Loading...
HomeMy WebLinkAbout20120915 Ver 1_401 Application_20120928201 209 15 LETTER OF TRANSMITTAL iw'.�WK DiCKSON community Infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 919.782.0495 tel. 919.782.9672 fax TO: NC DWQ Permitting Section 512 N. Salisbury Street 91h Floor Archdale Building Raleigh, NC 27604 ATTENTION: Karen Higgins DATE: September 27, 2012 RE: Apron Expansion — Phase 1 Henderson Field Airport Wallace, NC (Pender County) We are sending via: ® Overnight ❑ Regular Mail ❑ Pick -up ❑ Hand Delivered The following items: ❑ Correspondence ❑ Plans ❑ Specifications ❑ Other as listed below: COPIES DATE NO. DESCRIPTION 2 Courtesy Notification for Temporary Impacts to Stream/Wetlands 2 Plans SEP 28 7012 DEW- WATCH QUAT THESE ARE TRANSMITTED as checked below: ❑ For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections ® For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: COPY TO: 20120041.00.RA SIGNED: Randall Brookshire, PE Courtesy Notification for Temporary Impacts to Stream/Wetlands Apron Expansion — Phase I Henderson Field Airport Wallace, North Carolina (Pender County) 20120041.00. RA Prepared for: The Town of Wallace 311 East Murphy Street Wallace, North Carolina Prepared by: WK Dickson & Co. 720 Corporate Center Drive Raleigh, North Carolina 27607 September 2012 sk WDICKSON Randall Brookshire, P.E. DesignReport ............................................................................................ ..............................1 Background.......................................................................................... ............................... 1 Apron Parking Apron Expansion ........................................................... ............................... 1 Temporary Impacts to Stream / Wetlands ............................................. ............................... 2 Attachments: Exhibit # 1 Stream / Wetland Impacts Plan Set for the Apron Expansion — Phase 1 at Henderson Field Airport Courtesy Notification of Temporary Impacts to Stream/Wetlands Apron Expansion — Phase I Henderson Field Airport — Wallace, NC Background This submission package contains the necessary narrative and plans for a courtesy submission to the US Army Corps of Engineers and NC DWQ for temporary stream impacts at Henderson Field Airport (owned by the Town of Wallace) that are required for expansion of the parking apron. The proposed improvements to the airport include expansion of the existing parking apron and open and closed storm systems. The total disturbed area for the entire project is approximately 4.4 acres. Below is a detailed overview of the project outlining the existing conditions of the site as well as a detailed explanation of each temporary impact to streams and wetlands. Pursuant to Nationwide Permit 12 (Utility Line Activities), formal notification (PCN) is not required. Airplane Parking Apron Expansion Existing Conditions: The existing airport consists of a runway and a single taxiway that runs perpendicular to the runway. This taxiway leads to the existing apron where planes can tie -down and fuel. Multiple paved access points to the apron lead to hangar buildings and to the terminal building and vehicle parking lot. The majority of existing stormwater runoff at the site drains to vegetated ditches that run parallel to the runway. The existing hangar buildings and terminal building are disconnected from storm collection systems by grassed surfaces. Runoff from rooftops and paved areas around the hangar buildings sheet flows across the ground to vegetated ditches and to an existing storm sewer system that is clogged. The City of Wallace Public Works Department attempted to clean this storm line, but was unsuccessful as the line is likely collapsed near the outfall which is located just to the northwest of the terminal building. During heavy storm events, the areas that drain to the failing storm sewer line tend to flood and create standing areas of water. See the demolition plan sheet within the submitted plan set for the location of this clogged storm sewer line. The entire area shown on Exhibit #1 ultimately drains into Rock Fish Creek (Class C Swamp Waters, Index Number: 18- 74 -29). The streams shown in Exhibit #1 were delineated by WK Dickson Senior Scientist Ward Marotti in August 2012. Final Site Conditions: The currently proposed modifications that are detailed within the included plans consist of expansion of the existing asphalt parking apron to allow the tie -down of 14 planes on the airside portion of the airport property. See Exhibit #1 for the general location of the apron expansion. The plans call for removal of the failing storm sewer line that is located underneath the proposed location of the new apron. The existing drainage swale located to the southwest of the proposed apron that collects sheet flow and drains into the failing storm sewer system is proposed to be rerouted into the drainage swale that runs parallel to the runway. A new closed storm sewer system is proposed adjacent to the hangars to alleviate the flooding in the area. The rerouting of this storm sewer line occurs within both the airside and landside portions of the project. Henderson Field Airport -Wallace, NC Project No. 20120041.00.RA WK Dickson Courtesy Notification of Temporary Impacts to Stream/Wetlands Apron Expansion — Phase I Henderson Field Airport — Wallace, NC The majority of the proposed apron sheet flows in a southern direction, crosses a disconnected grassed surface, and ultimately outfalls into the straightened and maintained stream that runs parallel to the length of the runway that drains into Rock Fish Creek. A small portion of the apron drains to the storm sewer system and outfalls into an existing straightened and maintained stream located to the northwest of the vehicle parking lot. Temporary Impacts to Stream / Wetlands The temporary impact to streams and wetlands are shown on Exhibit #1 as well as being labeled within the plan set. Detailed Descriptions of each impact are shown below: S -1 — Temporary Stream Impact Impact S -1 is a 25 linear foot temporary impact to a straightened and maintained stream at the outfall of a proposed vegetated conveyance. This impact is necessary as a new outfall is created with the construction of Proposed Ditch "A" as shown in the plans. The existing failing storm sewer system that is removed with these plans was meant to convey existing flow to the north. In order to promote overland flow, infiltration, and stormwater flow through vegetated conveyances, the majority of the new apron will sheet flow to the south and away from the closed storm sewer system. This was a necessary step in gaining approval through DWQ for stormwater permitting purposes. As the proposed ditch outfall connects to an existing delineated stream, an impact will occur. In order to provide only temporary impact to the stream, a riffle grade control is proposed at the connection of the new ditch and the existing stream to provide subgrade stabilization. This condition mimics the existing stream bed more closely than a standard rip -rap dissipater pad. In addition, channel banks will be stabilized with erosion control matting and seeding. See Sheet 12 of the plan set for the details specific to the outfalI at Stream Impact S -1. S -2 — Temporary Stream Impact Impact S -2 occurs at an outfall to a storm sewer system replacement line. This outfall is also considered to be a temporary impact, as a riffle grade control is proposed in order to mimic existing stream conditions as much as possible. The outfall occurs in a bend in the stream and temporary impacts will only fall within a small length of 8 linear feet. The riffle grade control is proposed within the edge of the stream and will not span the full channel bed. The riffle grade control detail for this outfall is located on Sheet 11 of the plan set. In order to alleviate flooding in the areas adjacent to the existing hangar buildings, the failing storm sewer line will be replaced with these plans and a new outfall will be established. The storm sewer system location can be seen on Exhibit #1, as well as in the plan set. S -3 — Temporary Stream Impact The 25 linear foot temporary impact at S -3 occurs at the outfall of a temporary skimmer basin used for erosion control purposes. In order to stabilize the outfall /overflow of the basin, rip -rap will be required within the channel during construction. At completion of the construction and with the site stabilized, the rip -rap at the outfall of the basin will be removed entirely and the channel will be restored to existing conditions. Exhibit #1 and Sheet 7 of the plan set show the location of this temporary impact. Henderson Field Airport -Wallace, NC Project No. 20120041.00.RA WK Dickson Courtesy Notification of Temporary Impacts to Stream/Wetlands Apron Expansion — Phase I Henderson Field Airport — Wallace, NC S -4 — Temporary Stream Impact A temporary impact of 56 linear feet will occur at a temporary stream crossing that will be necessary for hangared planes to have an access point to the runway during construction. Throughout construction, access from the runway to the hangars will not be possible along the existing taxiway. The alternate method shown for access to the runway was selected and is the most practical for avoiding construction traffic. The width of the crossing is based on providing the same width of existing taxiway pavement. The location of this crossing can be seen in Exhibit #1 and Sheet 3 of the plan set. W -1 — Temporary Wetland Impact The temporary impact to wetlands (245 sf) occurs adjacent to temporary stream impact S -4 and is a result of a necessary temporary crossing that provides access to the hangars from the runway. See the description of S -4 for the same justification of this temporary crossing. Henderson Field Airport -Wallace, NC Project No. 20120041.00.RA WK Dickson Notes: 1. The stream and wetland impacts shown on this exhibit are all labeled within the plan -set that is included with this submission package. 