HomeMy WebLinkAbout20210451 Ver 1_Pre-Filing Meeting Information_20210326DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Ple ase list all e xisting proje ct ID's associate d with this proje cts.*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210451 1
Winston-Salem Regional Office - (336) 776-9800
Dave Wanucha
Pre-Filing Me eting Reque st submitte d 2/25/2021
Jerry Parker
japarker3@ncdot.gov
Gatewood Rd Bridge Removal
NCDOT
Caswell
City
Greensboro
State / Province / Region
NC
Postal / Zip Code
27415-4996
Country
USA
Street Address
1584 Yanceyville Street
Address Line 2
P.O. Box 14996
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
17BP.7.R.130
Dave Wanucha
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
NCDOT is proposing to remove Bridge #117 over Country Line Creek
in Caswell County. In order to do so, a temporary causeway will need
to be utilized which will result in stream impacts. NCDOT does not
plan to replace the bridge once removed.
3/4/2021
3/10/2021
Gatewood Rd Permit Drawings.pdf 1.34MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
2/25/2021