Loading...
HomeMy WebLinkAboutNCS000331_DOD Fort Bragg Permit Extension_20210331STATE of NORTH CAROLINA DEPARTMENT of ENVIRONMENT QUALITY DIVISION of ENERGY, MINERAL, and LAND RESOURCES PERMIT NO. NCS000331 TO DISCHARGE STORMW ATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with applicable law, including the regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Fort Bragg and Camp MacKall is hereby authorized to discharge stormwater and continue operation of oil water separators not associated with wastewater discharges from facilities located near: Fayetteville, North Carolina and falling within the boundaries of Cumberland, Hoke, Moore, Richmond, Scotland, and Hamett Counties to receiving waters designated as James Creek, Silver Run, Polecat Creek, Thuckahoe Creek, Horse Creek, Flat Creek, Mill Creek, Dear Creek, Buffalo Creek, Hectop Creek, Jumpng Run Creek, Little Creek, Cypress Creek, McPherson Creek, Tank Creek and its tributaries , Beaver Creek , Big Branch, Little Cross Creek, Drowning Creek, Bones Creek, Little Rockfish Creek, Patterson Branch, Black Creek, Ray Mill Puddy Creek, McDuffe Creek, Nicholson Creek, Juniper Creek, Cabin Branch, Field Branch, Gum Branch, Piney Bottom Creek, Calf Creek, Wolf Pit Creek, and Stewarts Creek, and tributaries to Mott Lake, McKiethan Pond, Lake McArthur, McKellers Pond, Big Muddy Lake, Little River and its tributaries, Creek Pond, Smith Lake, McFayden Pond, Texas Pond, Beaver Creek, Bonnie Doone Lake, Stewarts Creek, and Big Branch in the Cape Fear River Basin [and to receiving waters designated as Drowning Creek and its tributaries at Camp MacKall in the Lumber River Basin] in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, VI, VII and VIII hereof. This permit shall become effective April 1, 2021. This permit shall expire at midnight on September 30, 2021. Signed this day March 3 1, 2021. for Brian Wrenn, Director Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission THIS PAGE INTENTIONALLY BLANK PERMIT NO. NCS000331 TABLE OF CONTENTS PARTI PART II PERMIT COVERAGE FINAL LIMITATIONS AND CONTROLS FOR PERMITTED DISCHARGES SECTION A: PROGRAM IMPLEMENTATION SECTION B: PUBLIC EDUCATION AND OUTREACH SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS SECTION F: POST-CONSTRUCTION SITE RUNOFF CONTROLS SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING SECTION H: INDUSTRIAL ACTIVITIES SECTION I: OIL WATER SEPARATORS SECTION J: MONITORING REQUIREMENTS SECTION K: IMPAIRED WATERS and TOTAL MAXIMUM DAILY LOADS (TMDLs) PART III PARTIV PARTV PROGRAM ASSESSMENT REPORTING AND RECORD KEEPING REQUIREMENTS STANDARD CONDITIONS SECTION A: COMPLIANCE AND LIABILITY SECTION B: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS SECTION C: MONITORING AND RECORDS PART VI LIMITATIONS REOPENER PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VIII DEFINITIONS THIS PAGE INTENTIONALLY BLANK PERMIT NO. NCS000331 Part I Page 1 of 2 PARTI PERMIT COVERAGE 1. During the period beginning on the effective date of the permit and lasting until expiration, Fort Bragg and Camp MacKall, herein referred to as Fort Bragg, is authorized to discharge stormwater from the storm drainage system and continue operation of oil water separators not associated with wastewater discharges to receiving waters designated as James Creek, Silver Run, Polecat Creek, Thuckahoe Creek, Horse Creek, Flat Creek, Mill Creek, Dear Creek, Buffalo Creek, Hectop Creek, Jumpng Run Creek, Little Creek, Cypress Creek, McPherson Creek, Tank Creek and its tributaries, Beaver Creek , Big Branch, Little Cross Creek, Drowning Creek, Bones Creek, Little Rockfish Creek, Patterson Branch, Black Creek, Ray Mill Puddy Creek, McDuffe Creek, Nicholson Creek, Juniper Creek, Cabin Branch, Field Branch, Gum Branch, Piney Bottom Creek, Calf Creek, Wolf Pit Creek, and Stewarts Creek, and tributaries to Mott Lake, McKiethan Pond, Lake McArthur, McKellers Pond, Big Muddy Lake, Little River and its tributaries, Creek Pond, Smith Lake, McFayden Pond, Texas Pond, Beaver Creek, Bonnie Doone Lake, Stewarts Creek, and Big Branch in the Cape Fear River Basin [and to receiving waters designated as Drowning Creek and its tributaries at Camp MacKall in the Lumber River Basin]. Such discharge will be controlled, limited and monitored in accordance with Fort Bragg's Comprehensive Stormwater Management Program Plan, herein referred to as the Stormwater Plan. The Stormwater Plan must detail Fort Bragg's stormwater management program for the five-year term of the stormwater permit including, for each of the measure identified in the permit, a narrative description of the program, a table that identifies each best management practice (BMP) used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, funding and the responsible person or position for implementation, title and responsibilities for implementing this permit. If major modifications are proposed to the Stormwater Plan, the Division will be notified of the reasons and justifications for these changes. The Division may comment on these changes as deemed necessary to assure appropriate implementation of the Stormwater Plan. No provisions of this permit shall be interpreted as or constitute a commitment that Fort Bragg will obligate or pay funds in contravention of the Anti-Deficiency Act, 31 U.S.C. Section 1341. 2. All discharges authorized herein shall be lawfully managed in accordance with the terms and conditions of this permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. 3. This permit does not relieve Fort Bragg from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. 4. This permit covers current and future activities associated with the discharge of stormwater from the Fort Bragg. 5. Under the authority of Section 402(p) of the Clean Water Act and implementing regulations 40 CFR Part 122, 123 and 124, North Carolina General Statutes 143-215.1 and Session Law 2006- 246 and in accordance with the approved Stormwater Plan, all provisions contained and referenced in the Stormwater Plan are enforceable parts of this permit. Fort Bragg will develop and implement its approved Stormwater Plan in accordance with Section 402(p)(3)(B) of the Clean Water Act, provisions outlined by the Director, and the provisions of this permit. 6. The permit requires the development and proper implementation of the Stormwater Plan. The purpose of the Stormwater Plan is to reduce the discharge of pollutants from Fort Bragg to the PERMIT NO. NCS000331 Part I Page 2 of 2 maximum extent practicable, to protect water quality, and to satisfy the applicable water quality requirements of the Clean Water Act. Implementation of best management practices consistent with the provisions of the Stormwater Plan constitutes compliance with the standard ofreducing pollutants to the maximum extent practicable. Successive iterations of the Stormwater Plan and other components of this permit will be driven by the objective of assuring that discharges do not cause or contribute to the violation of water quality standards, through the expansion and tailoring of management measures within the scope of the Stormwater Plan. 7. The permit authorizes the point source discharge of stormwater runoff from Fort Bragg. In addition, discharges of non-stormwater are also authorized through the MS4 if such discharges are: (a) Permitted by, and in compliance with, another NPDES discharge permit including discharges of process and non-process wastewater, and stormwater associated with industrial activity; or (b) Determined to be incidental non-stormwater flows that do not significantly impact water quality and may include: water line flushing; landscape irrigation; diverted stream flows; rising groundwaters; uncontaminated groundwater infiltration; uncontaminated pumped groundwater; discharges from potable water sources; foundation drains; air conditioning condensate (commercial/residential); irrigation water; sprmgs; water from crawl space pumps; footing drains; lawn watering; residential and charity car washing; flows from riparian habitats and wetlands; dechlorinated swimming pool discharges; street wash water; flows from emergency fire fighting: ■ releases of clean waters from hydrostatic testing The Division may require that non-stormwater flows of this type be controlled by Fort Bragg's Stormwater Plan. PERMIT NO. NCS000331 Part II Page 1 of 16 PART II FINAL LIMITATIONS AND CONTROLS FOR PERMITTED DISCHARGES SECTION A: PROGRAM IMPLEMENTATION Fort Bragg will implement, manage and oversee all provisions of its Stormwater Plan to reduce pollutants discharged from Fort Bragg. This in cludes, but is not limited to, the following areas: 1. Fort Bragg will develop and maintain a Stormwater Plan with the authority to implement all provisions of the Stormwater Plan. Fort Bragg, will keep the Division advised of the status of development of appropriate authorities and will pursue these authorities in accordance with the schedule outlined in the Stormwater Plan. If major modifications are proposed to the Stormwater Plan, the Division will be notified the reasons and justifications for those changes. The Division may comment on modifications as deemed necessary to assure appropriate implementation of the Stormwater Plan. 2. Fort Bragg's Stormwater Plan will be implemented and managed such that the discharge of pollutants from Fort Bragg is reduced to the maximum extent practicable. It is anticipated that in order to meet this provision, implementation of the Stormwater Plan will occur with emphasis given to priority areas and to management measures and programs that are most effective and efficient at varying stages of the plan's implementation. 