HomeMy WebLinkAboutSW6210301_1633 Supplement Wet Pond_20210326SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
1PROJECT
INFORMATION
Project Name
Proiect Area (ac)
Coastal Wetland Area (ac)
1
Spring Village
2
49.26
3
4
Surface Water Area (ac)
5
Is this r)roiect High — I ow ne—ity?
High
6
Does this proiect use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4) E=E
7
Width ofvegetated setbacks provided (feet)
N/A
8
Will the vegetated setback remain vegetated?
1 9
IlfBUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
N/A
1 10
1 Is streambank stabilization proposed on this project?
...... . .............
NUMBER AND TYPE OF SCMs: I M
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
6
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting (RWH)
18
Green Roof
19
Level Spreader -Filter Strip (LS-FS)
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
Dry Pond
23
StormFilte
24
Silva Cell
I
1 25
113ayfilter
IFilterra
1 26
I
I FORMS LOADED
IDESIGNER CERTIFICATION
27 Name and Title:
28 rganization:
Scott Brown, PE - Vice President
4D Site Solutions, Inc
29
Street address:
409 Chicago Drive, Suite 112
30
City, State, Zip:
Fayetteville, NC 28306
1 31
JPhone number(s):
910-426-6777
1 32
JEmail:
sbrown(a)4dsitesolutions.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Seal
Signature of Designer
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
6
3
Does this oroiect h.". 1-' '4-ih, areas?
No
4
If so. number of 1--, 4-ify drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
I FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
3
4
5
4
Type of SCM
Wet pond
Wet pond
Wet pond
Wet pond
Wet pond
o a rainage area (sq ft)
6
Onsite drainage area (sq ft)
396696
236976
186113
422121
212824
7
Offsite drainage area (sq ft)
65752
78899
14918
193844
28582
8
Total BUA in project (sq ft)
181944 sf
108320 sf
115960 sf
254685 sf
123797 sf
9
New BUA on subdivided lots (subject to
permitting) (sq ft)
63525 sf
44225 sf
74856 sf
150272 sf
59261 sf
10
New BUA not on subdivided lots (subject to
1permifting) (sf)
98659 sf
58477 sf
41104 sf
104413 sf
64536 sf
1 11
10fifsite BUA (sq ft)
5618 sf
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft)
- Sidewalk (sq ft)
Roof (sq ft)
- Roadway (sq ft)
71831 sf
46013 sf
24295 sf
78512 sf
43307 sf
Future (sq ft)
- er, ease spec n e commen ox
below (sq ft)
26828 sf
12464 sf
16809 sf
25901 sf
21229 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
14
New infiltrating permeable pavement not on
subdivided lots (sq ft)
15
Existing BUA that will remain (not subject to
Ipermifting) (sq ft)
5618 sf
16
Existing BUA that is already permitted (sq ft)
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
39%
35%
58%
41%
51%
19
Design sto m (inches)
1.0 in
1.0 in
1.0 in
1.0 in
1.0 in
20
Design volume of SCM (cu ft)
22163 cf
14550 cf
14529 cf
32282 cf
14007 cf
21 Calculation method for design volume —J
JADDITIONALIN ORRA-50N 1011W
JlPlease use this space to provide any additional information about the
22 drainage area(s):
Simple
Simple
Simple
Simple
Simple
I
The other BUA listed is for the surface area of the wet ponds which are
impervious.
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
6
3
Does this oroiect h.". 1-' '4-ih, areas?
No
4
If so. number of 1--, 4-ify drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
I FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
6
4
Type of SCM
Wet pond
5
Total drainage area (sq ft)
98058
6
Onsite drainage area (sq ft)
98058
7
Offsite drainage area (sq ft)
8
Total BUA in project (sq ft)
54278 sf
9
New BUA on subdivided lots (subject to
permitting) (sq ft)
30474 sf
10
New BUA not on subdivided lots (subject to
permitting) (sf)
23804 sf
11
Offsite BUA (sq ft)
12
Breakdown of new BUA not on subdivided lots:
Parking (sq ft)
Sidewalk (sq ft)
Roof (sq ft)
Roadway (sq ft)
19276 sf
Future (sq ft)
Other, please specify in the comment box
be -low (sq ft)
4078 sf
13
INew infiltrating permeable pavement on
subdivided lots (sq ft)
14
INew infiltrating permeable pavement not on
subdivided lots (sq ft)
15
lExisting BUA that will remain (not subject to
permitting) (sq ft)
1 16
lExistina BUA that is already permitted (sq ft)
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
55%
19
Design sto m (inches)
1.0 in
20
Design volume of SCM (cu ft)
6139 cf
21 Calculation method for design volume —J
JADDITIONAL IN ORMATION 1111111K
JlPlease use this space to provide any additional information about the
22 drainage area(s): I
Simple
The other BUA listed is for the surface area of the wet ponds which are
impervious.
WETPOND
[--fl Drainage area number
1 21Minimum required treal
IGENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
Yes
Yes
Yes
Yes
4
Is the SCM located away from contaminated soils?
Yes
Yes
Yes
Yes
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
3:1
3:1
3:1
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
Yes
Yes
Yes
Yes
Yes
7
Are the inlets, outlets, and receiving stream protected from erosion
1 (11 0-yea r storm)?
Yes
Yes
Yes
Yes
Yes
81's
there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
Yes
Yes
Yes
Yes
91What
is the method for clewatering the SCM for maintenance?
