HomeMy WebLinkAbout20040275 Ver 8_Wetland Inspection Report_20121017Wetland Inspection Report
Project Num: 20040275
Project Name: NCDOT - 1 -85
County: Rowan
Location: NCDOT - 1 -85
Latitude:
SW Plan Location:
Site Owner Name: NC DOT PDEA
Inspection Date: 10/16/2012
Reason for Inspection: Follow -up
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Amy C Euliss
Secondary Inspector(s):
Facility compliance Status: M Compliant
Program Area: 401 (includes isolated /non -404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Version: 8 Status: Issued
I -2304a Project Type: Road maintenance /repair /improvements
Region: Winston -Salem
I -2304a
Longitude:
Title:
n Not Compliant
Phone:
Phone:
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? fl fl fl
Are the culverts and /or filled areas installed properly? fl fl fl
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? fl fl fl
Comment: Log veins have been repaired. Stream currently going underground for
@10', but should restore itself over time. Banks were laid back and stabilized as
requested.
Page: 1