Loading...
HomeMy WebLinkAbout20040275 Ver 8_Wetland Inspection Report_20121017Wetland Inspection Report Project Num: 20040275 Project Name: NCDOT - 1 -85 County: Rowan Location: NCDOT - 1 -85 Latitude: SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 10/16/2012 Reason for Inspection: Follow -up Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Amy C Euliss Secondary Inspector(s): Facility compliance Status: M Compliant Program Area: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Inspection Summary: Version: 8 Status: Issued I -2304a Project Type: Road maintenance /repair /improvements Region: Winston -Salem I -2304a Longitude: Title: n Not Compliant Phone: Phone: Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? fl fl fl Are the culverts and /or filled areas installed properly? fl fl fl Is the site compliant with additional conditions of the 401 WQC or non 404 permit? fl fl fl Comment: Log veins have been repaired. Stream currently going underground for @10', but should restore itself over time. Banks were laid back and stabilized as requested. Page: 1