Loading...
HomeMy WebLinkAboutNCC211913_ESC Approval Submitted_20210331TOWN OF WEDDINGTON EROSION and SEDIMENTATION CONTROL COMPLIANCE FORM Tracts Less than One -Acre Disturbed Residential and Commercial This compliance form shall be prominently displayed at the primary entrance to the site of the land disturbing activity Before construction begins and remain until all construction is complete, PROPERTY ADDRESS: _'JI-101—A NAME OF SUNAMEBDIVISIOW � I�11 PROPERTY PARCEL Ii�� LOT M NAME OF CONSTRUCTION MANAGER-. r. CONSTRUCTION MGR PHONE : ` EMAILa T f` PROPOSED START DATE OF CONSTRUCTION: PLEASE READ THE BACK SIDE BEFORE COMPLETING. EROSION CONTROL PLAN Choose e of the following approaches:��� The most ap ropriate option from the back of this form Mc���h ,ZvrZ1 is option or a combination of options and —P dates f LG _, - The sediment control plan is as drawn in the space to the right or is attached. Notes. THE LIND RSIGNED HEREBY CERTIFIES THAT HE/SHE HAS READ THE INFORMATION ON THE BACK OF THIS FORM AND IS AWARE OF THE STAT RE UIREMENTS OFTHE EROSION AND SEDIMENTATION CONTROL ORDINANCE. THE OWNER MUST COMPLY WITH THE PROVISION O HE O DINANCE, T UN SIGNED ACKNOWLEDGES FINANCIAL RESPONSIBILITY FOR PAYMENT OF ALL FEES ASSOCIATED WITH THIS ROJECT. P RTY OW ER/AUT ORIZED AGENT SIGNATURE PRINT NAME «� o PHONE EMAIL DATE [ . Exempt from Installation of ESC measures. REASON: T'a An Erosion Control Plan A �'�i`"` �fG�r c /� vele Approval is required. REASON: /° , �.� Attach approved NCCa01 Certificate of Compliance (CoC) (available at www.deq.nc.gov) n GeJ� � lo% P" P>v ep 6 a / C/e.✓e/G��/ . An Existing driveway will be used as the Temporary Construction Entrance. U I- Install Temporary Caravel Construction Entrance in accordance with NCDENR detail attached and as iyd' indicated above. (Atch A) (. Install Silt Fencing with steel pasts in accordance with NCDENR detail attached and as indicated above. (Atch 8) Confine siltation within 25% of lake or water course buffer zone per ESC Ord, Section 58,606 (a). i. Call Gary Wright of La Bella Engineering (704) 351-5306 for inspection 48 hours prior to start of work for inspection of measures. L / Groundcover on all slopes shall be established within 21 days of completion of any phase of construction (Sect. 58,606 (b)). Upon completion of any phase of construction permanent groundcover shall be established within 60 calendar days (Sect. 58.606 (d)) VED BY: DATE: