTille SITE PLAN Date JUNE 2012 sheet C200 Scale AS NOTED General Notes Q GENERAL NOTES: Z p Z M (IRATE AND 0013 G BACK OF CURB SEE 9TO.NO. 840.03 USE CLASS "B" CONCRETE THROUGHOUT. O N d -0 Q } PROVIDE ALL CATCH BASINS OVER 3' -e" IN DEPTH WITH STEPS 12" t i 43" u u 'r 1 u - NOTE: USE TYPE E F' AND G GRATE ON CENTER. USE STEPS WHICH COMPLY WITH STO. DRAWING 040.88. H Z rr ¢ ¢ rn 0 0 co 0 UNLESS OTHERWISE NOTED. P I �$ P Z cc H O M TOP ELEVATION OPTIONAL CONSTRUCTION - MOiIOLiTH[C POUR, 2" HEYWAY, OR k4 BAR DOWELS AT ,..1� 0r C7 n H O 0 r i-1 0 r!j U r- O -10 ?'..'; �.. t ?'..: �._:;° c l 12" CEWTER8 AS DIRECTED BY THE ENGINEER. LL.-1 O H r- 0-n --1 CIS L- L,. J O H ROWLOCK BRICK CAP z ...(� y Y v; ; -'` Y - - USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. Ca O Dr z M a -( n O O cn = z ROWLOCK BRICK CAP O C? .-� A - - - ;v; IF REIHFDRCEO CONCRETE PIPE IS SET IN BOTTOM SLAB OF SOX, ADD TO BLAB W ¢ Z Li- ^ '0 O c7 �� W Z LL 6" DIA PIPE STD BRICK 17 7y rT'1 m �, q..i As SHOWN ON STD. N0. 840.00. I-- U 0 ter} _ "n 3 � m 'r o � U ; O is 8' SPLIT FACE CMU s rn O O 6„ 8 6" s USE TYPE "E ", "F" AND "0" GRATES UNLESS OTHERWISE INDICATED. F¢- r 2 H - � 0 O 0 2 I+- •� H z [-I STEEL GATE, FRAME BRICK LLj z,. , n r- -n - - -- " U] t- Q Z H-u r -i1 N N rn F O W WITH 1 x 4 TREATED @ O Fi Q;. 6•• O ''c FOR 8'.0" IN HEIGHT OR LESS USE B" WALLS AND BOTTOM SLAB. OVER 0 LL F-I J O H _ LM- H -•� Ci 8 -0 TO 18' -0" IN HEIGHT USE B" WALLS AND BOTTOM SLAB. ADJUST O SECTION - LL sECrxaN - NaA o ¢ WOOD SCREENING n '. °:.p,':c•.' .:: ,'.5•.•,. °a v QUANTITIES ACCORDINGLY. Z H D n D D H w 8 SPUT FACE CMU •,; CONSTRUCT WITH PIPE CROWNS MATCHING. i... --I V m A © A ALIGN FRAiAE WITH INSIDE ice" Hyi o Cn H + PLAN X " a ° o- ~' H + © EDGE OF WALL TO ALLOW p �{ a . p I O 3�' 8EE NOTE CHAMFER ALL EXPOSED CGflNER6 1 ". ° O p z ' w0 z ° FOR VERTICAL ADJUSTMENT '.;o. r _ I ' p co T• SECTION X -X DRAWING NOT TO SCALE. IT C ° n �I 1 r s"-, 6" CONCRETE SLAB W[_ TOP ELEVATION c O O WALL SECTION �,�u � wWF m W o © *- ° ° SECTION - BB �� fi x fi W1.4 x W1.4 6' CONCRETE SLAB W/ TOP ELEVATION !� 6 x 6 WI.4 x WI.4 WWF - - _ - - FRAME ORA E O HOOD STEPS - STD. NO. 640,88 SECTION - PP SECTION - HH 6" CONCRETE SLAB W/ SEE STD.NO. 840.03 STEPS - STD. HO. 840.68 y Orr S'I' ®2' ^D' OC- - '0 . 9° a 0 ELEVATION - - - - - - -n PLAN rJ ? - �r' Ifl H r ,l - - - - - - - - . °.o I a 1 - �,J -i A 0 �3 FRA�IE,GAATE, &HOOD ASS'Y,I N I Q O 6" COMPACTED ABC STONE -� S_ 1 1 ¢ ' v F + I 6r, '.r : °V, _ E M = ��° ,- - o m #5 X 1' -O.0 2-0' oC ; =:_ ?,. ; � ELEVATION 2 w L ' . f, A. v. - e CD ua m H 6" 2r_0rr 6" Cs = '�: 2 15 CONT , . U] m . v.. ;. °. °.•p.. °. ° E� :;. z m rn z = - - - NOT TO SCALE Q W ww,, I 2'-G' �c H s - -i- I-, CONCRETE FOOTING z H Z 3r Or, _ _ r3 �r 17 R1 SECTION Y -Y 6" ° B _ .� = m a fi COMPACTED ABC STONE FILL PIPE CONC Cc -� p - N y ° SECTION SECTION 1 x 4 TREATED p RISER Hr. n' c ° to L ni L7 VARIES c ¢ Q v m oo ¢ W 0 . WOOD ( NO GAPS } rJl a °• 0'. p• .. °. _ n ' " .v'. p u7 p SECTION - AA WOOD -•� p ;� _ - 6" z ac x � L --i z a d NOT 7o SCAB NOT TO SCALE' x 4' X 1 -4' % 1/4' log LATCH i7 p 6f' Y.SrECTION �' , � 7" 0 2 6" STEEL STRAP S a J -d "� '.:rP•''•_:; • F LU 0 y 2C° co r-"r :v 'D� 8EE NOTE ERE 30" TO 98° PIPE I9 USED 0 W - n L IVI sECTION III -M Z '0 ##� H-1 WHERE 42" i0 54" PIPE I8 USED S= �' CV '� 0 J--I tl PHAAfE PLAN •+ O NOTE: DUMPSTER CONC. SLAB TO EXTEND OUT INTO PARKING. HINGES { 3 PER M > Z WIfERE 30" TO 38" PIPE IS USED (n I�} r SECTION - JJ cm ° VARIEB�' a G f>1 Sr, R 3,_0,8,1 5" W ABOVE AND UNDERLYING STONE TO STAY AS SHOWN SIDE ) O J `' J Z v D o C] �I r -"�� R 3 R Z GC 1----- - - ---- - - -- , - _b_:•'_.,...': �, W ©�� - -- - -- - ---� W �, DUMPSTER DETAILS A ti A srr 21.011 NOT TD SCALE ELEVATION NOT TO SCALE < �'. 3 6 3r Orr B �3W r � � 11 _ 4 WHERE 42" TO 54" PIPE I6 USED ek - m. _�.. n•.ON - KK *-� 1811 o, .- .`° :. d; -::.• • ° -•. 6.'.» '.' ° -.' • P: a' �.•? : •: °•,'::.P.::• o' .•.• c•;:'r a•,' 2`- i 11� 1r DETAIL SHOWING METHOD SHEET 1 OF 2 OF RISER CONSTRUCTION PLAN PLAN SHEET 1 OF 2 SHEET 1 OF 2 R SECTION - RR SHEET 1 OF 2 840.02 840" 02 840.03 HOOD ELEVATION 840.03 C S EXPANSION JOINTS ¢ C 2 %" }- ¢ ¢ , , DETAIL SHOWING TYPES OF GRATES UI O o 8" E� a -6 a' -6"z vi a a USE ACCORDING TO WATER FLOW. i CO M j y D ka BARS „V" $r e„ sm. 840.03 FRAME Q d a.�� M Z I M n o o��Z il EQUAL SPACES „ GRATE & HOOD 1= MIc G7 -� 1i¢ 1)�" W ls_ Q n "all " " rr rr W Q Lt s ° n rr' s" O c -,T n "' TYPE G TYPE E TYPE 1~ A A 1 u� 7 „ � 0 ¢ Q'c 2' HOT DIPPED GALV. STEEL PIPE BOLLARD I I I �o�� C -- O I 9/a cnr �oc� z H -n F_� r c s z s ° I- = t- z UL W/ CAP. PAINTED 2 COATS EXTERIOR ° a I I C, , °, , r c>L H Ja ENAMEL, COLOR RED, GLOSS EVERY 50 LF R w O 0 D _� 17 n O 0 a0 ALONG FIRE LANE AND AT END (TIP.) CONCRETE SIDEWALK OR ASPHALT R I B' -G^ z H WATER FLOW -� SAG �- WATER FLOW �-- 8/a c� �, O ¢ n o - a N In PLAN t`H �-I y �- ,�-t ROAD ONLY AT LOCATIONS INDICATED H + rnrA d 0~ ' - - - --------------------------------- CL 0 I>, CURB AND GUTTER WITH CATCH BASIN ON STEEP flHA0E9 O O LU "i a TOP 1 ° s °� B 11�" 1" , ° OON SITE PLAN THERWISE, PSOIL�TOPPING)TO BE USE ON FLAT ELEY. EXPANSION JOINT 6„ `� CONTINUOUS o GRADES 298 AND UNDER DEPRESSED GUTTER LINE �� �1'r SECTION B -B rr S EXPANSION JOINT m I '- -I - B TOPSOIL M PLAN OF TOP SLAB SECTION S •S ELEVATION Cc :A -� WATER FLOW - - - -� .SAG -�-- - -WATER F€ OW �- 1 �r .ZZ� n p O c 0 NORMAL CURB AND GUTTER ON LIGHT GRADES LL ( G) SECTION A -A LL G m CD j C7 NORMAL GUTTER LINE Z CD CA M Q LU i1<1 H Uj �•` I �/ z = _ ro '� = n „ ^ g EXPANSION JOINT $ m Z " TYPE NFN TYPE "Err TYPE "G" TYPE - E Z GRADE M !n $ E ke W BARS k4 AR all TOP ¢ R s�i ¢ a - ��' im L uyu USE ON GRADES OVER 241 ELEY. 0 'y' '� '1. __._- ° 9 RAISED FLOW ARROW „ _ I p DD !' -' rss�dda�c�scct�s rirJrh c - - - - DEPRESSED GUTTER LINE ~ tl3 p RAISED FLOW ARROW 2'r /I8 HIGH Q I- c�n it 0 a a a '�, ( 1y x- I fD B- ' ¢ Q En �$ HIGH D ¢ W p �, y ' 0 711 1'_ CA EXPANSION JOINT MAX, V O 15 (/1 Q 1 I O C] I� Z _C� ���� I r_l`'tn _ l -) -.� I ?�)L�� )?� ).�r_}(�) -, t �! • tw- Cy p , rr rl ai s" NCDOT j[J / STONE p '� -v- 2 v Q 1 1 s1- 11 1._'7`' r'}if'r?�lr �7'l '7 'r r'�' # „ 8 1 -0 Q W Q p Q O ¢ F•• i 'ir tirY 'i r,� i?� "r ti 'i�,; 'ini 1, , 17i i; � 1 i 1 r. r r r _ ELEVATION F- 1- F" (- " DOWEL � L7 a � � � ,�" mm 11�z T r � � 0 8 DIA. CONCRETE W H SECTION R -R NORMAL CURB AND GUTTER ON STEEP GRADES D~ W N 0 11'2 ,- rrl N 0 MINIMUM DIMENSIONS AHD QUANTITIES FOR CONCRETE CATCH SASIN {BASED ON MIN. HEIGHT, H. WITH H0 RISER) • H r x L7 I �1�r1 a a 1/B "� t1 W � 6" NCDOT ABC STONE 6 OZ. NONWOVEN DIMENSIONS OF BOX AND PIPE COVER CU,YDS. CONC. IH BOX DEDUCTIONS J u - -M , PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT DIMENSION BARS -U BARS -V BARS -W TOTAL TOP BOTTOM �TY1re ONE PIPE Z v DO C -n P 11�° 9 1 � ° c {COMPACTED) 2O MIN 12" GEOTEXTILE (AMOCO D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH LBS. SLAB SLAG C.M. R.C. VS 1�° j "�( CC �2tOOF), MIRAFI E3QQX 12" 3' -D" 2' -2^ -- 2' -9" -- _. -- -. -- -. -- _- -- 0.238 0.772 0.016 0.028 W k-1 0 1" 1 1r l �- r i �$!' 0 OR 15° 3' -0" 2' -2" 3' -0" 0.235 O.B29 0.023 0.038 Z 2' -11" 2'-11" u' GEOTEX 315ST) 18" W -0" 2' -2" 3' -3" 0.235 0.687 0.033 0.048 24" 3' -0° V -2" 3' -9" 0.235 LOOT 0.059 0.985 _ I fy- 11 t'.� �,S N jam, r 90° 3' -0" 2' -2" 3' -4" 4' -9" 1' -2" 4' -0" 4 1' -5" 2 3' -9" 3 3' -8" 30 0.123 0.321 ] .433 0.092 0.127 �1 %'2 y �'r II.._ ' ' FIRE LANE SUPPORT 36" 2' -2" 4' -9" 1' -8" 4' -0" 4 1' -]f" 3 3' -9" 3 3' -8" 43 0.181 0.358 1.714 0.132 0.176 irg , w A2° 3'•0" 2' -2" A' -5° 6 -3 f' -5" W -2" 4 1' -8" 2 2' -11" 3 2' -1]" 32 0.112 0.318 1.738 0.180 4.2A3 1 " SECTION A -A Imo"'" - II �$r, 48" 3'•0" 2' -2" 5' -0" 5' -9" 2' -0° 3' -2" 4 2' -3" 3 2' -f1" 3 2' -1i" 35 O.1A5 0.382 2,052 0.235 0.317 NOT TO SCALE 54" 3' -0" 2' -2" W -7° 6' -3" 2' -7" 3' -2" A 2' -i0" 5 2' -11" 3 W -11" 41 0.180 0.388 2,987 0.297 0.401 TYPE " F SECTION A -A SHEET 2 OF 2 SHEET 2 OF 2 =RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT SHEET 2 OF 2 SHEET 2 OF 2 TYPE G 840.02 840.02 840.03 840.03 pm OW PITT OUj F-I-0 GENERAL NOTES: - H'„ r•-1 iitN Sr_Gr' 5•, C -•t 2" WEEP HOLES I-- Q C - �'L C 1-4 '� Y USE CLASS "S" CONCRETE THROUGHOUT. ¢ 1-r ,Z _ rr Q n FO-I O PRBVIDE ALL CROP INLETS OVER W -8" IN DEPTH WITH STEPS 12" U y O 1" DEPRESSION `m 19"811 1 1.r,,uU Z v t--' 0 -n --( rn M-F-11 ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. W J O H r 0'71 -1 rn r $ 1 u -1 O mz z-� cn z m2 =� 1 -7�'g 1 -7§e �� I-1 F� a0°- z H -'I OPTIONAL CONSTRUCTION - M6HOLITHIO POOH 2" KEYWAY OR k4 BAR DOWELS AT O O W n r 1 I m n' O CJ -( X I X 12° CENTERS As DIRECTED BY THE ENGINEER. W ! y Ll 3 = O O m III W Q Q LL _ -n tT1 US E FORMS FOR THE c6HBTAUCIION OF THE BOTTOM BLAB. 3-- (] p �, �• •n _ T- O G E I E ~' U d C'3 Z H0 O - I IF REINFORCED CONCRETE PIPE IB SET IN 13. SLAB OF BOX, ADD TO SLAB ¢ )`-' ULI S 0 Q O CV t G ( H c z r-' LLJ O O -n - -� A8 SHOWN ON 870. N0. 8A0.00. Cl) � O C? �O - - - - - -I - - - - CONSTRUCT WITH PIPE CROWNS MATCNIHG. 0 Z --I Z O O H _ _ - - - - I - O !L O G7 -t __ I Qorn¢c c7��Z r © Ty - -r - - -- 0 (0 n n INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. z H • n b n LV 0 I Z rmo IILSTALL STONE DAMNS, OF A MINIMUM OF f CUBIC FOOT OF NO. 7614 STONE IN A �C4 0 POROUS FABRIC 61U3 OR WRAP, AT EACH WEEP HOLE DR AB DIRECTED BY THE ENGINEER. Lttf ° t7 r CHAMFER ALL EXPOSED CORNERS 1 ". + ° z rim SECTION G - G _� �M ' I DRAWING NOT TO SCALE. m� IF PLAN „ r Y WITH GRATE & FRAME REMOVED 0° 1' -7�B" 1' -7�Q'r PLAN cOF IRON r M BRICK COPING(INCIDENTAL) Cr M o m PLAN OF GRATING ac H 0 07- TOP ELEVATION 01- * 'a 0 i „ CAST IRON O z 1 REVISED PAVEMENT SECTIONS 9 -17 -12 ° LL H 2'- 3/4 LL Q OPENING A5 REQUIRED, o r v STD. 840.18 FRAME :: W L--3 ) ' co SEE ARCHITECTURAL No. Revision /Issue Date Z H & GRATE C'3 ..� = Z. H CD d• rn z Z W r� z r FOR DOWNSPOUT N _ e A e" ka BAR H � it1 _ DETAILS ,,fit 14 M -0-i e" B 8" a A r3- © •••i n 1� 11 �/ef1 1 it iBn < Q d ��� �[7 A 0' ®� M o ' it1 Z u rr 'r " C p I I O co p , n r 1r ° o i C ° p as x x O a 1 1 1 1 W uy CAST IRON DOWNSPOUT e• +�� d� c > tI_ BOOT 42 LENGTH MIN. a S`Q �`" v I m I 611 p 3 -3 2 -3 Qp OC 8" OUTLET w = SEAL - T, 1.8 r • 4 Signatu O - I F¢- H F 0 In �p 1 /S" I l �/g" _ ° I I1r _ Imo¢' W BARRYCRAFTED.R. SMITH DOWEL 4a n a rr a r, 0�° a R e H rn W ° _ SECTION H - H 34 34 `r - `� W McKINLEY, ZURN OR 00 ° - '••�j�G[N�sp' m SEE NOTE OOWEL(SEE NOTE) MAX. PIPE: THIS SIDE � � CV s D t-+ 3' -2" 2' -2" S � US / •�a n• � �o APPROVED EQUAL s 4as.•• SECTION X -X SECTION Y -Y ; a r 4k 0 � � � I _� � H � N � � °osgs�s Ck.A�a�a M z V z a 211 " �� 21/ " 0098iE604g949 Dale DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) W O 0 8 S W Uj DIMENSIONS OF BOX & PIPE CUBIC YARDS DEDUCTIONS FOR q0 R1 3' -1 " N '�' -1 " � C13 PIPE SPAN WIDTH MIN. HEIGHT CONC. IN BOX ONE PIPE 4 N D A B H BOTTOM WALL PER O C p SLAB FT. HT. F�,ONGiW C. M. R. C. s ,31_611 ,2-' -6.'r 0 12" 3' -0" 2' -0" 2 -0 0.222 0.222 0.592 0.015 0.026 01 Ll. SECURE TO WALL WITH 15" 2 -3 0.848 0.023 0.038 1B" 2'-B" 0.703 0,033 0.849 SECTION E - E SECTION F - F GRADE UNE AS REQUIRED 4 1O 24" 3 -0 0.814 0.059 G.o6S " LOCATIONS () ��Qy t0�� �r�� �� ��`� N40-14 ET 1 OF 1 30" ' " 2' -0" 3 -6 0.222 0.222 0.825 0.092 0.127 SHEET 1 OF 1 SHEET 1 OF , SHEET 1 OF 1 3 CIVIL & ENVIRONMENTAL ENGINEERING 840.14 840.16 840.1 fi 46 WEST WASHINGTON STREET COATS, NORTH CAROLINA 27521 PHONE; 910. 897 -7070 FAX: 910897 -67$7 4" 6" OR 8" License No. C -2570 www.ctctaylon.com r r 1.5° SF9.5A \ \\\ \ \\\ INE011 2° SF9.5A NE DRAIN SYSTEM HAR N ETT HEALTH 2" 1 19.08 .. f-. % 3" 1 19.OB �" INVESTORS LLC -' t 3 RAID. n v o n v a a 4 a o a s v 9-- 9-2"R, 6" B25.OB 8" B25.OB HARNETT COUNTY, NORTH CAROLINA ° ° NOTES: Project No: File Name: a o u° 0 1. BOOT SHALL BE PAINTED WITH FACTORY APPLIE=D PRIMER AND TWO COATS SEMI -GLOSS ENAMEL PRIOR TO INSTALLATION. 173001 173001 MAS r/ v ARCHITECT TO PICK COLOR. \ \ / \ / \�� \r \ / \ / \: COMPACTED / \ / \ / \ / \� \/ �� \ / \� \ \� \ \r \ \� \ \ /., COMPACTED u v \ \ / \ \ / \ \ / \ \ / \ \ / \� \ \ / \ \ / \ \/r / \ \ / \ \ / \ \ / \ \ / \ \ / \ \ / \� \,r \/ \/ \/ \/r 2. ALL CONNECTORS SHALL BE MANUFACTURED BY THE BOOT SUPPLIER OR THE CONNECTING PIPE SUPPLIER FOR THIS Designed By: Drawn By: SUBGRADE \/ f\//\\/ /\/�,/�\// \ \ /� \ / / \ \ / / \ \ / / \ \ / / SUBGRADE FOFc' � C APP LICATION AND SHALL BE WATERTIGHT. CTC Jr. AEB .-7,�r-�a.. 21 a».- .�.r --,¢. - 3. PRODUCT SUBMITTAL REQUIRED. _� 6" NCDOT NN OR 1' -6" (SEE PLAN ABC STONE Checked By. CTC Jr. Pro]. Eng.: CTC TYPICAL LIGHT ASPHALT ROAD TYPICAL HEAVY ASPHALT ROAD STANDARD CURB & GUTTER DOWNSPOUT BOOT Sheet Title CIVIL DETAILS PAVEMENT SECTION PAVEMENT SECTION NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE Date JUNE 2012 heel Scale C201 AS NOTED E Q N 0 N C) 0 TOP RAIL POST TIE WIRES TOP RAIL TIE WIRES ® 15" CENTERS TERMINAL ® 24" LINE POST POST CENTERS STRETCHER BAR , 3/8 IN. DIA. 5 Fr. NOTE: ALL POSTS TRUSS ROD ARE 7 *--6" MIN. HOOK BOLTS X , Ii =I TI =FI-1'=i 1 ITi= 1Ti- 1Ti =1T1 -111' 11-- 42' MIN. BRACE RAIL 36" MIN. 1 �« CONCRETE NOTE: LINE POSTS MAY BE DRIVE SET TO 40" MIN. 10" MIN. DIA. BELOW GRADE AND CONCRETE 10 FT. MAX. OMITTED. FENCE DETAILS SHAPE, SIZE AND WEIGHT REQUIREMENTS FOR FENCE POSTS AND RAILS ITEM SHAPE OUTSIDE WEIGHT 0.0' 5.8' DIMENSIONS LBS. /LIN. FT. 6' 0.0' INCHES 6.8' ** 7' 0.0' 7.8' TERMINAL ROUND 2.375 3.65 POSTS *ROUND 2.375 3.12 LINE ROUND 1.90 2.72 POSTS *ROUND 1.90 1 2.28 TOP & BRACE ROUND 1.66 2.27 RAILS I *ROUND 1 1.66 1.84 * GRADE B HIGH STRENGTH STEEL ** INCLUDES END, CORNER, ANGLE, INTERSECTION AND INTERMEDIATE BRACED POSTS CONSTRUCTION NOTES 1. MATERIALS AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALL CONFORM TO THE MANUFACTURER'S SPECIFICATIONS. 2. ALL POSTS SHALL BE INSTALLED VERTICALLY. WHERE POSTS ARE INSTALLED ON AN INCLINED SURFACE, THE ANGLE OF THE POST SHALL BE ADJUSTED SO THAT THE POST WILL BE VERTICAL. 3. THE FENCING SHALL BE #9 GAGE FENCE FABRIC, STANDARD 2 -INCH CHAIN LINK DIAMOND MESH. STANDARD CHAIN -LINK FENCE DETAIL NOT TO SCALE 6 \ \ G T�.p W A W +A +9" X B 5' 0.0' 5.8' 5.6' 5.0'* 6' 0.0' 6.8' 6.8' 6.0' ** 7' 0.0' 7.8' 7.3' 6.5' ** 8' 0.0' 8.8' 7.3' 6.5' ** 5' 2.0' 7.8' 7.81 5.0' 5' 2.5' 8.3' 8.1' 4.8' 5' 3.0' 8,8' 8.3' 4.4' 5' 3.5' 9.3' 8.4' 4.1' 5' 4.0' 9.8' 8.6' 3.8' 5' 4.5' 10.3' 8.7' 3.4' 5' 5.0' 10.8' 8.9' 3.1' B = X- (A +9 ") B = DISTANCE FROM FRONT EDGE OF SIDEWALK TO BACK POINT OF 12:1 (8.33 %) SLOPE. * BACK OF SIDEWALK DROP REQUIRED FOR ALL SIDEWALK SLOPES. ** BACK OF SIDEWALK DROP REQUIRED FOR SIDEWALK SLOPE 0.04. ISOMETRIC VIEW RAMP WIDTH AREA IS VARIABLE z ® ® 0 ® ® ® 0.45 "R ® a 0 0.02 "R ® ® ® ® ®® Lam'= 0 �4` 20" N r PRECAST DETECTABLE CLASS "B" CONCRETE WARNING DOMES ALTERNATE MATERIAL MAY BE SUBSTITUTED, PROVIDED THE PRODUCT IS APPROVED VIA SUBMITTAL PROCEDURES SPECIFIED IN THE PROJECT SPECIFICATIONS AND THE MANUFACTURER'S PRODUCT AND INSTALLATION SPECIFICATIONS ARE FOLLOWED. GATE FRAME MEMBERS SIZE AND WEIGHT GATE FRAME OUTSIDE WEIGHT DIMENSIONS DIMENSIONS LBS. /LIN. FT. INCHES INCHES ROUND ROUND 1.66 2.27 *ROUND 1.66 1.84 * GRADE B HIGH STRENGTH STEEL GATE POST SIZE AND WEIGHT GATE LEAF OUTSIDE WEIGHT WIDTH OF DIMENSIONS LBS. /LIN. FT. 6 FT. OR LESS INCHES 3 ROUND 2.875 5.79 *ROUND 2.875 4.64 * GRADE B HIGH STRENGTH STEEL TENSION WIRE GATE OPENING 12 FT. END CLAMP 3 11 LIGHT HALF V -6" HEAVY HALF 1 8 CONCRETE GATE DETAIL LEGEND PART NO. DESCRIPTION QUANTITY 1 STRAIGHT PLUG 2 2 BOTTOM HINGE 2 3 TOP HINGE 2 4 CORNER ELBOW 8 5 PLUNGER ROD 1 6 LATCH FORK 2 7 FORK CATCH 2 8 PLUNGER ROD CATCH 1 9 LOCK KEEPER GUIDE 1 10 LOCK KEEPER 1 11 ORNAMENTAL TOPS 6 12 TRUSS RODS 4 13 STRETCHER BAR 4 14 HOOK BOLTS 12 TYPICAL CURB & GUTTER TRANSITIONS NO SCALE DROP CURB - STA. 2' -6' CURB & GUTTER SHOWN) TENSION WIRE END CLAMP xxxxxx • I IJ I I= I =1 I 2' -6" MIN. V -0" MIN. -� MIN. DIA. NOTE: THE FENCING SHALL BE #9 GAGE FENCE FABRIC, STANDARD 2 -INCH CHAIN LINK DIAMOND MESH. STANDARD DOUBLE -GATE DETAIL NOT TO SCALE SECTION R -R SIDEWALK 6•_0" 4 *_ ELEVATION CURB CURB TOP OF CURB TRANSrTION 1130 TRANSMON VARIABLE SLOPES NOT GUTTER TO EXCEED 12:1 (8.33 SECTION S -S fiUM A PORTION OF ONE OR BOTH RAMPS MAY EXTEND OUTSIDE THE RETURN. STANDARD WHEELCHAIR RAMP NOTES: 1. DETECTABLE WARNING DOMES SHALL COVER 2'--0" IN LENGTH AND FULL WIDTH OF THE RAMP FLOOR AS SHOWN ON THE DETAIL. THE RAMP MAY BEYELLOW IN COLOR OR ANY COLOR WITH A 70% CONTRAST RATIO. 