3. Fort Bragg will maintain adequate funding and staffing to implement and manage the provisions of the Stormwater Plan. 4. Fort Bragg will implement programs to address the contribution of pollutants to the storm drainage system from industrial areas including planning, monitoring, education, and operation and maintenance activities. 5. Fort Bragg will implement the components of the Stormwater Plan to prohibit, to the maximum extent practicable, illicit connections, spills and illegal dumping. 6. Fort Bragg will implement provisions of the Stormwater Plan as appropriate to monitor and assess the performance of the various management measures that are a part of the Stormwater Plan and of this permit. 7. Fort Bragg will implement appropriate education, training, outreach, and public involvement programs to support the objectives of this stormwater discharge permit and the Stormwater Plan. 8. Fort Bragg will implement a program to reduce pollution from construction site runoff as described in the Stormwater Plan and in accordance with this permit. 9. Fort Bragg will implement a monitoring program as described herein. Monitoring will be used to assess the effectiveness of program components and modify program components as necessary. PERMIT NO. NCS000331 Part II Page 2 of 16 SECTION B: PUBLIC EDUCATION AND OUTREACH 1. Objectives for Public Education and Outreach Distribute educational materials to the community or conduct equivalent outreach activities about the impacts of storm water discharges on water bodies and the steps that the public can take to reduce pollutants in storm water runoff. 2. BMPs for Public Education and Outreach Fort Bragg shall implement the following BMPs to meet the objectives of the Public Education and Outreach Program. BMP Measurable Goals (a) Identify Goals and Objectives Defined goals and objectives of the Local Public Education and Outreach Program based on at least three high priority community wide issues. (b) Identify target pollutants and/or stressors Fort Bragg shall identify and maintain a description of the target pollutants and/or stressors and likely sources. (c) Identify target audiences Fort Bragg shall identify, assess annually and update as necessary target audiences likely to have significant storm water impacts and why they were selected. (d) Identify residential and industrial/commercial issues Fort Bragg shall identify and describe issues, such as specific pollutants, the sources of those pollutants, impacts on biology, and the physical attributes of stormwater runoff, in their education/outreach program. A minimum of three residential and three industrial/commercial issues should be targeted as part of the education/outreach program. (e) Identify and describe watersheds in need of protection and the issues that may threaten the quality of these waters Where applicable, the education/outreach program shall identify and describe watersheds in need of protection and the issues that may threaten the quality of these waters. (f) Informational Weh Site Fort Bragg shall promote, maintain, assess and update as necessary internet web site. (g) Distribute public education materials to identified target audiences and user groups. For example, schools, homeowners, and/or businesses. Fort Bragg shall distribute, assess and update as necessary stormwater educational material to appropriate target groups in such a way that is designed to convey the program's message to the target audience each year. Instead of developing its own materials , Fort Bragg may rely on Public Education and Outreach materials supplied by the state, and/or other entities through a cooperative agreement, as available, when implementing its own program. PERMIT NO. NCS000331 Part II Page 3 of 16 BMP Measurable Goals (h) Maintain Hotline/Help line Fort Bragg shall promote and maintain a stormwater hotline/helpline. Fort Bragg may utilize an existing hotline/helpline so long as it also promotes for stormwater concerns or may train staff to transfer calls to the stormwater administrator. (i) Implement a Public Education and Outreach Program. Fort Bragg's outreach program shall include a combination of approaches that are effective at reaching the identified target audiences based on data and information collected by Fort Bragg. For each media, event or activity, including those elements implemented locally or through a cooperative agreement measure and record the extent of exposure. PERMIT NO. NCS000331 Part II Page 4 of 16 SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION 1. Objectives for Public Involvement and Participation Comply with State and local public notice requirements when implementing a public involvement and participation program. 2. BMPs for Public Involvement and Participation Fort Bragg shall implement the following BMPs to meet the objectives of the Public Involvement and Participation. BMP Measurable Goals a. Allow the public an opportunity to review and comment on the Stormwater Plan Fort Bragg shall conduct at least one public meeting during the term of the permit to allow the public an opportunity to review and comment on the Stormwater Plan. b. Volunteer community involvement program Fort Bragg shall include and promote volunteer opportunities as part of its stormwater program designed to promote ongoing participation. C. Mechanism for Public involvement Fort Bragg shall provide and promote a mechanism for public involvement that provides for input on stormwater issues and the stormwater program. Fort Bragg may establish a stand-alone group or utilize an existing group or processes. d. Hotline/Help line Fort Bragg shall promote and maintain hotline /helpline. Fort Bragg may utilize an existing hotline/helpline so long as it also promotes stormwater concerns or may train staff to transfer calls to the stormwater administrator. PERMIT NO. NCS000331 Part II Page 5 of 16 SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION 1. Objectives for Illicit Discharge Detection and Elimination a. Develop, implement and enforce a program to detect and eliminate illicit discharges into your small MS4. b. Develop and maintain a storm sewer system map, showing the location of all outfalls and the names and location of all waters of the United States that receive discharges from those outfalls; c. Effectively prohibit, through ordinance, or other regulatory mechanism, non-storm water discharges into your storm sewer system and implement appropriate enforcement procedures and actions; d. Develop and implement a plan to detect and address non-storm water discharges, including illegal dumping, to your system; and e. Inform public employees, businesses, and the general public of hazards associated with illegal discharges and improper disposal of waste. f. Address the following categories of non-storm water discharges or flows (i.e., illicit discharges) only if you identify them as significant contributors of pollutants to your small MS4: water line flushing, landscape irrigation, diverted stream flows, rising ground waters, uncontaminated ground water infiltration, uncontaminated pumped ground water, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn watering, individual residential car washing, flows from riparian habitats and wetlands, dechlorinated swimming pool discharges, and street wash water (discharges or flows from fire fighting activities are excluded from the effective prohibition against non-storm water and need only be addressed where they are identified as significant sources of pollutants to waters of the United States). 