2. The streams shown on this exhibit were delineated by WK Dickson Senior Scientist Ward Marotti in August 2012. Legend Proposed Impacts Wetland Impact - W1 Temporary Crossing Temporary Impact 245 SF or 0.005 Ac. Stream I m pact - S4 Temporary Crossing Temporary Impact 56 LF WK DICKSON • 0. i Stream I m pact - S 1 Riffle Grade Control at Proposed Ditch "A" Outfall Temporary Impact 25 LF Scale 1 " =100' 100 50 0 100 200 Feet Stream I m pact - S2 Riffle Grade Control at Storm Sewer Outfall Temporary Impact - 8 LF Stream Impact - S3 Temporary Sediment Trap 0utfalI Temporary Impact 25 LF Exhibit #1 N Stream/ Wetland Impacts W E Henderson Field Airport S Wallace, NC i z w �w �a 0 O U F w fF Q0 aJ zQ fr m 0 J LU O 00 w w zo F-: U) Z Z O 7�; U 7 W U m O J 0J U Q = in F J O¢ F W U) Z0 OZ F Q W J Ir W D 0 F I Q O Z 7 zU) OQ �z o� otr O F Z w Q U O 0 O W (n y _ Ir F Q LL 73 OF (n Z F W Z W F U Z O O 0 U W U) a: a: F 0 0 W J U Q D Z_ tr (D O tr z O O w F = U F 0 0 O O tr aLU Iw 0 O W U I J W Z W O Ir o �� =m (D _ O J tr J LL Q U) U Z U — Z_ O U O �f U Z °5 O Z Y O Uy p U_ Y 0 Y 0 = O irz >-w > 00 U U Q ry 0 0 IT 0 0 N 0 N U m U N O q W a z U] CONSTRUCTION PLANS FOR APRON EXPANSION -PHASE I Valn HENDERSON FIELD AIRPORT WALLACE, NORTH CAROLINA SEPTEMBER 2012 WK DICKSON PROJ. No. 20120041.00.RA ISSUED FOR BIDDING - DO NOT USE FOR CONSTRUCTION LOCATION MAP NOT TO SCALE 11 41 — N I 41 40 TOWN OF DUPLIN WALLACE COUNTY PENDER n COUNTY HENDERSON FIELD AIRPORT 117 PROJECT 40 SITE VICINITY MAP NOT TO SCALE z O U Cn z O U O LL W Cn H O z O 0 C) C) m O LL W 0) D) VVK DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O 0 W 0 Lu 0 z O_ Y � Er DUPLIN �<v��� \co�� RAB PROJECT DATE: PENDER COUNTY COUNTY O ����� TOWN OF WALLACE N P�l W Q J —N _ COUNTY 5(REE I LINE W z O r-) wJ Q " W _ N 117 Z HENDERSON LP pPp OC FIELD ROAD ✓ 0 C3 PO (SR 1350) W X W � No�l O HENDERSON O FIELD AIRPORT O 0 Z �OJ 0_ W �O 90 LOCATION MAP NOT TO SCALE 11 41 — N I 41 40 TOWN OF DUPLIN WALLACE COUNTY PENDER n COUNTY HENDERSON FIELD AIRPORT 117 PROJECT 40 SITE VICINITY MAP NOT TO SCALE z O U Cn z O U O LL W Cn H O z O 0 C) C) m O LL W 0) D) VVK DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O 0 W 0 Lu 0 z O_ Y � Er rPROJ. MANAGER: W ry RAB PROJECT DATE: SEPT. 2012 0— _Z Q J F- Q 0 W z O r-) wJ Q " W _ —Z:w� Z o o OC � �zpw W X W � Q J O V O 0 Z 0_ W Q LLI 2 a 6i -1 z U Z w o a � o rPROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 1 OF 12 PROJ. NO.: 20120041.00. RA Z W F F U 00 VVK O O U F W Q� aJ zQ Ir W Om W O J F 00 W W Z0 F_: U) Z wO 20 7 W U m O J 0J Q _ = in F J O¢ FW U) Z0 OZ F Q W J Ir W D 0 F I Q O zU) OQ �Z o� ofr O F Z wQ 2 _ D F U O 0 O W (n y _ Ir F Q LL 2 OF (n Z F__ W W2 F c) Z U O O U 0 W U) a: a: F 00 W J U Q D Z tr (D O tr Z O W U F 0 0 O O tr Ir aLU Iw 0 O W U I J W Z W O Ir o cn W F F =m �_ �O J Ir J LL ¢W) Z U Z o- U O .5 U Z °5 U y p U_ Y 0 Y 0 =0 U, F Z �W 0 0 00 Q 0 0 IT 0 0 N 0 N U m U N O i W a Z W J_ LL DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL Z O it U C/) D w o U) Z 0 Y � � W W � J Q Q � V W Z 0 Q O =w= �H cn � — � 06 Z Q � Z Z W � 0 w � C1 W � J Z LL � O Z o W � z W � W _ Q Iii li; z U Z W o a IL o PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 20F12 PROJ. NO.: 20120041.00. RA LIST OF DRAWINGS SCHEDULE OF QUANTITIES Sheet Number Sheet Title 1 COVER SHEET 2 SHEET INDEX 8c SCHEDULE OF QUANTITIES APRON EXPANSION CONSTRUCTION SAFETY PLAN 4 DEMOLITION PLAN 5 GEOMETRIC LAYOUT PLAN 6 HENDERSON FIELD, WALLACE N.C. 7 EROSION CONTROL PLAN 8 MARKING 8c LIGHTING LAYOUT PLAN Schedule I DETAILS 10 DETAILS 11 DETAILS 12 Item Spec. Bid Record Extended No. Section Description Quantity Unit Quantity Total 1 M -101 Mobilization 100% LS 2 P -152 Unclassified Excavation 2,350 CY 3 P -152 Unsuitable Excavation 807 CY 4 P -152 Borrow Excavation 100 CY 5 P -152 Remove Existing Storm Drainage Pipe 510 LF 6 P -152 Remove Existing Storm Drainage Structure 5 EA 7 P -156 Temporary Skimmer Sediment Trap 1 EA 8 P -156 Temporary Diversion Ditch 323 LF 9 P -156 Temporary Fabric Check Dam 5 EA 10 P -156 Temporary Inlet Protection 4 EA 11 P -156 Temporary Construction Entrance 1 EA 12 P -156 Temporary Silt Fence Outlet 1 EA 13 P -156 Temporary Erosion Control Matting (NAG -75) 778 SY 14 P -156 Temporary Ditch Crossing — Complete 2 EA 15 P -159 Rip —Rap, for Riffle Grade Outfall — 2.5' Depth 98 SY 16 P -160 Pavement Milling (Asphalt) 200 SY 17 P -161 Temporary Silt Fence 2,372 LF 18 P -162 Pavement Removal, Including Base Material (Asphalt) 1,105 SY 19 P -209 Crushed Aggregate Base Course (8 ") 1,230 CY No. 6, Bare Copper Counterpoise in Trench 168 LF 20 P -401 Bituminous Surface Course ( 4 ") 1,336 TN 2 EA 36 21 P -602 Bituminous Prime Coat 2,745 GL 37 L -125 Medium Intensity Taxiway Edge Light, Stake — Mounted (Quartz) 4 22 P -603 Bituminous Tack Coat 15 GL Permanent Seeding (Mulched) 3 AC 23 P -620 Pavement Marking (Reflectorized Aviation Yellow) 911 SF 24 P -620 Pavement Marking (Black) 241 SF 25 Spec. Tie —Down (Installation) 42 EA 26 Spec. Tie —Down (Removal) 21 EA 27 EB -44 Pavement Sealcoat 2,231 SY 28 D -701 18" RCP Class III 205 LF 29 D -701 18" RCP Class IV 44 LF 30 D -751 Drop Inlet 4 EA 31 D -751 Junction Box -4' DIA. Manhole 1 EA 32 L -108 Cable Trench (in turf) 168 LF 33 L -108 1/C, No. 8, 5kW Cable in Trench 168 LF 34 L -108 1/C, O U H Z O U W O LL w 0) i- O Z O C) I 0 Z 6 C) m O LL C) W 0) S2 DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL Z O it U C/) D w o U) Z 0 Y � � W W � J Q Q � V W Z 0 Q O =w= �H cn � — � 06 Z Q � Z Z W � 0 w � C1 W � J Z LL � O Z o W � z W � W _ Q Iii li; z U Z W o a IL o PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 20F12 PROJ. NO.: 20120041.00. RA LIST OF DRAWINGS Sheet Number Sheet Title 1 COVER SHEET 2 SHEET INDEX 8c SCHEDULE OF QUANTITIES 3 CONSTRUCTION SAFETY PLAN 4 DEMOLITION PLAN 5 GEOMETRIC LAYOUT PLAN 6 GRADING 8c DRAINAGE PLAN 7 EROSION CONTROL PLAN 8 MARKING 8c LIGHTING LAYOUT PLAN 9 DETAILS 10 DETAILS 11 DETAILS 12 DETAILS No. 6, Bare Copper Counterpoise in Trench 168 LF 35 L -108 Cable Splice to Existing Circuit 2 EA 36 L -125 Remove Existing Taxiway Edge Light — Complete 6 EA 37 L -125 Medium Intensity Taxiway Edge Light, Stake — Mounted (Quartz) 4 EA 38 T -901 Permanent Seeding (Mulched) 3 AC 39 T -901 Temporary Seeding (Mulched) 3 AC DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL Z O it U C/) D w o U) Z 0 Y � � W W � J Q Q � V W Z 0 Q O =w= �H cn � — � 06 Z Q � Z Z W � 0 w � C1 W � J Z LL � O Z o W � z W � W _ Q Iii li; z U Z W o a IL o PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 20F12 PROJ. NO.: 20120041.00. RA LIST OF DRAWINGS Sheet Number Sheet Title 1 COVER SHEET 2 SHEET INDEX 8c SCHEDULE OF QUANTITIES 3 CONSTRUCTION SAFETY PLAN 4 DEMOLITION PLAN 5 GEOMETRIC LAYOUT PLAN 6 GRADING 8c DRAINAGE PLAN 7 EROSION CONTROL PLAN 8 MARKING 8c LIGHTING LAYOUT PLAN 9 DETAILS 10 DETAILS 11 DETAILS 12 DETAILS DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL Z O it U C/) D w o U) Z 0 Y � � W W � J Q Q � V W Z 0 Q O =w= �H cn � — � 06 Z Q � Z Z W � 0 w � C1 W � J Z LL � O Z o W � z W � W _ Q Iii li; z U Z W o a IL o PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 20F12 PROJ. NO.: 20120041.00. RA i z w uj w �0- 0 O U F w fF '(o aQ Z, fr w Om LU J 0 00 w w z0 F_: U) Z Z O D 0 C) ED 0J Q _° F J O¢ F W U) Z0 OZ F Q W J Ir W D 0 Q I Z O° °� Z J O F z o� ofr O F Z w < z U O 0 0 W (n y _ Ir F Q LL � OF (n Z F W Z W F U Z O O 0 U W U) a: a: F 0 0 W � U Q D Z_ tr ('J 0 t z O O w F_ F 0 0 O° tr Ir aLU W LU Ira O 0 U I J W ° Ir �� =m cD J Ir <a ¢U) U - Z U z 00 .f U Z05 00 U y p U_ Y 0 Y o� =0 �z Fr 00 MD C) Q ry 0 0 IT 0 0 N 0 N U m m U 0 q ui z w J TEMPORARY CONSTRUCTION ENTRANCE, SEE DETAIL 5/9 HENDERSON FIELD ROAD } TEMPORARY STAGING AREA, �� `• CONTRACTOR TO ENCLOSE AREA WITH SILT FENCE EXCEPT FOR NECESSARY INGRESS /EGRESS CONTRACTOR SHALL USE EXISTING DIRT ROAD TO ACCESS SITE. CONSTRUCT SILT FENCE ON BOTH SIDES OF ACCESS ROUTE EXCEPT WHERE NOTED. CONTRACTOR TO RESTORE ACCESS ROUTE TO EXISTING CONDITIONS ONCE CONSTRUCTION IS COMPLETE EXISTING DITCHLINE M 4" REFLECTIVE WHITE /ORANGE TAPE 10' LENGTH OF 8" DIAMETER WHITE SCHEDULE (TYP. BOTH SIDES OF PVC PIPE) 40 PVC PIPE SAWED IN HALF. FLASHING OR STEADY - BURNING RED LIGHT (TYPE A) SECURELY FASTENED, AND TURNED HORIZONTALLY AT 45' ANGLE TO THE LONGITUDINAL AXIS OF THE BARRICADE. 1" DIAMETER SCHEDULE 40 PVC INSERT DRILLED AND GLUED INTO 8" PVC BASE WITH 18 "x18" FLUORESCENT HI -VIZ 30" RED /ORANGE VINYL BLEND FLAG (TYP. ONE END ONLY) 45° 10' -0" ISOMETRIC VIEW NOT TO SCALE F_ PVC PIPE 5' MAX PLAN VIEW NOT TO SCALE NOTES 1. ALL PIPE SHALL BE WHITE WITH 4" REFLECTORIZED ORANGE /WHITE TAPE. SPACE BARRICADES A MAXIMUM OF 5' APART. 2. THE CONTRACTOR SHALL MAKE FREQUENT INSPECTION OF THE BARRICADES AND MAKE PROMPT REPAIRS AS NECESSARY. LIGHT SHALL BE OPERATING EVERY NIGHT. 3. BARRICADES SHALL BE ADEQUATELY SECURED WITH SAND BAGS OR OTHER APPROVED METHODS TO WITHSTAND HIGH WINDS AND /OR JET BLAST. 