Loading...
HomeMy WebLinkAbout20210451 Ver 1_Pre-Filing Meeting Information_20210326DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20210451 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 2/25/2021 Jerry Parker japarker3@ncdot.gov Gatewood Rd Bridge Removal NCDOT Caswell City Greensboro State / Province / Region NC Postal / Zip Code 27415-4996 Country USA Street Address 1584 Yanceyville Street Address Line 2 P.O. Box 14996 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No 17BP.7.R.130 Dave Wanucha Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date NCDOT is proposing to remove Bridge #117 over Country Line Creek in Caswell County. In order to do so, a temporary causeway will need to be utilized which will result in stream impacts. NCDOT does not plan to replace the bridge once removed. 3/4/2021 3/10/2021 Gatewood Rd Permit Drawings.pdf 1.34MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 2/25/2021