2. BMPs for Illicit Discharge Detection and Elimination Fort Bragg shall implement the following BMPs to meet the objectives of the Illicit Discharge Detection and Elimination Program. BMP Measurable Goals a. Maintain a Storm Sewer System Base Map of Major Outfalls. Fort Bragg shall maintain, assess, and update as necessary a map identifying major outfalls. At a minimum, components include major outfalls and receiving streams, and type of conveyance system (i.e., either closed pipe or open drainage). For closed pipe systems identify the pipe material, shape, and size. b. Detect dry weather flows Fort Bragg shall implement a program for conducting regular dry weather flow field observations in accordance with written field screening procedure for detecting and tracing the sources of illicit discharges and for removing the sources or reporting the sources to the State to be properly permitted. C. Investigations into the source of all identified illicit discharges. Fort Bragg shall maintain, asses annually and update as necessary written procedures for conducting investigations into the source of all identified illicit discharges, including approaches to requiring such discharges to be eliminated. PERMIT NO. NCS000331 Part II Page 6 of 16 BMP Measurable Goals d. Track investigations and document illicit discharges Fort Bragg shall track all investigations and document the date(s) the illicit discharge was observed; the results of the investigation; any follow-up of the investigation; and the date the investigation was closed. e. Training Fort Bragg shall implement and document a training program for appropriate personnel, who, as part of their normal job responsibilities, may come into contact with or otherwise observe an illicit discharge or illicit connection to the storm sewer system. The training program shall identify appropriate personnel, the schedule for conducting the training and the proper procedures for reporting and responding to an illicit discharge or connection. Follow-up training must be provided as needed to address changes in personnel, procedures, or techniques. f. Provide Public Education Fort Bragg shall inform public employees, businesses, and the general public of hazards associated with illegal discharges and improper disposal of waste. g. Reporting mechanism Fort Bragg shall promote, publicize, and facilitate a reporting mechanism for the public and staff to report illicit discharges and establish and implement citizen request response procedures. Fort Bragg must conduct reactive inspections in response to complaints and follow-up inspections as needed to ensure that corrective measures have been implemented by the responsible party to achieve and maintain compliance. h. Procedures to identify and report sanitary sewer overflows. Fort Bragg shall establish and implement, assess annually, and update as necessary written procedures to identify and report sanitary sewer overflows and sewer leaks to the system operator. PERMIT NO. NCS000331 Part II Page 7 of 16 SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS 1. Compliance with the NCDENR Division of Land Resources Erosion and Sediment Control Program effectively meets the requirements of the Construction Site Runoff Controls. This program is authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of Title 15A of the North Carolina Administrative Code. This program includes procedures for public input, sanctions to ensure compliance, requirements for construction site operators to implement appropriate erosion and sediment control practices, review of site plans which incorporates consideration of potential water quality impacts, and procedures for site inspection and enforcement of control measures. The NCG010000 permit establishes requirements for construction site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impacts to water quality. 2. Fort Bragg must provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems. Fort Bragg may implement a plan promoting the existence of the NCDENR, Division of Land Resources "Stop Mud" hotline to meet the requirements of this paragraph. PERMIT NO. NCS000331 Part II Page 8 of 16 SECTION F: POST-CONSTRUCTION SITE RUNOFF CONTROLS 1. Objectives for Post-Construction Site Runoff Controls a. Develop, implement, and enforce a program to address storm water runoff from new development and redevelopment projects, including public transportation maintained by Fort Bragg. b. Develop and implement strategies which include a combination of structural and/or non- structural best management practices (BMPs) appropriate for the base; and c. Ensure adequate long-term operation and maintenance ofBMPs. 2. Post-Construction Site Runoff Controls a. Construction projects that are performed by, or under contract for, Fort Bragg, including roads and bridges must meet the requirements the stormwater management and water quality protection required by Session Law 2006-246. Roads and bridges must minimize built-upon surfaces, divert stormwater away from surface waters as much as possible and employ other best management practices to minimize water quality impacts to the maximum extent practicable. To comply with the Post Construction requirements, Fort Bragg shall submit an application and appropriate fee to the Division for all projects, including public roads and bridges, that disturb greater than or equal to one acre including projects less than one acre that are part of a larger common plan of development. All designs shall comply with the State BMP Manual. The state will withhold approvals for projects not meeting the design standards in Session Law 2006- 246. b. Comprehensive Watershed Protection Plans. Fort Bragg may develop and implement a comprehensive watershed protection plan, approved by the State, to meet part or all of the requirements for a post-construction program. c. By the base adopting a Post-Construction Program that complies with the requirements of 15A NCAC 02H .1020 and the requirements of 15A NCAC 02B .0104(f) otherwise known as the Universal Stormwater Management Program (USMP), the base meets the requirement to develop and implement a Post-Construction Program. The base may elect to have the Division administer and implement the Universal Stormwater Management Program, either whole or in part, following their adoption of the program. Adoption of the USMP may not satisfy water quality requirements associated with the protection of threatened or endangered species or those requirements associated with a Total Maximum Daily Load (TMDL). PERMIT NO. NCS000331 Part II Page 9 of 16 SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING 1. Objective for Pollution Prevention and Good Housekeeping a. Develop and implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing pollutant runoff. b. Provide employee training to prevent and reduce storm water pollution from activities such as park and open space maintenance , fleet and building maintenance, new construction and land disturbances, and storm water system maintenance. 