2. CROSSWALK WIDTHS AND CONFIGURATION VARY BUT MUST CONFORM TO TRAFFIC DESIGN STANDARDS AND BE AS DEPICTED ON PLANS. 3. PROVIDE WHEELCHAIR RAMPS AT LOCATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. LOCATE WHEELCHAIR RAMPS AS DIRECTED BY THE ENGINEER WHERE EXISTING LIGHT POLES, FIRE HYDRANTS, DROP INLETS, ETC. AFFECT PLACEMENT. WHERE TWO RAMPS ARE INSTALLED PLACE NOT LESS THAN 2 FEET OF FULL HEIGHT CURB BETWEEN THE RAMPS. PLACE DUAL RAMPS AS NEAR PERPENDICULAR TO THE TRAVEL LANE BEING CROSSED AS POSSIBLE. 4. DO NOT EXCEED 0.08 (12:1) SLOPE ON THE WHEELCHAIR RAMP IN RELATIONSHIP TO THE GRADE OF THE STREET. 5, CONSTRUCT WHEELCHAIR RAMPS 48" (4' -0 ") OR GREATER FOR DUAL RAMPS AND 60" (5' --0 ") OR GREATER FOR DIAGONAL RAMPS. 6. USE CLASS "B" CONCRETE WITH A SIDEWALK FINISH IN ORDER TO OBTAIN A ROUGH NON -SKID TYPE SURFACE. 7. PLACE A y2" EXPANSION JOINT WHERE THE CONCRETE WHEELCHAIR RAMP JOINS THE CURB AND AS SHOWN ON STANDARD DETAIL 03000.07. 8. COORDINATE THE CURB CUT AND THE PEDESTRIAN CROSSWALK LINES SO THE FLOOR OF THE WHEELCHAIR RAMP WILL FALL WITHIN THE PEDESTRIAN CROSSWALK LINES. PLACE DIAGONAL RAMPS WITH FLARED SIDES SO 24" OF FULL HEIGHT CURB FALLS WITHIN THE CROSSWALK MARKINGS ON EACH SIDE OF THE FLARES. 9. CONSTRUCT THE PEDESTRIAN CROSSWALK A MINIMUM OF 6 FEET OR SHOWN ON PLANS. 10. USE STOP LINES, NORMALLY PERPENDICULAR TO THE LANE LINES, WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND WHICH VEHICLES ARE REQUIRED TO STOP IN COMPLIANCE WITH A TRAFFIC SIGNAL, STOP SIGN OR OTHER LEGAL REQUIREMENT. AN UNUSUAL APPROACH SKEW MAY REQUIRE THE PLACEMENT OF THE STOP LINE TO BE PARALLEL TO THE INTERSECTING ROADWAY. 11. PLACE ALL PAVEMENT MARKINGS IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) PUBLISHED BY THE FEDERAL HIGHWAY ADMINISTRATION AND THE NORTH CAROLINA SUPPLEMENT TO THE MUTCD. 12. FROM DETECTABLE WARNING DOME PORTION ALL THE WAY TO BACK EDGE OF SIDEWALK NEEDS TO BE BLACK. STANDARD WHEELCHAIR RAMP NOT TO SCALE 1' -0" MIN. DIA. PART NO. DESCRIPTION QUANTITY 1 STRAIGHT PLUG 1 2 BOTTOM HINGE 1 3 TOP HINGE 1 4 CORNER ELBOW 4 5 LATCH FORK 1 6 FORK CATCH 1 7 ORNAMENTAL TOPS 4 8 TRUSS RODS 2 9 STRETCHER BAR 2 1D HOOK BOLTS 6 STANDARD MAN -GATE DETAIL NOT TO SCALE - MIN 4' -0" SEE SITE PLAN FOR ACTUAL WIDTHS CONC. SIDEWALK W/ 6 "x6 "- W2.9xW2.9 WWF 1.5" RA IT F 7. -- - - -, - -- g'L -MEN, COMPACTED SUBGRADE MIN 6" NCDOT ABC STONE NOTES: 1) CONTRACTION JOINTS TO BE AT 6' O.C. 2) EXPANSION JOINTS TO BE AT ALL CHANGES IN DIRECTION AND AT 30' O.C. MAXIMUM. TYPICAL TURNDOWN SIDEWALK DETAIL NOT TO SCALE MIN 5' -0" SEE SITE PLAN FOR ACTUAL WIDTHS " CONC. SIDEWALK W/ 6 "x6 "- W2.9xW2.9 WWF - - d a II COMPACTED SUBGRADE MIN 6" NCDOT ABC STONE NOTES: 1) CONTRACTION JOINTS TO BE AT 6' O.C. 2) EXPANSION JOINTS TO ICE AT ALL CHANGES IN DIRECTION AND AT 30' O.C. MAXIMUM. TYPICAL SIDEWALK DETAIL NOT TO SCALE POST & END FOR FENCE NOTE: THE FENCING SHALL BE #9 GAGE FENCE FABRIC, STANDARD 2 -INCH CHAIN LINK DIAMOND MESH. CONCRETE WHEEL STOP AT LOCATIONS " ITE PLAN. SEE kIL THIS SHEET. 9' TYPICAL EXCEPT FOR ADA SPACES TYPICAL PARKING SPACE NOT TO SCALE 4' OR 4' OR 4' OR 4' OR - 4' OR RREN ADA AT QA CURRENT ADA CURRENT ADA CURRENT ADA I CURRENT ADA WHITE REFLECTIVE PAVEMENT MARKING 2" WIDE MIN. TYPE R7 -8E RESERVED 12" PARKING SIGN per NC r-- ----�� DEPARTMENT of z TRANSPORTATION MANUAL I I CTC Jr. CTC ON UNIFORM TRAFFIC COATS, NORTH CAROLINA 27521 VAN PHONE: 910 -897 -7070 FAX: 910-897-6767 0 CONTROL DEVICES, ? C202 ACCESSIBLE SECTION 2A• --23, PART li I I 12" STANDARD COLORS (ALL II - SIGNS): I I RESERVED BACKGROUND - WHITE LETTERING /BORDER - PARKING GREEN co ARROW - GREEN FIGURE - WHITE ON BLUE FIELD CORNER RADIUS -- 1 Y2" (TYPICAL) I q 2x, M_Y; � SIGN POST SHALL BE MAXIMUM GALVANIZED STEEL "U" i I PENALTY SHAPED CHANNEL POST $250 WEIGHING THREE (3) POUNDS PER LINEAR FOOT. I 112 II f�l HANDICAPPED PARKING SIGN DETAIL NOT TO SCALE UKUa7VVALK 7 I KIVI1Vla Ut I AIL NOT TO SCALE 36" to STANDARD COLORS (ALL SIGNS): BACKGROUND -- RED LETTERING /BORDER -- WHITE SIGN POST SHALL BE GALVANIZED STEEL "U" SHAPED CHANNEL POST WEIGHING THREE (3) POUNDS PER LINEAR FOOT. d to Q 0 a D z W L>= Q: U 0' O STOP SIGN DETAIL NOT TO SCALE \ 2" 4" 1 6 1 2" N r7 N � z (MIN.) END _VIEWS 12" TO EDGE OF PARKING STALL PLAN GROUT HOLE FULL HOLE FOR # 6 REINF. ROD 1 6 1 /2" 5 1/2 DRAINAGE DRAINAGE OPENING OPENING 2' -0" (MIN.) 1' -O" 2' -0" (MIN.) 7' -D" (MIN.) 8' -0" {MAX.} #6 REINF. ROD SHALL BE 1 PLACED IN A HOLE DRILLED IN THE FINISHED SURFACE WITH A TIGHT FIT OBTAINED BY AN APPROVED METHOD, OR DRIVEN INTO THE SURFACING PARKING STALL WHEEL STOP PAINTED STRIPES IF SHOWN ON THE DRAWINGS OR REQ'D BY THE SPECIFICATIONS INSTALLATION PLAN 1/2" MAX. ; r, CLEARANCE 2-- #3 1 3/8" TOOLED EDGE (T(P.) SECTION PRECAST CONCRETE WHEEL STOP DETAIL NOT TO SCALE ►1 General Notes C d a y a 3 U ti a B z o: M M v �i w cc IL IL 0 z 0 B w M R z S x z 3 0 x z cc0 cc 0 z w 0 z c� z Ln F of z Z G � • 5 Clllr: '_ ice... • .�� � .�� t z..3' Revision /Issue I Date HARN ETT HEALTH INVESTORS LLC HARNETT COUNTY, NORTH CAROLINA Project No: 173001 o: Elie Name: 173001 MAS Designed By: CTC Jr. z K_> Ckjlton, Sr., P. E., Ifle. CIVIL & ENVIRONMENTAL ENGINEERING CTC Jr. CTC 46 WEST WASHINGTON STREET COATS, NORTH CAROLINA 27521 Date JUNE 2012 PHONE: 910 -897 -7070 FAX: 910-897-6767 0 License No. C -2570 www.ddayton.com ? HARN ETT HEALTH INVESTORS LLC HARNETT COUNTY, NORTH CAROLINA Project No: 173001 Elie Name: 173001 MAS Designed By: CTC Jr. Drawn By: AEB Checked By: Pro). Eng.: CTC Jr. CTC Sheet Title CIVIL GENERAL NOTES Date JUNE 2012 sheet Scale C202 AS NOTED E rn In N N O N m Y 0. co tM iu Cr ti m Q r r _ r i r / NOW OR FORMERLY GENERAL SITE AND HARNETT FORWARD TOGETHER COMMITTEE ' ' ' ' DEED BOOK 2252, PAGE 911 CONSTRUCTION NOTES: , REMAINDER OF LOT No. 4 BRIGHTWATER PHASE 1 MAP BOOK 2012, PAGE 34 MAP BOOK 2010, PAGES 575 -576 w MAP BOOK 2010, PAGES 485 -487 1. EXISTING UTILITY SERVICES ARE NOT TO BE / MAP BOOK 2010, PAGES 644 -645 ' , / PIN 0650 -79- 1646.000 Z INTERRUPTED PRIOR TO APPROVAL BY THE _ .' �� I EP: 2 +01.48 / PROPERTY OWNER AND ENGINEER. END NEW WATER MAIN WITH 8" GATE VALVE v ' �" SHALL BE /�'� AND RELOCATED TEMPORARY BLOW -OFF ' TEMPORARY UTILITY SERVICE / ,,. AVAILABLE DURING INTERRUPTION. A MINIMUM (NOTE: ALL GATE VALVES AND BLOW -OFFS 4 NOTICE OF 72 HOURS IS REQUIRED PRIOR TO / f SHALL HAVE APPROPRIATE VALVES BOXES ^ INTERRUPTION. WRITTEN PERMISSION FOR PER CURRENT HCPU SPECIFICATIONS) 1 ! ' w INTERRUPTION MUST BE GIVEN PRIOR TO �'' ,`� ' 1 2+ 1 \ y PROCEEDING. / +Op I I \ 2. ENGINEER DOES NOT GUARANTEE THE / / NEW FIRE ACCURACY OF UTILITIES SHOWN OR THAT ALL , /,' ' HYDRANT ASSEMBLY / %S1 ' UTILITIES ARE SHOWN, ABOVE OR BELOW THE NEW „8"x4" TEE Q ' / ' BP: 0 +00.00 4x3 REDUCER SURFACE. THE CONTRACTOR IS RESPONSIBLE - O� BEGIN METER VAULT FOR SUBSURFACE UTILITY LOCATION PRIOR TO \ ' CONSTRUCTION TO DETERMINE THE EXISTENCE / NEW 6 FIRE SUPPRESSION LINE �; AND /OR EXACT LOCATIONS, BOTH HORIZONTAL �Ci� / °�� INSTALL 8 "x6" TEE +0 \ _ AND VERTICAL. CALL "NC ONE CALL" INSTALL 6" GATE �� p (1- 800 -632 -4949) AT LEAST 48 HOURS PRIOR TO VALVE & BOX x �Q� �, �, � / Q �a� \ ^ DIGGING OR EXCAVATION, AND CONTACT INDIVIDUAL UTILITY COMPANIES FOR J� °P RPZs / s, cs�''' \ — WETLANDS — °. ASSISTANCE IN LOCATION OF UTILITIES. / BP: 0+00-00 / �FDC MOUNTED ego y .� TO ENCLOSURE BEGIN NEW �' r 8" WATER MAIN ?� �'<� / � �`�`:. Fps ^:�` -.. ' NOW OR FOFMERLY 3. CONTRACTOR SHALL VERIFY THE LOCATIONS ' REMOVE & RELOCATE �I I 0 j / ��F .GpAC�. ' HARNETT FORWARD TOGETHER COMMITTEE AND SIZES OF ALL EXISTING FEATURES PRIOR NOW OR FORMERLY ° AGE 911 �' HARNETT FORWARD TOGETHER COMMITTEE BLOW —OFF. INSTALL / �� / SGA f DEED BOOK 2252 P DEED BOOK 2252 PAGE 911 8 GATE VALVE & / w \ 1 L LOT No. 3 TO CONSTRUCTION. THE ENGINEER SHALL BE ,� � � BRIGHTWATER PHASE 1 IMMEDIATELY NOTIFIED OF ANY DIFFERENCES LOT No. '5 BOX MAP BOOK40OK 20 2, PAGE 4576 BRIGHTWATER PHASE 1 FROM THAT SHOWN ON THE DRAWINGS. MAP BOOK 2012, PAGE 34 G � MAP BOOK 2010, PAGES 485 -487 CONTRACTOR SHALL SUBMIT SCALED MAP BOOK 2010, PAGES 575 -576 0, FS n� / / '1 +3 MAP BOOK 2010, PAGES 644 -645 MAP BOOK 2010, PAGES 485 -487 \ PIN 0650 -79- 1546.000 DRAWING(S) OF THE DIFFERENCE(S) OR MAP BOOK 2010, PAGES 644 -645 / FORMERLY UNKNOWN FEATURE(S) TO THE PIN 0650 -79- 1546.000 ENGINEER ALONG WITH A WRITTEN REQUEST` FOR FURTHER INSTRUCTION AND DIRECTION. �� F,y / / EP: 1+94.82 END FIRE SUPPRESSION y y 4. CONTRACTOR SHALL LOCATE ALL EXISTING /� �� ��,�a LINE UTILITIES PRIOR TO CONSTRUCTION. SEE PLUMBING 3" GATE PLANS O VALVE �/ CONTINUATION - 5. CONTRACTOR SHALL REPAIR ANY DAMAGES TO EXISTING UTILITIES RESULTING FROM CONSTRUCTION ACTIVITIES. 6. ANY CONCRETE, ASPHALT, CURB & GUTTER OR ` OTHER TYPE OF PAVEMENT SHALL BE SAW -CUT AT EXTENT OF REMOVAL PRIOR TO THE FIRE HYDRANT ,�/ REMOVAL. CONCRETE ITEMS SHALL BE ASSEMBLY`/ �^ SAW -CUT AT THE NEAREST CONTROL JOINT TO — �� r / ,,• - ° -` / THE REMOVAL AREA. 7. CONTRACTOR SHALL COORDINATE ANY REQUIRED WORK, RELOCATION, INSTALLATION, /OR REMOVAL OF EXISTING UTILITIES WITH THE / 41 `4 / APPROPRIATE UTILITY COMPANY PRIOR TO THE • y / y y / / T �`.� . ` BEGINNING OF CONSTRUCTION. SEE PLUMBING PLANS FOR • ���.- /� CONTINUATION • � � ` 8. TIE -INS TO EXISTING PAVEMENT SHALL BE co FLUSH AND EVEN. WHEN INSTALLING NEW �y' �c • / ,•'j l ASPHALT TO EXISTING SURFACES, EXISTING �o / PLUMBING PLANS FOR Y / ' SURFACES SHALL BE COATED WITH ASPHALT \ ���� ° ..y.: O • • �/ ' f /: 1 SPRAY TACK. CONTINUATION \ General Notes 1. FIRE HYDRANT AND FDC PLACEMENT AND ORIENTATION SHALL BE CONFIRMED BY FIRE MARSHALL PRIOR TO INSTALLATION. a Li 0 s U U N z o: bi I 9. ALL ACCESSIBLE ROUTES FROM HANDICAP ti o °�' O _ • // / i PARKING SHALL BE MAINTAINED AT A MAXIMUM �• ,� Op / yyR o• i / ' `� 2 ADDED GEN. CONST. NOTES 09/17/1 Z SLOPE OF 1" PER 20 LINEAR FEET. CROSS \ /` `� CQ . • / s R N� ! ' SLOPES ON ACCESSIBLE ROUTES SHALL BE A / �' 1 REVISED WATER LINE 0s /x4/12 MAXIMUM OF IA" PER LINEAR FOOT. THE No. Revision /Issue Date o CURRENT APPLICABLE ACCESSIBILITY CODE \ �' \ / '" r ,' / , �� °' ; SHALL BE FOLLOWED. ' �� !� // 4p�� • lr�J'�,, ` z t \ `� �,a4g$�% •'Y9 ,moo 10. COORDINATE INSTALLATION OF ANY REQUIRED \CO 02M FIRE APPARATUS WITH THE LOCAL FIRE F+ •'••fiN���E��,ir�?,� MARSHALL, BUILDING CODE INSPECTOR, AND �� sG °��o° / \ ! �'�,'p(�''•••••••'O�`�`o �� r�7� Pk f1� \ T� �� J / �` J �` �sOj��` CLA�,�� Date u FIRE DEPARTMENT PRIOR TO INSTALLATION TO F�� �k F,p \ — ¢ < ����,� C Lj VERIFY LOCAL REQUIREMENTS. TO INTENDED �` / ~ / Z 11. FINE GRADE AREAS TO DRAIN � \ � / � � ¢ Q DRAINAGE STRUCTURES IN ORDER TO PREVENT /lr nn �s T �� EX. SS MH ��.:. ..� \, i� �50 1` �< Cli%f%t�IR J1'.� P. , I1lG. ANY STANDING WATER. IF THERE IS ANY / RIM EL. 166.74 /' ~ �� /� CIVIL a ENVIRONMENTAL ENGINEERING r ' / NOW OR FORMERLY '� QUESTION ON THE COMPLETION OF THE FINAL INV. EL. 153.02 FksT CO ♦ ��� / 4ry� HARNETT FORWARD TOGETHER COMMITTEE COATS, N6 WASHINGTON t !A zi5 ti GRADING, THE CONTRACTOR SHALL CONTACT \ tic / ♦ / DEED BOOK 2252, PAGE 911 PHONE: 910 -897 -7070 FAX: 910-897 -6767 0 THE ENGINEER PRIOR TO CONSTRUCTION. / daytoo.com 0 / MAP BOOK 2010, PAGE 575 Lfcense No. C -2570 www.ciciaylon.com � � / / / MAP BOOK 2010 PAGE 485 PIN 0650- --79 -- 1646.000 SS I �� ��; HARNETT HEALTH INVESTORS LLC EX. 55 RIM EL. 167.36 �`�� SS l— � � '. �v • 4 \ INV. EL. 153.82 / / ��ir� — 4Z� � � 1 HARNETT COUNTY, NORTH CAROLINA Projad No: 1 73001 File Name: 173001 MAS Cosigned By: CTC Jr. Drawn ay. AEB Wt- / �12;W - - - - . f - -��f Checked Sy: F,,. g.: CTC Jr. CTC / �— -- -- --` / sheet Tate UTILITY PLAN / NOW OR FORMERLY / NOW OR FORMERLY NOW OR FORMERLY l Date JUNE 2092 Sheet HARNETT FORWARD TOGETHER COMMITTEE / HARNETT FORWARD TOGETHER COMMITTEE HARNETT FORWARD TOGETHER COMMITTEE GRAPHIC SCALE: 1 " 40' / DEED BOOK 2252, PAGE 911 DEED BOOK 2252, PAGE 911 DEED HOOK 2252, PAGE 911 1 Some C300 MAP BOOK 2010, PAGE 575 �\� MAP BOOK 2010, PAGE 575 ` MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 / MAP BOOK 2010, PAGE 485 MAP BOOK 2010, PAGE 485 0 20 40 $0 120 AS NOTED PIN 0650 -79-1646.000 / ` PIN 0650 -79- 1646.000 PIN 0650 -- 791646.000 l J TITLE KEY SYMBOL SEDIMENT BASIN SB SKIMMER SK DIVERSION BERM DB SILT FENCE SF INLET PROTECTION Ip OUTLET PROTECTION v;��f• TEMPORARY STONE CONSTRUCTION ENTRANCE CE a c PERMANENT SEEDING PS PS TEMPORARY SEEDING TS TS CHECK DAM CD LIMITS OF DISTURBANCE \\ 7 DAYS CDays 7 DAYS HATCHING 7 Days + + + + ANY SWALE, BERM, OR OTHER FEATURE THAT 7 D�)THAN CONCENTRATES FLOW, PLUS ALL OTHER SLOPES GREATER 3 :1 SHALL HAVE GROUND COVER PROVIDED WITHIN 7 CALENDAR DAYS. SEE STABILIZATION TIME FRAME CHART + + + (NPDES STORMWATER DISCHARGE PERMIT FOR + + + CONSTRUCTION ACTIVITIES NCG01) ON SHEET C -404. CONSTRUCTION SCHEDULE Phase 1: 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. FLAG THE WORK LIMITS. 3. HOLD PRECONSTRUCTION MEETING AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION. 4. INSTALL THE TEMPORARY GRAVEL CONSTRUCTION ENTRANCES AS THE FIRST CONSTRUCTION ACTIVITY. INSTALL SEDIMENT FENCE AND DIVERSION BERMS AS DICTATED ON THE PROJECT DRAWINGS. MAINTAIN PROPER SEPARATION WITH WETLANDS. ONLY DISTURB AREAS NECESSARY FOR INSTALLATION OF PERIMETER DIVERSIONS. VEGETATE DISTURBED AREAS. 5. INSTALL TEMPORARY SEDIMENT TRAPS AT LOCATIONS SHOWN ON THE PLANS. 6. CLEAR VEGETATION AS IDENTIFIED FROM THE ENTIRE WORK AREA. REMOVE TOPSOIL FROM AREA OF EXCAVATION AND STOCKPILE FOR USE DURING FINAL STABILIZATION. 7. ROUGH GRADE SITE TO FACILITATE DRAINAGE INTO THE PROPER E &S STRUCTURES. FINISH THE SLOPES ON AND AROUND THE PROPOSED ROAD AND STRUCTURES AS SOON AS ROUGH GRADING IS COMPLETE. LEAVE THE SURFACE SLIGHTLY ROUGHENED AND VEGETATE WITH TEMPORARY SEED MIX AND MULCH IMMEDIATELY. 8. DO NOT PROCEED WITH SITE DEVELOPMENT (SHEET C401) UNTIL ALL PERIMETER EROSION CONTROL MEASURES HAVE BEEN APPROVED BY ENGINEER AND LOCAL NCDENR LAND QUALITY INSPECTOR. 9. SEE STABILIZATION TABLE ON SHEET C404. NO WETLANDS SHALL BE DISTURBED. / f , / / / / / ' NOW OR/ FOR OENLY /' '� SILT FENCE l f`HARNETT FORWARD TOGETHER HER COWITTER / DEED BOdK 225,_' PAGE,IJ11 REMAINDER OF T Ng. 4 / f BRIGHTWATER HASE� 1 MAP BOOKS 2012, PAGE 34 MAP' BOOK 2610, PA ES 575 576,' SFO SILT FENCE 15 / MAP BOOK/ 2010, PA 3 ES 466-487 ' , MAP BOOK 2010, PA ES �44 -6.45 / /' OUTLET (TYP.) l \ f±160, /' PIN 0650 -79- 646.000 11 _ 1a4 - -� ;' STOQKPILE/ AREA LIMITS OF DISTURBANCE y / - "5.5 AC. 0 CONSTRUCTION 183 -` - -'' w`�\ ;r SFO ,ENTRANCE _ f EXISTING STORM r' .` \� , CE \ SEWER BY OTHE S / o \ _1eo /: _ ,�� - WETLANDS - SILT FENCE NOW OR FORMERLY NOW OR FORMERLY / -_ " �� 5Y -N -- 57s SF . ' ^/ HARNETT FORWARD TOGETHER COMMITTEE /� J ~ ^ Y N I ~ / /' o DEED BOOK 2252, PAGE 911 HARNE17 FORWARD TOGETHER COMMITTEE _ -- - - - ` -Y - 'tiI6' - - -- ,� ,� ' LOT 25 3 DEED BOOK 2252, PAGE 911 - ,, -'�'� 17a� _ _ _�- 1��Y - f y „ _ , y BRIGHTWATER PHASE 1 LOT Na. 5 EXISTING STORM Y _ _ _ _ - - - - - - - - - ,' \ MAP BOOK 2012, PAGE 34 BRIGHTWATER PHASE 1 SEWER BY OTHERS `� / `- ~~ _ Y~ /' �+ v MAP BOOK 2010, PAGES 575 -57fi MAP BOOK 2012, PAGE 34 / j , - - -�� ~� �,' ,' }} MAP BOOK 2010, PAGES 485 -487 MAP BOOK 2010, PAGES 575 -576 _ _17z--------------- t MAP BOOK 2010, PAGES 644 -645 MAP BOOK 2010, PAGES 485 -487 - .� - - 4 PIN 0650-79-1646.000 S 644 MAP BOOK 2010, PAGES 644- -645 Y �� .'' _ - _ - _ _ 1a PIN 0650 -79- 1646.000 _ SILT FENCE SHALL BE NO w LIMITS OF _t ;�� _ - - - - Ts ��- ,-CLOSER THAN, 5' TO WETLANDS DISTURBANCE / l ! / ,41 - - "- — / EXISTING STORM / ® �," f,' /,' \6$- _ / SEWER BY OTHERS , , , _ 1- - _ - J Z / ✓rap f , / f / / AREA DA2: 2.73 AC. 11 ! \ / N�� SFO SILT FENCE OUTLET TYP. ) Jam,/ ( LIMITS OF DISTURBANCE EXISTING STORM 5.5 AC. �r / SEWER BY OTHERS / / s / / ,' , / ' !! - !, y _ ��- �"�.W� _� z , DIVERSION DB 7 Da s „r BERM 16 i � SILT FENCE �� l CONSTRUCTION SF ENTRANCE. 