4. LIGHTED BARRICADES WILL NOT BE MEASURED FOR PAYMENT. NO SEPARATE PAYMENT WILL BE MADE FOR PROVIDING, INSTALLING, MAINTAINING BATTERIES, LAMP REPLACEMENT, AND INCIDENTALS. ALL COSTS RELATED TO THE LIGHTED BARRICADES SHALL BE INCIDENTAL TO PAY ITEM M -101. LIGHTED BARRICADE DETAIL NOT TO SCALE 8 LF TEMPORARY STREAM IMPACT -S2, SEE SHEET 7 DIRT ROAD EXISTING HANGARS F&NI HANGARS EXISTING JURISDICTIONAL STREAM GRAVEL ROAD EXISTING PARKING AREA TERMINAL BUILDING LEGEND LIMITS OF DISTURBANCE BENCHMARK AREA SHALL BE CONSTRUCTED DURING NIGHT -TIME HOURS ' PROPOSED 2. <�` �� ONLY (8PM -6AM, SEE "NIGHT PAVEMENT < WORK NOTES" ON THIS SHEET) ACCESS ROUTE PRIOR TO BEGINNING CONSTRUCTION. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY CONSTRUCTION ENTRANCE TO SITE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL LIGHTED SAFETY AREA BARRICADES EXISTING TEMPORARY SILT FENCE, DITCHLINE SEE DETAIL 1/9 PROPOSED 5. DITCHLINE 0 TIE DOWNS q (TO REMAIN) Ci 0 Q y FUEL l TANKS y LIGHTED BARRICADES, OFFSET 2' FROM EXISTING EDGE OF PAVEMENT, SEE DETAIL THIS SHEET 39.5' RUNWAY EDGE OF PAVEMENT BENCHMARK DATA: BM #1 MONUMENT N 354132.99 E 2299544.75 ELEV 31.14 BM #2 MONUMENT N 353777.34 E 2299012.89 ELEV 33.48 SURVEY NOTES: THE FOLLOWING INFORMATION WAS USED FOR THE EXISTING SURVEY: COORDINATE SYSTEM: NC STATE PLANE COORDINATES PROJECT DATUM: NAD 83 (NSRS 2007) VERTICAL DATUM: NAVD 88 COORDINATE UNITS: US SURVEY FEET VERTICAL UNITS: US SURVEY FEET PROJECT LOCALIZED ON AN NGS MONUMENT (WALLACE CBL 000) WITH COORDINATES OF: N = 353642.12 FT E = 2297608.65 FT USING A COMBINED SCALE FACTOR OF 0.99991967 ELEVATION = 36.45 ft NIGHT WORK NOTES: 1. WORK PROPOSED WITHIN THE DESIGNATED NIGHT -TIME WORK ONLY AREA SHALL BE ACCOMPLISHED BETWEEN THE HOURS OF 8PM TO 6AM, WITH THE EXCEPTION OF ASPHALT PAVEMENT. SEE NOTE 5. 2. AT THE CONCLUSION OF EACH NIGHT OF CONSTRUCTION (6AM), THE CONTRACTOR SHALL ENSURE NO VERTICAL EDGES EXIST WITHIN THE NIGHT -TIME WORK ONLY DESIGNATED AREA. IF VERTICAL EDGES AT THE END OF A WORK NIGHT ARE ANTICIPATED, THE CONTRACTOR MUST PROVIDE TEMPORARY BACKFILL IN THOSE AREAS. 3. NIGHT WORK WILL NOT BE MEASURED SEPARATELY FOR PAYMENT. CONTRACTOR SHALL ADJUST UNIT PRICES OR MOBILIZATION FEE AS NECESSARY TO ACCOUNT FOR INCREASED CONSTRUCTION COSTS ASSOCIATED WITH NIGHT WORK. 4. ALL CONSTRUCTION MATERIALS MUST BE REMOVED FROM THE NIGHT -TIME WORK AREA BEFORE 6AM FOR EACH NIGHT OF SCHEDULED WORK. 5. CONTRACTOR SHALL HAVE THE OPTION TO CONSTRUCT THE ASPHALT SURFACE COURSE LOCATED WITHIN THE NIGHT -TIME WORK ONLY DESIGNATED AREA DURING DAYTIME HOURS PROVIDED THAT COORDINATION OCCURS WITH THE AIRPORT MANAGER SUCH THAT A "NOTAM" (NOTICE TO AIRMEN) CAN BE ISSUED TO INFORM PILOTS THAT THE FUELING AND PARKING APRON AREA WILL BE CLOSED. AREA LIMITED TO NIGHT -TIME WORK ONLY (8PM -6AM, SEE "NIGHT EXISTING WORK NOTES" ON THIS JURISDICTIONAL SHEET) STREAM 60 0 30 60 120 1 inch = 60 ft. GENERAL NOTES: 1. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR HAVING VISITED THE SITE AND HAVING FAMILIARIZED HIMSELF WITH THE EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. 2. THE CONTRACTOR SHALL LOCATE AND PROTECT EXISTING UTILITIES AND FACILITIES (I.E., AIRPORT LIGHTING, NAVAIDS, ETC.) FROM DAMAGE BY EQUIPMENT OR PERSONNEL. THE CONTRACTOR SHALL CONTACT ALL UTILITY AND FACILITY AGENCIES FOR FIELD MARKING PRIOR TO BEGINNING CONSTRUCTION. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE UNDERGROUND UTILITIES. ALL UTILITIES AND FACILITIES ARE NOT NECESSARILY SHOWN. 3. ANY UTILITIES OR FACILITIES DAMAGED DURING THE PROJECT BY THE CONTRACTOR'S WORKERS OR EQUIPMENT SHALL BE PROMPTLY REPAIRED AT THE CONTRACTOR'S EXPENSE. HAND DIGGING TO PROTECT UTILITIES FROM DAMAGE SHOULD BE ANTICIPATED. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS, LICENSES, ETC. REQUIRED BY LOCAL, STATE, AND FEDERAL AGENCIES EXCEPT THOSE FROM NCDENR FOR EROSION & SEDIMENT CONTROL AND DWQ. 5. ALL DISTURBED AREAS, INCLUDING THE CONTRACTORS STAGING AREA, HAUL ROUTES, GRADING LIMITS, ETC., SHALL BE RESTORED TO A SMOOTH LINE AND GRADE WITH POSITIVE DRAINAGE. THE CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS. THERE WILL Z BE NO MEASUREMENT FOR PAYMENT OF SEEDING AND MULCHING REQUIRED OUTSIDE THE GRADING LIMITS, APPROVED STOCKPILE LIMITS 0 OR APPROVED HAUL LIMITS. P 6. THE CONTRACTOR WILL BE REQUIRED TO TRANSPORT AND STORE ALL EQUIPMENT AND MATERIALS IN A MANNER WHICH WILL NOT � DAMAGE ANY EXISTING PAVEMENT, BUILDINGS, SIGNS, LIGHTS, ETC. ANY DAMAGE WILL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE OWNER. THE CONTRACTOR SHALL KEEP ACCESS ROUTES CLEAN AND FREE OF LOOSE DEBRIS FROM CONSTRUCTION MATERIALS. (n THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR CLEARING ALL PAVEMENTS TRAVERSED BY CONSTRUCTION EQUIPMENT OF DEBRIS Z DAILY. 0 7. NO DEBRIS OF ANY NATURE SHALL BE ALLOWED OUTSIDE OF THE CONSTRUCTION AREAS. ALL LOOSE MATERIALS (DIRT, STONE, w PAVEMENT, FORMING, ETC.) MUST BE KEPT WITHIN THE LIMITS OF CONSTRUCTION. WHEN THE CONSTRUCTION BARRIERS ARE MOVED DURING CONSTRUCTION, CLEANUP OF THE AREAS OUTSIDE THE BARRIERS SHALL OCCUR IMMEDIATELY. IN ADDITION, NO LOOSE LL. MATERIALS THAT COULD BLOW INTO AIRCRAFT OPERATIONS AREA SHALL BE ALLOWED IN THE CONSTRUCTION AREA. 0) 8. THE CONTRACTOR SHALL PROVIDE STRICT SECURITY FOR ALL PERSONNEL AT THE SITE AND TO TRUCK DRIVERS HAULING MATERIALS AND EQUIPMENT. ANYONE FOUND IN RESTRICTED AREAS OR CROSSING ACTIVE RUNWAYS, TAXIWAYS, AND RAMPS, WILL BE PROMPTLY AND 0 PERMANENTLY REMOVED FROM THE JOB. Z 0 9. AT NO TIME WILL THE CONTRACTOR'S MEN OR EQUIPMENT BE ALLOWED IN THE TERMINAL OR AIRCRAFT PARKING RAMP AREAS EXCEPT IN 0 THE AREAS IMMEDIATELY ADJACENT TO THE PROJECT WORK AREAS. 0 10. THE CONTRACTOR SHALL PROVIDE FOR EMPLOYEE PARKING WITHIN OR ADJACENT TO HIS STAGING AREA. ONLY AUTHORIZED VEHICLES Z WILL BE ALLOWED INSIDE THE SECURITY FENCE. AT THE END OF EACH WORK DAY, THE CONTRACTOR SHALL POSITION ALL EQUIPMENT, Q TOOLS, MATERIAL, ETC. IN THE APPROVED STAGING AREA UNLESS OTHERWISE REQUESTED BY THE CONTRACTOR AND APPROVED BY THE 0 ENGINEER. m 11. EQUIPMENT NOT IN USE SHALL BE PARKED IN THE CONTRACTOR'S STAGING AREA OR IN AREAS DESIGNATED BY THE RESIDENT PROJECT 0 REPRESENTATIVE. LL. 0 12. ALL REQUIREMENTS OF FAA ADVISORY CIRCULAR 150 - 5370 -2F "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION" SHALL BE FOLLOWED DURING CONSTRUCTION. 13. ALL DE- WATERING REQUIRED TO EXECUTE WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. vw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL 0 z w 0 0 a Ln w 0 z Y 0 I 2 Z c� O z H 0- o � w 0 Ljj 0_ N I Lu o Q o0 z n§10E, Z � J LU Q Q F_ J W � LL O_j w = = W Zo Z Q°ZZ O X On 0 LL f H LU � _ V Z LU Q O Q w Z LU U) = Q Z O V li.i li.i 2 _j z U Z w o a � D PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 3 OF 12 PROJ. NO.: 20120041.00. RA i z w w �a 0 O U �w f� Q0 aQ Z, fr m 0 J LU O 00 W w Zw 0 F-: U) Z Z 0 7�; U 7 W U m 0 J 0 J U Q _U) F J OQ FW �U) Z 0 O Z F¢ W J Ir w 0 Q I Z 00 zU) OQ �z 0� ofr FO zZ wQ U 00 0 W (n y _Ir �Q LL 73 OF cn z �w Z g W� ~ U Z O 00 U WU) a: a: F-- F-- 00 W J U Q D Z_ tr (D 0 t z 0 O w U � 0 0 0 O tr Ir aLU Iw 0 O W U I J W Z W 0 Io �� _ co c� _ �0 J Ir J LL . U) U Z U — Z_ O U O �f U Z °5 O ZO U y p U_ Y 0 Y 0 F-- O (D z Fr 00 U U INV 27.51 YARD INLET TOP =30.82 INV =27.31 FULL OF WATER Q 0! 0 0 IT 0 0 N 0 N U U N ui a z U] PRESUMED LOCATION OF STORM SEWER PIPE REMOVE EXISTING ASPHALT &----' SUBBASE, SEE SHEET 6 FOR PROPOSED STORM SEWER SYSTEM, INCIDENTAL TO PAY ITEM D -701 POSSIBLE CONNECTION TO THIS STORM GRATE (NOT SURVEYED) N 354220.22 REMOVE E 2298971.16 EXISTING / YARD INLET I EXISTING ASPHALT SAWCUT PAVEMENT EXISTING ASPHALT PAVEMENT HANGAR APPROX. LOCATION OF EXISTING STRIPING N 354092.55 E 2298955.11 EXISTING ASPHALT "!A 'ell REMOVE EXISTING ASPHALT & SUBBASE, SEE SHEET 6 ;! FOR PROPOSED STORM SEWER SYSTEM, INCIDENTAL TO PAY ITEM D -701 PAVEMENT V 31.63 SAWCUT PAVEMENT 1 STORY BRICK BUILDING REMOVE 6 TIE -DOWN ANCHORS PER COVER EXISTING TIE -DOWN DETAIL 1 ON STRIPING WITH BLACK THIS SHEET PAINT (INCIDENTAL TO ANCHOR REMOVAL, TYP.) o L TIE DOWNS (TO REMAIN) 0 0 EXISTING COMPAcc ROSE (TO REMAI LEGEND- w 0 EXISTING LIGHT Z{ EXISTING LIGHT TO BE REMOVED EXISTING ASPHALT & SUBBASE TO BE REMOVED 0- EXISTING ASPHALT TO BE REMOVED (SUB -BASE TO REMAIN) EXISTING TIE -DOWN ANCHOR TO BE REMOVED ��\ STRIPING T ED \ BY COVERINGWI H BLACK PAINT j/ EXISTING STORM SEWER TO BE REMOVED REMOVE EXISTING TIE -DOWN STRIPING BY COVERING WITH BLACK PAINT. ANCHORS SHALL BE CUT & REMOVED PER DETAIL 1/4 0 W J ON THIS SHEET. — SAFETY AREA COVER EXISTING TIE -DOWN STRIPING WITH BLACK PAINT (INCIDENTAL TO ANCHOR REMOVAL, TYP.) NOTES: 1. THE CONTRACTOR SHALL LOCATE ALL UTILITIES WHETHER SHOWN OR NOT SHOWN ON THE PLANS. 2. CONTRACTOR SHALL EXERCISE EXTREME CARE, PARTICULARLY IN AREAS IMMEDIATELY ADJACENT TO TAXIWAY, AND SHALL NOT DISTURB EXISTING UTILITIES, STRUCTURES, AND FACILITIES, WHICH ARE NOT PART OF THIS PROJECT AND WHICH ARE TO REMAIN IN PLACE /OPERATION. 3. CONTRACTOR SHALL DISPOSE OF ALL MATERIAL REMOVED FROM THIS SITE TO AN OFFSITE LOCATION IN A SAFE AND LEGAL MANNER. O O U EXISTING I Li VVI NU SAWCUT ASPHALT SAWCUT PAVEMENT N 354060.27 APRON PAVEMENT REMOVE APPROX. 