2. BMPs for the Pollution Prevention and Good Housekeeping Fort Bragg shall implement the following BMPs to meet the objectives of the Pollution Prevention and Good Housekeeping Program. BMP Measurable Goals a. Inventory of facilities and operations with the potential for generating polluted stormwater runoff Fort Bragg shall develop an inventory of facilities and operations with the potential for generating polluted stormwater runoff. b. Map facilities and operations with the potential for generating polluted stormwater runoff Fort Bragg shall identify and either maintain a map or list facilities and operations with the potential for generating polluted stormwater runoff. The map must identify the stormwater outfalls corresponding to each of the facilities as well as the receiving waters to which these facilities discharge. The map must be maintained and updated annually and be available for review by the permitting authority. C. Operation and Maintenance (O&M) for facilities and operations with the potential for generating polluted stormwater runoff Fort Bragg shall maintain and implement an Operation and Maintenance (O&M) program for facilities and operations with the potential for generating polluted stormwater runoff. The O&M program shall specify the frequency of inspections and routine maintenance requirements. d. Spill Response Procedures for facilities and operations with the potential for generating polluted stormwater runoff Fort Bragg shall have written spill response procedures for facilities and operations with the potential for generating polluted stormwater runoff. e. Streets, roads, and parking lots maintenance Fort Bragg shall implement BMPs selected to reduce polluted stormwater runoff from municipally-owned streets, roads, and parking lots. PERMIT NO. NCS000331 Part II Page 10 of 16 BMP Measurable Goals f. Operation and Maintenance (O&M) for catch basins and conveyance systems Fort Bragg shall maintain and implement an O&M program for the stormwater sewer system including catch basins and conveyance systems. The O&M program shall include route maps and specify the frequency of inspections and routine maintenance requirements. g. Identify and map for structural stormwater controls Fort Bragg shall identify and map or maintain a list of all structural stormwater controls. The map or list must identify the stormwater outfalls corresponding to each structural stormwater control as well as the receiving waters to which these facilities discharge. The map or list must be maintained and updated regularly and be available for review by the permitting authority. h. O&M for structural stormwater controls Fort Bragg maintain and implement an O&M program for structural stormwater controls. The O&M program shall specify the frequency of inspections and routine maintenance requirements. Fort Bragg shall inspect and maintain all structural stormwater controls in accordance with the schedule developed by Fort Bragg. Fort Bragg shall document inspections and maintenance of all structural stormwater controls. I. Staff training Fort Bragg shall maintain and implement a training program for personnel involved in implementing pollution prevention and good housekeeping practices. J. Prevent or Minimize Contamination of Stormwater Runoff from all areas used for Vehicle and Equipment Cleaning Fort Bragg shall describe and implement measures that prevent or minimize contamination of the stormwater runoff from all areas used for vehicle and equipment cleaning. PERMIT NO. NCS000331 Part II Page 11 of 16 SECTION H: INDUSTRIAL ACTIVITIES 1. Objective Develop, maintain and implement a Stormwater Pollution Prevention Plan (Plan) for each facility with an industrial activity that is covered by this permit. 2. Industrial Activities as defined in 40 CFR 122.26 (b)(14) a. Fort Bragg shall implementation of the requirements of General Permit NCG080000, to control stormwater point source discharges associated with activities that have vehicle maintenance areas (including vehicle rehabilitation, mechanical repair, paintin g, fueling, lu brication, equipment cleaning operation areas and like activities deemed by DEMLR to be similar in the process and/or the exposure of raw materials, products, by-products, or waste materials). Implementation of the requirements of General Permit NCG080000 constitutes compliance with the requirements develop, maintain and implement a Stormwater Pollution Prevention Plan (Plan) and Monitoring Plan for each facility and/or area with an industrial activity covered by this permit. b. Fort Bragg shall implementation of the requirements of General Permit NCG150000, to control stormwater point source discharges associated with industrial activity from Air Transportation including air transportation, airports, and aircraft service and maintenance including: aircraft cleaning; aircraft servicing/repairing, and aircraft maintenance shops (including aircraft and equipment rehabilitation, mechanical repairs, painting, fueling, lubrication); and material handling facilities. Implementation of the requirements of General Permit NCG150000 constitutes compliance with the requirements develop , maintain and implement a Stormwater Pollution Prevention Plan (Plan) and Monitoring Plan for each facility and/or area with an industrial activity covered by this permit. c. Fort Bragg shall seek coverage under the NPDES program for their wastewater treatment plant. Coverage under the general permit, NCG11000, is applicable to all owners or operators of stormwater point source discharges associated Treatment Works treating domestic sewage or any other sewage sludge or wastewater treatment device or system, used in the storage, treatment, recycling, and reclamation of municipal or domestic sewage, with a design flow of 1.0 million gallons per day or more, or required to have an approved pretreatment program under Title 40 Code of Federal Regulations (CFR) Part 403, including lands dedicated to the disposal of sewage sludge that is located within the confines of the facility. 3. Base wide Stormwater Pollution Prevention Plan (Plan) and Monitoring Plan In lieu of complying with the requirements of paragraph 2 of this section, Fort Bragg may propose and submit to the Division for their approval a base wide Stormwater Pollution Prevention Plan (Plan) and Monitoring Plan for the base that effectively meets the requirements develop, maintain and implement a Stormwater Pollution Prevention Plan (Plan) and Monitoring Plan for each facility and/or area with an industrial activity covered by this permit. PERMIT NO. NCS000331 Part II Page 12 of 16 SECTION I: OIL WATER SEPARATORS All oil water separators that discharge to either the stormwater system, directly into the waters of the state, or have engineered diversionary catchment basins, including in the event of a bypass, will be fully described in the SPPP. The description will include: a) The location of the oil water separator b) The activities that occur in the oil water separator's drainage area c) The materials that are handled in the drainage area d) The name of the water body to which it drains e) The number of the outfall that the oil water separator discharges into f) The drainage area draining into the oil water separator g) The oil water separator ' s design capacity PERMIT NO. NCS000331 Part II Page 13 of 16 SECTION J: MONITORING REQUIREMENTS 1. Fort Bragg shall implement a monitoring program as outlined in the Stormwater Program to prioritize areas of the program and to assess the effectiveness of program components. These monitoring results will be used by Fort Bragg to modify the program components as necessary to accomplish the intent of the Stormwater Program. Results of the monitoring program will be submitted to the Division according to the provisions of Part IV of this permit. Analytical monitoring is required as part of the monitoring program in accordance with the provisions of the Stormwater Program. The parameters to be monitored are those that have the potential to be present at the outfalls based on industrial activities. Description of the location of each sample point, the activities which they drain, and the water bodies to which they drain are described in the Stormwater Pollution Prevention Plan (SPPP). a. The following list of parameters shall be monitored during a storm event, for Vehicle maintenance areas, designated in the SPPP as site 3-3 (outfall 53 to McPherson Creek), site 6-3 (outfall to an unnamed tributary to Stewarts Creek), site 7-1 (outfall to Big Branch), site 7-3 (outfall to Beaver Creek), and site 8-1 (combined outfalls 20, 21, and 76 to an unnamed tributary to Bonnie Doone Lake). Parameter Units Measurement Frequency Sample Type Total Suspended Solids (TSS) mg/1 Once per year Grab Oil and Grease mg/1 Once per year Grab pH Standard Units Once per year Grab Total Flow MG Once per year Event Duration Minutes Once per year Total Rainfall inches Once per year b. The following list of parameters shall be monitored during a storm event, for material handling areas, designated in the SPPP as site 4-2 (outfall to Tank Creek), site 8-2 (outfall 93 to an unnamed tributary to Beaver Creek), and site 8-3 (combined outfalls 18 and 19 to an unnamed tributary to Beaver Creek). Parameter Units Measurement Frequency Sample Type Total Suspended Solids (TSS) mg/1 Once per year Grab Oil and Grease mg/1 Once per year Grab pH Standard Units Once per year Grab Total Flow MG Once per year Event Duration Minutes Once per year Total Rainfall inches Once per year PERMIT NO. NCS000331 Part II Page 14 of 16 C. The following list of parameters shall be monitored during a storm event, for fueling areas, designated in the SPPP as site 3-14 (outfall 