175 ' / •- -'' _ -r/ / i `` `\ FINISHED CONTOURS ON �`\ - /- , i ADJOINING SITE BASED ON \ -173 - - -' _ ' ( OBTAINED ENGINEERING PLANS SILT FENCE SHALL BE NO / TS f CLOSER THAN 5' TO WETLANDS / \ EXISTING STORM _ _ \ SEWER BY OTHERS \\ »� /,'' r 1`2 ' ,'� / EXISTING STORM SEWER BY OTHERS or SFO It EXISTING BMP MAINTENANCE AND \ ` 170 - / 7 ❑ayS ' \ / .' / ACCESS EASEMENT MB 2010, PG. 485 / AREA -DA1. 1.62 AC., DB ` DIVERSION s�' It- BERM SEE SHEET C461 FOR LIMITS OF — _ D13 7 Days - - SEDIMENT BASIN GRADING DISTURBANCE - --.��, `•16/ 5.5 AC. 1 - - DIVERSION ------ BERM -" ,�� 7 Day�Ts UB ` ,65 _DIVERSION " -- ss2 / SXEWER BY OTHERS ` \�F --- - - - - -- 55�`" BERM =,../ ., o/ ' �' /„ ,' SILT FENCE \ 'P i / /SF O �� ,LIMITS OF DISTURBANCE Ts _ 1_ — sFO �:`.� �'' _,5.5 AC. / FORMERLY HARNETT FORWARD TOGETHER COMMITTEE SILT FENCE / �,1 I it OUTLET STRUCTURE / / DEED BOOK 2252, PAGE 911 SF 1 t .5_ SEE SHEET C501 / MAP BOOK 2010, PAGE 575 ` ';` 6 - ` ^- - - -' SF0 t r j / MAP BOOK 2010, PAGE 485 \ , ,`` DRAIN LINF� T / sFO , � %' ; t ,�. 0 DI,SCHAR�E PIPE PIN 0650 -79- 1646.000 EXISTING STORM •�. s L r \ } \- y SEWER BY OTHERS / ' J SILT FENCE EXISTING STORM SEWER Bl OTHERS- l / / NOW OR FORMERLY / NOW OR FORMERLY \ NOW OR FORMERLY HARNE17 FORWARD TOGETHER COMMITTEE HARNETT FORWARD FORWARD TOGETHER COMMITTEE HARNE17 FORWARD TOGETHER COMMITTEE GRAPHIC SCALE: 1" = 40' DEED BOOK 2252, PAGE 911 / / DEED BOOK 2252, PAGE 911 DEED BOOK 2252, PAGE 911 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 575 \ MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 % 1` MAP BOOK 2010, PAGE 485 MAP BOOK 2010, PAGE 485 0 20 40 80 120 I PIN 0650 -79- 1646.000 / } PIN 0650 -79- 1646.000 PIN 0650 -79- 1646.000 General Notes 1. SEE SHEET C404 FOR ALL EROSION AND SEDIMENT CONTROL NOTES, SPECIFICATIONS, MAINTENANCE AND CONSTRUCTION SEQUENCE. 2. ANY SWALE, BERM, OR OTHER FEATURE THAT CONCENTRATES FLOW, PLUS ALL OTHER SLOPES GREATER THAN 3:1 SHALL HAVE GROUND COVER PROVIDED WITHIN 7 CALENDAR DAYS. SEE STABILIZATION TIME FRAME CHART (NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES NCG01) ON SHEET C -404. 3 ADDED "7 DAYS" HATCHING 09/07/12 0 2 ADDED "7 DAYS" NOTE os a7 12 1 REVISED CONSTR. ENTRANCE 08/27/12 8 No. Revision/Issue Date 9qg >�► J1d m �o 0 rP O V ¢ R o p. m UAL& Ln a o n LM1 'c�'+'cy�s..' w n 026 IFS r, ' c"e Sffhature Q ° �aa�:j'j:a• �Si i aay n d� Jl p09P9ae � �: � v aB��d2 if L;A A a ° +� D ate ton, Sr., P..., Inc. ENVIRONMENTAL ENGINEERING ,.T WASHINGTON STREET COATS, NORTH CAROLINA 27521 PHONE: 9i0- 897 -7070 FAX:9IM97 -6767 License No. 0-2570 www.c4claylon.com HARNETT HEALTH INVESTORS LLC HARNETT COUNTY, NORTH CAROLINA Project No: 173001 Fife Name: 173001 MAS Designed Sy. CTC Jr. Drawn By: AEB Checked By: CTC Jr. Prof Eng.: CTC SheetTille EROSION AND SEDIMENT CONTROL PLAN PHASE 1 Date JUNE 2012 Sheet Scale C4 0 0 AS NOTED TITLE KEY SYMBOL SEDIMENT BASIN SB SKIMMER SK DIVERSION BERM DB SILT FENCE SF a -0 INLET PROTECTION IP OUTLET PROTECTION TEMPORARY STONE CONSTRUCTION ENTRANCE CF ' ' PERMANENT SEEDING PS PS TEMPORARY SEEDING T5 TS CHECK DAM CD LIMITS OF DISTURBANCE \\ ROLLED EROSION MATTING EM 7 DAYS 7 Days 7 DAYS HATCHING 7 Days + + + + ANY SWALE, BERM, OR OTHER FEATURE THAT 7 D CONCENTRATES FLOW, PLUS ALL OTHER SLOPES GREATER ;)THAN 3:1 SHALL HAVE GROUND COVER PROVIDED WITHIN 7 CALENDAR DAYS. SEE STABILIZATION TIME FRAME CHART + + + (NPDES STORMWATER DISCHARGE PERMIT FOR + + + CONSTRUCTION ACTIVITIES NCG01) ON SHEET C-404. CONSTRUCTION SCHEDULE r A - / / / / / / / / HIGH- SLOPE AREAS ���' \\----------\ (GREATER THAN 3:1) SHALL / BE LINED WITH NORTH ' NOW OR/FORM F,I' LY / BM NOW FORWARb TOGETHER COWITTEE AMERICAN GREEN 6/50 (OR DEED B06K 225,2, PAGE /911 EQUAL) PRIOR TO REMAINDER OF LOT N 4 , r PERMANENT SEEDING AND BRIGHTWATER PHASE 1 - f MAP BOOK,/2012, P,,dGE 34 /' -- STABILIZATION EFFORTS ,' I MAP,/ BOOK 2610, PAGES 575>` -576,' .' MAP BOOK.'2010, PAGES 48� -48�' /MAP BOOR 2010, PAGES 44 -645 PIN 0650 -7,6- 1646.000 1134 — \ t 7 Days \\ 184 _ + ~ 1 1 P *f!1- .1'75- ' / \'1¢ ,+ i,' + _ IP ,� ,,�� f $ - WETLANDS - r 1 y y y w w _ +/ 16 .5 X1 69.$ NOW OR FORMERLY `1 •8-X TC169.85 /' /' 1�' w ' w HARNETT FORWARD TOGETHER COMMITTEE NOW OR FORMERLY / _ _ - 7 Days 7y / �' . / n ' DEED BOOK 2252, PAGE 911 HARNETT FORWARD TOGETHER COMMITTEE - + \7 - - ---' X ,' LOT No. 3 DEED BOOK 2252, PAGE 911 - -'- - - I "/ _ -178 + - - 174 ^ -�Y 169.4 \ y w w w BRIGHTWATER PHASE 1 LOT No. 5 _-+- _ BRIGHTWATER PHASE 1 r~ 169.4 -� \ , MAP BOOK 2012, PAGE 34 MAP BOOK 2012, PAGE 34 I s73 IP , 1 MAP BOOK 2010, PAGES 575 -576 MAP BOOK 2010, PAGES 575 -576 - -- / Ip _ _172 -- - - MAP BOOK 2010, PAGES 4135 --487 MAP BOOK 2010, PAGES 485 -487, Ip / 4 MAP BOOK 2010, PAGES 644 -645 PIN 0650 -79- 1646.000 MAP BOOK 2010, PAGES 644 -645 PIN 0650 -79- 1646.000 - Ip PS TIC 169.6 / d -� TS ,/' `/' �,' ��� � _; % \•Ep ..0. t1 g- + t-7-.Days- PS - - -- - - -- / Aff ' /- pF + FIN. FL.' EL. 171.00' 168 --------- + 167 -_ _ PS / 7-Days / OU7 1 0 s r / //.INV. . p� + - 'yts S Phase 2; WALE Na._ 1 / �Ih I 1. MAINTAIN ALL EXISTING EROSION CONTROL STRUCTURES PREVIOUSLY pg CONSTRUCTED AS PART OF PHASE 1 (SHEET C400). 2. CONSTRUCT BUILDING FOUNDATION AND PAD. INSTALL STORM SEWER TO �`\ IP -'� f IP '' -' /'' + _ Days INTERSECT RUNOFF DRAINING TO BUILDING PAD AND PAVED AREAS. / �` 175 IP - t6* " ~" FINISHED CONTOURS ON `�` /`� , \7�' / _ - / /'� I /� / / •�� ' ' 3. CONTINUE ROUGH GRADING AND UTILITY INSTALLATION. INSTALL INLET PROTECTION ADJOINING SITE BASED ON - -173 -- 172,1,' AT LOCATIONS SHOWN ON THE PLANS. OBTAINED ENGINEERING PLANS 4. INSTALL RIPRAP APRONS ON PROPOSED STORMWATER PIPE OUTLETS AT TIME OF t ' 172 - -- — ------ PIPE INSTALLATIONS. ` 171.80 .:.,.:.; :.: I 7✓flays 5. COMPLETE FINAL GRADING OF GROUNDS, TOPSOIL CRITICAL AREAS, AND _ 171 X / i < PERMANENTLY VEGETATE AND MULCH AS PROJECT DICTATES. OP rNo. 3 INV. OUT 162.0 6. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE INSPECTED WEEKLY /• —'-%' / ' General Notes 1. SEE. SHEET C404 FOR ALL EROSION AND SEDIMENT CONTROL NOTES, SPECIFICATIONS, MAINTENANCE AND CONSTRUCTION SEQUENCE. 2. ANY SCALE, BERM, OR OTHER FEATURE THAT CONCENTRATES FLOW, PLUS ALL OTHER SLOPES GREATER THAN 3:1 SHALL HAVE GROUND COVER PROVIDED WITHIN 7 CALENDAR DAYS. SEE STABILIZATION TIME FRAME CHART (NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES NCG01) ON SHEET C -404. AND AFTER RAINFALL EVENTS. NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. �� + + ```' ==' ` / IP •' # u' / / ` _.ts4 -- I I ' '`1 .' 3 ADDED '7 DAYS" HATCHING 0s/07/1z � _ _- � - - � ` ° , ` i / Hq �o� ,' / `� 2 ADDED "7 DAYS" NOTE 0s /0/12 7. AFTER EACH PORTION OF THE SITE IS STABILIZED, REMOVE ALL TEMPORARY + + -16g - CaRN ,� MEASURES AND INSTALL PERMANENT VEGETATION IN THAT PORTION OF THE SITE. + + ,/ -~ I 5pR Nry� 1 REVISED GRADING PLAN 0s 04 12 1- tss - rs' ,58 �'� / /•' #' UFFVR No. Revision/issue Date 8. INSTALL STORM WATER PIPING. + + + + + � - "� '. `' `_�` �:.-' ., OP3 ty • � ! O �� \ . ---- 7 Days_ •- \6 �, -'� 7 Days HIGH-SLOPE AREAS `' � �p6aeBBtiassridd�� �,' r s6 r vao C �1e 9. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES SO THAT 6�- _ \ _ =/> > su -, r (GREATER THAN 3:1) SHALL �m ��H ARp vo ` r �� -163 -- -r / / 1 \1 / r OaO 0��•E�•f,�•� J, Ir AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN _ _ \6S f , BE LINED WITH NORTH a �J l ACCORDANCE WITH NCDENR -LQS STANDARDS. '� / '\�; ,``� ;AMERICAN GREEN %o (OR 1 co -- / / �' � EQUAL PRIOR TO SE a Slg at CALENDAR DAYS FOLLOWING �� ' i `OP No. 4 i ' 1PERMANENT SEEDING AND 5O \ n OZ8 10. DISTURBED AREAS SHALL BE SEEDED WITHIN 14 CA_ l / ' f. � 'i1' ,> � r t;INV. OUT 162.0 i -_ /�% COMPLETION OF GRADING (SEE TABLE SHEET C404)_ �e tsy` - - - SB2 /> / ��' \ �_�. ��STABILIZATION EFFORTS \ dBS °.�;NIIyE�;:•�' /7 bum G b! \` -- - - - - -- t6' �' / / lt' -__ ,f fi' �� �'A �e 11. COVER ALL AREAS THAT WILL NOT BE WORKED FOR MORE THAN SEVEN DAYS WITH ` �'` ��' �I sKZ 1 / ;7- �/,'/ `�� °'sae�SdC a Date E STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. COVER AREAS BEFORE cG `,� MAJOR STORM EVENTS. �� �� - - / \ MAINTAIN SEDIMENT BASINS 1�� and 2 SHOWN ON SHEET C4 12. ESTIMATED TIME BEFORE FINAL STABILIZATION - 12 MONTHS. SWALE DD `\I ,y!.� UNTIL FINAL STABILIZATION N0. 2 ��a \ _ _ ;`.,��� �; -,f� , / G47,V aA, Sr., FEI Inc. ,. _� \ ` 1 I r I "' `\ >'y / CIVIL & ENVIRONMENTAL ENGINEERING °1 `` .\` PS OP1 I'I �i / / NOW OR FORMERLY 46 WEST WASHINGTON STREET t �� 1 I 1 nsw l'^ I I &o_ / HARNETT FORWARD TOGETHER COMMITTEE m CONSTRUCTION SEQUENCE FOR CONVERTING THE SEDIMENT BASIN INTO A r , I I coars,NQIiiHCAROLINA 27521 I PERMANENT STORM WATER MANAGEMENT BASIN 1. AFTER COMPLETE STABILIZATION OF THE SITE AND APPROVAL FROM THE NCDENR EROSION CONTROL INSPECTOR, REMOVE ALL EROSION CONTROL MEASURES, DEWATER THE TEMPORARY SKIMMER TRAP AND CLEAN OUT THE ACCUMULATED SEDIMENT. 2. FOLLOW ALL RECOMMENDATIONS OF THE OWNER'S ENGINEER FOR ALL BASIN REPAIRS AND MAINTENANCE. 3. REMOVE SKIMMER AND BARREL PLATE. PLUG OR CAP SKIMMER CONNECTIONS ON CONCRETE RISER. 4. GRADE THE BASIN TO FINAL GRADES INDICATED AND SEED PER SPECIFICATIONS. 5. INSTALL PLANTS PER DETAIL ON SHEET C601. NO WETLANDS SHALL BE DISTURBED. 1 res _ _ `- J� • E t I i / / DEED BOOK 0-8 2252, PAGE 911 PHONE: M -897 -7070 FAX: 8197 -6767 �\ MAP BOOK 2010, PAGE 575 Llcense No. C -2570 www.adaytomcom - �— + ' MAP BOOK 2010, PAGE 485 OP5 PIN 0650 -79- 1646.000 s 1 MI, �- ��" I J . °`off HARNETT HEALTH INVESTORS LLC OP No. 1f INV. OUT 162.0 \ y �•_ _ J i HARNETT COUNTY, NORTH CAROLINA / } Project Na: 173001 File Name: 173001 MAS Designed By: CTC Jr. Draw' Sy AEB Checked By: CiC Jr. Proj. Eng.. CTC Sheet Title EROSION AND SEDIMENT / / — 1 `\ � ✓ / / � 1 ` � CONTROL PLAN PHASE 2 Sheet / NOW OR FORMERLY NOW OR FORMERLY ` NOW OR FORMERLY 1 Date JUNE 2012 HARNETT FORWARD TOGETHER COMMITTEE /� HARNETT FORWARD TOGETHER COMMITTEE HARNETT FORWARD TOGETHER COMMITTEE GRAPHIC SCALE: 1" = 40' / DEED BOOK 2252, PAGE 911 �� / DEED BOOK 2252, PAGE 911 DEED BOOK 2252, PAGE 911 ` Scale / MAP BOOK 2010, PAGE 575 �� I MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 575 y C401 j MAP BOOK 2010, PAGE 485 MAP BOOK 2010, PAGE 485 MAP BOOK 2010, PAGE 485 0 20 40 80 120 AS NOTED I S PIN 0650 -79-1646.000 / } PIN 0650 -79-- 1646.000 1 PIN 0650 -79- 1646.000 l / TEMPORARY SEEDING SCHEDULE SHOULDERS, SIDE DITCHES, SLOPES DATE: TYPE: PLANTING RATES: TS Aug 15 - May 1 Rye (grain) 200 lbs. /acre May I -Aug 15 German Millet 40 lbs. /acre Consult the Conservation Engineer or the Soil Conservation Service for additional information concerning other altemative for vegetation of denuded areas. Ground cover must be installed on exposed slopes within 7 days fallowing completion of any phase orgrading. * Omit annual lespedeza when duration of temporary cover is not to extend beyond June. * *Tempafaly - Reseed according to optimum season for desired permanent vegetation, Do not allow temporary cover to grow over 12" in height before mowing, otherwise fescue may be shaded out. SEEDBED PREPARATION 1. Chisel compacted areas and spread topsoil 3" deep over adverse soil conditions, if available. 2. Rip the entire area to 6" depth. 3. Remove all loose rock, roots, and other obstructions leaving surface reasonably smooth and uniform. 4. Apply agricultural lime, fertilizer, and superphosphate uniformly and mix with soil (see below *). 5. Continue tillage unit a well- pulverized, firm, reasonably uniform seedbed is prepared 4" to 6" deep. 6. Seed on a freshly prepared seedbed and cover seed lightly with seeding equipment or cultipack alter seeding. 7. Mulch immediately alter seeding and anchor mulch. S. Inspect all seeded areas and make necessary repairs or reseeding within the planting season, if possible. If stand should be over 60% damaged reestablish following original lime, fertilizer and seeding rates. 9. Consult the Conservation Inspector on maintenance treatment and fertilization after permanent cover is established. *Apply: Agricultural Limestone - 2 tons /acre or 3 tons /acre in clay soils. Fertilizer- 750 lbs/acre (10- 20 -10) Mulch - 2 tonslacre (small grain straw) Anchor - asphalt emulsion at 450 gal.lacre is straw is not crimped in place. PERMANENT SEEDING SCHEDULE ALL AREAS UP TO SLOPES OF 3:I P r DATE: TYPE: PLANTING RATES: J Aug 15 -Nov I Tall Fescue 300 lbs. /acre Nov 1 -Mar 1 Tall Fescue and 300 lbs. /acre Abruzzi Rye 25 lbs. /acre Mar 1 - Apr 15 Tall Fescue 300 lbs. /acre Apr 15 - Aug 15 Hulled Common Benmudagmss 25 lbs. /acre and Tall Fescue 200 Ibs.lacre Slopes (3:1 to 2: t ) Mar 1 -Oct 1 Centipede Sod Full Coverage- Staked -Olt (Mar I -Oct 1) Tall Fescue 200 lbs. /acre -OR- (Mar 1 -Oct]) Hulled Common Bermudagrass 75 lbs. /acre Consult the Conservation Engineer or the Soil Conservation Service for additional information concerning other alternative for vegetation of denuded areas. Permanent ground cover must be installed on al I disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development, * *Temporary - Reseed according to optimum season for desired permanent vegetation, Do not allow temporary cover to grow over 12" in height before mowing, otherwise rescue may be shaded out. SEEDBED PREPARATION 1. Chisel compacted areas and SPREAD TOPSOIL 3" DEEP. 2. Rip the entire area to 6" depth. 3. Remove all loose rock, roots, and other obstructions leaving surface reasonably smooth and uniform. 4. Apply agricultural lime, fertilizer, and superphosphate uniformly and mix with soil (see below *). 5. Continue tillage unit a well - pulverized, firm, reasonably uniform seedbed is prepared 4" to 6" deep. 6. Seed on a freshly prepared seedbed and cover seed lightly with seeding equipment or cultipack after seeding. 7. Mulch immediately after seeding and anchor mulch. B. Inspect all seeded areas and make necessary repairs or reseeding within the planting season, if possible. If stand should be over 60% damaged reestablish following original lime, fertilizer and seeding rates. 9. Consult the Conservation Inspector on maintenance treatment and fertilization after permanent cover is established. *Apply: Agricultural Limestone - 2 tonstacre or 3 tons /acre in clay soils. Fertilizer- 1000lbs/acre Superphosphate -500 lbs/acre (20 %) Mulch - 2 tonsfacre (small grain straw) Anchor - asphalt emulsion at 450 gal./acre NATURAL GROUND E 4 6 N NN of 0 a71 a NORTH AMERICAN GREEN $150 OR EQUAL I B I+ — W NATURAL GROUND SWALE M y B W FREE— VELOCITY TEMPORARY ID (FEET) (FEET) (FEET) (FEET) (FEET) (fps) NEEDED I A SEDIMENT PIT SHALL SB2 SEE TABLE BELOW BE DUG IN FRONT OF SILT FENCE, ALONG FILLED WITH SOIL AND 20' NONE 1 3 0.25 3 17.50 0,50 1,26 (GRASS MIX) STORAGE CAPACITY. ONE PIECE. IF MATERIAL DOES NOT EXTEND FULL ATTACHING TWO SILT FENCES LENGTH OF SPILLWAY, LAP UPPER PIECE OVER LOWER NONE 2 3 1.25 6 12.50 0.40 ___l 1.04 ( MIX) NOTE: REFER TO THE EROSION CONTROL FABRIC INSTALLATION (TEMPORARY LINER) DETAIL THIS SHEET. MATTING SHALL BE NORTH AMERICAN GREEN LINER LISTED OR EQUAL TYPICAL SWALE NOT TO SCALE SW C. Overlap- -Bury upper end of lower strip as in 'A' and 'B'. Overlap and of top strip 4 inches and staple. D. Erosion stop -- -Fold of lining buried in slit trench and tamped, double row or staples. B. Tamp the trench full of soil. Secure with row of staples, 10 inch spacing, 4 inches down from the trench. 1, + �✓ �4, ywW yr y' O _rgig 211 6tl V101 I d �OI 'i► �� 8 Typical Slrow with (Jet Lining Detail OI 0 It �f° s° A. Bury the top end of the strips in a trench 4 inches or more in depth. ' _BAFFLE (TYP.) OUTLET STRUCTURE SEE DETAIL SHEET C501 - SKIMMER -f. __.._ SKIMMEf� - -- ________ IRSTI CH BER - ... �...� ... _^...