Loading...
HomeMy WebLinkAbout20090554 Ver 3_20-042 Stormwater Design Calcs_20210325OLDE MILL STREAM — Phase 2 S. Halifax Road Nash County, NC STORMWATER DESIGN CALCULATIONS August 26, 2020 CA13 p.... BARTLETT &&JWEYW,PC 1906 Nash Street North Wilson, NC 27893-1726 Phone: (252) 399-0704 Fax: (252) 399-0804 Robert TABLE OF CONTENTS General Description Site Data Design Criteria USGS Quad Map USDA Soil Survey Map Storm Sewer System Calculations  Storm Sewer Inventory  Structure Report  Storm Sewer Summary  Storm Sewer Tabulation  Hydraulic Grade Line Computations  Inlet Report/Gutter Spread (2-Yr)  Dissipator Pad Calculations Wet Pond Design Calculations  Nutrient Calculations  Supplement EZ  Stormwater Pond Design Data  10-Yr & 25-Yr Hydrograph Report  Pond Calculations SCM Operations & Maintenance Manual OLDE MILL STREAM – Phase 2 STORMWATER POND DESIGN CALCULATIONS GENERAL SITE DESCRIPTION The proposed project is located at the corner of S. Halifax R (SR 1544), in Nash County. (Latitude: 35.946597°; Longitude: -77.871316 °). The site is currently wooded with areas that was used for farming. Phase 1 have been previously approved and currently under construction but is included in this report for purposes of determining the overall post development total nutrient export and the peak flow difference with the pre-development condition for the whole project site. The attached USGS topographic map shows a blue line (Maple Creek) crossing the property on the south but will not be impacted by the development. Site Data: Total acreage 95.30+/- acres Phase 1 20.31+/- acres Phase 2 38.42+/- acres Total number of lots Phase 1 61 (including SCM Lot 48) Phase 2 141 Roadway impervious Phase 1 2.42+/- acres Phase 2 4.04+/- acres Total 6.46+/- acres Total BUA Lots 1-61 3.25 acres Lots 62-102 9.52 acres Total 12.77 acres Open Space (Lots 205-206) 31.2+/- acres (including SCM’s) Proposed impervious Phase 1 5.67 acres ( 5.95%) Phase 2 13.56 acres (14.23%) Total 19.23 acres (20.18%) Design Criteria: Easement: - BMPs/SCMs : 15 feet beyond top of bank or toe of slope. - Drainage pipes: 25 feet centered Street & Gutters: - 2-yr storm maximum spread of water from edge of pavement into the travel lane = 6 feet - Minimum longitudinal slope = 0.5% Storm Drainage Pipes - Design storm event: 10-year - Minimum pipe slopes: o 36” diameter or less = 0.5% o Greater than 36” = 0.3% - Maximum Slope = 12% - Minimum flow velocity at 10-year storm = 2.5 fps - Pipe type: RCP Class III or higher - Minimum size: 15” for pipes to be maintained by the City of Rocky Mount - Flared end sections required for pipes 