61). Parameter Units Measurement Frequency Sample Type Oil and Grease mg/1 Once per year Grab Total Flow MG Once per year Event Duration Minutes Once per year Total Rainfall inches Once per year d. The following list of parameters shall be monitored during a storm event, for the airfield, designated in the SPPP as site 8-4 (outfall 22 to Cross Creek). Parameter Units Measurement Frequency Sample Type Total Suspended Solids (TSS) mg/1 Once per year Grab Oil and Grease mg/1 Once per year Grab pH Standard Units Once per year Grab Total Flow MG Once per year Event Duration Minutes Once per year Total Rainfall inches Once per year e. Ambient Monitoring. The following list of parameters shall be monitored at two points, a point north of Texas Pond and Simmons Airport and the other at Flat Creek near Inverness. Parameter Units Measurement Frequency Sample Type Total Suspended Solids (TSS) mg/I Once per year Grab Oil and Grease mg/1 Once per year Grab pH Standard Units Once per year Grab f. Analytical Monitoring Schedule. Monitoring Period Start End Year 1 April 1, 2016 March 31, 2017 Year2 April 1, 2017 March 31, 2018 Year 3 April 1, 2018 March 31, 2019 Year4 April 1, 2019 March 31, 2020 Year 5 April 1, 2020 March 31, 2021 g. Cutoff Concentrations. For each parameter, the arithmetic mean of all analytical sampling results collected during the term of the permit shall be calculated for each individual outfall and compared to the cut-off concentrations listed below. At a minimum, Fort Bragg must perform analytical sampling during the first year of the permit. If the analytical results fall at or below the cutoff concentrations listed below, Fort Bragg is not required to sample that parameter at that outfall for the remainder of the permit. If analytical results exceed the cutoff concentration, subsequent sampling is required annually. Each year, Fort Bragg has the option to assess if the arithmetic mean of data collected for each parameter at each outfall is below the cutoff concentration. If the arithmetic mean is less than the cutoff concentration then Fort Bragg is not required to continue analytical monitoring for that parameter at that outfall during the remainder PERMIT NO. NCS000331 Part II Page 15 of 16 of the term of the permit unless a significant change in the operations in the drainage area occurs. Parameter Cut-off Concentration Oil and Grease 30 mg/1 pH (do not take average, use most recent pH sample result) 6-9 standard units TSS 100 mg/1 h. Qualitative monitoring (color, odor, clarity, floating solids, suspended solids, foam, oil sheen, erosion or deposition at the outfall, and other visual indicators of stormwater pollution) requires a visual inspection of each stormwater outfall associated with industrial activities and/or oil water separators regardless of representative outfall status. No analytical tests are required. Qualitative monitoring of stormwater outfalls does not need to be performed during a representative storm event. All qualitative monitoring will be performed twice per year, once during the spring (April-June) and once in the fall (September-November). If Fort Bragg's qualitative monitoring indicates either that existing stormwater BMPs are ineffective, or that significant stormwater contamination is present, Fort Bragg shall investigate potential causes, evaluate the feasibility of corrective actions, and implement those corrective actions appropriate. A written record of Fort Bragg's investigation, evaluation, and response actions shall be kept in the Stormwater Pollution Prevention Plan. 2. Implementation of the requirements of General Permit NCG080000 constitutes compliance with the requirements develop, maintain and implement a Monitoring Plan for each facility and/or area with an industrial activity covered by this permit. 3. Fort Bragg may propose and submit to the Division for their approval modifications to the base wide Monitoring Plan that effectively meets the requirements develop, maintain and implement a Monitoring Plan for each industrial activity covered by this permit. PERMIT NO. NCS000331 Part II Page 16 of 16 SECTION K: IMPAIRED WATERS and TOTAL MAXIMUM DAILY LOADS (TMDLs) 1. For impaired waters Fort Brag shall evaluate strategies and tailor and/or expand BMPs within the scope of the six minimum measures to enhance water quality recovery strategies in the watershed(s) and describe the strategies and tailored and/or expanded BMPs in their annual reports. 2. Fort Brag shall comply with the requirements of an approved TMDL. 3. Within 12 months of the final approval of a TMDL, Fort Brag's annual reports shall include a description of existing programs, controls, partnerships, projects, and strategies to address impaired waters and a brief explanation as to how the programs, controls, partnerships, projects and strategies address impaired waters. 4. Within 24 months of the final approval of a TMDL, Fort Brag's annual reports shall include an assessment of whether additional structural and/or non-structural BMPs are necessary to address impaired waters and a brief explanation as to how the programs, controls, partnerships, projects and strategies address impaired waters. 5. Within 36 months of the final approval of a TMDL, Fort Brag's annual reports shall include a description of activities expected to occur and when the activities are expected to occur within the remainder of the permit term. PERMIT NO.NCS000331 Part III Page 1 of 1 PART III PROGRAM ASSESSMENT 1. Implementation of the Stormwater Plan will include documentation of all program components that are being undertaken including, but not limited to, inspections, maintenance activities, educational programs, implementation ofBMPs, enforcement actions, and other stormwater activities. If monitoring and sampling are being performed documentation of results shall be included. Documentation will be kept on-file by Fort Bragg for a period of three years and made available to the Director or his authorized representative immediately upon request. 2. Fort Bragg's Stormwater Plan will be reviewed and updated as necessary, but at least on an annual basis. Fort Bragg will submit a report of this evaluation to the Division on an annual basis. Fort Bragg's reporting will include appropriate information to accurately describe the progress, status, and results of Fort Bragg's Stormwater Plan and will include, but is not limited to, the following components: (a) Fort Bragg will give a detailed description of the status of implementation of the Stormwater Plan. This will include information on development and implementation of all components of the Stormwater Plan for the past year and schedules and plans for the year following each report. (b) Fort Bragg will adequately describe and justify any proposed changes to the Stormwater Plan. This will include descriptions and supporting information for the proposed changes and how these changes will impact the Stormwater Plan (results, effectiveness, implementation schedule, etc.). (c) Fort Bragg will document any necessary changes to programs or practices for assessment of management measures implemented through the Stormwater Plan. In addition, any changes in the cost of, or funding for, the Stormwater Plan will be documented. (d) Fort Bragg will include a summary of data accumulated as part of the Stormwater Plan throughout the year along with an assessment of what the data indicates in light of the Stormwater Plan. (e) Fort Bragg will provide a summary of activities undertaken as part of the Stormwater Plan throughout the year. This summary will include, but is not limited to, information on the establishment of appropriate legal authorities, project assessments, inspections, enforcement actions, continued inventory and review of the storm sewer system, education, training and results of the illicit discharge detection and elimination program. 3. The Director may notify Fort Bragg when the Stormwater Plan does not meet one or more of the lawful requirements of the permit. Within 30 days of such notice, Fort Bragg will submit a plan and time schedule to the Director for modifying the Stormwater Plan to meet the requirements . The Director may approve the corrective action plan, approve a plan with modifications, or reject the proposed plan. Fort Bragg will provide certification in writing (in accordance with Part IV, Paragraph 2) to the Director that the changes have been made . Nothing in this paragraph shall be construed to limit the Director's ability to conduct enforcement actions for violations of this permit. 