11.6' E 2299230.44 460 LF OF COVER EXISTING EXISTING 18" RCP STRIPING WITH N 354034.02 BLACK PAINT E 2298960.76 (73 LF) EP N 354043.39 E 2299176.67 N 354036.28 x X x �( E 2299294.09 MILL EXISTING ASPHALT--/// SPHALT TIE DOWNS YARD INLET DOWN TO EXPOSE TIE DOWNS TOP -30.44 SUBBASE (126 SY), REMOVE 3��( x REMOVE 3 PAY ITEM P -160 x TIE -DOWN INV L OF TIE -DOWN ANCHORS FULL OF REMOVE ANCHORS WATER EXISTING (ALL PARTS) (ALL PARTS) YARD INLET NOTE: THE EXISTING STORM SEWER X SYSTEM THAT IS BEING REMOVED WITH THIS PLAN IS CURRENTLY BLOCKED REMOVE REMOVE AND DOES NOT CONVEY FLOW. N I REMOVE EXISTING EXISTING EXISTING YARD INLET LIGHTS LIGHTS 0 118 "RCP REMOVE EXISTING U YARD INLET EXISTING EXISTING APRON D TOP -30.94 YARD INLET o ANCHOR PAVEMENT INV= 27.43 FULL OF WATER EXISTING � ASPHALT Z TAXIWAY U O EXISTING JURISDICTIONAL W o STREAM H 1 8°'RCP O INV =27 5 DITCH Z INV =26.61 ... ... ... ... O SIGN RUNWAY 27 -9 EXISTING EXISTING o �c o TAXIWAY A CONCRETE JURISDICTIONAL ANCHOR FOR REMOVAL: BREAKOUT Z EXISTING cn F3 STREAM CONCRETE, CUT -OFF JURISDICTIONAL 0 0 0 ANCHOR & BACKFILL WITH STREAM 30 0 15 30 60 ASPHALT, TACK SIDES m E SPLICE TIE -DOWN REMOVAL o inch = 30 ft. IN PAVEMENT o 4 NTS LU t Cn V w DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O U W 0 w o � z O_ Y � § L (-PROD. MANAGER: w DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 Q 0- Q Z z J Q a Z 0 0 W J v Z �w 0 Z < 0 Z 0 Z F— ,0 O W J O W C C Z LU Q W 0 0 a Z w Q Iii 2 li.i -1 z U Z w o a I D (-PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 4 OF 12 PROJ. NO.: 20120041.00. RA i z w w �a 0 O U �w f� Q0 aQ z� fr w Om W0 J F 00 W w zo F_: U) Z Z 0 7�; U 7 W U m 0 J 0J U Q = in F J OQ FW �U) Z 0 O Z F¢ W J Ir W D 0 Q I Z O O zU) OQ �z ofr 0 ~z w Q U O 0 O W (n y _ Ir F Q LL 73 OF (n Z F W Z g W� ~ U Z O 00 U W U) a: a: F-- F-- 00 W J U Q D Z tr cD 0 t z 0 0 w U � 0 0 O 0 tr aLU Iw 0 O W U I J w W° Io �� =m c� �0 J Ir J LL . U) U Z U - 0Z 0 U Z °5 00 U U D Q Y Y 0 F-- O (D z Fr >° 00 U U Q ry 0 0 IT 0 0 N 0 N U U N O q 6i a z w J TIE -IN TO EXISTING ASPHALT PAVEMENT, SEE DETAIL 3/11 N 354092.55 E 2298955.11 EXISTING ASPHALT N 354343.56 E 2299021.92 .:. N 354234.68 E 2299015.38 N 354005.27 E 2298991.89 Lad d L.i f i d � v "!A 'ell 198.31' N 53 4242.45 E 2299096.01 20' 258.72' > 1 STORY BRICK BUILDING TIE -IN TO EXISTING ASPHALT PAVEMENT, SEE DETAIL 3/11 19.44' N 354239.26 E 2299168.56 TAXILANE CENTERLINE N84' 29' 29 "E - 225.98' EXISTING ASPHALT APRON -* %..T TIE -IN TO EXISTING ASPHALT PAVEMENT, SEE DETAIL 3/11 N 354060.27_ E 2299230.44 N 354030.11 E 2299249.42 0 0 TIE DOWNS (TO REMAIN) 0 0 EXISTING MARKING R= 75.00' L= 52.97' PROPOSED APRON PAVEMENT PROPOSED MILL & OVERLAY EXISTING SAFETY AREA EXISTING CONCRETE N 354264.79 FE 2299425.67 R57.50' / PROPOSED \ N 354132.99 TAXIWAY EDGE E 2299544.75 LIGHTS (TYP.), Cs T -7 A 7 ,A SEE SHEET 8 WIND R= 75.00' N 354068.84 L= 67.49' RP FUTURE TAXIWAY PC A- CENTERLINE (300') RP OFFSET FROM RUNWAY CENTERLINE 17.76' N 353972.87 N 353982.13 N 353987.86 E 2299254.94 E 2299353.17 E 2299410.39 N 353978.17 E 2299312.19 EXISTING ASPHALT N 353980.32 TAXIWAY 1 E 2299332.52 0 0 EXISTING JURISDICTIONAL STREAM O O U N 354051.16 E 2299467.68 DITCH CENTERLINE SIGN N EXISTING JURISDICTIONAL STREAM 30 0 15 30 60 7C {n � CW SPLICE � L, 1 inch = 30 ft. O _DN wS O U w 0) Z O U w O LL LU 0) H O Z O 0 0 Z 0 0 m O LL 0 LU 0) 0) V w DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O D_ 0 w 0 Lu H Q 0 U) Z O Y L7 z w Q Q Q _ Z F_ Q 0 z 0 < 0 O w Q z= w o o J 0- IL z0 LL V X Cn 0 W � _j H Z W Q W o z 2 W O LU V li.i 6.i 2 _j Z U Z w 0 a � o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 5 OF 12 PROJ. NO.: 20120041.00. RA N 354132.99 E 2299544.75 Cs T -7 A 7 ,A WIND N 354068.84 �E 2299465.98 FUTURE TAXIWAY A- CENTERLINE (300') OFFSET FROM RUNWAY CENTERLINE 17.76' N 354051.16 E 2299467.68 DITCH CENTERLINE SIGN N EXISTING JURISDICTIONAL STREAM 30 0 15 30 60 7C {n � CW SPLICE � L, 1 inch = 30 ft. O _DN wS O U w 0) Z O U w O LL LU 0) H O Z O 0 0 Z 0 0 m O LL 0 LU 0) 0) V w DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O D_ 0 w 0 Lu H Q 0 U) Z O Y L7 z w Q Q Q _ Z F_ Q 0 z 0 < 0 O w Q z= w o o J 0- IL z0 LL V X Cn 0 W � _j H Z W Q W o z 2 W O LU V li.i 6.i 2 _j Z U Z w 0 a � o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 5 OF 12 PROJ. NO.: 20120041.00. RA w �w �0- 0 O U F w �Z fF Q0 aJ zQ fr w Om WO J F 00 W w zo F-: U) Z Z O 7�; U 0 W U m O J 0J U Q =n F J OQ FW �U) Z 0 Oz F¢ W J Ir w 0 Q I Z O� U� Z J O �z 0� ofr FO zZ wQ O F U O 0 0 (n y _Ir F Q LL 73 OF ZW W� F D Z U Oo U 0 WU) a: a: F F 00 W J U Q D tr cD 0 t z O O w U � 0 0 00 O tr Ir aLU Iw 0 0 W U I J w w� I 0 F F = m c� J tr J LL QU) U - Z U Z O O .f U Z05 O ZO U Y p U Y 0 Y 0 = O �Z Fr 00 Q ry 0 0 IT 0 0 N 0 N U m U N O q W a z Lu J_ LL 8 LF TEMPORARY --i A %�'I IX "/ X / REMOVE EXISTING STRUCTURE AND INSTALL STORM STRUCTURE E, PROP..... DROP INLET W/ GRATE TOP TOP: 31.30 INV IN (EX 6" CPP): 29.78 INV OUT: 27.53 SEE DETAIL 7/11 STORM STRUCTURE PROP. DROP INL W/ GRATE T TOP: 31. INV OUT: 28. SEE DETAIL 7/ a , �2v40 � PROPOSED PAVEMENT r ........................ ...._ CHAI PATCH, SEE DETAILS >......_ INK FE CE "® { 5 & 6, SHEET 10 76 LF OF 18" RCP 322 4P (CLASS 111) ® 0.5% E t ?: E 1 STORY BRICK HANGARS P, _ = PAVEMENT BUILDING 90 LF OF 18" RCP 4E D (CLASS 111) ® 0.5% 7 t 32,52 TO 50 18" RCP n PROP. DROP INLET 59 (CLASS IV) W/ GRATE TOP TOP 31 70 GRADING & DRAINAGE NOTES: 1. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR HAVING VISITED THE SITE AND HAVING FAMILIARIZED HIMSELF WITH THE EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL CABLE, CONDUITS, DUCTS, UTILITIES AND SIMILAR ITEMS PRIOR TO COMMENCING EXCAVATION WORK. ANY DAMAGE TO EXISTING CABLES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR TO THE SATISFACTION OF THE OWNER AND AT NO COST TO THE OWNER. 3. THE CONTRACTOR SHALL CONTACT THE UTILITY LOCATOR COMPANY TO LOCATE UTILITIES IN THE PROJECT AREAS PRIOR TO ANY CONSTRUCTION BEGINNING. 4. REPORT ANY UTILITY CONFLICTS TO THE ENGINEER IMMEDIATELY. 5. CONTRACTOR SHALL LIMIT AREAS OF DISTURBANCE AS MUCH AS POSSIBLE DURING THE COURSE OF THE PROJECT, AND STABILIZE AREAS AS WORK IS COMPLETED. NO SEPARATE MEASUREMENT WILL BE MADE FOR PAYMENT FOR AREAS REQUIRING SEEDING AND MULCHING OUTSIDE OF THE LIMITS OF CONSTRUCTION. 6. ALL AREAS DISTURBED DURING CONSTRUCTION NOT SHOWN TO BE PAVED SHALL BE PERMANENTLY SEEDED AND MULCHED. 7. TEMPORARY GROUND COVER SHALL BE PLACED ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS PER THE TEMPORARY SEEDING SPECIFICATIONS AND THE GROUND COVER SCHEDULE SHOWN IN DETAIL 3/9. 8. TEMPORARY GROUND COVER SHALL BE PLACED ON EXPOSED SWALES OR DITCHES WITHIN 7 CALENDAR DAYS PER THE TEMPORARY SEEDING SPECIFICATIONS AND THE GROUND COVER SCHEDULE SHOWN IN DETAIL 3/9. 9. CONTRACTOR SHALL DISPOSE OF ALL UNSUITABLE MATERIAL REMOVED FROM THIS SITE TO AN OFFSITE LOCATION IN A SAFE AND LEGAL MANNER. 10. CUT FOR SKIMMER BASIN #1 (SEE SHEET 7) SHALL BE TEMPORARILY STORED WITHIN THE DESIGNATED STAGING AREA 11 ®0 5% SHOWN ON SHEET 3. ORIGINAL GRADES SHALL BE RESTORED UNLESS OTHERWISE NOTED ON THIS SHEET. INV IN: 28.37 O INV OUT: 28.27 11. THE CONTRACTOR SHALL TILL ANY SOILS OUTSIDE OF THE APRON FOOTPRINT THAT MAY HAVE BECOME COMPACTED PROVIDE POSITIVE MATCH SEE DETAIL 7/11 TIE DOWNS 5S DURING CONSTRUCTION SUCH THAT INFILTRATION OF STORMWATER IS PROMOTED. TO REMAIN DRAINAGE TO STRUCTURED � EXISTING ( ) PAVEMENT CONCRETE 7,C;.E. � fi .p EXISTING �� �L `��� .. `,,` ,,; 4T4 C C x ,... -, fit, 7' 3 . CON CRET -,'0 § R ='L` SEE DETAIL 1/11 1 mommommoom 4 OEM@ ME 3 E 32 55 32.78 '} 41-1 d r� FOR ASPHALT 7,EG 31.6 31 8 32.45 PAVEMENT SECTION E +.HT �f 31X50 �f X X x 32 - .,:t CONCRETE 31.92 � � 31.40 .a t ", : E .':,H 7 *3 27 32 32.67 32.80 ....... .......:32.90 , _ '*3 E "s EXISTING ASPHALT IN so EMENNIIIII ME ME == ME as MATCH EXISTING PAVEMENT 32 EXISTING ASPHALT 32.17 MATCH EXISTING f PAVEMENT 149 LF (TOTAL) OF PROPOSED PERMANENT DITCH "A ", SEE DETAIL 4/10 FOR DITCH CROSS- SECTION No on mmmmmmm= ME ME *3 .9 C 32.16 7 3.4' 32.27 1.87 ,2.23 2 It .0' 30. 3.0.60 �., ...., �.�, ,,.q X,.3 PROVIDE POSITIVE 3. 8 1 7 ?0 s° DRAINAGE INTO E`' 1 -31 DITCH "A ", THIS '3-38 \ AREA f \ 33.29, E 1 O 33,7('J' 7,7 3.38 ".,, 3 .0 \ Es.£7f V # a f x..i?.a , f� D \� ME ME MEMNEEMso so as sommmmm IN/ ON \. x 6 �." N - - 29.45 29.45 .7 �')n, �;1r, j � u � H vw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL CL0 Z W 0 0 0 w D 0 a N a w 7 a CL J Q F- O Q 2 ♦-� Z o O F- Z W � U M C/) OL W C N I LL' o Q o0 z O_ Y L Er _ Z W � J Q Q 2 z W Z 0 Q Q 0 =w= Z Q°Zz 0 L 06 W � -j ♦^ V z � � Z O Z I..L W V li.i li.i 2 -1 z U Z w o a tr tr I o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 6 OF 12 PROJ. NO.: 20120041.00. RA 44 LF OF , S ,7 2 STORM STRUCTURE C GRADING & DRAINAGE NOTES: 1. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR HAVING VISITED THE SITE AND HAVING FAMILIARIZED HIMSELF WITH THE EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL CABLE, CONDUITS, DUCTS, UTILITIES AND SIMILAR ITEMS PRIOR TO COMMENCING EXCAVATION WORK. ANY DAMAGE TO EXISTING CABLES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR TO THE SATISFACTION OF THE OWNER AND AT NO COST TO THE OWNER. 3. THE CONTRACTOR SHALL CONTACT THE UTILITY LOCATOR COMPANY TO LOCATE UTILITIES IN THE PROJECT AREAS PRIOR TO ANY CONSTRUCTION BEGINNING. 4. REPORT ANY UTILITY CONFLICTS TO THE ENGINEER IMMEDIATELY. 5. CONTRACTOR SHALL LIMIT AREAS OF DISTURBANCE AS MUCH AS POSSIBLE DURING THE COURSE OF THE PROJECT, AND STABILIZE AREAS AS WORK IS COMPLETED. NO SEPARATE MEASUREMENT WILL BE MADE FOR PAYMENT FOR AREAS REQUIRING SEEDING AND MULCHING OUTSIDE OF THE LIMITS OF CONSTRUCTION. 6. ALL AREAS DISTURBED DURING CONSTRUCTION NOT SHOWN TO BE PAVED SHALL BE PERMANENTLY SEEDED AND MULCHED. 7. TEMPORARY GROUND COVER SHALL BE PLACED ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS PER THE TEMPORARY SEEDING SPECIFICATIONS AND THE GROUND COVER SCHEDULE SHOWN IN DETAIL 3/9. 8. TEMPORARY GROUND COVER SHALL BE PLACED ON EXPOSED SWALES OR DITCHES WITHIN 7 CALENDAR DAYS PER THE TEMPORARY SEEDING SPECIFICATIONS AND THE GROUND COVER SCHEDULE SHOWN IN DETAIL 3/9. 9. CONTRACTOR SHALL DISPOSE OF ALL UNSUITABLE MATERIAL REMOVED FROM THIS SITE TO AN OFFSITE LOCATION IN A SAFE AND LEGAL MANNER. 