48” or less Stormwater Detention - Peak flow: Post Development =/< Pre-Development conditions up to the 25-yr storm event. /776. / x. ■y BoE STORM SEWER SYSTEM CALCULATIONS  STORM SEWER INVENTORY  STRUCTURE REPORT  STORM SEWER SUMMARY  STORM SEWER TABULATION  HYDRAULIC GRADE LINE COMPUTATIONS  INLET REPORT/GUTTER SPREAD (2-YR)  DISSIPATOR PAD CALCULATIONS Storm Sewer Inventory Report Page 1 Line No. Alignment Flow Data Physical Data Line ID Dnstr Line No. Line Length (ft) Defl angle (deg) Junc Type Known Q (cfs) Drng Area (ac) Runoff Coeff (C) Inlet Time (min) Invert El Dn (ft) Line Slope (%) Invert El Up (ft) Line Size (in) Line Shape N Value (n) J-Loss Coeff (K) Inlet/ Rim El (ft) 1 End 46.003 -123.423 Comb 0.00 0.26 0.60 5.0 121.00 0.35 121.16 42 Cir 0.013 0.50 126.50 LA2 2 1 27.504 16.502 Comb 0.00 0.22 0.50 5.0 121.16 0.36 121.26 42 Cir 0.013 1.50 126.50 LA3 3 2 38.686 -47.294 Comb 0.00 0.18 0.50 5.0 121.91 0.49 122.10 30 Cir 0.013 1.16 127.10 LA10 4 3 24.500 -46.906 Comb 0.00 0.26 0.50 5.0 122.10 0.49 122.22 30 Cir 0.013 1.50 127.10 LA11 5 4 80.000 89.835 Comb 0.00 0.36 0.50 5.0 122.22 1.00 123.02 30 Cir 0.013 1.50 127.84 LA12 6 5 142.644 -0.723 Comb 0.00 0.48 0.50 5.0 123.02 1.05 124.52 30 Cir 0.013 1.50 129.28 LA14 7 6 136.055 -12.205 Comb 0.00 0.05 0.60 5.0 125.02 1.00 126.38 24 Cir 0.013 1.49 130.68 LA16 8 7 81.000 -7.353 Comb 0.00 0.46 0.45 17.0 126.38 1.00 127.19 24 Cir 0.013 0.50 131.49 LA20 9 8 109.750 0.000 Comb 0.00 0.40 0.45 16.6 127.18 1.00 128.28 24 Cir 0.013 1.50 132.58 LA21 10 9 60.000 0.000 Comb 0.00 0.35 0.45 16.7 128.83 1.00 129.43 18 Cir 0.013 0.50 133.18 LA23 11 10 60.366 0.000 Comb 0.00 0.41 0.45 17.4 129.43 0.99 130.03 18 Cir 0.013 0.50 133.79 LA24 12 11 64.440 0.000 Comb 0.00 0.33 0.45 17.8 130.03 0.99 130.67 18 Cir 0.013 1.50 134.43 LA25 13 12 55.663 -4.759 Comb 0.00 0.28 0.50 16.8 130.67 1.11 131.29 18 Cir 0.013 0.54 135.01 LA27 14 13 94.574 -18.024 Comb 0.00 0.25 0.50 16.0 131.29 1.10 132.33 18 Cir 0.013 1.48 136.01 LA28 15 14 100.450 -22.945 Comb 0.00 0.42 0.50 5.0 132.58 0.76 133.34 15 Cir 0.013 1.49 137.06 LA30 16 15 24.500 82.982 Comb 0.00 0.31 0.50 5.0 133.34 0.49 133.46 15 Cir 0.013 1.50 137.06 LA31 17 16 128.000 -90.000 Comb 0.00 0.48 0.50 5.0 133.66 1.00 134.94 15 Cir 0.013 1.00 138.34 LA32 18 14 24.500 78.528 Comb 0.00 0.31 0.50 5.0 132.48 0.53 132.61 15 Cir 0.013 1.00 136.01 LA29 19 12 24.500 90.000 Comb 0.00 0.48 0.50 5.0 130.90 0.53 131.03 15 Cir 0.013 1.00 134.43 LA26 20 9 24.500 90.000 Comb 0.00 0.47 0.50 5.0 128.78 0.53 128.91 18 Cir 0.013 1.00 132.58 LA22 21 7 39.952 -52.353 Comb 0.00 0.15 0.60 5.0 127.27 1.73 127.96 15 Cir 