4. The Division may request additional reporting information as necessary to assess the progress and results of Fort Bragg's Stormwater Plan. PERMIT NO.NCS000331 THIS PAGE INTENTIONALLY BLANK PERMIT NO.NCS000331 Part IV Page 1 of 2 PARTIV REPORTING AND RECORD KEEPING REQUIREMENTS 1. Records Retention Visual monitoring shall be documented and records maintained at the facility along with the Stormwater Pollution Prevention Plan. Copies of analytical monitoring results shall also be maintained on-site. Fort Bragg shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring in strumentat ion, and copies of all reports required by this Permit for a period of at least 5 years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. 2. Report Submittals (a) A signed copy of all reports required herein, shall be submitted to the following address: Department of Environmental Quality Division of Energy, Mineral and Land Resources Land Quality Section 1612 Mail Service Center Raleigh, North Carolina 27699-1612 and Fayetteville Regional Office Division of Energy, Mineral and Land Resources Land Quality Section 225 Green Street Systel Building Suite 714 Fayetteville, North Carolina 28301-5043 (b) All applications, reports, or information submitted to DEMLR shall be signed by duly authorized representative. A person is a duly authorized representative only if: (i) The authorization is made in writing by a principal executive officer or ranking elected official; (ii) The authorization specified either an individual or a position having responsibility for the overall operation of a regulated facility or activity or an individual or position having overall responsibility for environmental/stormwater matters; and (iii) The written authorization is submitted to the Director. (c) Any person signing a document under paragraphs (a) or (b) of this section shall make the following certification: PERMIT NO.NCS000331 Part IV Page 2 of 2 "I certify, under penalty oflaw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information , the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for knowing submitting false information, including the possibility of fines and imprisonment for knowing violations." 3. Recording Results For each activity performed or information collected pursuant to the requirements of this permit, Fort Bragg shall record the following information: (a) The dates, exact place, and time of the activity or information collected; (b) The individual(s) who performed activity; (c) The techniques or methods used; and (d) The results of such activity or information collected. 4. Twenty-four Hour Reporting Fort Bragg shall report to the central office or the appropriate regional office any noncompliance that may constitute an imminent threat to health or the environment. Any information shall be provided orally within 24 hours from the time Fort Bragg became aware of the circumstances. A written submission shall also be provided within 5 days of the time Fort Bragg becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Director may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. 5. Additional Reporting The Director may request reporting information on a more frequent basis as deemed necessary either for specific portions of Fort Bragg's Stormwater Plan, or for the entire Program. 6. Other Information Where Fort Bragg becomes aware that it failed to submit any relevant facts in applying to be covered under this permit or in any report to the Director, it shall promptly submit such facts or information. PERMIT NO.NCS000331 Part V Page 1 of 6 PARTV STANDARD CONDITIONS SECTION A: COMPLIANCE AND LIABILITY 1. Duty to Comply Fort Bragg must comply with all lawful conditions of this permit. Any permit noncompliance constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or denial of permit coverage upon renewal application . (a) Fort Bragg shall comply with standards or prohibitions established under Section 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified to incorporate the requirement. (b) The Clean Water Act provides that any person who violates a permit condition is subject to a civil penalty not to exceed the maximum amounts authorized by Section 309(d) of the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note) as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently $27,500 per day for each violation). Any person who negligently violates any permit condition is subject to criminal penalties of $2,500 to $25,000 per day of violation, or imprisonment for not more than 1 year, or both. Any person who knowingly violates permit conditions is subject to criminal penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. Also, any person who violates a permit condition may be assessed an administrative penalty not to exceed $11,000 per violation with the maximum amount not to exceed $137,500. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).] (c) Under state law, a daily civil penalty of not more than twenty-five thousand dollars ($25,000) per violation may be assessed against any person who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [Ref: North Carolina General Statute 143-215.6A] (d) Any person may be assessed an administrative penalty by the Administrator for violating sections 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of this Act. Pursuant to 40 CFR Part 19 and the Act, administrative penalties for Class I violations are not to exceed the maximum amounts authorized by Section 309(g)(2)(A) of the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note) as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently $11,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $27,500). Pursuant to 40 CFR Part 19 and the Act, penalties for Class II violations are not to exceed the maximum amounts authorized by Section 309(g)(2)(B) of the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note) as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently $11,000 per day for each day during which the violation continues, with the maximum amount of any Class II penalty not to exceed $137,500). PERMIT NO.NCS000331 Part V Page 2 of 6 2. Duty to Mitigate Fort Bragg shall take all reasonable steps to minimize or prevent any discharge in violation of this permit that has a reasonable likelihood of adversely affecting human health or the environment. 3. Civil and Criminal Liability Nothing in this permit shall be construed to relieve Fort Bragg from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6A, 143-215.6B, 143-215.6C or Section 309 of the Federal Act , 33 USC 1319. Furthermore, Fort Bragg is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. 4. Oil and Hazardous Substance Liability Nothing in this permit shall be construed to preclude the institution of any legal action or relieve Fort Bragg from any responsibilities, liabilities, or penalties to which Fort Bragg is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. 5. Property Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state or local laws or regulations. 6. Severability The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby. 7. Duty to Provide Information Fort Bragg shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the coverage issued pursuant to this permit or to determine compliance with this permit. Fort Bragg shall also furnish to the Director upon request, copies of records required by this permit. 8. Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4 years, or both. PERMIT NO.NCS000331 Part V Page 3 of 6 9. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. 10. Permit Actions This permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any permit condition. 11. Permit Expiration Fort Bragg is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, Fort Bragg shall submit forms and fees as are required by the Division no later than 180 days prior to the expiration date. 12. Transfers This permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirement as may be necessary under the Clean Water Act. Fort Bragg is required to notify the Division in writing in the event the permitted facility is sold or closed. SECTION B: OPERATION AND MAINTENANCE of POLLUTION CONTROLS 1. Proper Operation and Maintenance Fort Bragg shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are owned and/or operated by Fort Bragg to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by Fort Bragg only when the operation is necessary to achieve compliance with the conditions of this permit. 