�... \moo '� I SEC0NQ _ 4 ��,. CHAMBER 4 `�' FIRST CHAM ER SECOND \ CHAMBER EMERGENCY SPILLWAY •EMERG N Y ; SPILLWAY —— ~~`�`1 � `••' '�i /�\`�� ���I ~t �� i ;" DS HC ARGE -. PIPE',', .'SEE DETAIL �SHEET 0501 PLAN VIEW 3 �1 EROSION CONTROL FABRIC SWALE INSTALLATION (TEMPORARY LINER) NOT TO SCALE SW ANCHOR TOP EDGE IN TRENCH Q N SPACING OF POSTS TO BE 8 FEET MAX APART FILTER FABRIC MATERIAL SECURELY FASTENED TO THE POSTS AND THE WIRE MESH STEEL POST 1.33 IB /LF 5' MIN LENGTH 24 INCHES (MIN) FILTER FABRIC MATERIAL FOR ADDITIONAL STRENGTH FILTER FABRIC MATERIAL SHALL BE ATTACHED TO A 6 -INCH (MAX) MESH WIRE SCREEN WHICH HAS BEEN FASTENED TO THE POSTS DIRECTION OF RUNOFF WATERS APPROXIMATE DRIVE BOTH 4-INCH BY POSTS ABOUT 10 8 -INCH DEEP I J��o -" INCHES INTO THE TRENCH - GROUND AND BURY FLAP CONSTRUCTION OF A SILT FENCE NOT TO SCALE SF ALL EROSION AND SEDIMENTATION CONTROL STRUCTURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (LATEST EDITION) FFN 1006 • LAMINATED PLASTIC OR ANCHOR EDGES IN TRENCH SECOND IMPERMEABLE GEOTEXTILE KNIFE ALONG THE SIZE FABRIC I S�D�M WIDTH CKFILLED TRENCH �O 3 f€ I A SEDIMENT PIT SHALL SB2 SEE TABLE BELOW BE DUG IN FRONT OF SILT FENCE, ALONG FILLED WITH SOIL AND 20' CROSS %\ -- NOTE: ENTIRE LENGTH AS FEASIBLE TO INCREASE EXTEND FROM SIDE TO SIDE IN STORAGE CAPACITY. ONE PIECE. IF MATERIAL DOES NOT EXTEND FULL ATTACHING TWO SILT FENCES LENGTH OF SPILLWAY, LAP UPPER PIECE OVER LOWER APPROXIMATELY 12 PIECE, SECURING EDGE OF LOWER PIECE WITH STAPLES. INCHES OF FILTER 2'--0" PLACE THE END FABRIC MATERIAL POST OF THE MUST EXTEND INTO SECOND FENCE A TRENCH AND BE ter- INSIDE THE END ANCHORED WITH ---�� POST OF THE COMPACTED FIRST FENCE BACKFILL MATERIAL / ROTATE BOTH POSTS AT LEAST 180 DEGREES IN RUNOFF �' -- A CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL WITH THE \/ FABRIC MATERIAL DIRECTION OF RUNOFF WATERS APPROXIMATE DRIVE BOTH 4-INCH BY POSTS ABOUT 10 8 -INCH DEEP I J��o -" INCHES INTO THE TRENCH - GROUND AND BURY FLAP CONSTRUCTION OF A SILT FENCE NOT TO SCALE SF ALL EROSION AND SEDIMENTATION CONTROL STRUCTURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (LATEST EDITION) FFN 1006 • EXTRA POST IN MIDDLE "HOG WIRE ATTACHED-J/ OF OPENING TO POSTS WITH LENGTHS OF WIRE HORIZONTAL METAL POST WIRED SECURELY TO VERTICAL POSTS BAFFLE INSTALLATION - STEP 1 l LONGITUDINAL SECTION THRU SPILLWAY FABRIC CUT AND FOLDED OVER THE TOP HORIZONTAL WIRE-7 CUT 6" SLITS IN THE LAMINATED PLASTIC OR ANCHOR EDGES IN TRENCH SECOND IMPERMEABLE GEOTEXTILE KNIFE ALONG THE SIZE FABRIC I I- WIDTH WIDTH \ 3 f€ I BOTTOM OF BAFFLE IN SB2 SEE TABLE BELOW 1 1/4- FILLED WITH SOIL AND 20' CROSS SECTION THRU SPILLWAY -- NOTE: LINING MATERIAL MUST EXTEND FROM SIDE TO SIDE IN ONE PIECE. IF MATERIAL DOES NOT EXTEND FULL LENGTH OF SPILLWAY, LAP UPPER PIECE OVER LOWER PIECE, SECURING EDGE OF LOWER PIECE WITH STAPLES. 4' -6" 2'--0" BERM BEYOND 3 3 10 Q1 EXTRA POST IN MIDDLE "HOG WIRE ATTACHED-J/ OF OPENING TO POSTS WITH LENGTHS OF WIRE HORIZONTAL METAL POST WIRED SECURELY TO VERTICAL POSTS BAFFLE INSTALLATION - STEP 1 l LONGITUDINAL SECTION THRU SPILLWAY FABRIC CUT AND FOLDED OVER THE TOP HORIZONTAL WIRE-7 CUT 6" SLITS IN THE SKIMMER ORIFICE FENCE FABRIC WITH A SECOND SPILLWAY KNIFE ALONG THE SIZE BOTTOM WIRE IN CHAMBER EVERY OTHER SQUARE WIDTH OF THE HOG WIRE \ HORIZONTALLY AND 30' VERTICALLY BOTTOM OF BAFFLE IN SB2 TRENCH AND TRENCH 1 1/4- FILLED WITH SOIL AND 20' COMPACTED EXISTING GROUND BASIN SKIMMER ORIFICE FIRST SECOND SPILLWAY ID SIZE DIAMETER CHAMBER CHAMBER WIDTH SB1 2" 1 1/4" 30' 20' 6.5' SB2 2" 1 1/4- 24 20' 7' TOP OF BAFFLE SHOULD BE 6" HIGHER THAN THE BOTTOM OF THE SPILLWAY AND 1' LOWER THAN THE TOP OF THE BERM BAFFLE INSTALLATION - STEP 2 sB SEDIMENT BASIN NOT TO SCALE SEE ALSO SECTIONS SHEET 501 ARM ASSEMBL "C" ENCLOSURE ATER ENTRY UNIT PERSPECTIVE VIEW PVC CAP \END PVC ELBOW alm■ -t'1< PVC SCHEDULE VENT D PVC PIPE PIPE SCHEDULE 40 PVC FLEXIBLE PIPE HOSE\ e BOT FRONT VIEW TEE PLATE STANDARD BASIN SKIMMER DETAIL NOT TO SCALE SK M FENCE AND FABRIC BURIED IN TRENCH- FABRIC FOLDED OVER HORIZONTAL TOP WIRE a a 6 "x6" TRENCH, BACKFILLED AND m N COMPACTED >a s a >o SECTION AT BAFFLE FINAL DRAWINGS FOR REVIEW ONLY NOT FOR CONSTRUCTION C Ld d J ' [J IN L rn I� a a 0 Z R. 0 U W m 0 0 Z m c� Z m r a.1 d t`n \ END / CAP PVC TEE PVC PIPE 1/2" HOLES IN UNDERSIDE alm■ -t'1< PVC SCHEDULE VENT D PVC PIPE PIPE SCHEDULE 40 PVC FLEXIBLE PIPE HOSE\ e BOT FRONT VIEW TEE PLATE STANDARD BASIN SKIMMER DETAIL NOT TO SCALE SK M FENCE AND FABRIC BURIED IN TRENCH- FABRIC FOLDED OVER HORIZONTAL TOP WIRE a a 6 "x6" TRENCH, BACKFILLED AND m N COMPACTED >a s a >o SECTION AT BAFFLE FINAL DRAWINGS FOR REVIEW ONLY NOT FOR CONSTRUCTION C Ld d J ' [J IN L rn I� a a 0 Z R. 0 U W m 0 0 Z m c� Z m r a.1 d t`n MIN. 12' 5 WASHED STONE �CLASS 'A' STORE UPSTREAM SIDE --\ W A 2� IAM. .rte CENTER FILTER FABRIC SECTION A - A A L- THE DISTANCE =H THAT POINTS B A AND B ARE OF EQUAL ELEVATION NOTES: (1) STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DANE. (2) STONE CHECK DAMS SHOULD BE SPACED IN A CHANNEL SO THAT THE CREST OF THE DOWNSTREAM DAM IS AT THE SAME ELEVATION OF THE TOE OF UPSTREAM DAM. ROCK CHECK DAM DETAIL NOT TO SCALE CD 2' COMPACTED FILL N FLOW —>`1 41r L °2 -II ' I I DIVERSION DITCH DETAIL NOT TO SCALE DD ALL EROSION AND SEDIMENTATION CONTROL STRUCTURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE — NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (LATEST EDITION) NORTH AMERICAN GREEN EROSION CONTROL Products Guaranteed SOLUTIONS 14649 HIGHWAY 41 NORTH EVANSVILLE, IN 47725 800- 772 -2040 www.nogreen.com SLOPE INSTALLATION 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL —O —SEED DO NOT SEED PREPARED AREA. CELL —O —SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED BEYOND THE UP —SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES /STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP's. 3. ROLL THE RECP's (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM"' , STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" — 5" (5 CM — 12.5 CM) OVERLAP DEPENDING ON RECP's TYPE. 5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE RECP's WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP's. EROSION MATTING SLOPE DETAIL NOT TO SCALE S TOP OF MUST BE ABOVE TI THE WAS FILTER FABRIC, STEEL FENCE POST u AND HARDWARE SET MAX 2' APART I CLOTH IN TRENCH FRONT VIEW MIN. 18" INTO SOLID GROUND I CONSTRUCTION SPECIFICATIONS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH BLOCK OPENINGS. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 --INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL, 3/4— TO 1/2 —INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE 13LOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. Ift7I.jI21 ElIkq [e] CONCRETE BLOCK -- R- 2:1 SLOPE, GRAVEL FILTER EXCAVATED SEDIMENT STORAGE PIT TO BE CLEANED AFTER EVERY RAIN OVER 0.5 INCHES AND A MINIMUM OF ONCE A WEEK OR IF IT REACHES 75% FULL. SEDIMENT PIT 1800 CF MIN. NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. SILT FENCE OUTLET NOT TO SCALE SFO SPECIFIC, APPLICA710N: THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPES NO GREATER THAN 5 %) WHERE SHEET OR OVERLAND FLOWS (NOT EXCEEDING 0.5 CFS) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. DROP INLET WITH GRATE; STEEL FU WIRE FEN( HARDWARE POST LTER OF #57 AZHED STONE 3' FILTER FABRIC N ON GROUND ce o IuI � BURY WIRE FE CE AND HARDWARE CLOTH 11 SECTION VIEW BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH La A Da W OUTLET PIPE PLAN OUTLET PIPE STONE LINING CLASSIFICATION SECTION LNon—woven Geotextile NOTE: Fabric REFER TO THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL FOR SEE TABLE ABOVE FOR OUTLET ADDITIONAL SPECIFICATIONS PROTECTION APRON DIMENSIONS. WHEN PIPING TO FLAT AREAS OR CHANNELS. RIP RAP APRON ID Do La W RIP RAP OP1 18" 10' 12' NCDOT CLASS A OP2 18" 10' 12' NCDOT CLASS A OP3 24" 10' 13' NCDOT CLASS A OP4 18" 10' 12' NCDOT CLASS A OP5 24" 12' 15' NCDOT CLASS B OUTLET PROTECTION NOT TO SCALE WIRE SCREEN DP TEMPORARY SEDIMENT STAKES FILTERED WATER POOL DEWATERING SILT FENCE FABRIC - -- �' ------ - - - -__ � DRAWINGS T NCDOT#57 STONE FINAL NAL 1 SEDIMENT ... 1' MIN. °� - C- 16 " 1. FOR REVIEW ONLY ITTTIT 2' MAX. 1. Vy._000 ,04 ---� 1 RUNOFF WATER y, NOT FOR CONSTRUCTION III= II WITH SEDIMENT STORMEDRAIND -B I - - =1 I 1 =1 I MI I I- , _ _ -= _ _= OVERFLOW I -1 I I_I I III I =1 11 =1 11 -I 11=111=111=1 I I = ,- DROP INLET - 1I -I 11 -I 11 -I 11 -I I I -I 11= ' I- III ^I 1 11-1 I =I I -I I= I I WITH GRATE -I.1= I I -I 11 -I � I -III. -1 i l- 11-1 111 II I Ivl I1 - ., <Ti ITN TI 11_11 i, ° 1/3 PIPE SEDIMENT —1 I I —III11_1 _ I I ITT 1 I BURIED SEDIMENT FENCE FAE3RIC — D r D ° DIAMETER No. Revisionlissue Dat 0 = 1— i =f 1 I— 1 3 —I 1L- BLOCK AND GRAVEL INLET PROTECTION I , "— "'- ITITITI- — " 1111 _'I -' —,I= '.����y NOT TO SCALE L - -- ----- - - - - -- 3/4' EXTERIOR 1 �N' I //J PLYWOOD �.�' S Signature �L3bB EAL PLYWOOD INLET PROTECTION 01 02MO 8" Thtck (min.) 2 to 3 -Inch type stone (Recommend NCI: #3 OR #4 Stone) I50' min. HUMP TO DIVERT RUNOFF FROM PAVED ROAD 2 to 3 -inch ballast type / stone (Recommend NCDOT `J #3 or #4 Stone) 6" EXISTING PAVEMENT _r' 8„ j-- 413" —I 50' min. ELEVATION TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE CE WASHED STONE FIL ACROSS PIPE INLE' iTREAM END OF )RM DRAIN HARDWARE ° 1/3 PIPE r D DIAMETER i> ° D IL ° D �, i U U u STONE FILTER INLET PROTECTION NOTE: ALL PARTIALLY COMPLETED STORM DRAINS SHALL BE PROTECTED AT THE END OF EACH DAY IN ACCORDANCE WITH THESE DETAILS. STANDARD PIPE INLET PROTECTION (PLYWOOD & STONES NOT TO SCALE S E .w 0 EROSION AND SEDIMENT CONTROL NOTES: 1. DISTURBED ACREAGE: 5.5 ACRES. GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING EROSION AND SEDIMENT CONTROL PLAN REVISION APPROVAL FOR ANY ADDITIONAL DISTURBED AREA IN EXCESS OF THIS AMOUNT AT NO ADDITIONAL COST TO THE OWNER. 2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROL STRUCTURES DURING CONSTRUCTION. 3. ADDITIONAL GRAVEL CONSTRUCTION ENTRANCES MAY BE INSTALLED AS NEEDED PROVIDED PRIOR WRITTEN APPROVAL IS GIVEN BY THE ENGINEER. 4. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 5. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL TO BE PLACED PRIOR TO CLEARING AND /OR LAND DISTURBANCE AS PROJECT PHASING DICTATES. 6. EROSION CONTROL MEASURES SHOWN ON APPROVED PLANS ARE SITE SPECIFIC AND ARE DESIGNED TO PREVENT SOIL EROSION AND TO PREVENT SEDIMENT FROM LEAVING THE SITE. HOWEVER, EROSION CONTROL DESIGN IS PERFORMANCE BASED. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 7. ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. CONTRACTOR STAGING AREA(S) SHALL BE RETURNED TO ORIGINAL CONDITION AT THE COMPLETION OF ALL WORK. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO THE RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF - PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. RECORDS OF THESE INSPECTIONS ARE TO BE MAINTAINED AND MADE AVAILABLE FOR INSPECTION BY NCDENR, THE OWNER, AND ENGINEER ONSITE AT ALL TIMES, 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY THE CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. 13. ALL EXCESS EARTHWORK, CLASSIFIED AS SUITABLE FILL MATERIAL OR TOPSOIL, SHALL REMAIN AND BE STORED ONSITE AT A LOCATION DESIGNATED BY THE ENGINEER OR OWNER, UNLESS DIRECTED OTHERWISE BY THE ENGINEER OR OWNER. THIS EXCESS SOIL SHALL BE STOCKPILED WITHIN THE APPROVED DISTURBANCE AREA AND ADEQUATELY PROTECTED FOR EROSION AND SEDIMENT CONTROL, 14. DISTURBED AREAS LEFT INACTIVE BETWEEN ANY PHASE OR GRADING SHALL BE STABILIZED PER TABLE THIS SHEET, CONSTRUCTION SCHEDULE Phase 1: 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. FLAG THE WORK LIMITS. 3. HOLD PRECONSTRUCTION MEETING AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION. 4. INSTALL THE TEMPORARY GRAVEL CONSTRUCTION ENTRANCES AS THE FIRST CONSTRUCTION ACTIVITY. INSTALL SEDIMENT FENCE AND DIVERSION BERMS AS DICTATED ON THE PROJECT DRAWINGS. ONLY DISTURB AREAS NECESSARY FOR INSTALLATION OF PERIMETER DIVERSIONS, VEGETATE DISTURBED AREAS. 5. INSTALL TEMPORARY SEDIMENT TRAPS AT LOCATIONS SHOWN ON THE PLANS. 6. CLEAR VEGETATION AS IDENTIFIED FROM THE ENTIRE WORK AREA. REMOVE TOPSOIL FROM AREA OF EXCAVATION AND STOCKPILE FOR USE DURING FINAL STABILIZATION. 7. ROUGH GRADE SITE TO FACILITATE DRAINAGE INTO THE PROPER E8£S STRUCTURES, FINISH THE SLOPES ON AND AROUND THE PROPOSED ROAD AND STRUCTURES AS SOON AS ROUGH GRADING IS COMPLETE. LEAVE THE SURFACE SLIGHTLY ROUGHENED AND VEGETATE WITH TEMPORARY SEED MIX AND MULCH IMMEDIATELY. 8. DO NOT PROCEED WITH SITE DEVELOPMENT (SHEET C401) UNTIL ALL PERIMETER EROSION CONTROL MEASURES HAVE BEEN APPROVED BY ENGINEER AND LOCAL NCDENR LAND QUALITY INSPECTOR. Phase 2: 9. MAINTAIN ALL EXISTING EROSION CONTROL STRUCTURES [PREVIOUSLY CONSTRUCTED AS PART OF PHASE 1 (SHEET C400). 10. CONSTRUCT BUILDING FOUNDATION AND PAD, INSTALL STORM SEWER TO INTERSECT RUNOFF DRAINING TO BUILDING PAD AND PAVED AREAS. 11. CONTINUE ROUGH GRADING AND UTILITY INSTALLATION INSTALL INLET PROTECTION AT LOCATIONS SHOWN ON THE PLANS. 12. INSTALL RIPRAP APRONS ON PROPOSED STORMWATER PIPE OUTLETS AT TIME OF PIPE INSTALLATIONS. 13. COMPLETE FINAL GRADING OF GROUNDS, TOPSOIL CRITICAL AREAS, AND PERMANENTLY VEGETATE AND MULCH AS PROJECT DICTATES. 14. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS. NEEDED REPAIRS SHALL BE MADE IMMEDIATELY. 15. AFTER EACH PORTION OF THE SITE 1S STABILIZED, REMOVE ALL TEMPORARY MEASURES AND INSTALL PERMANENT VEGETATION IN THAT PORTION OF THE SITE. 16. INSTALL STORM WATER PIPING. 17. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH NCDENR -LQS STANDARDS. 18. DISTURBED AREAS SHALL BE SEEDED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF GRADING (SEE TABLE THIS SHEET). 19. COVER ALL AREAS THAT WILL NOT BE WORKED FOR MORE THAN SEVEN DAYS WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. COVER AREAS BEFORE MAJOR STORM EVENTS. 20. ESTIMATED TIME BEFORE FINAL STABILIZATION -12 MONTHS. E &S CONTROL MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF - PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 3. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASINS AND BLOCK AND GRAVEL INLET PROTECTION DEVICE WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. 4. INSPECT ALL INLET PROTECTION STRUCTURES AFTER EACH RAINFALL. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY IN ORDER TO MAINTAIN OPERATION OF THE STRUCTURE AS DESIGNED. REMOVE SEDIMENT AS NECESSARY IN ORDER TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. 5. THE GRASS LINED SWALES WILL BE CLEANED OF SEDIMENT AS NEEDED WHEN THE SEDIMENT ACCUMULATION REACHES A DEPTH OF APPROXIMATE 0.5 FT DEEP. ALL EROSION SHALL BE REPAIRED AS NECESSARY IN ORDER TO MAINTAIN AN OPERABLE DIVERSION CHANNEL. 6. ALL SEEDED AREAS SHALL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN IN ORDER TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER, 7. MAINTENANCE PROCEDURES SPECIFIED IN THE NORTH CAROLINA EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL SHALL BE FOLLOWED FOR ALL STRUCTURES. CONSTRUCTION SEQUENCE FOR CONVERTING THE SEDIMENT BASIN INTO A PERMANENT STORM WATER MANAGEMENT BASIN 1. AFTER COMPLETE STABILIZATION OF THE SITE AND APPROVAL FROM THE NCDENR EROSION CONTROL INSPECTOR, REMOVE ALL EROSION CONTROL MEASURES, DEWATER THE TEMPORARY SKIMMER TRAP AND CLEAN OUTTHE ACCUMULATED SEDIMENT. 2, FOLLOW ALL RECOMMENDATIONS OF THE OWNER'S ENGINEER FOR ALL BASIN REPAIRS AND MAINTENANCE. 3. REMOVE SKIMMER AND BARREL PLATE. PLUG OR CAP SKIMMER CONNECTIONS ON CONCRETE RISER. 4. GRADE THE BASIN TO FINAL GRADES INDICATED AND SEED PER SPECIFICATIONS. 5. INSTALL PLANTS PER DETAIL ON SHEET C601. CONSTRUCTION SPECIFICATIONS (THE FOLLOWING SPECIFICATIONS ARE FOR GENERAL COMPLIANCE. UPON BIDDING THE PROJECT FOR CONSTRUCTION, THE TECHNICAL SPECIFICATIONS ISSUED AS PART OF THE CONTRACT DOCUMENTS WILL GOVERN.) A. SEDIMENT FENCE MATERIALS 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461 (SHOWN IN PART IN TABLE 6.628 IN THE SPECIFICATIONS). SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS IN ORDER TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120° F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB /LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET, MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UP SLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH, FASTEN THE WIRE REINFORCEMENT, CULVERT CAPACITY CALCULATION SHEET - 25vr STORM 64FOE!N�nORDIILIERTAL n, ,Sr, P.E. Inc. RurixltEERlttO I CULVERT CAPACITY CALCULATION SHEET 25- C Storm �i;7jk� #SS� tiiy�l,t! IiE,I fnf rt.r[ � ! }li1€9 #ll� ElEff'i: ! 