10. CUT FOR SKIMMER BASIN #1 (SEE SHEET 7) SHALL BE TEMPORARILY STORED WITHIN THE DESIGNATED STAGING AREA 11 ®0 5% SHOWN ON SHEET 3. ORIGINAL GRADES SHALL BE RESTORED UNLESS OTHERWISE NOTED ON THIS SHEET. INV IN: 28.37 O INV OUT: 28.27 11. THE CONTRACTOR SHALL TILL ANY SOILS OUTSIDE OF THE APRON FOOTPRINT THAT MAY HAVE BECOME COMPACTED PROVIDE POSITIVE MATCH SEE DETAIL 7/11 TIE DOWNS 5S DURING CONSTRUCTION SUCH THAT INFILTRATION OF STORMWATER IS PROMOTED. TO REMAIN DRAINAGE TO STRUCTURED � EXISTING ( ) PAVEMENT CONCRETE 7,C;.E. � fi .p EXISTING �� �L `��� .. `,,` ,,; 4T4 C C x ,... -, fit, 7' 3 . CON CRET -,'0 § R ='L` SEE DETAIL 1/11 1 mommommoom 4 OEM@ ME 3 E 32 55 32.78 '} 41-1 d r� FOR ASPHALT 7,EG 31.6 31 8 32.45 PAVEMENT SECTION E +.HT �f 31X50 �f X X x 32 - .,:t CONCRETE 31.92 � � 31.40 .a t ", : E .':,H 7 *3 27 32 32.67 32.80 ....... .......:32.90 , _ '*3 E "s EXISTING ASPHALT IN so EMENNIIIII ME ME == ME as MATCH EXISTING PAVEMENT 32 EXISTING ASPHALT 32.17 MATCH EXISTING f PAVEMENT 149 LF (TOTAL) OF PROPOSED PERMANENT DITCH "A ", SEE DETAIL 4/10 FOR DITCH CROSS- SECTION No on mmmmmmm= ME ME *3 .9 C 32.16 7 3.4' 32.27 1.87 ,2.23 2 It .0' 30. 3.0.60 �., ...., �.�, ,,.q X,.3 PROVIDE POSITIVE 3. 8 1 7 ?0 s° DRAINAGE INTO E`' 1 -31 DITCH "A ", THIS '3-38 \ AREA f \ 33.29, E 1 O 33,7('J' 7,7 3.38 ".,, 3 .0 \ Es.£7f V # a f x..i?.a , f� D \� ME ME MEMNEEMso so as sommmmm IN/ ON \. x 6 �." N - - 29.45 29.45 .7 �')n, �;1r, j � u � H vw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL CL0 Z W 0 0 0 w D 0 a N a w 7 a CL J Q F- O Q 2 ♦-� Z o O F- Z W � U M C/) OL W C N I LL' o Q o0 z O_ Y L Er _ Z W � J Q Q 2 z W Z 0 Q Q 0 =w= Z Q°Zz 0 L 06 W � -j ♦^ V z � � Z O Z I..L W V li.i li.i 2 -1 z U Z w o a tr tr I o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 6 OF 12 PROJ. NO.: 20120041.00. RA ME ME MEMNEEMso so as sommmmm IN/ ON \. x 6 �." N - - 29.45 29.45 .7 �')n, �;1r, j � u � H vw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL CL0 Z W 0 0 0 w D 0 a N a w 7 a CL J Q F- O Q 2 ♦-� Z o O F- Z W � U M C/) OL W C N I LL' o Q o0 z O_ Y L Er _ Z W � J Q Q 2 z W Z 0 Q Q 0 =w= Z Q°Zz 0 L 06 W � -j ♦^ V z � � Z O Z I..L W V li.i li.i 2 -1 z U Z w o a tr tr I o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 6 OF 12 PROJ. NO.: 20120041.00. RA w �w �a 0 O U �w f� '(o aQ Z, fr w Om LU J 0 00 W w Zw 0 F_: U) Z Z O D 0 C) co 0 J I¢ _U) F J OQ FW �U) Z 0 Oz F¢ W J Ir w 0 Q I Z O� U� Z J O �Z 0� ofr FO ZZ wQ c� U O 0 0 (n y _Ir �Q LL 73 OF ZW W� �5 Z U O O U 0 W U) a: a: F-- F-- 00 W � U) Q D Z tr cD 0 t z Ow 0 0 Oo I� aLU Iw 0 0 W U I J W Z W O I 0 (n W F F = CO O J tr J LL Q U) U Z U - Z_ O U O .f U Z °5 00 U Y p U Y 0 Y 0 = O U ~ Z Fr 00 U U Q ry 0 0 IT 0 0 N 0 N U m U N O q i W a z Lu J_ LL TEMPORARY INLET PROTECTION, SEE DETAIL 4/9 TEMP RARY INLET PRO ECTION, SEE D TAIL 4/9 TEMPORARY INLET \ PROTECTION, SEE DETAIL 4/9 SITE ACCESS ROUTE, SEE 130 LF TEMPORARY SILT FENCE, SEE DETAIL 1/9 SHEET 3 FOR FULL LENGTH OF ROUTE & LOCATION OF CONSTRUCTION ENTRANCE y II�III� II�IIIi .... . .......................... ............................. ..................... ........... ............................. .............. ............. ............................................ EXISTING ASPHALT R!OE1.....W IN ON mmmmm=i ON ME Boom== ME NO EXISTING ASPHALT CONSTRUCT TEMPORARY DIVERSION DITCH AS SHOWN (10' WIDE, 0.7% SLOPE, APPROX. 105 LF) INTO TEMPORARY SKIMMER BASIN #1 203 LF TEMPORARY DIVERSION BERM, SEE DETAIL 7/10 TEMPORARY FIBER CHECK DAM, SEE DETAIL 2/9 No on MENEMMOMEN ON ME somommmm as 30.60 O ME almommoom on so TEMPORARY FIBER CHECK DAM, SEE DETAIL 2/9 X00 31.. 3 .X \ Y/ 31.5 x29.2 O O w 31.5 X29.2 O . D X - v N. 1. 1.89 ACRES ACRES\ O PAVEMENT En IL LEGEND TEMPORARY PROPOSED APRON SKIMMER OUTFALL, PAVEMENT SEE DETAIL 3/10 X33.45 PROPOSED TEMPORARY INLET SPOT SHOT PROTECTION, SEE DETAIL 4/9 PROPOSED RIP —RAP PAD TEMPORARY DIVERSION —TDD $ DITCH & BERM, SEE PROPOSED RIFFLE GRADE DETAIL 7/10 CONTROL TEMPORARY SILT FENCE, SEE DETAIL 1/9 �r EXISTING 0 CONTOURS TEMPORARY FIBER CHECK DAM, SEE 31 PROPOSED DETAIL 2/9 30 CONTOURS MEMNON= oom LIMITS OF TEMPORARY SILT FENCE OUTFALL, DISTURBANCE SEE DETAIL 6/9 0 TIE DOWNS (TO REMAIN) EROSION CONTROL NOTES: 1. THE CONTRACTOR SHALL MAINTAIN ALL SEDIMENT AND EROSION CONTROL DEVICES THROUGHOUT THE LIFE OF THE PROJECT, AND PROVIDE PERIODIC CLEANOUT AS NECESSARY. THE CONTRACTOR SHALL INSPECT ALL DEVICES EVERY SEVEN (7) CALENDAR DAYS OR AFTER EACH RAINFALL EVENT THAT EXCEEDS 1/2 INCH (0.5 "). SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCES WHEN IT BECOMES ABOUT 1/2 FOOT (0.5') DEEP AT THE FENCE. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED, AS NECESSARY. 2. CONTRACTOR SHALL LIMIT AREAS OF DISTURBANCE AS MUCH AS POSSIBLE DURING THE COURSE OF THE PROJECT, AND STABILIZE AREAS AS WORK IS COMPLETED. NO SEPARATE MEASUREMENT WILL BE MADE FOR PAYMENT FOR AREAS REQUIRING SEEDING AND MULCHING OUTSIDE OF THE LIMITS OF CONSTRUCTION. 3. ALL AREAS DISTURBED DURING CONSTRUCTION NOT SHOWN TO BE PAVED SHALL BE PERMANENTLY SEEDED AND MULCHED. 4. TEMPORARY GROUND COVER SHALL BE PLACED ON EXPOSED SLOPES WITHIN 14 CALENDAR DAYS PER THE TEMPORARY SEEDING SPECIFICATIONS AND THE GROUND COVER SCHEDULE SHOWN IN DETAIL 3/9. 5. TEMPORARY GROUND COVER SHALL BE PLACED ON EXPOSED SWALES OR DITCHES WITHIN 7 CALENDAR DAYS PER THE TEMPORARY SEEDING SPECIFICATIONS AND THE GROUND COVER SCHEDULE SHOWN IN DETAIL 3/9. 6. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. 7. THE TEMPORARY SEEDING SCHEDULE SHOWN IN DETAIL 3/9 SHALL BE USED FOR TEMPORARY GROUNDCOVER CONDITIONS WHERE NEEDED. ONCE FINAL GRADES AND STABILIZATION OF AN AREA ARE ESTABLISHED, THE PERMANENT SEEDING MIXTURE SHOWN ON DETAIL 3/9 SHALL BE APPLIED. 8. TOTAL DISTURBED AREA FOR THIS PROJECT: 4.4 ACRES. O U w 0) Z O U O LL LU 0) H O Z O 0 0 Z m O LL 0 LU 0) 0) vw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL w U z w L� Z J_ O fn _ w O W b Lu H Q D � Z O Y � w Q Q (L _ Z � Q � J 0� O z U w OZ:wZ Z Z ' L o O O Z Z 0— IL O LL V X Cn Q Z W [)� _ O Z LU O Q U) Z O LU Q = W LLI 6i 2 _j z U Z w 0 a I o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 7 OF 12 PROJ. NO.: 20120041.00. RA i Z W w Da 0 O U I- w ?:D F-:I- Q0 aQ z> aw Om JLU 0 00 w Uj zo F_: U) Z wo 7�; U 7 W U m O J 0 J 1< = cn F J oQ Fw �U) Zo OZ F¢ w J Ir WD 01-- 1 Z O O zU) 0Q Fz s c5 o� ~ -0 Z Z Q U 00 °w cn y _ Ir F Q LL � OF cn Z F W Z W z U Z 0 00 U W U) _ _ 00 W J CO Q D Z_ tr 0 O tr z O ow F = U � 0 0 O O tr Ir a� Iw a O 0 U wz co w J W° Ir o co w I- I- m = cr Fr0 J Ir Q a J U) U Z U - Z_ O U O �f U Z05 00 U Y FD U_ Y 0 Y 00 U Z Fr 00 Q ry 0 0 IT 0 0 N 0 N 0 U U N n ui a z w J <� - 00P Cam N 354255.53 E 2299060.69 EXISTING ASPHALT N 354130.38 E 2298977.99 1 STORY BRICK BUILDING 50.7' GROUP I TAXILANE PC (88.8' OFA) O TIE DOWNS (TO REMAIN) 0 O EXISTING MARKING PROPOSED 6" YELLOW CENTERLINE 289.0' 40.5' N 354155.70 / E 2299280.79 39.0' / EP PROPOSED 6" YELLOW CENTERLINE / / I GROUP II TAXILANE (115' OFA) 115.0' m r 5 O �" �? ...„ : .........2.......................................... . r / N 354127.91 r / E 2299300.02 O�O#� P � TAX�LAN ......... �� :: / / 2 �}p�i, -7 T f EXISTING N 354115.64 N 3.54106 2 5 ' 21.5' 25.0' ASPHALT .0 E 2299323.83 TYP. 15.7 E 2290 0 ( ) TYP. � ( ) 1 7.34 ES 10.0 SAL00AT 17.0' 54.0' RP 0 10U .II T. X1LANE Ct RRENT PROROSEo 65.5' PROPOSED 14 TIE N 354095.52 E 2299303.13 DOWN SPACES R� G. R 11 T X1 WAY EUTUE � , S 17.5' PROPOSED STAKE MOUNTED TAXIWAY EDGE 10.5' OFFSET / LIGHTS (SPACED EVENLY), FROM EP SEE DETAIL 5/11 / / N 353973.15 / E 2299257.87 / RP PROPOSED CABLE & TRENCH, SEE DETAIL 6/11 TIE NEW CABLE TO EXISTING CIRCUIT AT EXISTING LIGHT (TYP.), (INCIDENTAL TO L -125 ITEMS OF WORK) EXISTING TAXIWAY LIGHT (TYP.) IS E� PC EXISTING ASPHALT TAXIWAY CO z ') �E Cv < Ui _jz X Ln 0X [If W C_ CL <0 PRC PT PC 32.6' EXISTING ASPHALT 10.0' / APRON 5.0' EP PROPOSED CABLE & TRENCH, SEE DETAIL 6/11 SIGN RUNWAY 27 -9 o TAXIWAY A W T..mP A SPLICE -'DLLs 17.0'(TYP.) 0 O U z LEGEND PROPOSED APRON PAVEMENT PROPOSED SEALCOAT PROPOSED PAVEMENT PATCH PROPOSED 6" YELLOW CENTERLINE PROPOSED STAKE MOUNTED LIGHT - PROPOSED TIE DOWN SPACE TYP. SEE DETAIL 1/8 Li . n... SAC? . TIE DOWN LAYOUT N TS 8 WIND 497 SY SEALCOAT 30 0 15 30 60 1 inch = 30 ft. POWER ^POLE GUY WIRE ANCHOR 3/4" MIN. DIAMETER. A.B. CHANCE CO. OR EQUAL (CAT. NO. 4345) TYPICAL NEW TIE DOWN ANCHOR NTS O U H Z 0 O LL LU H O Z O 0 I 0 W O LL LU Cn DVVK DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O o_ it 0 w o U) Z O Y w Z Q J LU ~ Cn 0 M 2 z � Q � Q ' 0 J Z 0 Q 0 w W v H - Z Zoo H LL 0 LLI Z X Cn < W J Z w Q 06 O z � 0 LLJ Z Q CQ C li.i li.i 2 _j z U z w o a I D PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 8 OF 12 PROJ. NO.: 20120041.00. RA E 21.5' i TYP. / 138.8' / 25.0 TYP. EXISTING ASPHALT 10.0' / APRON 5.0' EP PROPOSED CABLE & TRENCH, SEE DETAIL 6/11 SIGN RUNWAY 27 -9 o TAXIWAY A W T..mP A SPLICE -'DLLs 17.0'(TYP.) 0 O U z LEGEND PROPOSED APRON PAVEMENT PROPOSED SEALCOAT PROPOSED PAVEMENT PATCH PROPOSED 6" YELLOW CENTERLINE PROPOSED STAKE MOUNTED LIGHT - PROPOSED TIE DOWN SPACE TYP. SEE DETAIL 1/8 Li . n... SAC? . TIE DOWN LAYOUT N TS 8 WIND 497 SY SEALCOAT 30 0 15 30 60 1 inch = 30 ft. POWER ^POLE GUY WIRE ANCHOR 3/4" MIN. DIAMETER. A.B. CHANCE CO. OR EQUAL (CAT. NO. 4345) TYPICAL NEW TIE DOWN ANCHOR NTS O U H Z 0 O LL LU H O Z O 0 I 0 W O LL LU Cn DVVK DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O o_ it 0 w o U) Z O Y w Z Q J LU ~ Cn 0 M 2 z � Q � Q ' 0 J Z 0 Q 0 w W v H - Z Zoo H LL 0 LLI Z X Cn < W J Z w Q 06 O z � 0 LLJ Z Q CQ C li.i li.i 2 _j z U z w o a I D PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 8 OF 12 