2. Need to Halt or Reduce not a Defense It shall not be a defense for Fort Bragg in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this permit. PERMIT NO.NCS00033 l Part V Page 4 of 6 3. Bypassing of Stormwater Control Facilities Bypass is prohibited and the Director may take enforcement action against Fort Bragg for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. Fort Bragg submitted notices as required under Section E of this Part. If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after considering its adverse effects. SECTION C: MONITORING AND RECORDS I. Representative Sampling When required herein, stormwater samples collected and measurements taken shall be characteristic of the volume and nature of the permitted discharge. Analytical stormwater sampling shall be performed during a representative storm event. These samples shall be taken on a day and time that is characteristic of the discharge. Where appropriate, all stormwater samples shall be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance. When specified herein, monitoring points established in this permit shall not be changed without notification to and approval of the Director. If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, Fort Bragg may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and Fort Bragg is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. 2. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. PERMIT NO.NCS000331 Part V Page 5 of 6 3. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. To meet the intent of the monitoring required by this permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. 4. Inspection and Entry Fort Bragg shall allow the Director, or an authorized representative (including an authorized contractor acting as a representative of the Director), or in the case of a facility which discharges through a separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to; a. Enter upon Fort Bragg's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this permit; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit; c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment) , practices, or operations regulated or required under this permit; and d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. 5. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Division. As required by the Act, analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.6B or in Section 309 of the Federal Act. 6. Bypass a. Anticipated bypass. If Fort Bragg knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and effect of the bypass. b. Unanticipated bypass. Fort Bragg shall submit notice within 24 hours of becoming aware of an unanticipated bypass. PERMIT NO.NCS000331 Part V Page 6 of 6 7. Other Noncompliance Fort Bragg shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted. 8. Anticipated Noncompliance Fort Bragg shall give notice to the Director as soon as possible of any planned changes at the permitted facility which may result in noncompliance with the Permit requirements. 9. Planned Changes Fort Bragg shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the Permit or subject to notification requirements under 40 CFR Part 122.42 (a). 10. Non-Stormwater Discharges If the storm event monitored in accordance with this Permit coincides with a non-stormwater discharge, Fort Bragg shall separately monitor all parameters as required under the non- stormwater discharge permit and provide this information with the stormwater discharge monitoring report. 11. Discharge Monitoring Reports Fort Bragg shall retain all monitoring information for a period of at least 5 years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. When no discharge has occurred from the facility during the report period, Camp LeJeune shall indicate "NO FLOW" as per NCAC T15A 02B .0506. Fort Bragg shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report form provided by the Division, and shall retain the completed forms on site. Visual monitoring results should not be submitted to the Division, except upon DEMLR's specific requirement to do so. PERMIT NO.NCS000331 Part VI Page 1 of 1 PART VI LIMITATIONS REOPENER The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et. al. This permit shall be modified or alternatively, revoked and reissued, to comply with any effluent guideline or water quality standard issued or approved under Sections 302(b)(2)(c), and (d), 304(b)(2) and 307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved; a. Contains different conditions or is otherwise more stringent than any effluent limitation in the permit. b. Controls any pollutant not limited in the permit. This permit as modified or reissued under this paragraph shall also contain other requirements in the Act then applicable. THIS PAGE INTENTIONALLY BLANK Part VII Page 1 of 1 PERMIT NO. NCS000331 PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS Fort Bragg must pay the reasonable administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the permit. THIS PAGE INTENTIONALLY BLANK PERMIT NO. NCS000331 Part VIII Page 1 of 7 PART VIII DEFINITIONS 1. Act See Clean Water Act. 2. Arithmetic Mean The arithmetic mean of any set of values is the summation of the individual values divided by the number of individual values. 3. Best Management Practice (BMP) Measures or practices used to reduce the amount of pollution entering surface waters. BMPs can be structural or non-structural and may take the form of a process, activity, physical structure or planning (see non-structural BMP). 4. Built-upon Area Built upon area has the same meaning as in Session Law 2006-246 and means that portion of a project that is covered by impervious or partially impervious surface including, but not limited to, buildings; pavement and gravel areas such as roads, parking lots, and paths; and recreation facilities such as tennis courts. "Built upon area" does not include a wooden slatted deck, the water area of a swimming pool, or pervious or partially pervious paving material to the extent that the paving material absorbs water or allows water to infiltrate through the paving material. 5. Bulk Storage of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 6. Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 7. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et. seq. PERMIT NO. NCS000331 Part VIII Page 2 of 7 8. Common Plan of Development A construction or land disturbing activity is part of a larger common plan of development if it is completed in one or more of the following ways: • In separate stages • In separate phases • In combination with other construction activities It is identified by the documentation (including but not limited to a sign, public notice or hearing, sales pitch, advertisement, loan application, drawing, plats, blueprints, marketing plans, contracts, permit application, zoning request, or computer design) or physical demarcation (including but not limited to boundary signs, lot stakes, or surveyor markings) indicating that construction activities may occur on a specific plot. It can include one operator or many operators. 9. Department (DEO) Department means the North Carolina Department of Environment Quality 10. Division (DEMLR)) The Division of Energy, Mineral and Land Resources (DEMLRt 11. Director The Director of the Division of Energy, Mineral and Land Resources (DEMLR), the permit issuing authority. 12. EMC The North Carolina Environmental Management Commission. 13. Grab Sample An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively monitored must be taken within the first 30 minutes of discharge. 14. Hazardous Substance Any substance designated in 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 15. Illicit Discharge Any discharge to a MS4 that is not composed entirely of stormwater except discharges pursuant to an NPDES permit (other than the NPDES MS4 permit), allowable non-stormwater discharges, and discharges resulting from fire-fighting activities. PERMIT NO. NCS000331 Part VIII Page 3 of 7 16. Industrial Activity Industrial activities shall mean all industrial activities as defined in 40 CFR 122.26. 17. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long- term storage facility or a surface storage facility. 