1E 3 1 d € ;i �3i� °'''F � P {io�ect'' Harnett Health lli'i£,'�I,}?r0)ect:Numb,rt 173009 c61 } #i tEl i I€ E it -� 3 1 +S € iE El I k,#E #.,'l, - a „{ ,. M_ i l D _tOf September 5, 2012 CTC J r €: ... ,.. .... ..<.- ..,,..,tm ,.t i..l c €• .':i,. ..: .,, . :P „3, =. �, #t ! � E 1., I : [[,, >'9 i..F: {t d ..{ : tt.. uRf.E2 `E€, ..E. F .3.!¢....11: :. :.I. f � ,. .!It r �.t _ ........ . .. . ... .. ... ,.... ..,� ., ,. , ..... ,.... tip.: ..< >..... ... ,- _ : . n � ., ,. -:< .. }: . t n e: , 3 i,, f3. ,'�... h. -' ,t:F..E E Ef::E !�• ^€ F Et ! 3' d,3r. -t''YF Y .Y,.•I T }!f ....t ..: =:• <.... , ..z .,, y,....! .,ni: yr. .m,..,. ._ ...t. <.., ;,: r: trc. s .. E c .. .: .r IE!, :s'..... .t. t 1. i : <,,. .. 3 .'i'.: i f ',11i!! .�l;:i:,. .3„ ,€ .. i . }!_ t:'i t.s a l 3E . .s , ,.I.. it - i- - -¢'•' ,.i7 :i t , 1,.. .F I, 4 -,i I i. 1 i' .:i -. i.! 3.• x.i &r -.. : ". a -.E' .1... [ E € .€ � cL: � E . , €�•- ; E: i'f.i, r.t.. i =' ,E -- t '� -a' . 11 ••1, is " ^,€ .. . °.>; ' :i'S? FI` .E t }� i' ! ...a it sx. &<, «. ,•. ,.._.., v <,..E... - a. , ».,.. .,: _.. .. .. z .. h.., ..,) ...e. ... �« E. .,€ 3. i,: sS - St E 9„ .� . <_F.. L3 ; {,lt ,i:t: = Et ;3;3x.1 {:! .'•j' - E ',1. i . "5',:t .S. • =:C:°; i.- 9 _ ':�� I.: } . f ' i•t .f. I 1 ! �:.i -t.;�' ..5;:3: ,': z -, t :.. •: L.. ,.. .': < °. `...... -, v'.e, s: .:..,L .,. e.. . >.> .?., .a.•, .:F :"., yE, °•- :s' ,3,E ,i, 12l ( I . ,.1 , ice;.€ , E: : d . .dn' ..E.. r:7.3, ,. -f.:«. ,E,.. ,<E G.t> .S.a ,d.3r �: "��• = 3 i„ S,f F:l" . l,t. � - "Y.v� , � i' \'. 1 3 t.� l:•r =�= .£i' <i' ti =F. E`. `Q �''��! }} a.iiE "'`a _ 9. €,t 3. : .,< {"- S. FG «e -�•..F , =..E,. , ;, >. ...t. ... ,:,. �9 ., tls t .� . : e a.. .S. # E f;' t't t,.. li'' i'E � -�� � -.t i.ai p� ,iE D3i< J ::.Ql kr' E �T E, 3`¢ §' ,]:IE., € -, .3,l. ,il ��. ";tP• ' -9.. : • ,.f' � '. Q/� I'iEw .�i�Q "� �.1 e� �, _3_ :1t°S. 1 � t..r }� .E..Y -'.,� - ..E.r. . >.i r' 0, .;' YT•.. st'e -I.9> . J ✓• `.4t EE., G3l3 � �3' } ,., . I AA� .,, ``441l.:' t,: .::`, r! ;a a•' Et.#EI 1y1�'E i , y q :111 s .:,3.°.tllri� .. .., . ...... ..� FI2 { t _, I �I! `E<. ,.:_. !. attE,- €..,,�a,r -at,.r <?.' .f'.3l ,i. - i }, � � �!= ib- �s3•_, �- .... .... _s -( )_..� ''E�... ac ... < ... d. ..��(m n).,•. • >, `f �.. f ...., .,, -... , i, -r: E�(y ).� �.,._ ., b. ,. to -, 7` niter _ .._ a {f _. )� .i:..m.,a' • -, .s. -, . T:Ef're •.P r i..1. <��, 1, � £.? _ �. � .� ., .. t ii aa ,E 1 €- �::. �(�:is �I .,'3 3 ,- 3:t.:,., .]. E 0 r'ti t 3 13 -. L. ,rL, a n , _: ., d /),31,,, .�,.. v3.a'4 :. :3.3E 1r ![�(„ tj[j 3. in E ..�.' ,,,, i �. E" ti' € €. �.. ,i(,f. _ _� � in -i �.f )„ :1Ii 'fie ,•t €3.> t .. iilsec) °.!f'il' .a:1[ �)♦ _�.. ff :I 3' ,I 3 '.. ,. (� ),�.. fi' F '.if - 3. ,.ir,o t. <,� t (ft) :P�...... 1 �I- 2str� _- ❑I1 D12 0.18 5.00 25 8.63 0.65 1.01 0.38% 8.98 1 15 3.22 133 169.50 1 166.50 166.00 DI D13 0.32 5.00 25 8.63 0.67 2.86 0.47% 12.73 1 15 3.59 107 169.50 166.00 165.50 DI CB1 0.26 5.00 25 8.63 0.57 4.14 1.20% 12.26 1 18 6.50 217 169.50 165.30 162,70 1 D14 CB1 0.07 5.00 25 8.63 0.74 0.45 2.44% 4.66 1 15 8.22 131 169.90 165.90 162.70 C61 Outlet 0.58 5.00 25 8.63 0.90 9.09 4.17% 13.04 1 18 12.12 12 168.50 162.50 162.00 DI5 CB2 0.20 5.00 25 8.63 0.92 1.59 0.71% 9.45 1 15 4.42 99 169.60 166.40 165.70 DI6 D17 0.19 5.00 25 8.63 0.61 1.00 0.87% 7.64 1 15 4.90 46 169.50 166.50 166.10 D17 CB2 0.27 5.00 25 8.63 0.83 2.93 0.34% 13.61 1 15 3.09 58 169.50 165.90 165.70 CB2 Oul]eE 0.14 5.00 25 8.63 0.95 5.67 0.50% 16.25 1 18 4.20 100 169.00 165.50 165.00 Fire Road Culvert 0.39 5.00 25 8.63 0.59 7.66 1.29% 15.23 1 24 8.16 136 NIA 163.75 162.00 DIB D19 0.14 5.00 25 8.63 0.85 1.03 0.51% 8.52 1 15 3.76 39 169.50 166.50 166.30 D19 D111 0.13 5,00 25 8.63 0.77 1.89 0.56% 10.55 1 15 3.92 36 169.50 166.10 165.90 D110 D111 0.11 5.00 25 8.63 0.79 0.75 1.87% 5.94 1 15 7.20 32 169.50 166.50 165.90 .......... . DIi 1 D112 0.11 5.00 25 8.63 1 0.76 3.36 0.38% 14.03 1 18 3.68 78 169.50 163.70 163.40 D112 I Outlet 0.16 5.00 25 8.63 1 0.82 4.49 3.33% 10.44 1 18 10.84 36 170.00 163.20 162.00 HEN FABRIC ON THE UP SLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS AT MAXIMUM OF B FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH, 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UP SLOPE FROM THE BARRIER (FIGURE 6,62A). 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH COMPACTED SOIL PLACED OVER THE FILTER FABRIC. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10, DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD INSTEAD OF EXCAVATING A TRENCH, PLACING FABRIC AND THEN BACKFILLING TRENCH, SEDIMENT FENCE MAY BE INSTALLED USING SPECIALLY DESIGNED EQUIPMENT THAT INSERTS THE FABRIC INTO A CUT SLICED IN THE GROUND WITH A DISC. INSTALLATION SPECIFICATIONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 -INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. B. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL (NCDOT #3 OR #4 STONE) TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION. C. TEMPORARY SEDIMENT BASIN SPECIFICATIONS 1. SITE PREPARATIONS - CLEAR, GRUB, AND STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTIL THE DAM IS COMPLETE AND THEN REMOVE BRUSH, TREES, AND OTHER OBJECTIONABLE MATERIALS TO FACILITATE SEDIMENT CLEANOUT. STOCKPILE ALL TOPSOIL OR SOIL CONTAINING ORGANIC MATTER FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATE VEGETATIVE ESTABLISHMENT. PLACE TEMPORARY SEDIMENT CONTROL MEASURES BELOW THE BASIN AS NEEDED. 2. CUT -OFF TRENCH - EXCAVATE A CUT -OFF TRENCH ALONG THE CENTER LINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 FEET DEEP. THE CUT -OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST, OR THE SPILLWAY CREST IF THERE IS NO RISER. MAKE THE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT, BUT IN NO CASE LESS THAN 2 FEET, MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. COMPACTION REQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT, KEEP THE TRENCH DRY DURING BACKFILLING AND COMPACTION OPERATIONS. 3. EMBANKMENT - TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ON THE PLANS. IT SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIAL MUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL IT 1S TOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8 INCH CONTINUOUS LAYERS OVE R THE ENTIRE E E RE LENGTH OF THE FILL AREA AND COMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL TO THAT THE ENTIRE SURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ON WHEEL OR TREAD TRACK OF HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10 PERCENT HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. STABILIZATION TIME FRAME NPDES Stonnwater Discharge Permit for Construction Activities iNCGOl j 4. CONDUIT SPILLWAYS - SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NO USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTI -SEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 -INCH LAYERS, AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETE OR OTHER SATISFACTORY MEANS TO PREVENT FLOTATION. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. EMERGENCY SPILLWAY - INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE EMERGENCY SPILLWAY. 6. INLETS - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL TO IMPROVE BASIN TRAP EFFICIENCY. 7. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION. POROUS BAFFLE INSTALLATION 1. GRADE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2. INSTALL POSTS AND SAW HORSES. SEE SEDIMENT FENCE SPECIFICATIONS. 3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED AT A MAXIMUM OF 4 FEET APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 4. INSTALL AT LEAST 3 ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISCHARGE POINT. 5. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE MEASURE TO PREVENT SAGGING. 6. WRAP POROUS MATERIAL, SUCH AS JUTE BACKED BY COIR MATERIAL, OVER A SAWHORSE OR THE TOP WIRE. HAMMER REPAR INTO THE SAWHORSE LEGS FOR ANCHORING, THE FABRIC SHOULD HAVE 5% -10% OPENINGS IN THE WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES, WERE, OR STAPLES. 7. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 8 -INCH EROSION CONTROL MATTING STAPLES. B. DO NOT SPLICE THE FABRIC. USE A CONTINUOUS PIECE ACROSS THE BASIN. POROUS BAFFLE MAINTENANCE 1. INSPECT BAFFLES AT LEAST ONCE PER WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. BE SURE TO MAINTAIN ACCESS TO BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IMMEDIATELY. 3. REMOVE SEDIMENT DEPOSITS WHEN HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN EVENT AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNATED STORAGE DEPTH. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS. BRING THE AREA O GRADE AND STABILIZE. SEDIMENT BASIN MAINTENANCE 1. INSPECT TEMPORARY SEDIMENT BASINS AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE -HALF THE DESIGN DEPTH. PLACE REMOVED SEDIMENT IN AREAS WITH SEDIMENT CONTROLS. 2. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. D. BLOCK AND GRAVEL INLET PROTECTION (DROP INLETS OR CATCH BASIS 1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 X 4 WOOD STUDS THROUGH BLOCK OPENINGS. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH ' /.INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL,'/ -TO' /,INCH IN DIAMETER, PLACED 2INCHES BELOWTHE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. 4. IF ONLY STONE AND GRAVEL ARE USED, KEEP THE SLOPE TOWARD THE INLET NO STEEPER THAN 3:1. LEAVE A MINIMUM 1 -FOOT WIDE LEVEL STONE AREA BETWEEN THE STRUCTURE AND AROUND THE INLET TO PREVENT GRAVEL FROM ENTERING INLET. ON THE SLOPE TOWARD THE INLET, USE STONE 3 INCHES IN DIAMETER OR LARGER. ON THE SLOPE AWAY FROM THE INLET USE %z- Y44 -INCH GRAVEL (NCDOT #57 WASHED STONE) AT A MINIMUM THICKNESS OF 1 FOOT. NCDENRlOivisien of Water Quality NEW STABILIZATION TIMEFPAMES. , ,... .. c .. 29 I g t I SITE AREA DESCRIPTION STABILIZATION TIMEFRAME; EXCEPTIONS @) Perimeter dikes, swales, ditches, slopes 7 days None 9 High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 I 7 days if slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. Alt other areas with slopes flatter than 4:1 14 days I None, except for perimeters and HQW Zones, I E. OUTLET STABILIZATION STRUCTURE (RIP RAP APRON) CONSTRUCTION 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA, ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER - RESISTANT AND WELL GRADED, 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. MAINTENANCE 1. INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. F. ROCK CHECK DAM CONSTRUCTION 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION. 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH SANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES, MAINTENANCE 1. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY, CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM, CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN, SUCH AS INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, TO ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND TO PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED IN ORDER TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. G. GRASS -LINED CHANNEL (VEGETATIVE SWAB CONSTRUCTION 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA, AND DISPOSE OF PROPERLY. 2. EXCAVATE THE CHANNEL, AND SHAPE IT TO NEAT LINES AND DIMENSIONS AS SHOWN ON THE PLANS PLUS A 0.2 -FOOT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. THE PROCEDURE USED TO ESTABLISH GRASS IN THE CHANNEL WILL DEPEND UPON THE SEVERITY OF THE CONDITIONS AND SELECTION OF SPECIES. PROTECT THE CHANNEL WITH MULCH OR A TEMPORARY LINER SUFFICIENT TO WITHSTAND ANTICIPATED VELOCITIES DURING THE ESTABLISHMENT PERIOD. MAINTENANCE 1. DURING THE ESTABLISHMENT PERIOD, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY , VIGOROUS LL IMES SINCE IT IS THE PRIMARY EROSION PROTECT/ ON FOR CONDITION AT A T THE CHANNEL. ALL EROSION AND SEDIMENTATION CONTROL STRUCTURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (LATEST EDITION). NO WETLANDS TO BE DISTURBED AS PART OF THIS WORK. General Notes c ci a: U L, O z 0 rn m a en a 6 w F 0 3 a_ a z 0 0 REVISED DA1 -E C- FACTOR 09/17/12 3: z L1 N REV ISED CULVERT CALCS 09/05/12 Revision /Issue Date o IA CARP J' °P,, €l5•S1d �!ti ' -' 9 l v S 714, EAL g Signals 028W9 Ciat�ti Data ! ClA,Vta& SA, FE, Aft. CIVIL a ENVIRONMENTAL ENGINEERING 46 WEST WASHINGTON STREET COATS, NORTH CAROLINA 27521 PHONE: 910 -897 -7070 FAX: 910 -897 -6767 License No. C -2570 www.ctdayton.com HARNETT HEALTH INVESTORS LLC HARNETT COUNTY, NORTH CAROLINA Project No. 173001 1 File Name: 173001 MAS Designed By: CTC Jr. I Drawn By: AEB Checked By: CTC Jr. f Prnj Eng.: CTC Sheet Title EROSION AND SEDIMENT CONTROL NOTES Dale JUNE 2012 Sheet Scale AS As NOTED E CL r ci N a 1) +n rn v '' NOW OR-'FORMEF�LY r' /HARNETT FORWARD TOGUHER COWITTEE, DEED B06K 225,2' PAGE /'911 J ' REMAINDER OF LOT N 4 BRIGHTWATER PHASE 1 MAP BOOK/ 2012, PAGE 34 MAP//BOOK 2610, PAGES 575 576/' f -- -- ' MAP BOOK, /2010, PAGES 4p6 -4B %' 185 / • !, MAP BOOK 2010, PAGES t4 -645 PIN 0650 -7,9- 1646.006 FINISHED / rY r' CONTOURS ON f - -- ' ADJOINING SITE \ f w w BASED ON OBTAINED L�� / ENGINEERING � r PLANS Js - / ------ DA -2A - N C =0.92 t$n ! /,!! ,!/ ,�� }� j - WETLAI\II�S - NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE NOW DR FORMERLY � - - DA-1A'' ,' - - -Y _ - ,,'� !!'! / o DEED BOOK OT2252,3PAGE 911 COMMITTEE -�J - = 5 16 a - -- - ! ' w HARNETT FORWARD TOGETHER 0.6 , 17 / w DEED BOOK 2252, PAGE 911 -- .-,� — 1�8� / _ _ .DA -2D,- , BRIGHTWATER PHASE 1 LOT No. 5 MAP BOOK 2012, PAGE 34 ��� _ - C.5::0'95 // ! /4 \� MAP BOOK 2010, PAGES 575 -576 BRIGHTWATER PHASE 1 l - w w 17 `- �' / / � MAP BOOK 2010, PAGES 485 -487 _ t w MAP BOOK 2010, PAGES 644 -645 MAP BOOK 2012, PAGE 34 y_,�� - / -� - DA -2B MAP BOOK 2010, PAGES 575 -576 1' - C °0.61472 ~ Y ~ ' MAP BOOK 2010, PAGES 485 -487 - PIN 0650 -79- 1646.000 MAP BOOK 2010, PAGES 644 -645 / PIN 0650 -79- 1646.000 - - -- L - -. - _.- - _� -_ —, — / Z. , \6 / -' /' ! / FINISHED .� %� - - '/ c-D.67 rj - - - - - -_ / -� CONTOURS ON _ ADJOINING SITE / / , ! DA BASED ON c =�. _ -,67 -- - Y OBTAINED / J DA -2E ENGINEERING /� PLANS -' - DA-1C C =0.79 - i� C =0.57 \]TOURS ON `♦ , \ 1 ` TE BASED ON \ ♦` —173 I I �� - / / ♦♦ / GINEERING PLANS `17T -s. _— _ - 171 —`l DA -1 D DA -2I ' / j \ - 0.40 V • ,' -' _� / • m / / �/ ` 8 / f __ -DA-1 E y \ bb _/ / / y 1 r� r / ♦`. i /� ♦ � \ 162 , .1' ..._, _ y = = == \ �°�, G'G S' \fin.' -. _ % —.' / - -�:— . —,� �= // ♦\ , / FAQ 'ti;♦ \\ �6�' __ / /' ��— " —�� / \� �� ��/ ♦ ♦♦ �/, ♦ ♦ \ ( �'=.may J : — .\ �, , � y EX. SS MH .J rr+ ,• f NOW OR FORMERLY BRIM EL. 166.74 �: I I HARNETT FORWARD TOGETHER COMMITTEE INV. EL. 153.02 If \�\ ,\ \`'si �_.. -. / \ �� � I I �.re� / `/ DEED BOOK 2252, PAGE 911 ♦ 'ys. `� '_ / _Y- f- ``�;� ! 1 �+ / MAP BOOK 2010, PAGE 575 4 �' _� MAP BOOK 2010, PAGE 485 160 ` � � \`J � • � .� /. I r �� % 1 I/ �` — � � } PIN 0650 -79- 1646.000 EX. SS MH RIM EL. 167.36 / INV. EL. 153.82 ` 4 NOW OR FORMERLY / /^ HARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 �i MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 % PIN 0650 -79-- 1646,000 NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE DEED BOOK 2252, PAGE 911 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 PIN 0650 -79- 1646.000 NOW OR FORMERLY HARNETT FORWARD TOGETHER COMMITTEE GRAPHIC SCALE: 1 " = 40' DEED BOOK 2252, PAGE 911 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 0 20 40 80 120 t PIN 0650 -79- 1646.000 General Notes 1. SEE SHEET- C404 FOR ALL EROSION AND SEDIMENT CONTROL NOTES, SPECIFICATIONS, MAINTENANCE AND CONSTRUCTION SEQUENCE. FINAL DRAWINGS FOR REVIEW ONLY NOT FOR CONSTRUCTION a o= License No. 6-2570 wtwr.ctdayton.com o- a HARNETT HEALTH INVESTORS LLC 4 V HARNETT COUNTY, NORTH CAROLINA Project No: 173001 File Name: 173001 MAS Designed By: CTC Jr. Drawn By. AEB Checked By: CTC Jr. Pro, Ong-: CTC Sheet Title DRAINAGE AREA MAP Date JUNE 2012 Sheet Scale C405 AS NOTED 0 x a No. R Revision /Issue D Date 0 W p �; W = SEAL = . z ., S Signalu z I'� •aoie.