Loading...
HomeMy WebLinkAbout20210430 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210327Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, March 27, 2021 12:01 AM To: cyabroudy@ecepower.com Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Strickland Bridge Substation to HWY 401 Transmission Line - 20210430 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Strickland Bridge Substation to HWY 401 Transmission Line that you submitted on 2/24/2021. The ID number for that project is 20210430, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210430 Version * 1 Fayetteville Regional Office - (910) 433-3300 Chad Turlington Pre -Filing Meeting Request submitted 2/24/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Caitlin Yabroudy cyabroudy@ecepower.com Strickland Bridge Substation to HWY 401 Transmission Line Lumbee River Electrical Membership Corporation Cumberland Street Address 6090 NC HWY 711 Address Line 2 City State / Rovince / Region Pembroke North Carolina Fbstal / Zip Code Country 28372 US Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below.* The project consists of a proposed 3-mile transmission line from the existing Strickland Bridge Substation to an existing tie point along Hwy 401. The first half of the transmission line will be run along a new distribution easement following the proposed 1-295 and the second half of the line will run along an existing transmission line easement. The project will be located just 10 miles West of Fayetteville in Cumberland County, North Carolina. The scope includes the transmission line, direct bury poles, and minimal row -of -way clearing for the additional width of the transmission line. Please give a couple of dates you are available for a meeting. 3/3/2021 3/10/2021 Please attach the documentation you would like to have the meeting about. Strickland to Hwy 401 Aerial - Pre Filing Mtg.pdf 1.89MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature e u ygika4 Submittal Date 2/24/2021