18. Municipal Separate Storm Sewer System (MS4) A conveyance or system of conveyances (including roads and street with drainage systems, catch basins, curbs, gutters, ditches, manmade channels, or storm drains): a. Owned or operated by the United States, a State, city, town, county, district, association, or other public body (created by or pursuant to State law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under State law such as a sewer district, flood control district or drainage district , or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under Section 208 of the Clean Water Act (CWA) that discharges to waters of the United States or waters of the State. b. Designed or used for collecting or conveying stormwater; c. Which is not a combined sewer; and d. Which is not part of a Publicly Owned Treatment Works (POTW) as defined in 40 CFR 122.2 19. Non-stormwater Discharge Categories The following are categories of non-stormwater discharges that Fort Bragg must address if it identifies them as significant contributors of pollutants to the storm sewer system: water line flushing, landscape irrigation, diverted stream flows, rising groundwater, uncontaminated groundwater infiltration, [as defined in 40 CFR 35.2005(20)], uncontaminated pumped groundwater, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn watering, individual residential car washing, flows from riparian habitats and wetlands, dechlorinated swimming pool discharges, and street wash water (discharges or flows from fire fighting activities are excluded from the definition of illicit discharge and only need to be addressed where they are identified as significant sources of pollutants to waters of the United States). 20. Non-structural BMP Non-structural BMPs are preventive actions that involve management and source controls such as: (1) Policies and ordinances that provide requirements and standards to direct growth to identified areas, protect sensitive areas such as wetlands and riparian areas, maintain and/or increase open space, provide buffers along sensitive water bodies, minimize impervious surfaces, and/or minimize disturbance of soils and vegetation; (2) policies or ordinances that encourage infill development in higher density urban areas, and areas with existing storm sewer infrastructure; (3) education programs for developers and the public about minimizing water quality impacts; (4) other measures such as minimizing the percentage of impervious area after development, use of measures to minimize directly connected impervious areas, and source PERMIT NO. NCS000331 Part VIII Page 4 of 7 control measures often thought of as good housekeeping, preventive maintenance and spill prevent ion. 21. Outfall The point of wastewater or stormwater discharge from a discrete conveyance system. See also point source discharge of stormwater. 22. Overburden Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding topsoil or similar naturally-occurring surface materials that are not disturbed by mining operations. 23. Permittee The owner or operator issued this permit. 24. Point Source Discharge of Stormwater Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state. 25. Redevelopment Means any rebuilding activity unless that rebuilding activity; a. Results in no net increase in built-upon area, and b. Provides equal or greater stormwater control than the previous development. 26. Representative Storm Event A storm event that measures greater than 0.1 inches of rainfall. The time between this storm event and the previous storm event measuring greater than 0.1 inches must be at least 72 hours. A single storm event may have a period of no precipitation ofup to 10 hours. For example, if it rains but stops before producing any collectable discharge, a sample may be collected if the next rain producing a discharge begins within 10 hours. 27. Representative Outfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DEMLR may grant representative outfall status. Representative outfall status allows Fort Bragg to perform analytical monitoring at a reduced number of outfalls. 28. Residential Development Activities Residential development activities has the same meaning as in 15A NCAC 02B .0202(54). PERMIT NO. NCS000331 Part VIII Page 5 of 7 29. Rinse Water Discharge The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse waters from vehicle and equipment cleaning areas are process wastewaters and do not include washwaters utilizing any type of detergent or cleaning agent. 30. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event. 31. Section 313 Water Priority Chemical A chemical or chemical category which: a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right-to-Know Act of 1986; b. Is present at or above threshold levels at a facility subject to SARA title III, Section 313 reporting requirements; and c. Meets at least one of the following criteria: (1) Is listed in appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to Section 311(b)(2)(A) of the CWA at 40 CFR 116.4; or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. 32. Severe Property Damage Means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 33. Significant Materials Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under Section 101(14) of CERCLA; any chemical the facility is required to report pursuant to Section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. PERMIT NO. NCS000331 Part VIII Page 6 of 7 34. Significant Spills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.10 and CFR 117.21) or Section 102 of CERCLA (Ref: 40 CFR 302.4). Reportable quantity means that quantity, the release of which requires notification pursuant to Section 311 of the Clean Water Act (Ref: 40 CFR 110.10 and CFR 117.21) or Section 102 of CERCLA (Ref: 40 CFR 302.4). 35. Stormwater Discharge Outfall (SDO) The point of departure of stormwater from a discernible, confined, or discrete conveyance, including but not limited to, storm sewer pipes, drainage ditches, channels, spillways, or channelized collection areas, from which stormwater flows directly or indirectly into waters of the State of North Carolina. 36. Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. 37. Stormwater Associated with Industrial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 38. Stormwater Pollution Prevention Plan A comprehensive site-specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site. 39. Ten Year Design Storm The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten years. Design storm information can be found in the State of North Carolina Erosion and Sediment Control Planning and Design Manual. 40. Total Flow The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the amount of built-upon (impervious) area, and the total amount of rainfall, or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event. PERMIT NO. NCS000331 Part VIII Page 7 of 7 41. Total Maximum Daily Load (TMDL) A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed water quality assessment that provides the scientific foundation for an implementation plan. The implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to restore and maintain water quality standards in all seasons. The Clean Water Act, Section 303, establishes the water quality standards and TMDL programs. 42. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(l) of the Clean Water Act. 43. Upset Means an exceptional incident in which there is unintentional and temporary noncompliance with technology based permit effluent limitations because of factors beyond the reasonable control of Fort Bragg. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment or control facilities, inadequate treatment or control facilities, lack of preventive maintenance, or careless or improper operation. 44. Vegetative Buffer Vegetative buffer has the same meaning as in 15A NCAC 02H .1002(22) and means an area of natural or established vegetation directly adjacent to surface waters through which stormwater runoff flows in a diffuse manner to protect surface waters from degradation due to development activities. 45. Vegetative Conveyance Vegetative conveyance means a permanent, designed waterway lined with vegetation that is used to convey stormwater runoff at a non-erosive velocity within or away from a developed area. As used herein, "conveyance system" shall not include a stormwater collection system. 46. Vehicle Maintenance Activity Vehicle or vessel rehabilitation, mechanical repairs, painting, fueling, lubrication, cleaning operations, or airport deicing operations. 47. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye. 48. 25-year, 24 hour storm event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years.