� PoPg�aSO 0 Date c 0>0� q9���o��� D a { v v c� Clu�rtan, Sr., F E, Inc. s CIVIL & ENVIRONMENTAL ENGINEERING h 46 WEST WASHINGTON STREET V COATS, NORTH CAROLINA 27521 PHON: 9197 -7070 FAX 910- 897 -6767 c E 0-8 RUNOFF - DRAINAGE AREA DA -1 Phase 1 10 yr. • DA -2C ....._ ...._ , 1 .. .... i i I , 1111._ 1111._ _.. Total Area: - - -.__ ._ -_..._ 11,832 i .. __. ?sf i _. 1111__ ---. ,.._. ; I ... ....: ... I - -- -- - - .. ..- __- 1111_ -'- - -- . .. 0 271Ac. _ - _.. - - -- I_ -.. - i -- - - - -_. ,-- - -__ --- I I I -- _ ... - .... . . ---... -.--,. . -._. - - -- - - 1 Imp al p I -1 9,659, sf h - - _._I _....__. _ ���__....__.....- 1111. -._ -_. 0.221Ac. -_.m_T - - '. - - - - - - -- -- - - _ I ._ ...... _ ... 1:111.... CI _ Q... 81 /0 0 95 I 0.771 ...._... -- ..__.. - - . _.. I I I - -__ . -_ _...... - -._ 1111- - -.. -- ---. 0 19 /° 1111 1111_- _. . - -- -I- __ 0.35: .. _- .- . _ I 0.06 I . - -_._ -._ -_ -- .- 11_.11 -I I 1. _ 1111• -- ... - - -_ -. _ -.: ,. - r I C= - _.: _ 1 I . --1111_, -. € ................ 0.83 1 - _I..__. __, ... .... ............ .._ ...... ..... I 1111.. �.. 1111._. 1111 1111.- I_._. : _. -_ I __........ -_ _ _- ..._L.- C T .. - - - -. .... I __ ....:...... I I • - . . _- 1111.. 1111 ........ ......... A I _1.11.1... _.._._.._ .._ ._.- Q _,-- __...____.....I ._...._.._..._.. .__.._._._.__- _.__._.._. 0.831 __.__.__.-- _ 1111_. 7.76; ___ -__ 1_ --1 1 1111 . 1111__ - 0.27! -__ - _. - - :.- _... - -1111 - 1.._.- i _.._. -_ .___,._. ..__ ---- .....__- - -I __._..... I Q 1 ._ -- 1.74; cfs _.._ ,_- .__._._.... DA -1 A i . --.- _ . -. -- _- ... - 1- ; __ 1 , 1 .. .... - -- - _ _... I- _- . I [ Total Area' 7 736 of , 1 3 _ _ _ .._._.._ I ...____.. :_. _ _- . ! 018,Ac. - I � . I -- I I __ 1111 _.. 1111 - - - -..- 1111_ --- . ............... E_._-_......�..._1......... ! I - -.. __ _.. ..._.:.. - - -_ - •__ - - -_ - -. 1111 .. .......... .. . ......... Imp Area 2,835;sf I ° -- 1111 1111 .. 1111 1111 1111 1 __. _.._........ .1 111 .. ..........1.1..1. .. -.. i......... 0.07 1Ac. -.i .._......_I .._._ -.-.-- --1-11 I ... - .... . . ---... -.--,. . -._. - - -- - - ... -.. : _._._......_... -_.__ ... __,.,..... I I I . .......... ... 1111 ._.._._ _- .............. ._._.._., -., 1111__.... C 39 %, 0.95 .. ...,- ....- ._1111 0.37! _.- - - - I 1._....1.11...._....... -_ _ - ._ - -- 61 % I 0,45 _ - ........ _._._..... - __...... . _._._._.i......._ 1111.. .. - ....... _I . _.. _. . I 1---------------------- L-- c= la.s5 __ .. -._ ... _,' "!.......... _1...._ I - -- - ... __ -1111 I_..._.._ �____- __�_ i I I I A I __.__.. __ _ -.._1_ ! ._.._...__.._...__...C...._..i . 1..... Q 0.651 7.761... _._ - I I _ - - 1111.._ - -.. i _ .......... .... - - - 1 1 I_- 1111 -1111, ,........._____t_ 1111. .. ..... . _.. Q= ! -.. 1 I i .. . ...,.:.. 0.91 ! cfs. _.. _... I DA -2D i 1.- _ . _ ; [ i _.. I - - - - -1 -- Total Area, - ...I..._... _._ 1 -, 5,911 Isf I .. - -..I-----.----- I -� 1 I -._ i _- �.._... ..... .�...........__ ;... - - I 0.14 iAc. I -. ..- .- .----------- ... -.. ......_ I __. _.._........ 1 I .. I I I 1111,. .. _. 1 I -- __ - I Imp Area P 5,9111sf -� -- I - ' - !.. - _._......_I- 1111_._ _.' . _._ _ •.... 1 - 1111.__ ............................... 0.14iAc. ...._ . -.�----- -1. -.. 1111.- I .. I i C 1 [ I 100% 1 0.951 0.95 , - _.-.1 I , I - -_ 1111. _ _ .. 1111.. I I _ 1111..- �_........_. 0 /0 0.45 I 1111... I...._. 1111__ . ............._... r I 0.00 _. -1111 I I ... ... .. .. _. ! 1111. ,....,..... 1 I I . 1111 ,. - I _r ., I ......- `._.. 1111_ ,._,.,,... 1111., ., C= -- _.- 0.951 __. a -1111 1111... .............. _.. ... _, i ........... ! I 1111. . ,. _ 1111.. . ._....... 1111.., I.. _.._ .. ,..,... 1111,._ _. -_ -- I_ -- ...- ...._.L_._..... _.... Q I..._.. _ 1111 . 0.95! .7.761 �1 0.14.1..__....- 11,111. 1 - -... _. _.1_ ..... ..._ I 1 I I .....__ -- -1- - i Q- 1. I ._ .. 1.03 _. - E • cfs R UNOFF - DRAINAGE AREA DA -1 Phase 1 25 yr. 1111.1111_ DA-1A1 i . i i _.. I - I .-------.---1 ._ .,_ ...... -..----------------i Total Area 1 i _- -- 1111-- . - - -_. 7.736 sf I I _ - -. -_, ._....__._._._.._. I -� 1 I - - -- - - -! -- - - - I 0.18,Ac. i - - -- - - -i - - -- 1111 .._; 1111.. I 1 __. _.._........ - - ; ___ Imp Areaj ...___.. -.. - _I. . - - -- ... ...._..... - - _- _, - -_ -i_ _- --- I -_-.--------1- I Imp Area p __ -,- .. -.--. I - ,._.....,. _., ..,_I. _ 2 835. sf 1111,. .. _. r - _._.... - - -- I .._.. 11!11 1 0.071Ac. I I_ - i C1 I _ .. 1111... ... 1111 ... C! . ..i _ 39 %I 0.951 -- 0.37 -- ........., I -- - I I -- -.. -.. -- _ . 1111. ... 61%1- 0.45 i _. _.-- ..1_._--- __ -_ -. 0.281 " - - - _ _. ._......_ _ !- _ - -.__ -.. -. ,,..._...._- I . _._....----.--.1A- -1 __. _._....._..._... 1 1111.. .�. . ..... .. I C =1 ._ -.. ._.__.!........ 1111...,......... 0.66 -' - -- - . -. - -- 1111_.. I ..._.... 1111 .: I .__....___..._ ............ _ __..I_.. _, .., , i i - __... . C 1 1 1 -1111 _ - -1. A ... .. -. _ - -- I _ i -- -- - - I Q 1 -- 1111.. -.. _�- .___._.. - -.. _ -.__ - - -� _ .. 1111.._ _ 0.65; 8.63 -- w- ..........._..-- ..._..._.� ..... _ 1111__ .- 0.181 . ....... .. 1......... _...._.. . ... . _. ... . !... 1111 1111 .. .. i _. 1111. j i . ........ _ ; .........1 .. . 11 '_ Q =i ,.. .- - .._.1.. { 4 ......__.... 1.01Icfs -.. - . -.... I 1111... __..._.. ---- .._. I DA -2 E i - -s - -- I ' _.. .. _ .._- __ 1 - - 1 -- -. i .. 6,099 _ - .........- ...._.._.. _ - ....._...._....__. -�. - .. ..._. - -- . -1111_ ..___..._ 1.. 0 141Ac 1 -1 I i. _. ... - - -- - - .-- ____ -- - - ; ___ Imp Areaj I -._ 1111_.__._._.._.__._(_ 4,8991sf 1 _.-- _ I -- - - - - - -- _ . - -. __ - , i 2 - 0 11 !Ac - -I - -_-. _. .d . 411 - - i C1 o I . 80.3/°1 0.95, 0.76! ..... - - - --- - -- - 1 - - -- _ 19.7%1 0.451 1111. , _.. _._.._�... ....--..--.--.---.....I....--..-.,---.... ...' - _._ .._.___.___._ 1111... I.....-....---- .- _ _ . - _ i C =1 !._............- 1- I....... - _. _._! _ . __ ._ L - L---....---- . 0.851 11--- - .. _ .. 1111._. _ ] - .... I r € i i _ _ I I I C :._...._.._ A 1 .__ 1111. - .---- -- - - -- 1111. 61 -. - -_ , 0.85.1----..B.-6.31 -- -1111. I 0.14! - - -, - -- -- ._... ... .... :._ . 1111._ ._...... i _ _ I .. I I 11 I Q -1 I 1.031 cfs E co 0 uq M1 N O N C6 a m M m 0 Er °1 ro rn m cc co 2 0 0 co n 6 9 0 9 0 0 n n U J J O U 10 °3 2 9 U CS7 (L •E U) m r a DA -1 B I __ 1111 I.. I. I I 1111. _ 1 . - -- - _.._ "'...- ' - - Total Area, 13 9801 sf 1 I 0.321Ac. 1 - - -- -• -- -- DA -1 B -- .. _ _ - -- I I - .- , ..._... ......_ C -; _---- _....._..._!._..._.._ . _ _ _ _ 11. Total Area ..�.._-.._.___-_... -._- ...__.,,, 1111 -1111 _....._._._.._. ... 1.1_3 ..............: 13 980 sf -... _- 1111.- . -..-_- 1111,. 1111.. . - _ _. _. .�, __` - - -,__` 1 .. - .___.__. ..I 1111 1111. _ If 0.--- A-- 1 1111. 1111 -. 1111_ -.- -1111 -.. _. _.._.- . ............... ...._. -1. .......... 111 1 .. _. i - Area 1 p 1111 1111... ..., - .. ... ...,......_ ......... 6 01-: -- _ r.._. 1 111 '111 1 - -1111 - _ _, 0.14 -Ac. I _; 1..........1.1..1. ....1111..... I i CI _1..1.11 ° 1111. ; . 43.0%, 0.951 .d . 411 - 11-1.1 ..1111 -,_. _ _ .. _ 0 57.0 /° 0.451 _ _ .. - - -- -- - -- : 0.... 2-.61 _. - ...-....... -_. - ..._- ._ -.., - 1111.._ ..1111..._.. ! i I i 1111.. _ ....._._. .... i _ C- I I _ -',._ _ ... .. - 67 . - ._........_ ................... ...I... -.. I _�...... -._� .._...., , ... A . I . _. - . Q 1 . 1111 _..._..._... ..- -- .............__.._........ 0.671 7.761 1111.._ 1111 - 1111._. -. _ ._. -€ . 0.32'' _. '... .. . . I .1...1.......... .. _..... ......1- I . . . -- -- -Q. _ . i _ 1.fi r cfs - - - 0.95 0.411 ... - 0.45 ._ - -_ -. 0.26_ -, i . ..._... ......_ C -; I . _... i ....... ......__.. 0.67 ........ 1 1--l-1-1- 7-.- I - A li -- 8.63' .. . I ....... - ...- .....1... _ ...... . ...... 0.32 I ...... ...... :_.. ... Q= .__.. _....1. - 1.851 cfs . .. ! 62% 0.35 I .... . _ .. ... .. 1 D.22i 1111 1111... 1111 I ... 1111. .. .:...,.., _......... ..._ ...... ........... 1111. 1111. i I i C= I .. ... 1111. 1111 .. ... 0.571 - .. -. -_ -_ r - -.. -_.. - -_•• __ - - - - -_ 1111.. 1111 . „ - 1111._ � .._ .- 1111. I I 1 C 1 l _- - 1. -, ,....,.. 1111,.. A . ..._ .... .. ....... . .. .I.. -- - -- -- - - - -- - - -. ! Q I D.57r 8.63 - I i I ! - ... .._........ 0 26' , [ - i ._....- - - - - -- Imp Area; 1111..- - - - - -- - . -.... I I I i I Q= _ 1 28 eft DA -2G - 11..1.1- .. -..._ -- - . ... I I 1 i 1111 _. Total Area - - - - -- 1111... 1111. 1111 .........................!. Total Area; .- - 4,8 - 1 -1111 _ Isf _ _._ -.. - - 1 ....... -- . ...... . ...... .. - - - -- 0.1 1,Ac 1111 4 236 ` sf . . ... 1. 1111._ - i ._....- - - - - -- Imp Area; - - - 3,39510 -. - ... .. . _..... .. ..._I-- ....._.._ - -- .1111.. -. .._ --1 - -- 0 081Ac. -- 1--'--'----1- ._......_ -.I. I - CI �_ 73% 0.95 0.691 I ----- - -- .._.. .... .....- __ ._......_.- ._- ..-- 27% .....-- - -. -._ ....0.35. _ _ .. ...... 0..- ... 10 - -1 1_.1.1_..1... -... .................. .... 1 C - I _ .-- -- . . . 0 .... ; C I I I ..... A , Q I ._.....- ...- ._......- .1..._....11 .. i _ 0.79 - - . __ 1111. 8.63 - -- __ 0.11 111 1... _ . 111._.1. ._... ... .... :._ . 1111._ ._...... i . -- - _. -- Q- 0.75 c ....... L- . - DA -1 C 111.1 I I 1 I Total Area - - - - -- 11,436;sf - - -_ -- :_ - -- -_. -- _ -- -_ - -_. _ - 0 26'Ac. !- -- Imp Area 1. P 11 4 236 ` sf . . ... 1. 1111._ I 0.10'Ac. - - - 1 1 C. 38 %' .0.90' 0.. ,3- 5'; ... . 11 ...... ° • 62 /o : 0 35' 0 22 1111... .. .. ! 1111 .. ......... .. . : 11.11 C=!. E . - .. -{ -. ... 0.57 1 I 11 . ..._ C I A Q 0.571 7.76' 0.26` 1111 Q =', 1. 115 DA - . .. 2F I I 1 i ... . -. .......- .. . Total Area; .. , 5,682sf . . . . 11. .._.. 0.13Ac. .. .. .. ...... .. 1111 ---,. .... 1111... ... [m Area Imp _ .. .i_ 11111 _. ..- ... 1 .. .1 1111 . ... � 4 562 • sf _, 1111 111.1...... , I 0.101Ac ` i C: 77 %1 0 90; 0.69'' .. .. . . _. _. _. 0 i - ...._.I 1111.. .. - ..1.111... . '. : : i C- I 0 . . . . ...... . 1111. .. . -- .. E I C i l I A . ' . ... ...... .... Q . . , . r 1 I 0.77, 7 76` . _.... ,. . .; . . . 0.13', . 1111 I Q =1 !. 0.78' cfs _. ... 1111 .._ 1111 DA -1 D ; , i I Total Area: 2,884sf .. .. I 0.07IAc. 1111 _ _-__..._. .. I. . .. . - I I Imp Area: p . . I_... _ _ . 2 008Isf .. .......'.. 1111 .... . . I 0 0 51Ac. .11 ` C 1 66 %' 0.95 0.62 ! €I 1111.. 1111. .. I , 1111 o 34 /° 0.35 1111, 0.12'. I 1111. -'" - -. -. 1111. I - - -. . .. .... ... .... C =' . . � -. -..- 0.741 1 C f A I ....- 111- -.1 - I Qi I _ . - 0.741 8.63: - 0 0. 7. I .. .. .. ..1. I .... .. .... Q= . 045 � efs DA -2H' , i -.. Total Area _ 4,709 sf . _ -. _ .. .. I 0.11 'Ac. 1 1111 _ _-__..._. .. I. . .. .._.... .1 :1.1.1.._.... 1 Imp Area i .- .... ... . 3,209 sf .. .......'.. 1111 .... . . I 007 Ac 1 , 1111. Ci 64% 0.62 I 1. -. ..1. ........ _. L . 36 %': 0.45 i 1 ...1.; .... _- -_. . 0.16; ..... r... I . C I _ 1111.. 0.76 ` - : I . i C I A i Q 076863 0111 1 .... .... . . I 1111 ...... I Q- ' . ""' ... ..,. i 0.72 ° cfs _ _ 1111... DA -1 D I , i - - -. -_ Total Area 1..1_.11..._._.... 2 88 4 sf .... :._ - __ 1111_ _ _ __ - ._..___.. 1111, . 11 1111... 1111. 1111.. _ 1111. ,. _. -. _ . __ .. _ .._ 0.07'''Ac. ... ''.. 1111 _ _-__..._. .. I. . .. . . __ .111.1. . .i. Imp Area' ...__, .. ... .... ..' 2,008 sf ; 1111.- -.. _1111..... ..I .. .......'.. 1111 .... . . I 0.05'Ac. ' 1 , 1111. C I 66% :0 0.95 �11 0.62 I 1. -. ..1. 34 /° 0 35 -• 0.121 -- ; - .. . : - . .. ........ ... . ... C= 1111._.... '. ......11.1.. 0.741 i - : I . i _I ..,. C I • • -. . .. A ' Q 0.74' 7.76' 0.07 . 1 -_i Q= i -- - .... 0.401 cfs - - -- - -- -- _.. . DA -2G , i . ......... . Total Area; ! 4,895 sf ! -_ i . . . . _ ...._... _.. _. r.._. _ 0.11 Ac. i ...._....: . I I - Imp Area 3 395f s .. 1111. ... {. 1111 , ,.. .. ..._. _. .... r 0.08'Ac i ,.. [ 1 , 1111. C . . 1. 73% I 0 951 0 691 -. ..1. .; 0 27/0 435° 1111 ._... -._; .. 0.10. 1 ... 1111 _ i : ! t C= i 0.791 .. .. . . .. €. .. . , .. C 1 1 ! . .. 1111 A .. . ... .. .. . Q . ,. 0.79 7.761 . .... -- 0.11 _.,- .... - 1.11_ ...11111. -. . ... . ..- Q= F . ...;.... .. 0.67 = cfs . -- - !1111.. 11. I DA -1 E' , i - Total Area _ ;1111.. - 25,250;; sf i -_ i 1 ___- .__.__ - .___,__E -_ 'i 0.58Ac. I - I . . .. I Imp Area l .... . : 1 . ... . 22, 8451 sf ......1.11.1. ... - 1 ... E i . - - ! . 0.52'Ac. _.. I , 11111... I- C I 1 90% 1 0.95 I ..... 0.851 -- .. e... ...... O 1 1-- ' - - - -. I.. 1 fl io , 0.45: ... . . . ... ._........; ....._._ I.._......._. 0.05 .. : ! t C= .......... _ _- 111.1_._,11...11__._ 0.90 _ I . . 1_... I ... I. 1 _ .. -. _ .. _ C I : _. A i I QI 0.90. 8.63' _ . _ ... .............. 0.58''1 1111 _ I... . ... _ . . .... ..._. _ Q- _ :- 1. -_ -- 4.50'cfs - I -� - -- DA -21 , I Total Area 6,901 sf . . ... . . ... . _ . -- - -- - -_ _.. ._..,.._...._._I 0.16 Ac. . 11.1.1... - 1111.. . I ___,_ Imp Area - 5,083 'sf . - . .. _: . .. :. 0.12 !Ac __ C 73.7% 0.95: 0.70:: ................. ._. _. -. 1 . - 1111......._ - -.. ... _ _ -.... -- 26 3% 0.45' _ - - i 0.121 ............ .... _ __ C=: 0.82' ... ... ..... .. .. ...m,.....- 1111 1111 L � I . . - . _ - I - . . C I _ - . . . A Q 0.82 8 63 0.16' . _.. . Q=' - .. 1 13' efs DI A -1 EI - , I I ; _. ... ' ... ........... Total Area! ..... . 25,250 sf i . . ... . . ... . _ - - .............. .. i I 1111 .. ... ... .. I [ I .. 1111 ,.. .... .1111 0.5$:AG. 1 _. _ . 11.1.1... - 1111.. . I ___,_ . .. -... ! .. :1111 Imp Area p _ _ _. _ 1111_.. - i 1111.. I 22 845,sf ....._.. .. . ... i I 0.52!Ac. I __ _ - - -. - - ': 1111 - .......- .. ! ..... % C I ! I ...... .. ...i...... _. 11- - 90% , 0.951 :.- 1111- .. -... . 0.85 ___. - .. _ ........_.._ I .. . L .- - - -_1 0 10 /° • 0.451 i -_ 0.05 _- - -.. :._ 1111 - -.. _....... I ._. _..... _..... '. . ... 1111... ......... C =1 . .......11......1.1... 0.90 ... ... ..... .. .. ...m,.....- 1111 1111 L � I . . - . _ - I - - -- . -. -.. 1111 ... .. : _ C I I I 1111... 1111. 1111.. ..,.......... ,. A - I. Q. . ... . ... . I 11.1.1... .. I 6 0.90 7.7 1111 .. ... L.... - i 0.s -. 1111 -- -. I - . .. I __ { =1 I .- I , 4.05 cfs _. 11.11._ DA-2H ' I i .- .. I I ; - . Total Area ... . .. 4_,709 sf . - ... _. . . -.... . I I . _ .._ 0.11 Ac. . ; ; : : ; I ;... . 1 Imp Area ,1.1. 3,209 sf .... -.. ....1.1... . . .. . ... . ....... ... ... - 0.07 Ac. __ - .1... C: ......... _ 64% 0.95: _ - 0.60 1111. -.. I 36% 0.45. 0.16 11.. 11 ...!1 . .1.111 - _ 1111. _..._. C= . 0.76 1- i E . ....... ... ... . C... A - _ :. Q' 11..11.. 1111.. 0.76 7.761 - 0.11 -- - _:_- -- ---- .._ -'.-- 1 .11 _ _...._ _ - -- -------;---- Q= - - - -- . - -- -- 0.65' cfs - -. _. RUNOFF - DRAINAGE AREA DA -2 Phase 1 10 yr. DA -21 ' I i .- .. I I ; _ Total Area, . . . ,...._...111.1 -, .... 6,9011sf _..._ - , _ .. ; ; . � , - ! j _ I � 0.16 iAc. ; ; : : _ _. __ ..._ - . ...111.1 . ". _ Imp Area, .. ..I :.. 5,083 sf ., . . . . .1111 i 1111... . i ;" "' __. ! -._.. - - - 0.12`Ac. I __ _ .. __1.......... C I . .. 73, 7% 0.95 1111.. ; 11 1. 0.701 1111. -.. I o I 26.3 /o i 0.45; - - 0 21 1 _ _ . . . . ! .. . .. .... .I.. '. ... 1 C -1 -.. 111 1 : ... 0.821 i . .. .'. .... .. .._., I . 11 . 1 1 I . `:......_. .!. C 1 I i . ..i. A . , : Q': _.. _... .;.. - . . ,, 0.82 7.76; _._ - 0.16' - - - °.- -- _ ---I -,� .._._ - E ......_.... 1 ... 1__. 3 _. Q ; ,--: . r --- 1.02 cfs DA -2A! I i .- .. 3 I . I _. ....._... -_ Total Area I -_. !....._.. 61805 '1 sf 1 _......1..._ . -. i I I'll. __ -.- ..__..____ i : I 2 c. 0 �A I -1111 .- _..;....__.,.... r . i f ' - ..... -- I 1- j f .ti i 1111. ___..____...._.._.__ -- __._-_ I Imp Area p - 1111. 1111. 1 __-- _.._..._............_.: . 8 265 sf ....I.._ ....;_.._ ----- . , I 1111... , - . 1111 .: ... 