DEPARTMENT OF THE ARMY
~ ;`�~ WILMINGTON DISTRICT,CORPS OF ENGINEERS
a °'ii . 69 DARLINGTON AVENUE
roe WILMINGTON, NORTH CAROLINA 28403-1343
/go-
STg7F.5 OF
March 29, 2021
Regulatory Division/1145b
Action ID: SAW-2009-01114
Mr. Robert Heuts
Raleigh Executive Jetport
700 Rod Sullivan Road
Sanford, NC 27330
Dear Mr. Huets:
Reference the Department of the Army (DA) permit issued to you on April 30,
2019, for the discharge of fill material into 0.48 acre of wetlands and 138 linear feet of
intermittent stream channel associated with the expansion of the Raleigh Executive
Jetport. The project site is located on the existing Raleigh Executive Jetport property, at
the Rod Sullivan Road terminus, in the north portion of Lee County, North Carolina
(35.5768N, -79.1084W). The site lies within the Hughes Creek watershed in the Cape
Fear River Basin (HUC 03030004).
Reference is also made to your letter dated February 5, 2021, requesting
modification to the existing DA permit referenced above. Specifically, you have
requested to modify construction drawings to meet stormwater needs from the Jetport
expansion. These modifications result in an additional 0.047 acre of permanent wetland
impacts. In order to offset unavoidable impacts to the additional 0.047 acre of wetlands
in the permit modification request, the applicant has proposed mitigation at a 2:1 ratio,
in the form of payment to the North Carolina Division of Mitigation Services.
I have determined that the proposed project modifications described above are not
contrary to the public interest and are consistent with the 404 (B) (1) Guidelines and
therefore, the DA permit is hereby modified. The authorized work shall be completed in
accordance with the attached revised drawings. To mitigate for additional unavoidable
impacts associated with this permit modification special condition "17" is hereby added
to read as follows:
- 2 -
"In order to compensate for additional impacts associated with the permit modification
request, mitigation shall be provided in accordance with the provisions outlined on the
most recent version of the attached Compensatory Mitigation Responsibility Transfer
Form. The requirements of this form, including any special conditions listed on this
form, are hereby incorporated as special conditions of this permit authorization."
This approved modification should be attached to the original permit and will be
utilized for future compliance reviews of the project. It is understood that all other
conditions of the permit, including the permit expiration date, remain applicable. Should
you have questions, contact Mr. James Lastinger, Raleigh Regulatory Field Office at
telephone (919) 554-4884, Extension 32.
FOR THE DISTRICT COMMANDER jc.vrA-1.4, �✓
Benjamin A. Bennett
Colonel, U. S. Army
District Commander
Enclosures
Copy Furnished: (w/enclosures)
Ms. Kelly Williams
Division of Mitigation Services
1652 Mail Service Center
Raleigh, NC 27699
Ms. Amy Chapman
Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699
Mr. Edward Smail
Michael Baker International, Inc.
4425 Belle Oaks Drive
North Charleston, SC 29405
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee:Raleigh Executive Jetport,Attn: Robert Heuts Action ID:SAW-2009-01114
Project Name: Raleigh Executive Jetport expansion County: Lee
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting
authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the
mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic
Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must
be provided to the appropriate Mitigation Sponsors.
Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released
and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified
mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor
must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project
Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on
page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements
Permitted Impacts Requiring Mitigation*: 8-digit HUC and Basin:03030004,Cape Fear River Basin
Stream Impacts(linear feet) Wetland Impacts(acres)
Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal
.047
*If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8-digit HUC and Basin:03030004, Cape Fear River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal
.094
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks,also list the specific site. For NCDMS,list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document(see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington
District,are currently available at the mitigation site identified above. Further,I understand that if the Sponsor fails to provide
the required compensatory mitigation,the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Page 1 of 2 Form Date July 7, 2020
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized
impacts conducted by the North Carolina Department of Transportation(NCDOT),construction within jurisdictional areas
may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District
within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this
form,confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor,and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District
Project Manager(address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the District, the Sponsor must obtain case-by-case approval from the District Project Manager and/or North Carolina
Interagency Review Team(NCIRT). If approved, higher mitigation ratios may be applied,as per current District guidance
and a new version of this form must be completed and included in the District administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions:
This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the
District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District
Mitigation Office,3331 Heritage Trade Drive,Suite 105, Wake Forest,NC 27587(or by email to SAWMIT@usace.army.mil).
Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office.
USACE Project Manager: James Lastinger
USACE Field Office: Raleigh Regulatory Field Office
US Army Corps of Engineers
3331 Heritage Trade Drive,Suite 105
Wake Forest, NC 27587
Email:james.c.lastinger@uscace.army.mil
c✓rnco �✓
March 29, 2021
Wilmington District Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.armv.mil.
