Loading...
HomeMy WebLinkAboutWQ0002829_NOV-2021-LM-0014; NOV-2021-LV-0139; NOV-2021-LM-0015_20210316 rir f,r► / , Operations & Maintenance X secrc 16,2021 Robert Tankard Mty AR 9o�f Reg NC DEQ Water ce 943WasWashingtohington n Square ional Mall �°�`hingto per °n�eetion Washington,NC 27889 Regi°nai Qoe RE:NOV-2021-LM-0014;NOV-2021-LV-0139;NOV-2021-LM-0015 Please accept this response to the NOVs listed above on behalf of KDHWWTP,LLC.Please note that the management agreement between KDHWWTP LLC and Atlantic OBX was executed on 10/09/2021. NOV-2021-LM-0014: Total Nitrogen and Phosphorus reduction is beyond the capability of the plant during this reporting period. The plant modifications to a 5 stage Bardenpho Process were not completed at time of reporting. PH frequency violation,March 28 was a Saturday.PH was recorded correctly March 23-27 and again on March 30- 31. NOV-2021-LV-0139: Total Nitrogen and Phosphorus reduction is beyond the capability of the plant during this reporting period. The plant modifications to a 5 stage Bardenpho Process were not completed at time of reporting. NOV-2021-LM-0015: Total Nitrogen and Phosphorus reduction is beyond the capability of the plant during this reporting period. The plant modifications to a 5 stage Bardenpho Process were not completed at time of reporting. Total flow,Turbidity and PH was not recorded by the previous Operator/Management company.PH results were not reported by us until a new PH meter was ordered as the previous Operator/Management company took the meter from KDHWWTP stock. Please consider the information provided when assessing whether a civil penalty will be issued. Regards, Jimmy Bliven,ORC Atlantic OBX 252.491.8771 jbliven!atlanticsewage.com