0.19Ac 1111. 1111... .! .. -. -- - : -.- . .... -_ ... I �_... L .11.. - i i 93.9 %, 0.951 --, 1- 0.891 .....CI i 1 I ...1111. _.. _- .1...._..,...1.1 6.1% 0.45; - - ... 1.1....11. .. . - -- 0.031 ... _ I ...._..... I -. -__. _. 1111 .. 1111 . .......... .. .. ... _.. I i I i .. .. ... .. .. i. .. I C ! i I I 1111.. ....__,.. 0.921 -. -. .. .......I I I . -. - - ...... `.. 1111 ... ..i .. 1111. ., C i I .. __. 76' _. . _ A i - 0-21 I Q! - - -- - -. -._ -_ I 0.92 7 -1111 .._ .. _.... .1..11.1 3 _ [ ] _1111. 1111.1111__ i j I. L 1111 II r -. 11:11. r .._ . I... Q °.!. I . 1.43' cfs - -- -- I ------ -- " -_ DA -2J .... .. . .... .. ..... .. I i .- .. 3 I . Total Area 17,070,sf ,_.. , . - _ - _ - -!- . - I - . ... _.._..._ ._._.. 1111 0 39'Ac '� _.. - 11 1.1. i- .. ,.. ....... ' . ;_ ... _ f 11111 ............ 1.. 1 1.1 ..... 1 1.11 , Imp Area' .1111_ . _ i . I 1.1.1 ..1 .1 11 1. 7,200isf .ti i 1111. 1111.. 1111 _. 017!Ac. E t .. _ 1 i 1 ..1.1...1....__ : ci - , 44 %! 0.901 ... E 09' .3! .. 56% 11 0.351 . I.... ... 0.20; ..1. ..... t ,, -.. 1111. 1111 ......... 1 .,111 , ............ .. 1111 -.. - 1111 -' . C- I I -- 11111111 -..,I _- _- ... -_.. . -.. i ................. 0.59; I -.. ............ .1111.. - -1 ! I i.. ._I 1_ C I . - -, 1 . _ _..._ . I . - .... . . Q 0.591 7.76 E .. -1- 1111... _ .. _. 0.391 1111.. . ..... ... I -- ..... • 1111. I. - .. _.. _' 1 Q.._....- I - I_ -. ,. 1111. 1 1 Q= I. 1111 _ 1111. I 1.791 cfs _ _..._...... .. , .. I RUNOFF - DRAINAGE AREA DA -2 Phase 1 2.5 -yr. DA 2A -------.--.--- - ._._._ .. . . ......... I 11.- - I --- - - .- ; _ - - - -- - . ......... _.... ..... . . Area' i 8,805;sf 1. .. ......111...1_... ' 0.2;Ac. I ...... "' . _ _. 1111 . Imp Area 11.11_.. - -... _.. . _.._.... . _ 1 8,265'sf - ....... . - - . .1111. _. . .... 0.19IAc. --- ;_. 0.09 Ac. ... _ 11 . . _ _ _ - 11 C i ........ 93.9 % i 0.95 ..... - .... 0.89 ; . _ . _ 1 .. , . .. %6. i 0.45 ...... ..... 0.03' ..... . ._ -... .. 1111... 1111.... .... I I ..... .'- - I I C= 1 I .... . -- 0.921 -..- . ._I 1111_. .. 1111 ._. .... 1.1 ...11.. - -- .- . ... -, -.. 1111.. -. - 111 1 if C i J _ -- 1111 . . .. ..... ..... 1111. A i ... .. ... Q' i 0.92• 8.63 1111 1. 1111... _ .. 0 21 1 1111. ...._..__ .. . • 1111. I. - .. _.. _' 1 Q.._....- I _.. - 1111. _._..... 1.59icfs 11:11_.... i DA -2B f __- .- _ . - .. -11-- - -• - -- - - - I , . .. -- - -- .. 1 -... i .. . _.........._ 1111 ...,.... Total Area` .. . 1111. 1111 1111... 8,245,1 sf 1111. I .. - ... ._ ... .. _1 1.1111, ... --.1.1 . ..111 0.19 Ac. . 1 .;_ - Imp Area 3,916'',sf _.._.. _. _.... -.. I - 111_. 1. - ........ .. . E --- ;_. 0.09 Ac. ... ..1....- 1- _. .. -. ...... • ' C - . _.. 47 %l 0.90 __1: - 11.1..... 1 0.43' 1. 11 1 1 .. -.. 53 %1 0.35 . ........... .. L 1 ...., -- -.. _.. ._.._. .. 0.18; ._ ... ...... ... _.. . .................. .1111. .... . -. 1111. _. -__ .. ., .. I .:111. C -' .. I _....._......!._._... ... ;.. 0.61 '. C I I A 1111. ....... -, 1. Q .- - - 1- - - 0. 1, 8.63 -- ._ _1 _ ", I' ' ..._. 0.19 ... 1.. _ , i.. ..... . . . ... . ..... � . .... . .. ... .. i;Q 1.00ds ...1111.. -1 DA -2C -.._ 1111- . _ -._ ._ _ i__.. _. _._ - -___I _ _.........._. 1 -... i .. . : I -... _..- . . - 11- . I Total Area' - . -.. -__ ..1111 . .. . .. ........... 11,832,sf ;1111... I . l 1 .__ 1 I..1......... _.- .__.__.1...11.1....:_.__ i . . .- ......... - 0.271Ac... .:. _ ! I--_ i ..11...1...1 .. .. 1 ..... 11--.1. I Imp Area: ....... .....- . ... I 9,659�sf I 1 - - _ _ _. __....__. . ... .... 0.221Ac. ...... ._.... .... _.... ...._. ......... .. C: ..- ...... 81%€ 1 _.. 077! _. 1111.. ........ - .- 111.. . 11.11. .... 0 I ..0.95; . 19/0! 0.35' - - -. 1111 E - 1111 .I".--'.-'-:' -.. 0.061 1111_- - 1111.. -.. . .................. .1111. .... . -. 1111. _. -__ .. ., .. I 1111. - -1... ;.. C=:: .. !.. ... 1111 .111.1 1. .- ,...,...,._ 0.831_....1111. ..... . 1111. ! i ... .............. ... ..... . C= _..... __ - - C I A 1 1 1111.. _ .., - 1- 1111.. ..._ .. 0.83 8.63 ._ ..,.. I -1111 ......... -_ -- -- 0.27; 1 - I - ; - .- _ 1. .- Q . ... -... I . 1 . - _., 1 93 i cfs __1_. DA -2B I I 1111. Total Area - 8,245 'I , 1 I .__._.._.. _. ._...._._._._._ -. _. . 1111___ I 0.19'Ac. I - - -__ - -- --, - I "-- .- __ ............._...,.... I --d- . 14 I _. ! I -. _ - Imp Area p -- - 1111 3,916,sf i __ _ 1111 - I I -- - -- � _ ............ ... -.-.-....---.-------.---,� 0-.d9'Ac. f - - -- -1111 1 { I _ 1111 _ ._ _...____ 1 .. -1- _...._...:.....111.1. - .--- .._- C _. -..- _ -- - _.....__ -_..- ...._...1111. 47 %'• 0.901 I.._........ ... 0.43! - - 1111 ___ ............. -_ - . 1 .35 531° 0.35 _ - - -- -__� ._ 0..I. 1 -- - - - -- 0.18 I __.._.__ 1111_ _...._.. __ _:..._._ ..__ ..: . _.... _ _ 11.11... ... .............. ... ..... . C= _..... __ - - I _.._.._.... I-- ........._._._ 0.61 -- -- -I - - 1111 .. ........... .. -. - " __. . -_. -_ - 1111.. .:. -1I _ -' - - -- -- _ .. _ 11'11 _ _ ....._f C I - - -- - - -- _.. - - -1 111 ..1111 1111.1111... A A- - -- 1- -1- - .. . Q _1_111._ _.. _.. __......_ .... -11- �� _ -- - 0.61 ` - - 7 76 -_ 7 _ -. __ -_-- 1111..- --- - - -..- 0.19 - ._ -_r- 1-111. -.-_ ...__ ... _ _...... _..._..._.._.. . -. . . -- -- -- .- _ ---1-,---,-- 1111 _. - _ -- - Q= I I [ 0.90': cfs . _ -- - - -- - - -- DA -2D -_ 11 1111. - -- - - ! -_ ;- __ _ __I_... Total Areal _ 1111.1111 _.I..._ 5,9111- . I - -- ! -1111 _.. --d- . 14 I _. - i Ac - - - - -- - ._ .................. _....... 1111.. ..' Imp Area,. . -.. . _ I i _.. -1--1 _ .I I I i 1 - -- - -1 ...- - - -,- 1 ___ -- - €- ! 0.14,Ac. I I -...- 1111 -- . 1 111 - 1111 -_{ C .. _ - -.- 1111.. _ - 1 100% 111.... ..... _.....� I 0.95 _.... ..............I ......,. 1111 . I 0- I I I Ir _ .; . - ._...... . -1111 ,,. ,...�. ... 1111 ...._i.... I • - __ - - °- d/o 1111.. 1111 _ - _ - -- 0.451 ._ 1111. -i - - ,--- ­ _ -_i_ ....._.... 000; . 1111.. i. . 1111. 1111.. _ 1111 _. .. 1111.. _ _ _.'' .. _ . _ 1111... .._.__.... . ._.I_.._...... _ 1111!.._ _. 1 .. .. .. 111- -I . I.. . ....... _- _.J .,.1111_._ ._.I_______ 1111 I! C -... -- - - -I J 1111.. _ . 1111.. fl 95 • I -- - -- - -I - -- - - - - -- L -_ -___ - - -- ,- -_ __ -I-- Q ! �1 C ! 11- __ -- 0.95 i ( I _- ___�.. 8.63 I I -- - -_.. _ .. _..._.._.. 0-.-14-1 - _ _,_ -_�I_. i ._......... -1-1. 1111... 111.1. ......_.... -1_ 1111 _........ .. 111 _ - - -- -i I... j -... .._.._!_._......__._.____._.._. ... - -1111 ...._.... ........... ....__f. .. ... 1111 ..__.....I 1 ... 1111... ..._.......1,._ I .._.1..__..... 1.15 cfs .- _._._..._,_- ..- ._. -... i' Lj d w z U z 1 0 Lj d c`n Z n U N U w Ln M z I 0 E CL r N 0 N 0 ra a OUTLET PROTECTION OP -1 Subdrainage Area: Discharge from C131 4 A,�pendlces r j r ,AI{I51 .IRi�fElll wlllx;W,I�fl�lil, , Iark mfi I.i 1f � I %■!Jl ■1 li 1, I � ■� �� � �i"I�ItI i� t ln� i l' ��'IIEYI II �I u I .r I ' d ��I @'' :u.■IitYlSs {�� T (0, • j} � '1{ fin iClo { {�liel C IIIRIIi I I �� I .a llh IlillA{ I"', "f {'iii . OF, ii{ SAO r :u��lll�l� Illli'w { °r ' Q e�Il�l I ■1 1 r°ei a � f ��I° a oral um ■ I, s ■ 1 w nlRrrl lK w I I° �I r I^ >€fll. IIIIIgi1 iIIltllllw0 {r � rsl,5i �if ; � � "" :I Irl 11a' '" r!Fipl ''+`� lllllq {{ i {gi911C¢} °- li�r'�• Ed E, ..,Jji r Hill Hrr ■1ILl f ■ E,WI M1ll {111!1 1 1 , M u r�lllnllrrnw•mwufr ELI 1 1 .- .�U 111 � •i.• .ill Inl l I i 11 i 1 0 _ Eii' a�� r q ail nli'i tl 99 { IIA .�q�u++Pr.�7� �•I''ij l I A�C 1 i awl xl�Ilalr l�uPC IIr3.�'-1 >�"''r ;lili j II ��. _rprAllr"'•�,I�r'.;Ir1 i , I I� , ���I. �■■■■■iiIwrI HIl' � II�iIEi !..�1Gill'jl { {I�.l���.."�r'lll� ICI I 1 RRT■■R ■RI.1, 1 w �lil1{ ='r �liR,lii!SIh,;L ii1''iiiimnrliili Im'Elilil�il {nl {� ' tlgiii{ fir" l' :i.■IF� I'1 it 1111 d 'i iil{n ne1g11: ularunu 1 I 7■ ELI l�� ' , 1r.■xr °0114 RII {I��{IAIi rrr IRA I 1 F111 I���rr�� ,.6, ..yNl rE 1 ■ r ay.I�lll I{I(JI n �l7I F Mi}%t• I■rir lip If �11�11111.�� =i {Ia1I1 1 111 I r[ Ileeal1111 IFFe.}I Ir.II��r. j , I �.'r�'� � °�!�1,�;;€.1i},yIaII�,�,g�rr��Y�i 3■ ss■.11I11���a1�W�japrr1I�� � IrII1�1 11111 +yIt�,I l� +�.[Il,'I�y l��%r��Y�il�wlwlA����YOrwwv YIr1111eI�n/Y1� M�� »Iltll{f�ilM "�1�® 1[I®MUIE��ll�� 1 , •i 111 1 1 •r SEDIMENT BASIN SB -1 1 OUTLET PROTECTION OP -2 SEDIMENT BASIN SB1 ; Date` July23, 2012 I .... . ......... SKIMMER SEDIMENT BASIN Area: �',,,� By= WLF 3.. ............. . ........... ....... _ -- _. _ - 1.30'.ac ........... . Intensity:, - Basin Sizing' I - -- 1 E 38,346.00 sf Drainage area number:: 1 Coefficient:: 0.76' Disturbed area:: 1.68 lsturb acres 2. ..... - ....... .... .._.. - .. ..___... _ .__..... .._ Ditch Design g Runoff coefficient, C: 0.50 ............ .... _ _ _. - __ ..._ _ .._ _ .__ _ _ .._ _ ... _ _ _ __ ___ acres Rainfall intensity, I. 7.76 in /hr Side Slope Ratio. - - Runoff coefficient, C:1 10-year r un- o-f- f, Q=. 6 ft/sec j . ._. ... ....._.. - _ ...52 - - ..... -- ....._..... Volume required,= 1800 ft per acre disturbed area -__ ______.--------- ---- - ----- .i____ !! - -_ Wetted Perimeter. - =1800 X 1.68 = 10-year runoff, Q= 6.71 ft'/sec 0.774ft 3, U41 ft3 Volume required I 3 ' � 1800 ft p er acre disturbed - .._......... - .._ __..........._ ......... .... ..... ... ... ... 2 3 = c Surface area required; 325 ft perft Ise Q10 - - _.... Slope, S: =325 X 6.5184 0.067VIlt I I. I 1.26A/ sec OK I 211 8 ft IIIIF I I � Elevation Depth Area I Volume . Surface, main pond', 160.5 3144 - 1 2141; 2 'C 2 ft 182 Bottom of shelf 159.5 ft 11381 _ Elevation Depth E 1 10281 Surface 1 main P and Dewatering elevation 158.5 37 40 918; I 3.5 21351 2629.5;: Bottom of main pond: 155 Bottom of shelf 302; 1519 -- -- -- l - -_- - -- ___ L. Surface, forebay 160.51ft ..... _ .... 725, -.. --- .._... -.. _.... 1 _._.......__.. -- -------------- - - -.. . ii 4,5 17641 ... ......._ Dewatering elevation - - -- ....._..__...__..__.1........_ Bottom of forebay: 156 .._.._.._ ft - - -.._ 59 - i Basin volume = 3.5 70681ft3 Basin volume required q - 155 _ 3024,ft3 Conclusion :ADEQUATE 160. 5 f i. - -- - _ - - _._._._........... Spillway Design ..... Skimmer Sizing Weir coefficient, Cw: 3 Maximum water volume:; 3,169jft3 -- ...._.... 156 ft Maximum flow depth: 0.50 ft Max. Dewatedng Time:! 72 - hrs Flow, Q: 6.52 ft3 /sec Minimum Skimmer Size: 1.5 in Bottom width =,Q/ (3 x H "1.5) Factor j 2880 ft3 ,6.51841 (3 x 0.5 "1 5) Orifice Area 13169/2880 6.1 ft = 1.101 in ._............_ ..... .... .. Skimmer Sizing . __ Orifice Diameter 1 18 in ------ ___ .- - - - -_- - -- - ___m_ - - -- -----_ _.._____...----- .._- _- __- ____ -_ Outlet Structure Bouyancy Calculation Maximum flow depth 0.50 ft Exterior volume of box =A! x 4' x 4.5' 72 hrs I 6.71 ft sec Minimum Skimmer Size 2 in Interior volume of box -'T x Tx 2.5' / (3 x H "1 5) _ I Factor'. _ 22.5 #3 1 6 71241 (3 x 0 5 "1 5) Orifice Area 4015.5 1 3369 Volume of concrete /grout ',72 22.51 -49.5 ______ _ ._ ...._..__.._.__.._.....__._.... 6.3 ft _.........._ .....__..... - - ._ ._____ -- . = i ._ . _ - -- . 1.19 in2 j _ _.... 1 0 Orifice Diameter = _ _ ........ -- . 1.23, in Unit weight of concrete 145 NO I...... _...... _. .. Weight of box =,.49,-5_x_.145_ - . 7177.51b -. _I Unit weight of water:' 62.4 _ - - -- _...------ .._ ........... .. -..._. __ .. --- _. -_ -- - .......... _... . ___ - - - - - . .... ...... _._ Weight of water displaced ='' 72 x 62.4 lb/0 - 4492.811b Box will not float l 9 purlcr U • ga 4 La PIPC 4'10maler too) Ld �+ oi.Fo i r 3 N t a L° . cc Dlachargeltt�lae,:) - -- .�� ...- Curves may not ba axlra¢oletEd, rlarm,Lilaa bcF 4n a!pug7L pfvSa r> n prat =rJWn riMt a round plpq flaring hl I. rrtn(mLm b ?rra�r rrrdi'nn (jw t05 dle,lrlcrj. La= 10 ft dso =.4 ft = Class A Rip Rap W =12ft ik, M93 Do= 18" = 2 ft outside diameter SEDIMENT BASIN SB -2 OUTLET PROTECTION OP -3 Subdrainage Area: i Discharge from Fire Road Culvert ..... .E.. 1 I APPVulfus 3n thll}.`.i u pn 4 L. I- I I t dl meler 413oY _ ao o.spo O _ _ I. N111-1 QI'nChr�fge (ft313e.:) -'- • •• +••• •••• Curves may nv bs BXlrapclste i. Ftatmr�a6at? c�pncy+ autlerplalu: rr: nFa- arcnaq( rtMershndplvallaringf�il •rllnlmunbirratcrrcrdiicn(Y c0r+tlirrnrlcrj. La =10ft d5v =.4 ft = Class A Rip Rap W =13ft Hm 11M Do= 24" = 2.5 ft outside diameter E SEDIMENT BASIN SB2 ; Jul 23, 2012SKIMMER Road Culvert _..... - -- - -- - - - -- -- I .... . ......... NWLF Area: SEDIMENT BASIN 56,758 sf 3.. ............. . ........... ....... _ -- _. _ - 1.30'.ac ........... . Intensity:, 8.63 Impervious Area:: 38,346.00 sf Basin Sizing, Coefficient:: 0.76' Runoff Drainage area number: 2. ..... - ....... .... .._.. - .. ..___... _ .__..... .._ Ditch Design g , -- Disturbed area: acres 3:0 ft 30 ft h /ft v Side Slope Ratio. - - Runoff coefficient, C:1 _1_7.3 0.50 Water Depth: j Welted Perimeter. Rainfall intensity, I: 7.76 in /hr .. ....- Wetted Perimeter. 10.91'ft 10-year runoff, Q= 6.71 ft'/sec 0.774ft VR: Volume required I 3 ' � 1800 ft p er acre disturbed area 0.135; (2" -611 grass) Slope, S: =1800 X 1.73 0.067VIlt I I. I 1.26A/ sec OK l 3,114 ft - ...... 10.61 ft3lsec OK I � Surface area re uired q - 2 3 - 325 R per ft /sec P Q10 + =325 X 6.7124 = 2 'C 2 ft 182 I _ Elevation Depth Area Volume Surface 1 main P and l 160.5 37 40 I { I 1 2629.5;: Bottom of shelf 159.5 1519 ' -------- ----- ._.... -.. --- .._... -.. _.... 1 1386.0; Dewatering elevation 158,5 1253 l 3.5 3008.25; . ...... Bottom of main pond 155 466 Surfac e fore bay 160. 5 f 8391 4 5. 2182.5 Bottom of forebay -- ...._.... 156 ft 13111 ... _..... _ Basin volume - 9206.2513 Basin volume required - 3114 ft' Conclusion: ADEQUATE _....__...- _...._:_ Spillway Design ._............_ ..... .... .. Skimmer Sizing .... ................ ...... __......... _ .. _.._. Weir coefficient, Cw: 3 Maximum water volume . .. ..... _ 4,016; #3 Maximum flow depth 0.50 ft I Max. Dewatering Time 72 hrs Flaw Q I 6.71 ft sec Minimum Skimmer Size 2 in _ Bottom width =IQ / (3 x H "1 5) _ I Factor'. _ . __- 3369. ft3 1 6 71241 (3 x 0 5 "1 5) Orifice Area 4015.5 1 3369 - ----------- = ______ _ ._ ...._..__.._.__.._.....__._.... 6.3 ft _.........._ .....__..... - - ._ ._____ -- . = i ._ . _ - -- . 1.19 in2 j _ _.... 1 - . . - Orifice Diameter = _ _ ........ -- . 1.23, in SWALE 1 OUTLET PROTECTION OP -4 Subdrainage Area Discharge from D112 rlpprruTirses 3o_ ___ Discharge(Olsec) curves may nca be axlra_--DletCj, r lac, oBUG= L}^.r:h,0.tAUII ?lprotuxr:nFret dbA110ASreLndpl anibr inghli. rrllnllnLti 'rrb3rrsb:rrr_rldtcrltrwe0 stiernelrr). La= 10 ft dso =.4 ft = Class A Rip Rap W =12ft ROT. I 9!3 Do= 18" = 2 ft outside diameter �.tf6a SWALE 1 i From CB #2 to Fire -- Road Culvert _..... - -- - -- - - - -- -- I .... . ......... Runoff Area: Area: 56,758 sf ............. . ........... ....... _ -- _. _ - 1.30'.ac ........... . Intensity:, 8.63 Impervious Area:: 38,346.00 sf Coefficient:: 0.76' Runoff 8.49 cfs 25 r ..... - ....... .... .._.. - .. ..___... _ .__..... .._ Ditch Design g Lining: -- Lining: Grass-legume mixture, easily erodible soil Boo Width: Bottom i 3:0 ft 30 ft h /ft v Side Slope Ratio. - - 3.0 ft hlft v - -- . . . . .. ... ...... . . .. .. .... ..... .... Water Depth: 1.25 ft Welted Perimeter. Area, A .. ............. ... ... ... ................. ................. ................. .... .... 8.441 ft2 ............... ... ...... .. .. _ ,.. .. ... .....,., .,.,.�.... .. ....- Wetted Perimeter. 10.91'ft ; 0.2231 Hydraulic Radius, R:' 0.774ft VR: 0.97 Roughness Coeffticient, n: Roughness Coeffiicient, n: 0.135; (2" -611 grass) Slope, S: 0.018,fuft 0.067VIlt I I. Velocity, V= 1.491nxR211XS112: 1.26A/ sec OK I ....... _. _ ._ . Flow, Q: - ...... 10.61 ft3lsec OK Flow, Q SWALE 2 ; l � i- i I I I I i I I OUTLET PROTECTION OP -5 Subdrainage 1 r Discharge pipa rml '' ok .r >a pq.u1 �..� ff li jii�'•�II 1 �pl1r 1 rill■ -,Ir r u c , Ilm 1E1�! 1 °I1p �Ml .7 Il /r�lrall! IL I� ' I1 , 1 I 777'f/flii {:rflll• Eft�r�il�l[, rl , �,� �u w W rnr�rtt Ilali�{ j I ql�. �'r/iIpiAl 11■EI1.��. ,r ■�q II!■I a r��1r,Ifr1f;lrIyy�,�� r / nlgiu { { {!u' , °I {.i'.I . O r I I i w•JMiL �[ R111II�1II" .. ■iuEII{I {71 ■■ 1:1 I flow► i� rdtl J rn,all.1 �rr■r ■1. ar j , jll: ■rrrA■ ■E4 p � I 1r. , II I APoiii. 1' : [�, ••7 rlllq Ilr,wwwrr■ �',atGERlit. I iR�ll I n 1 ..A °.