Page 2 of 2
EXISTING CONDITIONS'
'� Legend
HEADWATER FOREST WETLAND\\ —Existing Facilities
----- _ADJACENT TO RPW PROJECT STUDY AREA / i Airport Property Boundary
-_----_ - •Delineated Stream
\ / I Project Study Area Boundary
, O.Z Delineated Wetland
- -- ®Stormwater Pond
..\_
EXISTING STORMWATER POND ❑ '
JURISDICTIONAL z _
STREAM - E _ —� 0 -immiliiiiiiiiiih___
- - -
-- C ] C ] C C
J1— D D 0
L J C
C C ] C / �pIl� �
11
ONmnAWuunIIQ 1
C ? j C C Cuwuw�Xuuwun
umnni noon°
CC NIIII1 Wn/ innit l(I FA(
3. 1
J [
�— C .
•
R}i z
AimelA A 7A7---.7- . L, L__ L:41;__ ,--,
1TJ TJ TI T1
I } 1T1T1TLT1T1T1T1TTT1 V T T T T T T T T T T T T y
1 1 1 1 1 1 1 1 1 1 1 1
T T T T T
C I T T T T T T T T \.........T T T T T T T T T T T T
1( ;:ir-4_______1
u RALEIGH EXECUTIVE JETPORT
EXISTING AIRPORT FACILITIES
SOUTH TERMINAL DEVELOPMENT
" LEE COUNTY N.C.
DATE:JANUARY 11,2021
eo e MONCURE 7.5'USGS TOPO
eI T. e u o SHEETIOF3
1In_ e e - 0 150 300
, e e I Feet
e 1 inch=300 feet
PROPOSED PLAN VIEW
Proposed New Hangars— \
PROJECT STUDY AREA
_ J
__ --_ — _ Proposed New Taxilane/Aprons
\ 1
EXISTING STORMWATER POND �--_�
I/
__ --- Limits of Disturbance
_
0000000A, Is,
�`v•., NkNOI'__ Proposed New Hangars -----
i •_ �111 '_J Legend
/.• —..Delineated Stream
•
/,• I/ —_— _� `__ Existing Facilities
� t — Airport Property Boundary
j
/ �� ■ II _ * --•Limits of Disturbance
■ C •■ ■ \ -- NPDES-Silt Fence
■ in ■ ■ QProjectArea Boundary
/: — ■ A.
: [ • ■ I I I Proposed Hangars
• C A. I=Proposed Taxilane/Aprons
■
HEADWATER FOREST WETLAND 1- A C ■ ■ ®Proposed Riprap Pads
ADJACENT TO RPW C ■ ■ > fl_d Clearing Impacts
0.007 ACRES FILL(RIPRAP) [ 7 ■ ■ ■ ■ � I' \
i• • UIImmYuIInIN ®Riprap Pad
0.04 ACRES CLEARING [ : ■ C ■ ■ I u"." uuuwln ODelineatedWetland
•
�, [ ■ ■ C ■ �_— I 111111111111,11111111111J ®DNE Thick
C D .I . L m . ::. ..*::::' I il 111, --- 1:11
Proposed Clearing -D——1— A&A - A.eaA c E \ — — _ iiii
v
` 1T1T1T1T1 1r
Proposed Riprap Pads- —
P@4 J .L J.-L1T1.1.1.LJ.1 TTTTTTTTTTTT
:;' 111111111111
r 4I ( I T T T T T T T T T T RALEIGH EXECUTIVE JETPORT
—AJ itA
., \ SOUTH TERMINAL DEVELOPMENT
� � LEE COUNTY N.C.
9�k - DATE:JANUARY 11,2021
NPDES-Silt Fence ,44 MONCURE 7.5'USGS TOPO
�� ` , • SHEET 2OF3
Limits of Disturbance
��` •01, 0 150 300
��` Feet
CROSS-SECTION VIEW
TRENCH FORMER DETAIL TOGGLE LOCK AUXILLARY RAIL — SLOPE
0.7 NTC
TRANSITION TO OUTL.T RIPRAP TRENCH!
• 12"OF CLASS
SEE STRUCTURE TABLE
I�I� �� ;i +a..-- FLOW
„�%IX�9G- 1 �r%�' Y 1Zbi
2-15"CMP CULVER � �/����j����=����ij�
�� fir, �--�.
FLO
[Said
A '�•t,.. - _`��i 1�1i�� A TRENCH RIRRAP
�`�`►•1� .��_� •��!11 HORIZONTA
�t�``�a!�'�•'� % GEOTEXTIL
nizzigaMrd TRANSITION TO MATCH
SECTION A-A
B
PLAN VIEW
RIP RAP BASIN NUMBER
TABLE FOR DETAIEXISTING WESWOND 2 OUTLET BER
_ NATURA
A 1.5 1.68
2.7 O
GEOTEXTILE
SECTION B-B
NOTES:
ROCK ENERGY DISSIPATOR BASIN DETAIL
0•7 NTS
RALEIGH EXECUTIVE JETPORT
SOUTH TERMINAL DEVELOPMENT
LEE COUNTY,N.C.
DATE:JANUARY 11,2021
MONCURE 7.5'USGS TOPO
SHEET 3OF3