Pump (preferred)
Pump (preferred)
Pump (preferred)
Pump (preferred)
Pump (preferred)
10
If applicable , will the SCM be cleaned out after construction?
Yes
Yes
Yes
Yes
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
Yes
Yes
Yes
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
Yes
Yes
Yes
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
N/A
N/A
N/A
N/A
14
Is there an O&M Agreement that complies with General MDC (111)?
I
Yes
Yes
Yes
Yes
Yes
151
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
Yes
Yes
Yes
161
Does the SCM follow the device specific MDC?
Yes
Yes
Yes
Yes
Yes
17JWas
the SCM designed by an NC licensed professional?
Yes
Yes
Yes
Yes
Yes
WET POND
MDC FROM 02H.1053 L
18
Sizing method used
SA/DA
SA/DA
SA/DA
SA/DA
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
Yes
Yes
Yes
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
297.65
314.20
297.50
296.00
299.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
300.15
315.70
299.00
298.50
301.50
22,
Elevation of the bottom of the vegetated shelf (fmsl)
304.65
320.70
303.50
303.00
306.00
23
Elevation of the permanent pool (fmsl)
305.15
320.20
304.00
303.50
306.50
24
Elevation of the top of the vegetated shelf (fmsl)
305.65
320.70
304.50
304.00
307.00
25
Elevation of the temporary pool (fmsl)
306.67
322.40
305.69
305.22
307.84
26
Surface area of the main permanent pool (square feet)
12620
11512
7023
16113
8863
27
Volume of the main permanent pool (cubic feet)
45885 cf
44784 cf
25737 cf
65688 cf
29702 cf
28
Average depth of the main pool (feet)
3.60 ft
3.90 ft
3.70 ft
4.10 ft
3.40 ft
29JAverage
depth equation used
Equation 2
Equation 2
Equation 2
Equation 2
Equation 2_
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
8494 cf
8441 cf
4947 cf
12517 cf
5842 cf
33
Is this 15-20% of the volume in the main pool?
Yes
Yes
Yes
Yes
Yes
34
Clean -out depth for forebay (inches)
30 in
18 in
18 in
30 in
30 in
35
Design volume of SCM (cu ft)
22163 cf
14550 cf
14529 cf
32282 cf
14007 cf
361
Is the outlet an orifice or a weir?
Orifice
Orifice
Orifice
Orifice
Orifice
37
If orifice, orifice diameter (inches)
3 in
2 in
2 in
3 in
2 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.2
2.5
2.1
2.1
2.3
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
Yes
Yes
Yes
Yes
421Are
berms or baffles provided to improve the flow path?
No
No
No
No
No
43
Depth of forebay at entrance (inches)
90 in
72 in
78 in
90 in
90 in
44
Depth of forebay at exit (inches)
78 in
60 in
66 in
78 in
78 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
Yes
Yes
Yes
Yes
46
Width of the vegetated shelf (feet)
6 ft
6 ft
6 ft
6 ft
6 ft
47
Slope of vegetated shelf (H:V)
6:1
6:1
6:1
6:1
6:1
48
Does the orifice drawdown from below the top surface of the
I pe rma ne nt poo I?
Yes
Yes
Yes
Yes
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
lyr, 24-hr storm?
Yes
Yes
Yes
Yes
Yes
50
Are fountains proposed? (If Y, please provide documentation that
I MDC(9) is met.)
No
No
No
No
No
51
1 Is a trash rack or other device provided to protect the outlet system?
Yes
Yes
Yes
Yes
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
Yes
Yes
Yes
Yes
53
Species of turf that will be used on the dam and embankment
Centipede
Centipede
Centipede
Centipede
Centipede
54
Has a plantinq plan been provided for the vegetated shelf?
Yes
Yes
Yes
Yes
Yes
,ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
ithe wet pond(s):
Wet Pond 1 4:30 PM 3/26/2021
WETPOND
[--fl Drainage area number
1 21Minimum required treal
IGENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
Yes
7
Are the inlets, outlets, and receiving stream protected from erosion
1 (11 0-yea r storm)?
Yes
81's
there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
91What
is the method for clewatering the SCM for maintenance?
Pump (preferred)
10
If applicable , will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
N/A
14
Is there an O&M Agreement that complies with General MDC (111)?
1
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17JWas
the SCM designed by an NC licensed professional?
Yes
WET POND
MDC FROM 02H.1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
293.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
294.00
221
Elevation of the bottom of the vegetated shelf (fmsl)
298.00
23
Elevation of the permanent pool (fmsl)
298.50
24
Elevation of the top of the vegetated shelf (fmsl)
299.00
25
Elevation of the temporary pool (fmsl)
299.92
26
Surface area of the main permanent pool (square feet)
3429
27
Volume of the main permanent pool (cubic feet)
10453 cf
28
Average depth of the main pool (feet)
3.00 ft
29JAverage
depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
1536 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
12 in
35
Design volume of SCM (cu ft)
6139 cf
361
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
1 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.5
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42jAre
berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
66 in
44
Depth of forebay at exit (inches)
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
I pe rma ne nt poo I?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
lyr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
I MDC(9) is met.)
No
51
1 Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Centipede
54
Has a plantinq plan been provided for the vegetated shelf?
Yes
1ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
ithe wet pond(s):
Wet Pond 2 4:30 PM 3/26/2021