PROJ. NO.: 20120041.00. RA Z W �w 00 0 O U �w ?:Ir fr� Q0 aJ z> ow 0 LU Co J O 00 �w Ir zo F_:° z w0 0 W O [ O J 0 J 1 Q _ F J oQ F W 0° ZO oz F¢ W J Ir WD 0Q 1Z o0 zU) 0J FZ o c5 ofr 0 �Z ZQ W U 00 0W n y _Ir �Q LL 2 OF co z zw W Z ° o° U � W co __ 00 W DZ tr 0 0 t zo ow 0 0 O 0 tr aLU W LU Ira 0 0 U I J wz W° Io cn w �I— =m c� J Ir J ¢ d U � Z U Z 0 U O U zC6 oz Y O U CO FD U_ Y � Y o� = o 0Z Z >_ W 00 U U Q ry 0 0 IT 0 0 N 0 N a) U m U 0 n ui 5 z w J SILT FENCE DETAIL: WHEN AND WHERE TO USE IT SILT FENCE IS APPLICABLE IN AREAS: WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100 -FEET. WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1 V. THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS. DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP. CONSTRUCTION SPECIFICATIONS: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0' TO 120' F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB /LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. CONSTRUCTION: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY SEEDING - LATE WINTER /EARLY SPRING SEEDING MIXTURE SPECIES RATE (LB /ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT 50 AND COASTAL PLAIN, KOREAN IN MOUNTAINS) OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES MOUNTAINS - ABOVE 2500 FT: FEB. 15 -MAY 15 BELOW 2500 FT: FEB. 1 -MAY 1 PIEDMONT - JAN. 1 -MAY 1 COASTAL PLAIN - DEC.1 -APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB /ACRE 10 -10 -10 FERTILIZER. MULCH APPLY 4,000 LB /ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IM- MEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 1121 k Iasi 2_1:w-i2121 oil 2L 01100y:121 Bill I4=111111119F_1II SEEDING MIXTURE SPECIES RATE (LB /ACRE) RYE (GRAIN) 120 SEEDING DATES MOUNTAINS AUG. 15 - DEC. 15 COASTAL PLAIN AND PIEDMONT AUG. 15 - DEC. 30 SOIL AMENDMENTS FOLLOW SOIL TESTS OR APPLY 2,000 LB /ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB /ACRE 10 -10 -10 FERTILIZER. MULCH APPLY 4,000 LB /ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB /ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB /ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. 1.25 LB. /LINEAR FT. STEEL P EXTRA STRENGTH FILTER FABRIC WITH WIRE FENCE BACKFILL TRENCH WITH COMPACTED EARTH STq 4 M Y/ USE EITHER FLAT - BOTTOM OR V- BOTTOM TRENCH SHOWN BELOW Z FILTER FABRIC N COMPACTED o EARTH z_ RUNOFF z I ;........III Z D 1 �z t.. N FILTER FABRIC 4 -IN. FLAT - BOTTOM TRENCH DETAIL HEAVY DUTY PLASTIC TIE FOR STEEL POSTS BURY FABRIC SILT FENCE INSTALLATION FILTER FABRIC COMPACTED EARTH RUNOFF z I z FILTER FABRIC z D I z N ]j V- SHAPED TRENCH DETAIL TEMPORARY SILT FENCE 9 NTS TEMPORARY SEEDING SCHEDULE - SUMMER SEEDING MIXTURE SPECIES RATE (LB /ACRE) GERMAN MILLET 40 IN THE PIEDMONT AND MOUNTAINS, A SMALL - STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB /ACRE. SEEDING DATES MOUNTAINS - MAY 15 -AUG. 15 PIEDMONT - MAY 1 -AUG. 15 COASTAL PLAIN - APR. 15 -AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB /ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB /ACRE 10 -10 -10 FERTILIZER. MULCH APPLY 4,000 LB /ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS AN ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. NOTES: 1. TEMPORARY FIBER CHECK DAMS SHALL BE LOCATED AS SHOWN ON THE PLANS. 2. BEFORE INSTALLATION OF FIBER ROLL, SMOOTH AND SHAPE EARTH SURFACE AND REMOVE ALL STONES, ROOTS, OR OTHER DEBRIS GREATER THAN 2 INCHES IN DIAMETER. 3. EXCAVATE A TRENCH 3 INCHES DEEP FOR PLACEMENT OF EACH ROLL. 4. STAKES SHALL BE 24" IN LENGTH SPACED 3 FOOT ON CENTER ON THE UPSTREAM & DOWNSTREAM SIDE OF THE FIBER ROLL. 5. FABRIC OF FIBER ROLL SHALL BE STAPLED INTO THE GROUND APPROXIMATELY 1 INCH UPSTREAM OF THE EDGE OF THE ROLL. MAINTENANCE: INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIP -RAP LINER IN THAT PORTION OF THE CHANNEL. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE FIBER CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. FIBER CHECK DAM SHALL BE CLEANED OUT WHEN 50% OF STORAGE CAPACITY HAS BEEN FILLED IN WITH SEDIMENT. PERMANENT SEEDING SCHEDULE PERMANENT SEED MIX SEEDING MIXTURE 15 LBS /ACRE OF: PERCENT OF MIX BERMUDAGRASS 100 SEEDING IDEAL PLANTING DATES DATES ARE APRIL 15 - JULY 15 SEEDING GREATER BLADDER DEDGE AMENDMENTS APPLY LIME AND FERTILIZER PER SOIL TESTS. PERMANENT SEED MIX - DITCHES ONLY 1. GROUND COVER - WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE (1) ACRE, A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. 2. GRADED SLOPES AND FILLS - PER THE GROUND COVER SCHEDULE SHOWN BELOW, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. GROUND COVER SCHEDULE 15 LBS /ACRE OF: PERCENT OF MIX SEEDING SWITCHGRASS 40 MIXTURE GREATER BLADDER DEDGE 30 COMMON RUSH 20 NONE SHALLOW SEDGE 10 SEEDING IDEAL PLANTING DATES DATES ARE APRIL 15 - JULY 15 14 DAYS SEEDING AMENDMENTS APPLY LIME AND FERTILIZER PER SOIL TESTS. 1. GROUND COVER - WHEREVER LAND DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE (1) ACRE, A GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE PLANTED OR PROVIDED PER THE GROUND COVER SCHEDULE SHOWN ON THIS SHEET. 2. GRADED SLOPES AND FILLS - PER THE GROUND COVER SCHEDULE SHOWN BELOW, OR AT THE COMPLETION OF ANY PHASE OF GRADING, WHICHEVER PERIOD IS SHORTER, SLOPES SHALL BE PLANTED OR OTHERWISE PROVIDED WITH GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. GROUND COVER SCHEDULE SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND 7 DAYS NONE SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) THAN 4:1 SEEDING SCHEDULE NTS FIBER CHECK DAM ROLL (8" DIA.)� A TEMPORARY FIBER CHECK DAM NTS 1 APPLY TEMPORARY 5 SEEDING PER DETAIL 3, THIS SHEET & STRAW MATTING FOR STABILIZATION A I *VIEW IS FACING DOWNSTREAM FIBER CHECK DAM ROLL (12" DIA.) STAPLE FABRIC INTO---\ GROUND ON UPSTREAM & DOWNSTREAM SIDE OF ROLL BACKFILL AND COMPACT LOOSE MATERIAL UPSTREAM OF ROLL GENERAL NOTES: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5 -FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2 -FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUNDCOVER. MAINTENANCE: INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. CONTRACTOR SHALL INSTALL CONSTRUCTION ENTRANCE AT LOCATIONS WHERE TRUCKS WILL BE ENTERING EXISTING ROADWAY. OpO Ot MAINTENANCE: 6" (MIN.) EMBEDMENT NCDOT #5 OR #57 WASHED STONE COARSE AGGREGATE - STONE SIZE = 2 " -3" 6" THICK MINIMUM �S GEOTEXTILE FABRIC INSTALLED UNDER CONSTRUCTION ENTRANCE MAINTAIN THE CONSTRUCTION ENTRANCE IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL 5 CONSTRUCTION ENTRANCE NTS T,I�I111 =''III ,II I SECTION A - A 6" (MIN.) EMBEDMENT SECTION A -A 4' MAX. �1 5 WOODEN STAKES SHALL BE SPACED 3' ALONG THE ENTIRE LENGTH OF THE FIBER ROLL. PROVIDE 2 STAKES ANGLED AS SHOWN. VIII- ,,lliil_ 19 -GAUGE HARDWARE CLOTH (" MESH OPENINGS) NCDOT #5 OR #57 WASHED STONE INLET PROTECTION NTS TOP VIEW SILT F SEE DE 2/ FRONT V DVw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O it W 0 w o W z O_ Y � L L1 � Q Z_ J O Z 0 Q Ow w= J 2 Cn Q°zz W 0 w X U W Z LLI >Q 0 0 Z 0_ w Q = li.i li.i 2 _j z U Z w o a � D PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 9 OF 12 PROJ. NO.: 20120041.00. RA O U 1' - 6" Cn z 1' - 6" MIN 0 SEDIMENT J CONTROL v> � IU STONE 27 2 F-_ 1 1 - 6" 0 LU 0) SECTION VIEW =11 STRUCTURAL 1' STONE NOTE: 0 STRUCTURAL STONE SHALL BE CLASS B RIP RAP STONE FOR EROSION CONTROL PURPOSES. Z SEDIMENT CONTROL STONE IN STONE OUTLETS SHALL BE NO. 5 OR NO. 57 STONE. Q LOCATIONS OF STONE OUTLETS HAVE BEEN INDICATED AT MAJOR LOW LYING AREAS. CONTRACTOR RESPONSIBLE FOR LOCATING AND INSTALLING OUTLETS AT THESE AREAS AS WELL AS LOCAL LOW LYING SPOTS. Z MAINTENANCE: 0 INSPECT THE SILT FENCE OUTFALL AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT m (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR ANY DAMAGE IMMEDIATELY. ADD STONES AS NEEDED TO MAINTAIN THE DESIGN HEIGHT AND CROSS- SECTION OF THE OVERFLOW DAM. O LL. 6 SILT FENCE OUTLET LULU 9 NTS Cn DVw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O it W 0 w o W z O_ Y � L L1 � Q Z_ J O Z 0 Q Ow w= J 2 Cn Q°zz W 0 w X U W Z LLI >Q 0 0 Z 0_ w Q = li.i li.i 2 _j z U Z w o a � D PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 9 OF 12 PROJ. NO.: 20120041.00. RA i z w a- 00 O U �w ?:0 Ir �_: I— Q0 aQ z> �w Om LU J 0 00 �w Ir zo 1-:0 Z wo 0w Om 0 J 1¢ =0 F J O¢ F W 00 z0 oz F¢ W J Ir WD 0Q 1Z o0 U� I J 0 Fz 0� o� Fo z< U 00 0W (n y _ Ir �Q LL � OF � w Z W z U z U 00 U W U) 00 W � 0Q Dz tr 0 0 t zo ow 0 0 O 0 tr aUj Iw a 0 � U w z W� Io �� m = c� J Ir <a Z U z 00 U z05 00 U Y p U Y � Y 00 0 z >_ W 00 Q of 0 0 IT 0 0 N 0 N a) U m m U 0 n w 5 z w J ..M ......................... ....... ............................... n ..............: .. BASIN VOLUME (CF) SKIMMER SIZE ORIFICE RADIUS 1 ) t r 3,216 4" 1.0" fit t � lit lit i Q J � Z 0 Q Cn • i P i • Y ■ = mass WMIN MMW NEW .11101110 40 INIM011 MINIM 1111110111111 minim IRMO WIN= MINIM Q BAFFLE DETAIL FOR USE IN BASINS NTS LINE WITH TEMPORARY SEEDING AS SHOWN ON DETAIL 3/9 & STRAW MATTING OFFSITE FLOW WASTE MATERIAL - COMPACT, SEED & MULCH AFTER CONSTRUCTION OF DITCH MAINTENANCE: CROSS SECTIONAL VIEW INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. TEMPORARY DIVERSION DITCH & BERM NOTES: 1. ALL EXCAVATION AND EMBANKMENT REQUIRED FOR THE INSTALLATION OF THE SEDIMENT BASIN AS WELL AS RESTORING THE SWALE TO ITS ORIGINAL GRADE AT THE CLOSE OF THE PROJECT SHALL BE INCLUDED IN THE PRICE FOR THE SEDIMENT BASIN. 2. THE FLOATING SKIMMER, DISCHARGE PIPE, EMERGENCY SPILLWAY SHALL BE INCLUDED IN THE PRICE FOR THE SEDIMENT BASIN. 3. