Loading...
HomeMy WebLinkAboutR-2597_FieldVerifMemo.docxBEVERLY EAVES PERDUE GOVERNOR DATE: SUBJECT: FROM: PARTICIPANTS STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION EUGENE A. CONTI, JR. SECRET. -kRY October 5, 2012 Regulatory Field Verification, September 27 and October 1, 2012, US 221 from SR 1366 in Rutherford Countv to US 221 -NC 226 in McDowell County , TIP R- 2597/R- 0204D &E Jeff Hemphill, Project Development and Environmental Analysis Branch, Natural Environment Section Loretta Beckwith (09/27 only) Amy Euliss Jeff Hemphill Sarah Schvvarzer (09/27 only) Richard Darling Ed Small (09/27 only) Heath Caldtivell Dti-,°ayne Huneycutt (09/27 only) USACE Asheville Regulator- Field Office DWQ Winston -Salem Regional Office NCDOT PD &EA NES NCDOT PD &EA NES Michael Balser Engineering Michael Balser Engineering Michael Balser Engineering Michael Balser Engineering The North Carolina Department of Transportation (NCDOT) proposes to improve a 15 -mile portion of existing US 221 from north of SR 1366 (Roper Loop Road) to SR 1153 (Goose Creels Road) (TIP R -2597) and a 4 -mile portion of US 221 from SR 1153 (Goose Creels Road) to US 221 -NC 226 (TIP R- 0204D &E) in Rutherford and McDowell Counties. The proposed improvements consist of widening US 221 from a two -lane roadv, -ay to a four -lane divided roadN -,-ay and some realignment to straighten curves on US 221 between Thermal City and Glenwood and near I -40. Jurisdictional resources (wetlands, streams, and other -,eaters) on the subject project (present ,within 25 feet of the slope - stake line) ��ere field - verified on September 27 and October 1 2012 at the project location. Prior to specific site review on September 27, Ms. Beck with asked whether all "NRPW "- designated intermittent channels listed in the Aquatic Upload Spreadsheet should be changed to "RPW" and Mr. Darling confirmed that because OHWM was applicable in all cases here that change Nvould be made. Ms. Beck with confirmed that, for Rapanos purposes, W8, W8a, and W46a (nevv) are the only "adjacent" wetlands, all others are "abutting'. Thirteen locations were reviewed by the United States Army Corps of Engineers ( USACE, for jurisdiction and potential mitigation requirement) and the North Carolina Department of Environment and Natural Resources (NCDENR) Division of Water Quality (DWQ, for intermittent/perennial status) on September 27 with adjustments agreed as follows: S4: no change (ephemeral) S5: no change S16a: no change S22b: DWQ requested change to perennial due to biology, USACE concurred MAILING ADDRESS: TELEPHONE: 919 - 707 -6000 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919- 707 -6052 CENTURY CENTER, BUILDING A PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1000 BIRCH RIDGE DRIVE 1548 MAIL SERVICE CENTER WEBSITE: WWW..NCDOT.ORG /DOH /PRECONSTRUCT /PE/ RALEIGH NC 27610 RALEIGH NC 27699 -1548 S29: change to ephemeral due to lack of biology & storm-,vater influence, USACE concurred non jurisdictional 530: no change 531: no change S46a: DWQ requested change channel to perennial due to biology, USACE requested add new wetland (W46a) upstream of perennial channel 546: DWQ requested change to perennial, add upstream reach, USACE concurred; S46aa: DWQ requested add new perennial channel, USACE concurred S47d: no change 550: no change S52b: DWQ requested change to ephemeral, USACE concurred non jurisdictional above and below culvert within study area Field review concluded at 3:00 pm on September 27 and scheduled for continuation of DWQ verification October 1 at 9:00 am. Eleven locations were reviewed by DWQ, for intermittent/ perennial status on October 1 with adjustments agreed as follows: S53b: DWQ requested change to perennial due to biology S57b: no change to channel classification; new wetland (W57b) delineated adjacent to channel S62a: DWQ requested change to perennial due to biology S63a: no change S63b: no change S65a: DWQ requested change to ephemeral from pond outlet to half way down channel; intermittent from there to pipe inlet; perennial due to biology on west side of US 221. S69d: no change S72aa: DWQ requested change to perennial due to biology S76b: DWQ requested change to perennial due to biology at Flag "S76c" S78b: DWQ requested change to perennial due to biology The USACE and DWQ agreed that, with all the modifications listed above, the jurisdictional verification was complete and written confirmation would be forthcoming. If any meeting participants have any comments, questions, or edits to this memorandum, please contact Jeff Hemphill, Environmental Senior Specialist at (919) 707 -6126 or jhemphill(d ;ncdotgov. Attachments: Preliminaiy Jurisdictional Determination Form (revised) USACE Waters Upload Table (revised) Jurisdictional characteristics of water resources in the study area (revised) Revised field forms (S22b, S29, S46, S46a, W46a, S46aa, S52b, S53b, W57b, S62a, S65a, S72aa, S76b, & S78b) Revised maps (Sheets 7, 10, 16, 20, 21, 23, 24, 25, 30, & 34)