■r {�'',1• .. • �' hf''r� /f� ' iiwii;l I irtl�lu:�IAIi t II �n� 7{T I[jry�� 1I■■ _s I �I�ft 'IdI1� ■�0 ■■ IIiF IA IJIIIi EIIfl[:j- il IllllllilllEl�I�� w � �� '.i -.sl ��l L11 11 I jl• ' I 11,��1 ■ � � r 111(lf`I: I'� K�1 -• I -� rr-�ar rl II � l � "IiGl�l'll i 'a{CI��I ,,,, :i'f: Er 'f. 1 ill in wiwl •.m1 iwl�rr�i ellnl. r�jy. 3 5 10 20 50 I ua r� ;ir• ! 1: {�iIP'�.J'f'1'- �[ {alrll!ila1 ' I I x� ■ I� Ar ■ r• • rJ"• Iif?aruiiallWiSir i��' w■Ille x ■(� ►- :r��7111[r�"r' r�ir lcl;� %mYiilir'_�li { { {{ {frill r � '�a"Irr"'i■i� �1@'I` `r'. -rte' ' ,�I�LP;d!�$Insm:v uu I I ll ®RI {u IpI Y ��r.�II {����ry;� li � i�i I I{ jlj���Fr�illili ,l'�x'oyu'�iniii {' rllw■IlElt�llll� ' ' •...�i ✓lt {II�jIY'�'' {iY�Y`1Y��0�� I l�%IAIg19tIAil °ai1aI {1 �r)E!Fd'III C'iiI{�+sal�.'�II rE Ir 200 500 1033 { . ft Class B Rip Rap D. outside diameter SWALE 2 i 1 3 From CB #2 to Fire Road Culvert i Runoff o Area: _ 14, 900 sf l 0.34 ac Intensify: 8 =63 Impervious Area:, - - O.OD sf - ._. _ i Coefficient: 0.353 Runoff = 1.03' cfs 25- r Y I Ditch Design 9 I 1 _ I f I Lining: Grass - legume mixture, easily erodible soil i I I Bottom Width: _ _ E I 6 0 f _. Side Slope Ratio 30 ft h /ft v I Water Depth 0.25 ft E Area, A: E ; 1.69ft2 j Welted Perimeter. E 7.581 1 E i I I Hydraulic Radius, R: ; 0.2231 i VR: 0.231 Roughness Coeffticient, n: 0.135(2 " -6° grass) i Slope, S: 0.067VIlt I I. _.._...........___ .. . ..................... _ _.._..._.._ _..._. _. S 112 Velocit Y, V =1 9 In x R 213 x ...._...: ....... ....... 1 04 ilse c 1 OK Flow, Q 3 1 ft Isec 1.76 `OK 1 DRAWINGS ©©W /`1 FINAL D r��� FOR REVIEW ONLY N NOT FOR CONSTRUCTION UC TiO ■I_ 1W � M N E co M N 0 N CO m M m GENERAL SITE AND ' LIMITS OF NOW OR FORM�F LY CONSTRUCTION NOTES: / / , - DISTURBANCE HARNETT FORWAR[7 TOGETHER COivIMITTEFt �,•'' DEED Bp6K R OF LOTANo. 4� 1 ,' BRIGHTWAT�R PHASI` 1 MAP 800K,, 2012, PAGE 34 MAP' BOOK 2IS10, ' 1. EXISTING UTILITY SERVICES ARE NOT TO BE -- — — ' PAGES 575 576, _ \ �. 5_ MAP BOOK/'2010, PAGES 485` -48 ' INTERRUPTED PRIOR TO APPROVAL BY THE , / , ' 1g ,MAP BQOK 2010, PAGES 44 -645 �' PROPERTY OWNER AND ENGINEER. PIN 0650-7,9-1646 .00O , Ile TEMPORARY UTILITY SERVICE SHALL BE // / \ r_- _ _ STOCKPILE AREA AVAILABLE DURING INTERRUPTION. A MINIMUM i \ I _Ian NOTICE OF 72 HOURS IS REQUIRED PRIOR TO INTERRUPTION. WRITTEN PERMISSION FOR INTERRUPTION MUST BE GIVEN PRIOR TO PROCEEDING. \ I �_/ ,, 2. ENGINEER DOES NOT GUARANTEE THE ACCURACY OF UTILITIES SHOWN OR THAT ALL UTILITIES ARE SHOWN, ABOVE OR BELOW THE SURFACE. THE CONTRACTOR IS RESPONSIBLE FOR SUBSURFACE UTILITY LOCATION PRIOR TO CONSTRUCTION TO DETERMINE THE EXISTENCE � ,'DI No. 5 AND /OR EXACT LOCATIONS, BOTH HORIZONTAL /�'Q�/ _+B4 RIM 169.6 y y y AND VERTICAL. CALL NC ONE CALL /// INV. 1 fi6.4 (1- 800 - 632 -4949) AT LEAST 48 HOURS PRIOR TO /, /SV/ DIGGING OR EXCAVATION, AND CONTACT INDIVIDUAL UTILITY COMPANIES FOR Q�j r ,ra -" / tK _ +_ ='' \ , ASSISTANCE IN LOCATION OF UTILITIES. /' �' ,' `� �� ,so /" � ��' ' s - WETLANDS - , / j�� X169,8/ ,� �' � 3. CONTRACTOR SHALL VERIFY THE LOCATIONS '% 0 169.5 g -� NOW OR FORMERLY AND SIZES OF ALL EXISTING FEATURES PRIOR / ,' +- Y 1 x '�� f- , -.;: TCifi3.85 / , f' .� HARNETT FORWARD TOGETHER COMMITTEE TO CONSTRUCTION. THE ENGINEER SHALL BE NOW OR FORMERLY / ~Y ,� HARNETT FORWARD TOGETHER COMMITTEE � , ,_' ,16 -• � Y '" ,� p DEED BOOK 2252, PAGE 911 IMMEDIATELY NOTIFIED OF ANY DIFFERENCE(S) DEED BOOK 2252 PAGE 911 "- - ---- - 4 - -Y- 69.4 W W LOT No. 3 /' ,' LOT No. / � l _ _ ♦J Cc�'' � "' ` "' "' "' BRIGHTWATER PHASE 1 FROM THAT SHOWN ON THE DRAWINGS. / - - 169 4 , , CB No. 2 MAP BOOK 2012, PAGE 34 BRIGHTWATER PHASE 1 �� MAP BOOK 2010, PAGES 575 --576 CONTRACTOR SHALL SUBMIT SCALED MAP BOOK 2012, PAGE 34. -''- - _ Iii RIM 169.0 _/ / - .Dt No. 1 DI No. 6 _ _ _ _ MAP BOOK 2010 PAGES 485 -487 MAP BOOK 209 0, PAGES 575 -576 - - _ _, 72 -- -- D _ INV. IN 165.7 ' DRAWING(S) OF THE DIFFERENCE(S) OR MAP BOOK 2010, PAGES 485 -467 - ;� RIM 169.5 - "RIM 169.5 Y - - MAP INV.. OUT 165.5 P N O 00-79-1646.000 51 0, PAGES 60-645 FORMERLY UNKNOWN FEATURE(S) TO THE MAP BOOK 2010, PAGES 644 -645 / ,� INV. 166.5__ -INV. 166.5 LF 15 ENGINEER ALONG WITH A WRITTEN REQUEST PIN 0650 -79- 1646.000 �� % - -' - - _ - ; CPP ^ -- 5$ -' .� y FOR FURTHER INSTRUCTION AND DIRECTION. -:� - , �f %,.' _ _ - --- ^, ^ ^T is TC169.7 / TC169.6 4. CONTRACTOR SHALL LOCATE ALL EXISTING �,� -------------- / UTILITIES PRIOR TO CONSTRUCTION. s� j A ' / OO - l y y NOTE: CONNECT ALL ROOF �RWNDROPS/ r / .' . _ -TC 1 9. h$' . (SEE ROOFING PLAN AND PLUMBING PLAN) , 6s - - - - - - - ' - TO PROPOSED UNDERGROUND STORM - __ y ^ s ' . ,'CONNECTION S SYSTEM. DROPR INLET DI No. 7 5. CONTRACTOR SHALL REPAIR ANY DAMAGES TO BOXES. RIM 169.5 t / EXISTING UTILITIES RESULTING FROM y' X -�� ,. —FIN. FL: EL. 171 .00' — INV. IN 166.1 - � �� " CONSTRUCTION ACTIVITIES. ,�D! No. 2 INV. OUT 165.9 - RIM 169.5 DI No. 8 INV. 166.0 ,� !1 RIM 169.5 /6. ANY CONCRETE ASPHALT CURB & GUTTER OR +�6 INV. 166.5 -- 167- - :_ OTHER TYPE OF PAVEMENT SHALL BE SAW -CUT ,¢ , -` _rr —~ 6s_,'/ AT EXTENT OF REMOVAL PRIOR TO THE / �` %` ,'~ / FES INV - • / %' ^ . REMOVAL. CONCRETE ITEMS SHALL BE ' / OUT 165.0 SAW -CUT AT THE NEAREST CONTROL JOINT TO THE REMOVAL AREA. �� '`° ,'DI No. lb nll RIM 169.5 INV. 166.5 7. CONTRACTOR SHALL COORDINATE ANY ,� REQUIRED WORK, RELOCATION, INSTALLATION, .., DI No. 3 ` a.;:=::;'' DI No. 9 ,i'- �,t3 RIM 169.5 -� •�.. OR REMOVAL OF EXISTING UTILITIES WITH THE z INV. IN 165.5 / s "� �, `'`' ,, RIM 169.5 r� / oA INV. IN 166.3 - INV. IN 163.75 APPROPRIATE UTILITY COMPANY PRIOR TO THE ♦ -'INV OUT 165 3 / ,o BEGINNING OF CONSTRUCTION. FINISHED CONTOURS ON / \ ` ADJOINING SITE BASED ON 8. TIE -INS TO EXISTING PAVEMENT SHALL BE ` OBTAINED ENGINEERING PLANS 1 FLUSH AND EVEN. WHEN INSTALLING NEW ASPHALT TO EXISTING SURFACES, EXISTING C� SURFACES SHALL BE COATED WITH ASPHALT SPRAY TACK `fiO - -173- -.. `. 174 r >3 r� General Notes 1. WETLAND LOCATION TAKEN FROM A MAP PREPARED BY ENOCH ENGINEERS, P.A. TITLED "WETLANDS DELINEATION MAP FOR BRIGHTWATER TRACT ", DATED 04 -22 -2008. 2. THE PROPERTY SHOWN HEREON IS LOCATED IN FLOOD ZONE "X", AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE AND FUTURE CONDITIONS 1% ANNUAL CHANCE FLOODPLAIN PER FEMA FIRM PANEL 3720164000J DATED OCTOBER 3, 2006. 3. THIS PROPERTY IS LOCATED IN THE WATER SUPPLY WATERSHED CLASSIFICATION N (WS -IV). • INV. OUT 166.1 FINAL DESIGN DI No. 12 > =' / 172,1 r f...:f ' "- .RIM 170.0 ' �, y 1 ��� / ��, �` '' NOT RELEASED FOR DI No. 11 ��� INV. IN 163.4 If ; / ,RIM 169.5 INV. OUT 163.2 ; / CONSTRUCTION INV. IN 165.9 - -' ��• / y Ir ` �' i C- INV. OUT 163.7 '�cA j _ �, `� /'•I 1`71.80 �,' 4 0 Ln g U NOTE: \ s `yam`' ,,r 11,50 =DI /No. 4 — �' ry I �° TC INDICATES TOP OF CURB y/ �'A _ +1 '' `� '' �'j RIM 169'9 / 1 4 ADDED GEN. CONST. NOTES Os 17 �L 's 7�o INV. 165.9 9. ALL ACCESSIBLE ROUTES FROM HANDICAP 12 / / PARKING SHALL BE MAINTAINED AT A MAXIMUM `�` �,':- ' ! ,`° v; / / ° 9. � 16 _ ,, 3 ADDED EASEMENT 09/12/12 SLOPE OF 1 PER 20 LINEAR FEET. CROSS 9, -_ - ,� sL - ,6 " "�YY 1_ .n `� / HqR a• i `� 2 REVISED PIPE NETWORK 09/04/12 SLOPES ON ACCESSIBLE ROUTES SHALL BE A �- �; _ Uoa MAXIMUM OF 114" PER LINEAR FOOT. THE 16� f r _ " \ , - -'r ' / ,! f . �REyyn' r' / �' 1 REVISED GRADING PLAN Os/2a/12 e sa_ -'�a \\ ,� `� `� /' ,/ FFR !' / ,' No. Revision/Issue Date o CURRENT APPLICABLE ACCESSIBILITY CODE / _ -- SHALL BE FOLLOWED. i / _`• r �.'` \` � / ` / 'Q . lf�` II /i�r� l' r / �' `' \ NOUlBf10! /��� ° FES I NV. I r o O • • Al 10. COORDINATE INSTALLATION OF ANY REQUIRED OUT 162.0 r _ ` I II �,•�Q� � 7b, "'y9 ' Ln 6 + \ 1� 5 I S Q i M FIRE APPARATUS WITH THE LOCAL FIRE ' -ti166 - -- \� 1- 5 '� , � / + ry + I � �° / � � Syy,�{{yyyyL : e Slgnatu z ^v. , \ -- -164 -- - -'` '� I � 3 tJLA3Va, MARSHALL BUILDING CODE INSPECTOR AND ��i , / / /r ' ' + jjlr 1 �� ''� I 1 ` = Cs, a FIRE DEPARTMENT PRIOR TO INSTALLATION TO /°\ �e 6 \ +65' - J ..� f + �- / e .- .F,�entE��`• � VERIFY LOCAL REQUIREMENTS. �,� ►V`�`\ ��,�, CB No. 1 -� -9� r ~� ' �- =� 1 `� °�', •/Si "'..•..••'��`r' q �"� �0��• RIM 168.5 DETENTION Dare ` +�" INV. IN 162.7 _ - }62 -� _ _ -_ -_� G91F f INV. OUT 162 /✓ ;;, EASEMENT / o / / `,\ , WET DETENTION tit �� 11. FINE -GRADE AREAS TO DRAIN TO INTENDED / � DRAINAGE STRUCTURES IN ORDER TO PREVENT " �� BASIN 2 ANY STANDING WATER. IF THERE IS ANY ` ill :. '� -" W�•, �� r QUESTION ON THE COMPLETION OF THE FINAL I \+ GRADING, THE CONTRACTOR SHALL CONTACT ~r�=� .. _�- - �. >�; ii �6Q COMMON OUTLET' STRUCTURE / ' NOW OR FORMERLY THE ENGINEER PRIOR TO CONSTRUCTION.,�s HARN D ED FORWARD TOGETHER BOOK 2252, PAGEC9MMITTEE 4" GATE VALVE MAP BOOK 2010, PAGE 575 CONSTRUCTION E SEDIMENT `` Q] - + �-1 �+ r I ! ~ MAP BOOK 2010, PAGE 485 R CTION SEQU NCE FOR CONVERTING THE FES �� �; i r I \ /�• + r " PIN 0650- 79- 1646A00 BASIN INTO A PERMANENT STORM WATER MANAGEMENT BASIN / INV. OUT 162.0',_'� 4 PVC EMERGENCY DRAIN ®0.50% TO DAYLIGHT 4`l 1, AFTER COMPLETE STABILIZATION OF THE SITE AND /IS " . 24 RCP DISCHARGE PIPE ®1.30% APPROVAL FROM THE NCDENR EROSION CONTROL sg /-� --FES INV. OUT 162.0 INSPECTOR, REMOVE ALL EROSION CONTROL MEASURES, 1 DEWATER THE TEMPORARY SKIMMER TRAP AND CLEAN ''� WET DETENTION BASIN 1 ' } OUT THE ACCUMULATED SEDIMENT. 2. FOLLOW ALL RECOMMENDATIONS OF THE OWNER'S / a ENGINEER FOR ALL BASIN REPAIRS AN D MAINTENANCE. 3. REMOVE SKIMMER AND BARREL PLATE. PLUG OR CAP SKIMMER CONNECTIONS ON CONCRETE RISER. 4. GRADE THE BASIN TO FINAL GRADES INDICATED AND SEED PER SPECIFICATIONS. 5. INSTALL PLANTS PER DETAIL ON SHEET C601. / NOW OR FORMERLY NOW OR FORMERLY ` NOW OR FORMERLY NO WETLANDS SHALL BE DISTURBED. HARNETT FORWARD TOGETHER COMMITTEE f�� // HARNETT FORWARD TOGETHER COMMITTEE HARNETT FORWARD TOGETHER COMMITTEE GRAPHIC SCALE: 1" = 40' DEED BOOK 2252, PAGE 911 i DEED BOOK 2252, PAGE 911 DEED BOOK 2252, PAGE 911 ' MAP BOOK 2010, PAGE 575 �,�� 1 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 575 MAP BOOK 2010, PAGE 485 MAP BOOK 2010, PAGE 485 MAP BOOK 2010, PAGE 485 / [ PIN 0650 -79- 1646.000 / j PIN 0650 -79- 1646.000 1 PIN 0650 -79- 1646.000 I 0 20 40 80 120 ton, Sr., P.E., Im. ENVIRONMENTAL ENGINEERING — T WASHINGTON STREET COATS, NORTH CAROLINA 27521 PHONE: g10-697 -7070 FAX: 810 - 897 -6767 License No. C -2570 tiwm,ddayIDn.com HARNETT HEALTH INVESTORS LLC HARNETT COUNTY, NORTH CAROLINA Project No: 173001 Fire Name: 173001 MAS Designed By: CTC Jr. Drawn By AEB Checked By: CTC Jr. prof Eng.: CTC Sheet idle GRADING AND DRAINAGE PLAN Date JUNE 2012 Sheet Scare C500 AS NOTED ii O a IL 3 E 0. O N 1.5 I j III�.�,,;r,•, I I. 1 C ' I- 1 I I I� CLAY LINER -TOPSOIL IIPERMAN PSOIL SECTION A--A SCALE: 114" = 1 -0" BERM CONCRETE ANTI -SEEP COLLAR - EXTEND 1' BEYOND R.C.P. EACH SIDE I_ I I � -- I I I MINI NOTE: PROVIDE GATE VALVE ON DRAIN LINE W/ CAST IRON BOX ON BACK SIDE OF BERM. 0 T POOL ELEV. 160.0 - I- r 15 r r TOP OF BERM ELEV. 162.0 3 3 161.0 1 (- —I I II I i —;: ,' .� . TOP OF SHELF 111 I I- r: , .r:. ,..,:; .•'. - 1 I ( ELEV. 160.5 - BOTTOM OF SHELF ELEV. 159.5 TOP OF SEDIMENT STORAGE ELEV. 155.0 BOTTOM OF SEDIMENT STORAGE ELEV. 154.0 CLAY LINER 24" R.C.P. DISCHARGE PIPE- W/ 0 -RING JOINTS @ 1.30% I I I I I�I I I1 I I —I I l��l_ I_II I 4" SCH. 40 PVC 1 = 1 EMERGENCY DRAIN PIPE @ 0.50% G �C RUBBER BOOT 1" X 14" STEEL HIP BARS SLOPED 35.3' WELDED TO ANGLE & END PLATE CLAY LINER SPECIFICATIONS z TOP OF BERM ELEV. 162.0 -_ CLAY LINER THE CLAY LINER FOR THE WET DETENTION POND SHALL BE 12 ", MINIMUM, THICK AND CONFORM TO THE FOLLOWING REQUIREMENTS: 0. UNIFIED SOIL CLASSIFICATION SYSTEM DESIGNATION OF CL, CHL OR MLSC b. MINIMUM OF 40% PASSING #200 SIEVE C. MINIMUM PLASTICITY INDEX OF 12 d. MAXIMUM INFILTRATION RATE OF 0.01 IN /HR A MINIMUM OF 2 TESTS FOR EACH OF THE ABOVE PARAMETERS SHALL BE PERFORMED AND SUBMITTED TO THE ENGINEER FOR APPROVAL. THE LINER SHALL BE COMPACTED TO 95% OF MAXIMUM PER ASTM D698 AT A MOISTURE CONTENT WITHIN t3 PERCENTAGE POINTS OF OPTIMUM. ONE COMPACTION TEST SHALL BE PERFORMED FOR EACH 2500 SQUARE FEET OF LINER. THE LINER SHALL EXTEND TO THE TOP OF THE PERMANENT POOL. 8" OF TOPSOIL SHALL BE PLACED OVER THE LINER. CARE SHALL BE TAKEN NOT TO DAMAGE THE LINER AS TOPSOIL IS PLACED. 5' -O" 0 EL. 159.7 EL. 15=FILL LONGITUDINAL SECTION 1" X 1" X 1/4" STEEL ANGLE - PRECAST CONCRETE BOX WELDED FRAME OF I rr X 1" X 1/412 STEEL ANGLES /2" DIAMETER STEEL ROD BENT @ 45' ANGLE, WELDED TO -RAMS, ANGLE & BENT RODS 1/2" DIAMETER STEEL RODS BENT @ 90' NNGLE, WELDED TO =RAMS - 3 REQIRED 2" DIA. STEEL RODS DPED 45' WELDED TO qME & HIP BARS - REQUIRED NOTE: FRAME TO BE HOT -DIP GALVANIZED AFTER FABRICATION. TRASH RACK DETAIL SCALE: 1" = 1 -0" GALVANIZED STEEL TRASH RACK - SEE DETAIL THIS SHEET PRECAST CONCRETE BOX CD 1 r �_u I F-1 177-1 tF._ r -- _ I I-mimdL .mot I'T -- -- —rr 11 1l--•\1'Y t'."r/. rti A nr r1 r 1 4Cn n CLAY LINER SECTION B--B SCALE: 1/4" = 1 -0" 5' -0" GALVANIZED STEEL TRASH RACK - SEE DETAIL THIS SHEET PRECAST CONCRETE BOX NN \V EL. - - 159.7 i 1/ SL FR 16 L-1" X 1/4" STL. END PLATE - 2 REQUIRED 1 " X 14" STEEL HIP BARS SLOPED 35.3' WELDED TO FRAME & END PLATE 3'-11 3/8" - PRECAST CONCRETE BOX WELDED FRAME OF I rr X 1" X 1/412 STEEL ANGLES /2" DIAMETER STEEL ROD BENT @ 45' ANGLE, WELDED TO -RAMS, ANGLE & BENT RODS 1/2" DIAMETER STEEL RODS BENT @ 90' NNGLE, WELDED TO =RAMS - 3 REQIRED 2" DIA. STEEL RODS DPED 45' WELDED TO qME & HIP BARS - REQUIRED NOTE: FRAME TO BE HOT -DIP GALVANIZED AFTER FABRICATION. TRASH RACK DETAIL SCALE: 1" = 1 -0" GALVANIZED STEEL TRASH RACK - SEE DETAIL THIS SHEET PRECAST CONCRETE BOX CD 1 r �_u I F-1 177-1 tF._ r -- _ I I-mimdL .mot I'T -- -- —rr 11 1l--•\1'Y t'."r/. rti A nr r1 r 1 4Cn n CLAY LINER SECTION B--B SCALE: 1/4" = 1 -0" 5' -0" GALVANIZED STEEL TRASH RACK - SEE DETAIL THIS SHEET PRECAST CONCRETE BOX 4" PVC PIPE GROUTED IN, TYP. 2 SIDES 4" PVC CLEANOUT FITTING, TYP. 2 SIDES 4" PVC SCH. 40 TEE, TYP. 2 SIDES 4" PVC CAP W/ 1 1/4" HOLE, TYP. 2 SIDES 4" PVC PIPE GROUTED IN -ATTACH 4"X 2" REDUCER & SEDIMENT BASIN SKIMMER HERE - TYP. 2 SIDES - - E I _ II CROSS SECTION OUTLET STUCTURE DETAIL SCALE. 112" = 1 -0" CONSTRUCTION SEQUENCE FOR CONVERTING THE SEDIMENT BASIN INTO A PERMANENT STORM WATER MANAGEMENT BASIN 1. AFTER COMPLETE STABILIZATION OF THE 51TE AND APPROVAL FROM THE NCDENR EROSION CONTROL INSPECTOR, REMOVE ALL EROSION CONTROL MEASURES, DEWATER THE TEMPORARY SKIMMER TRAP AND CLEAN OUT THE ACCUMULATED SEDIMENT. 2. FOLLOW ALL RECOMMENDATIONS OF THE OWNER'S ENGINEER FOR ALL BASIN REPAIRS AND MAINTENANCE. 3. REMOVE SKIMMER AND BARREL PLATE. PLUG OR CAP SKIMMER CONNECTIONS ON CONCRETE RISER. 4. GRADE THE BASIN TO FINAL GRADES INDICATED AND SEED PER SPECIFICATIONS. 5. INSTALL PLANTS PER DETAIL ON SHEET C601. NO WETLANDS SHALL BE DISTURBED. FINAL DRAWINGS FOR REVIEW ONLY NOT FOR CONSTRUCTION U R 0 U a a 0 z 0 a V) LLJ III 10) ■ : EL. - - 159.7 4" PVC PIPE GROUTED IN, TYP. 2 SIDES 4" PVC CLEANOUT FITTING, TYP. 2 SIDES 4" PVC SCH. 40 TEE, TYP. 2 SIDES 4" PVC CAP W/ 1 1/4" HOLE, TYP. 2 SIDES 4" PVC PIPE GROUTED IN -ATTACH 4"X 2" REDUCER & SEDIMENT BASIN SKIMMER HERE - TYP. 2 SIDES - - E I _ II CROSS SECTION OUTLET STUCTURE DETAIL SCALE. 112" = 1 -0" CONSTRUCTION SEQUENCE FOR CONVERTING THE SEDIMENT BASIN INTO A PERMANENT STORM WATER MANAGEMENT BASIN 1. AFTER COMPLETE STABILIZATION OF THE 51TE AND APPROVAL FROM THE NCDENR EROSION CONTROL INSPECTOR, REMOVE ALL EROSION CONTROL MEASURES, DEWATER THE TEMPORARY SKIMMER TRAP AND CLEAN OUT THE ACCUMULATED SEDIMENT. 2. FOLLOW ALL RECOMMENDATIONS OF THE OWNER'S ENGINEER FOR ALL BASIN REPAIRS AND MAINTENANCE. 3. REMOVE SKIMMER AND BARREL PLATE. PLUG OR CAP SKIMMER CONNECTIONS ON CONCRETE RISER. 4. GRADE THE BASIN TO FINAL GRADES INDICATED AND SEED PER SPECIFICATIONS. 5. INSTALL PLANTS PER DETAIL ON SHEET C601. NO WETLANDS SHALL BE DISTURBED. FINAL DRAWINGS FOR REVIEW ONLY NOT FOR CONSTRUCTION U R 0 U a a 0 z 0 a V) LLJ III 10) ■ : E 4 N a N of 0 7 '+7 ¢ Y 0 0 m n a a U 0 0 m n Y U E 0 U cu m a� U ro Q .E c-i n a_ E M Y Y a ai 0 rn Q rn v C0 r 0 0 r O Q U_ 0 0 c� U i E 0 U m m U IL L m h Q.