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN FOR MAINTENANCE PURPOSES. TOP OF DAM 31.5 SPILLWAY CREST 30.5 0_3' DESIGN HIGH -WATER 30.99 SKIMMER CREST 30.2 2 1r Y SEDIMENT CLEAN Fi OUT ELEV. Z OUTAN BOTTOM OF BASIN 29.2 3.0' TOP OF DAM 31.5 SKIMMER (SEE DETAIL) BLOCK FOR SKIMMER TO REST ON 12.0' DESIGN HIGH -WATER 30.99 SECTION A -A SEE SECTION A -A FOR PRINCIPAL SPILLWAY DIMENSIONS ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT 0.5' FREEBOARD TO EXCEED 9 INCHES, AND _ 5' _ I MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 III -III- INCHES TO ALLOW FOR III - III -I- 1 SETTLEMENT. III - III - III -� I I TEMPORARY CLASS B RIP -RAP (1.0' DEPTH) MI DISCHARGE PIPE 30 LF OF SCHEDULE 40, 4" PVC PIPE ® 0.5% 3.0' TOP OF DAM 31.5 TEMPORARY CLASS B RIP -RAP (1.0' DEPTH) MAINTENANCE: 1. INSPECT SKIMMER SEDIMENT BASINS AT LEASE WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE -HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. 2. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE- ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OF AROUND THEM. 3. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS. 4. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. 5. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. 6. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. 2 TEMPORARY SKIMMER SEDIMENT BASIN NTS 0 N NOTES: 1. TEMPORARY SILT DITCH TO BE USED TO BYPASS OFFSITE FLOWS AND PREVENT SEDIMENT EROSION. 2. SILT SHALL BE REMOVED FROM DITCH ONCE IT IS ONE -HALF FULL 3. DITCH SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY FILL. ISTING PAVEMENT 0CJ�oo 00000 ° EXISTING ABC NOTE: USE FAIRCLOTH SKIMMER ARM ASSEMBLY OR APPROVED EQUAL. IF THE CONTRACTOR CHOOSES TO USE A MANUFACTURER OTHER THAN FAIRCLOTH SHOP DRAWINGS "C" ENCLOSURE SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. WATER ENTRY UNIT PERSPECTIVE VIEW PVC END CAP PVC VENT PIPE SCHEDULE 40 PVC PIPE- SCHEDULE 40 PVC PIPE WATER SURFACE PVC END CAP PVC TEE ?;�,0�1 E FLEXIBLE HOSE O\P �5 BOTTOM SURFACE END VIEW FRONT VIEW 3 SKIMMER DETAIL 10 NTS SKIMMER SIZING CHART RISER DRAINAGE AREA (AC.) BASIN VOLUME (CF) SKIMMER SIZE ORIFICE RADIUS 1 1.89 3,216 4" 1.0" � * BASIN SHALL DRAIN IN 72 HOURS. NAG S75 (1.6 LBS /SF MIN. SHEAR STRESS) STRAW BLANKET OR APPROVED EQUAL, INSTALL PER MANUFACTURER'S RECOMMENDATION S• 1.5't 1.5'f g:� I I 7.5' 10.0' 7.5' DITCH "A" (TRAPEZOIDAL) NAG S75 (1.6 LBS /SF MIN. SHEAR STRESS) STRAW BLANKET OR APPROVED EQUAL, INSTALL PER MANUFACTURER'S RECOMMENDATION 1.3't NOTES: 1. THE PAVEMENT SHALL BE DEFINED BY A STRAIGHT EDGE FORMED BY A MACHINED SAW CUT. 2. THE TRENCH SUBGRADE MATERIAL SHALL BE BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED TO A DENSITY OF AT LEAST 95% OF THAT OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH AASHTO T -99 AS MODIFIED BY NCDOT. 3. THE FINAL 1' OF FILL SHALL CONSIST OF ABC MATERIAL COMPACTED TO A DENSITY EQUAL TO 100% OF THAT OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN ACCORDANCE WITH AASHTO T -80 AS MODIFIED BY NCDOT. BITUMINOUS BASE OR BINDER MAY BE SUBSTITUTED IF APPROVED BY THE ENGINEER. 4. THE ENTIRE THICKNESS /VERTICAL EDGE OF THE CUT SHALL BE TACKED. 5. THE SAME DEPTH OF PAVEMENT MATERIAL WHICH EXISTS SHALL BE REINSTALLED, BUT IN NO CASE SHALL THE ASPHALT BE LESS THAN 2" THICK. 6. THE ASPHALT PAVEMENT MATERIAL SHALL BE INSTALLED AND COMPACTED THOROUGHLY TO ACHIEVE A SMOOTH LEVEL PATCH. NTS 5 ASPHALT PAVEMENT PATCH �I MAINTENANCE: - ORIFICE PLATE PVC TEE DURING THE ESTABLISHMENT PERIOD, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL. INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR DURING OUT -OF -BANK FLOW. PERMANENT DITCH SECTIONS OUTSIDE DIAMETER NTS MAXIMUM SLOPE BASED ON OSHA STANDARDS - COMPACTED APPROVED EXCAVATED MATERIAL OR SELECT MATERIAL ( NCDOT 18" RCP - CLASS III, TYPE 2) 24" 24" PLACE PIPE ON SUITABLE EXISTING MATERIAL OR FOUNDATION CONDITIONING MATERIAL PER NCDOT STANDARDS CIRCULAR RCP (SEE NOTES FOR SELECT MATERIAL CLASS) AND /OR AS DIRECTED BY THE ENGINEER NOTES: 1. A MINIMUM OF 24" FROM OUTSIDE DIAMETER OF PIPE TO SIDE OF TRENCH MUST BE ALLOWED FOR COMPACTION OF FILL MATERIAL. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. THE FILL AROUND THE PIPE SHALL BE PLACED IN LAYERS NOT TO EXCEED 6 ". UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INTO PLACE. 2. ALL BACKFILL MATERIAL SHALL HAVE AN IN PLACE COMPACTED DENSITY OF 95% STANDARD PROCTOR. THE FINAL 2' BELOW FINISHED GRADE SHALL BE 100% STANDARD PROCTOR. 3. ALL TRENCHING OPERATIONS SHALL MEET OSHA STANDARDS. 4. ALL BACKFILL MATERIAL BENEATH ROADWAY SHALL BE SELECT MATERIAL ( NCDOT CLASS III, TYPE 2). EXCAVATED MATERIAL THAT MEETS OR EXCEEDS THAT STANDARD SHALL BE USED WHERE AVAILABLE. IN AREAS OUTSIDE THE ROADWAY, BACKFILL SHALL CONSIST OF EXCAVATED MATERIAL. 6 PIPE TRENCHING DETAIL NTS ` 10 1 NTS O U O w O LL. LLl H Z O 0 I 0 Z 6 0 m 0 LL LU Cn Ln DVw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O it 0 w o � Z O Y � (PROD. MANAGER: LU DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 � Q Z i Q J � Z 0 Q Cn 0 - LU W 2 = J F ~ Q Q 0 Z Z W X 0 w U W Z LLI Q 0 C Z LLJ Q li.i 2 a li.i _j Z U w Z a o � D (PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 10 OF 12 PROJ. NO.: 20120041.00. RA i LU LU LU 00 0 O U I—w ?:D �-: I— fo aQ Z> 0 0 w co LU J O 00 �w Ir Z W 0 �U) Z w 0 Dw U m O � 0 J �¢ _0 F J oQ F W 0° z0 Oz F- LU w J Ir wD 0Q oz O O Z J 0 z o� ofr [�:° ZZ W Q 7�;_ D. U O 0 0 (n y _ Ir F Q LL 73 OF F W Z g wD ~ U Z 0 00 U W U) 00 W � U Q D Z tr cD 0 t z 0 0w U � 0 00 0 0 aUj w Uj Ira 0 0 U > J W° �o co w I— m = cr J Ir <a Q0 U Z U z 00 �f Z U °5 U Y FD U_ Y Y o� =0 0Z Fr 00 U U Q ry 0 0 IT 0 0 N 0 N a) U m m U n Q z w J 12" MILL AND OVERLAY (TO BE w NOTES: 1. REMOVAL OF EXISTING STONE BASE WILL NOT BE MEASURED SEPARATELY FOR PAYMENT. COSTS FOR STONE BASE REMOVAL SHALL BE INCLUDED IN THE PAVEMENT REMOVAL ITEM OF WORK. 2. REMOVAL OF EXISTING SUBGRADE SHALL BE PAID FOR UNDER THE "UNCLASSIFIED EXCAVATION" ITEM OF WORK (P -152). 3. IF UNSUITABLE SUBGRADE MATERIAL IS ENCOUNTERED IT SHALL BE EXCAVATED TO A DEPTH SPECIFIED BY THE ENGINEER AND BACK FILLED WITH SUBBASE COURSE MATERIAL (P -154). PAYMENT FOR EXCAVATION OF UNSUITABLE SUBGRADE MATERIAL SHALL BE MADE AT THE CONTRACT UNIT PRICE FOR UNSUITABLE EXCAVATION (P -152). EXISTING ASPHALT PAVEMENT SECTION NTS PROPOSED ASPHALT PAVEMENT, P -401 DEPTH = 4 ", (2) 2" LIFTS TACK COAT, P -603 PRIME COAT, P -602 CRUSHED AGGREGATE BASE COURSE, P -209 DEPTH = 8" ' EXISTING SUBGRADE (COMPACTED TO 95% </ OF MODIFIED PROCTOR MAX DRY DENSITY)' `0, / \>,Xv\;', O PROPOSED ASPHALT PAVEMENT SECTION - SCHEDULE I EXISTING CRUSHED-/ BASES AGGREGATE 6' PAVEMENT TRANSITION DETAIL NTS BASE COURSE APRON EDGE OF _ 4 PAVEMENT DETAIL 11 NTS TAXIWAY LIGHT - BLUE OR RED GLOBE WITH 30 WATT QUARTZ FIXTURE (FAA SPEC. L -861T) IDENTIFICATION NUMBER GRAVEL SUBSTRATE 50 / 50 MIX OF CLASS A OUNTING COLUMN RIP RAP AND # 5 STONE RANGIBLE COUPLING & ISCONNECT PLUG 11 DESIGN /DRAWN BY: NTS 1 #6 AWG. BARE, SOLID, CU. YDS. BRICK MASONRY PER FT. HT. DEDUCTIONS FOR ONE PIPE (CU.YD.) D BASE ABOVE S -L T -901 SEEDING - MULCHED C. M. R. C. PART SECTION Y -Y EXISTING (DO NOT CONNECT TO 1.5" 0.032 15" 1 0.560 NO. 6 BARE `COOPPER BITUMINOUS o 0.047 1/C NO. 6 BARE 0.560 0.530 COUNTS POISEOCONNECTED 0.044 0.065 24" COPPER COUNTERPOISE, 0.530 MIN. 6" 5/8" X 8' COPPER CLAD GROUND 0.113 30" 0.560 EXOTHERMICALLY WELDED L -823 0.122 0.170 ROD, WITH 500' MAX. SPACING 0.560 0.530 0.323 TO THE GROUND ROD 1/C, #8, 5KV L -824, TYPE TRANSFORMER, W U 2" w PROPOSED SHOULDER BUILD -UP (TYP.) L -830 -1 \ \ SLACK FOR REPAIRS) (PLACED Q PARALLEL TO 0 W z LINE OF 0� Z SAFETY GROUND (CONNECT LIGHTS) n LU ONOTE: PLACE #6 GROUND WIRE TO 5/8" W 1/C NO. 8 L -824 TYPE C 5000 V, CABLE TYP O COUNTERPOISE ON TRENCH SIDE NEAREST PAVEMENT EDGE. EXISTING CRUSHED-/ BASES AGGREGATE 6' PAVEMENT TRANSITION DETAIL NTS BASE COURSE APRON EDGE OF _ 4 PAVEMENT DETAIL 11 NTS TAXIWAY LIGHT - BLUE OR RED GLOBE WITH 30 WATT QUARTZ FIXTURE (FAA SPEC. L -861T) IDENTIFICATION NUMBER GRAVEL SUBSTRATE 50 / 50 MIX OF CLASS A OUNTING COLUMN RIP RAP AND # 5 STONE RANGIBLE COUPLING & ISCONNECT PLUG FLOW - SELECT FILL HAND - PLACED COUNTERPOISE & POWER 6 CABLE TRENCH DETAIL GRADE CONTROL ROCK 50/50 MIX CLASS A/B RIP RAP 1.5' PROPOSED FLARED END SECTION PROPO FLARED ENSED D O O O O O 6' SECTION UG�� 00°0°0°00 O�O�O�O�O oQoQoQoQo 1.5' �0 A A 1.5' 6.0' RIFFLE GRADE CONTROL - PLAN VIEW NTS ®.. . PROPOSED APRON CROSS- SECTION NOTES: 1. NO SEEDING SHALL BE APPLIED IN THE ENGINEERED SOILS AREA. GRASS WITHIN THE SWALE SHALL BE CENTIPEDE SOD. CONTRACTOR TO SUBMIT SHOP DRAWINGS PRIOR TO INSTALLATION. 2. MINIMUM DEPTH OF PLANTING MIX SHALL BE 2.00'. THE PLANTING MIX FOR USE IN THE SWALE SECTION SHALL BE AS FOLLOWS: 85 -88% SAND 8 -12% SAND 3 -5% ORGANIC PERMEABILITY: 1 -2 IN /HR 3. SOIL MEDIA MUST NOT BE INSTALLED UNTIL ALL OF THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED AND APPROVED BY THE INSPECTOR. SOIL MIXTURES SHALL BE INSTALLED IN 8 TO 12 INCH LIFTS TO ENSURE ADEQUATE FILTRATION. 4. STORM STRUCTURES SHALL BE WATERTIGHT AND SHALL BE CONSTRUCTED AS SHOWN ON THE (0, 0 DETAILS ON THIS SHEET. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND ANTI - FLOATATION CALCULATIONS FOR THE ENGINEER'S APPROVAL PRIOR TO INSTALLATION OF STORM STRUCTURES C & 11 D. i NTS IN SITU SOILS, CONTRACTOR TO MINIMIZE COMPACTION IN THIS AREA. SECTION A -A DRAINAGE SWALE W/ ENGINEERED SOILS NTS O, GENERAL NOTES: MORTAR JOINTS 1,t" ±1/8" THICK. CONCAVE TOOL ALL EXPOSED JOINTS. USE CLASS "B" CONCRETE THROUGHOUT. USE FORMS TO CONS "rRUCT THE BASE SLAB. JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICK. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN IN STD. NO. 840.00. WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT THE TOP OF THE MANHOLE FLUSH WITH THE GROUND. AT OTHER LOCATIONS CONSTRUCT A MINIMUM OF 9" ABOVE THE GROUND. PROVIDE MANHOLES OVER 3' -6" IN DEPTH WTH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. GRAVEL SUBSTRATE 50 / 50 MIX OF CLASS A -TOP OF RIFFLE RIP RAP AND # 5 STONE (ELEV: 27.20) BANKFULL ELEVATION FLOW - - DESIGN BED 0.5 BOTTOM OF RIFFLE SURFACE F �(ELEV: 27.20) / \/ /\ 5' MIN )L 1.75' Mll` DIMENSIONS AND QUANTITIES FOR MANHOLE DESIGN /DRAWN BY: PIPE DIM. 1 #6 AWG. BARE, SOLID, CU. YDS. BRICK MASONRY PER FT. HT. DEDUCTIONS FOR ONE PIPE (CU.YD.) D BASE ABOVE S -L COPPER COUNTERPOISE C. M. R. C. PART SECTION Y -Y I (DO NOT CONNECT TO 0.020 0.032 15" 1 0.560 0.530 STAKE, SEE COUNTERPOISE o 0.047 18" 0.560 0.530 INSTALLATION DETAIL) 0.044 0.065 24" 0.560 0.530 PRIMARY CABLE CONNECTORS, 0.078 0.113 30" 0.560 0.530 L -823 0.122 0.170 ISOLATION 0.560 0.530 0.323 0.176 1/C, #8, 5KV L -824, TYPE TRANSFORMER, W U 0 W C CABLE, (TYP.) (LEAVE 3' L -830 -1 SLACK FOR REPAIRS) (PLACED Q PARALLEL TO 0 W z LINE OF 0� Z SAFETY GROUND (CONNECT LIGHTS) n LU #6 GROUND WIRE TO 5/8" W = x 8' GROUND ROD AT 0 < z EACH FIXTURE) STAKES SHALL (1° MAX. DEVIATION). BE PLUMB TOP 1­- U- z 30" GALV. STAKE INSTALLED OF STAKE SHALL BE AT Z a o � IN PREDRILLED HOLE 10' THE DESIGN ELEVATION OF o FROM PAVEMENT EDGE FINISHED SHOULDER. W CONCRETE ANCHOR 6" X 6" X 12" TO BE � POURED IN PLACE NOTE: FIXTURE IDENTIFICATION NUMBERS (1" MIN. HEIGHT) SHALL BE IMPRESSED ON A 2" MIN. DIA. NON- CORROSIVE METAL DISC AND ATTACHED TO THE MOUNTING COLUMN WITH TWO STAINLESS STEEL SCREWS. STAKE - MOUNTED MEDIUM INTENSITY TAXIWAY EDGE LIGHT DETAIL 5 (VIEW FACING PAVEMENT EDGE) FLOW - SELECT FILL HAND - PLACED COUNTERPOISE & POWER 6 CABLE TRENCH DETAIL GRADE CONTROL ROCK 50/50 MIX CLASS A/B RIP RAP 1.5' PROPOSED FLARED END SECTION PROPO FLARED ENSED D O O O O O 6' SECTION UG�� 00°0°0°00 O�O�O�O�O oQoQoQoQo 1.5' �0 A A 1.5' 6.0' RIFFLE GRADE CONTROL - PLAN VIEW NTS ®.. . PROPOSED APRON CROSS- SECTION NOTES: 1. NO SEEDING SHALL BE APPLIED IN THE ENGINEERED SOILS AREA. GRASS WITHIN THE SWALE SHALL BE CENTIPEDE SOD. CONTRACTOR TO SUBMIT SHOP DRAWINGS PRIOR TO INSTALLATION. 2. MINIMUM DEPTH OF PLANTING MIX SHALL BE 2.00'. THE PLANTING MIX FOR USE IN THE SWALE SECTION SHALL BE AS FOLLOWS: 85 -88% SAND 8 -12% SAND 3 -5% ORGANIC PERMEABILITY: 1 -2 IN /HR 3. SOIL MEDIA MUST NOT BE INSTALLED UNTIL ALL OF THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED AND APPROVED BY THE INSPECTOR. SOIL MIXTURES SHALL BE INSTALLED IN 8 TO 12 INCH LIFTS TO ENSURE ADEQUATE FILTRATION. 4. STORM STRUCTURES SHALL BE WATERTIGHT AND SHALL BE CONSTRUCTED AS SHOWN ON THE (0, 0 DETAILS ON THIS SHEET. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND ANTI - FLOATATION CALCULATIONS FOR THE ENGINEER'S APPROVAL PRIOR TO INSTALLATION OF STORM STRUCTURES C & 11 D. i NTS IN SITU SOILS, CONTRACTOR TO MINIMIZE COMPACTION IN THIS AREA. SECTION A -A DRAINAGE SWALE W/ ENGINEERED SOILS NTS O, GENERAL NOTES: MORTAR JOINTS 1,t" ±1/8" THICK. CONCAVE TOOL ALL EXPOSED JOINTS. USE CLASS "B" CONCRETE THROUGHOUT. USE FORMS TO CONS "rRUCT THE BASE SLAB. JUMBO BRICK WILL BE PERMITTED. CONCRETE BRICK OR 4" SOLID CONCRETE BLOCKS MAY BE USED IN LIEU OF CLAY BRICK. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN IN STD. NO. 840.00. WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT THE TOP OF THE MANHOLE FLUSH WITH THE GROUND. AT OTHER LOCATIONS CONSTRUCT A MINIMUM OF 9" ABOVE THE GROUND. PROVIDE MANHOLES OVER 3' -6" IN DEPTH WTH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. GRAVEL SUBSTRATE 50 / 50 MIX OF CLASS A -TOP OF RIFFLE RIP RAP AND # 5 STONE (ELEV: 27.20) BANKFULL ELEVATION FLOW - - DESIGN BED 0.5 BOTTOM OF RIFFLE SURFACE F �(ELEV: 27.20) / \/ /\ 5' MIN )L 1.75' Mll` MINIMUM DIMENSIONS AND QUANTITIES FOR MANHOLE DESIGN /DRAWN BY: PIPE DIM. CU. YDS. CONCRETE TOTAL BRICK MASONRY CU. YDS. CU. YDS. BRICK MASONRY PER FT. HT. DEDUCTIONS FOR ONE PIPE (CU.YD.) D BASE ABOVE S -L BELOW S -L C. M. R. C. PART SECTION Y -Y MINIMUM DIMENSIONS AND QUANTITIES FOR MANHOLE DESIGN /DRAWN BY: PIPE DIM. CU. YDS. CONCRETE TOTAL BRICK MASONRY CU. YDS. CU. YDS. BRICK MASONRY PER FT. HT. DEDUCTIONS FOR ONE PIPE (CU.YD.) D BASE ABOVE S -L BELOW S -L C. M. R. C. 12" 0.560 0.530 0.323 0.020 0.032 15" 1 0.560 0.530 0.323 0.031 0.047 18" 0.560 0.530 0.323 0.044 0.065 24" 0.560 0.530 0.323 0.078 0.113 30" 0.560 0.530 0.323 0.122 0.170 36" 0.560 0.530 0.323 0.176 0.238 FILTERS GRADE FABRIC CONTROL ROCK 50 / 50 MIX RIFFLE GRADE CONTROL - PROFILE A -A CLASS A / B RIP RAP RIFFLE GRADE CONTROL (STORM SEWER OUTFALL) IN SITU SOILS, CONTRACTOR TO MINIMIZE COMPACTION IN THIS AREA. NTS VARIES SPRING LINE FRAME AND COVER STD. NO. 840.54 FINISHED GRADE ELEVATION z 2 12" 12" STEP STD. ° NO. 840.66 � N N _° N all X 3' -6" ° X ; ---------- ° F1411 I O 411 1. is 2' -9" 2' -9" io 5' -6" iC) SECTION ON C. Y�I 5' -6" T�- SECTION X -X BRICK MANHOLE NTS FRAME AND GRATE: USF 4139 FRAME & 6429 GRATE OR APPROVED EQUAL - CONCRETE BASE 8' OUTLINE w Of a GROUT FROM INVERT TO INVERT a a 4' X 4' (OUTSIDE) PRECAST OR MASONRY STRUCTURE CAPABLE a. OF SUPPORTING H -20 LOADINGS. THE 8" CONTRACTOR SHALL SUB -MIT SHOP DRAWINGS FOR REVIEW as AND APPROVAL. a a INSTALLATION LOCATION POINT a (NORTHING AND EASTING) KEY (TYP.-\ PLAN AT GRATE f COVER ALL SIDES) SECTION NOTE: 1. GROUT AROUND ALL PIPE OPENINGS FOR WATERTIGHT SEAL. r7 DROP INLET STRUCTURE NTS PLAN VIEW - SWALE WITH ENGINEERED SOILS 10 0 5 10 20 1 inch = 10 ft. z OC/) 1­4>- Q Q Ho~Cc!)U LL -i O O U 2 =:z LU Q U < O LL CnHLL OJ oo�Q z , > 1 a_~ w� o I.i O tL cs H W w 3 J IL =oIL OX Z co Q � z uv Cn H 2 N m T H J C'3 z LU HEET 1 OF 1 840.51 VARIES DESIGN /DRAWN BY: W/ GRATE /COVER w LU J 0- > _ O d O Q J ° Z 0 Q D D LU W 2 D D D D J D � Q D Q O Z 0 Cn D D 0 W U 0 W W O O W LU NTS FRAME AND GRATE: USF 4139 FRAME & 6429 GRATE OR APPROVED EQUAL - CONCRETE BASE 8' OUTLINE w Of a GROUT FROM INVERT TO INVERT a a 4' X 4' (OUTSIDE) PRECAST OR MASONRY STRUCTURE CAPABLE a. OF SUPPORTING H -20 LOADINGS. THE 8" CONTRACTOR SHALL SUB -MIT SHOP DRAWINGS FOR REVIEW as AND APPROVAL. a a INSTALLATION LOCATION POINT a (NORTHING AND EASTING) KEY (TYP.-\ PLAN AT GRATE f COVER ALL SIDES) SECTION NOTE: 1. GROUT AROUND ALL PIPE OPENINGS FOR WATERTIGHT SEAL. r7 DROP INLET STRUCTURE NTS PLAN VIEW - SWALE WITH ENGINEERED SOILS 10 0 5 10 20 1 inch = 10 ft. z OC/) 1­4>- Q Q Ho~Cc!)U LL -i O O U 2 =:z LU Q U < O LL CnHLL OJ oo�Q z , > 1 a_~ w� o I.i O tL cs H W w 3 J IL =oIL OX Z co Q � z uv Cn H 2 N m T H J C'3 z LU HEET 1 OF 1 840.51 OUTLETI PIPE CONCRETE SHALL BE 4000 P.S.I. (MAX. AGGREGATE SIZE 3/4 ") O U D 0) z 0 0 LU H O z O 0 I 0 z 0 2 m O 0 W 0) 0) DVw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL Lj DESIGN /DRAWN BY: RAB w LU J 0- > _ d OUTLETI PIPE CONCRETE SHALL BE 4000 P.S.I. (MAX. AGGREGATE SIZE 3/4 ") O U D 0) z 0 0 LU H O z O 0 I 0 z 0 2 m O 0 W 0) 0) DVw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL (PROD. MANAGER: Lj DESIGN /DRAWN BY: RAB PROJECT DATE: LU J 0- _ a z_ Q J ° Z 0 Q 0 - LU W 2 = J J ~ li Q Q O Z 0 Cn W 0- X 0 W U 0 W W W LU Q 0 0 W z 0� Z Z n LU W = 6i < 0 6i � z 1­- U- z Z a o � J O o W o � o 0 co °a w o � z O Y � (PROD. MANAGER: Lj DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 0- _ a z_ Q J ° Z 0 Q 0 - LU W 2 = J ~ li Q Q O Z z W 0- X 0 W U Q W Z LU Q 0 0 3� 0� Z n LU Q = 6i < 6i � z 1­- U w Z a o � o (PROD. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 11 OF 12 PROJ. NO.: 20120041.00. RA Z W F F U �a 0 O U F w fF Q0 aJ zQ fr w Om w0 J F 00 W w z0 F-: U) Z Z 0 7�; U D 0 C) co 0J U Q __ _0 F J 0¢ F W U) Z0 0Z F Q W J Ir W D 0 F I Q O zU) OQ �z o� ofr O F Z w Q U O 0 O W (n y _ Ir F Q LL 73 OF � w Z g W F U Z O 00 U W U - __ F F 00 W J U Q D Z tr cD 0 t z 0 0 w U F 0 0 O O tr aLU w LU Ira O 0 U I J W Z W ° Ir �� =m c� �0 J Ir J LL ¢U) U Z U — Z_ O U O �f U Z °5 O Z Y O Uy p U_ Y 0 Y 0 F-- O (D z Fr > cn 00 U U Q ry IT 0 0 N 0 N U m U N O q i W a z Lu J_ LL OF BANK 50 / 50 MIX OF CLASS A i RIP RAP AND # 5 STONE i 25' RIFFLE GRADE CONTROL - PLAN VIEW EROSION CONTROL LINER, SEE DETAIL 2 ON THIS SHEET FILTER FABRIC UF\r\vL-L aUDIDIM IL- .•.. ..— 50 / 50 MIX OF CLASS A RIP RAP AND # 5 STONE RIFFLE GRADE CONTROL - PROFILE B -B 012"1 1 BANKFULL ELEVATION 1.75' MIN: U GRAVEL SUBSTRATE 50 / 50 MIX OF CLASS A RIP RAP AND # 5 STONE CO. INVERT SET AT PROFILE GRADE W. III N GRADE CONTROL ROCK 50 / 50 MIX CLASS A / B RIP RAP RIFFLE GRADE CONTROL - SECTION A -A RIFFLE GRADE CONTROL (DITCH "A" OUTFALL) NTS EROSION CONTROL LINER, SEE DETAIL 2 ON THIS SHEET. NAG S75 (1.6 LBS /SF MIN. SHEAR STRESS) STRAW BLANKET OR APPROVED EQUAL, INSTALL PER MANUFACTURER'S RECOMMENDATION NOTE n0n1k1AMv HIGH ARK NAG S75 (1.6 LBS /SF MIN. SHEAR STRESS) STRAW BLANKET OR APPROVED EQUAL, INSTALL PER MANUFACTURER'S RECOMMENDATION 1. LINE ALL DISTURBED CHANNEL BANKS WITH EROSION CONTROL MATTING. 2. MATTING SHOULD BEGIN INSIDE THE CHANNEL AT OR BELOW THE ORDINARY HIGH WATER MARK AND EXTEND EXISTING CHANNEL BED, PAST NEWLY GRADED TOP OF BANK A MINIMUM OF 24 ". RIFFLE GRADE CONTROL TO BE INSTALLED PER DETAIL 1 ON THIS SHEET. TYPICAL BANK STABILIZATION N TS O U D 0) Z O U w O LL LU 0) F- 0 Z O 0 0 Z 0 0 m O LL 0 LU 0) 0) vw DICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 (919) 782 -0495 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL z O IZ 0 W 0 Lu H Q 0 U) z O Y Ln W U) _ � Q z_ J I Z 0 Q U) Oww= J 2 0 F- Qozz W 0L p X Cn U W Z W Q 0 C Z W Q Iii li.i 2 -1 z U Z w 0 a � o PROJ. MANAGER: PDS DESIGN /DRAWN BY: RAB PROJECT DATE: SEPT. 2012 DRAWING NUMBER: 12 OF 12 PROJ. NO.: 20120041.00. RA