0.013 1.13 132.19 LA18 22 21 24.500 45.000 Comb 0.00 0.64 0.50 16.4 128.16 0.49 128.28 15 Cir 0.013 1.00 132.19 LA19 23 7 24.500 82.647 Comb 0.00 0.45 0.50 5.0 127.15 0.49 127.27 15 Cir 0.013 1.00 130.68 LA17 Olde Mill Stream Phase 2 Number of lines: 63 Date: 8/25/2020 Storm Sewers v2021.00 Storm Sewer Inventory Report Page 2 Line No. Alignment Flow Data Physical Data Line ID Dnstr Line No. Line Length (ft) Defl angle (deg) Junc Type Known Q (cfs) Drng Area (ac) Runoff Coeff (C) Inlet Time (min) Invert El Dn (ft) Line Slope (%) Invert El Up (ft) Line Size (in) Line Shape N Value (n) J-Loss Coeff (K) Inlet/ Rim El (ft) 24 6 24.500 85.798 Comb 0.00 0.34 0.50 5.0 125.75 0.49 125.87 15 Cir 0.013 1.00 129.28 LA15 25 2 77.247 -94.311 Comb 0.00 0.27 0.50 5.0 121.26 0.60 121.72 24 Cir 0.013 0.50 126.98 LA4 26 25 229.515 -6.937 Comb 0.00 1.06 0.45 5.0 121.72 0.60 123.10 24 Cir 0.013 1.48 126.90 LA5 27 26 74.312 14.178 Comb 0.00 0.26 0.50 5.0 123.10 0.50 123.47 18 Cir 0.013 0.50 127.18 LA7 28 27 125.299 11.785 Comb 0.00 0.21 0.60 5.0 123.72 0.50 124.35 15 Cir 0.013 1.50 127.84 LA8 29 28 25.485 85.618 DrGrt 0.00 0.84 0.50 5.0 124.35 0.47 124.47 15 Cir 0.013 1.00 128.00 LA9 30 5 24.500 90.000 Comb 0.00 0.42 0.50 5.0 124.31 0.49 124.43 15 Cir 0.013 1.00 127.84 LA13 31 26 27.500 -80.204 Comb 0.00 0.62 0.60 5.0 123.36 0.51 123.50 15 Cir 0.013 1.00 126.90 LA6 32 End 32.250 -50.772 DrGrt 0.00 0.01 0.60 5.0 120.70 0.40 120.83 42 Cir 0.013 0.51 128.93 LB2 33 32 128.000 16.972 Comb 0.00 0.25 0.50 5.0 120.83 0.50 121.47 36 Cir 0.013 0.50 130.07 LB3 34 33 27.502 0.000 Comb 0.00 0.45 0.50 13.7 121.47 0.47 121.60 36 Cir 0.013 2.22 130.08 LB4 35 34 114.288 85.663 Comb 0.00 0.86 0.50 16.1 121.60 0.50 122.17 36 Cir 0.013 1.96 127.20 LB7 36 35 149.763 -91.398 DrGrt 0.00 0.89 0.50 5.0 122.67 3.72 128.24 24 Cir 0.013 0.50 132.50 LB8 37 36 175.052 -7.100 Comb 0.00 0.70 0.50 5.0 128.74 3.00 133.99 18 Cir 0.013 0.50 137.77 LB9 38 37 24.500 0.000 Comb 0.00 0.78 0.50 5.0 134.24 0.49 134.36 15 Cir 0.013 1.00 137.77 LB10 39 34 154.284 -79.068 Comb 0.00 0.49 0.50 5.0 126.43 2.60 130.44 15 Cir 0.013 0.50 134.05 LB5 40 39 112.430 16.196 Comb 0.00 0.43 0.60 5.0 130.64 1.45 132.27 15 Cir 0.013 1.00 135.67 LB6 41 35 71.507 -3.514 Comb 0.00 0.86 0.50 5.0 122.17 0.50 122.53 30 Cir 0.013 1.50 126.41 LB11 42 41 136.160 -6.225 Comb 0.00 0.39 0.45 13.2 123.53 0.50 124.21 18 Cir 0.013 0.50 127.06 LB13 43 42 77.418 -6.403 Comb 0.00 0.35 0.45 14.7 124.21 0.50 124.60 18 Cir 0.013 0.50 127.45 LB14 44 43 70.612 -4.436 Comb 0.00 0.43 0.45 15.4 124.60 0.51 124.96 18 Cir 0.013 0.50 127.81 LB15 45 44 127.906 -5.950 Comb 0.00 0.06 0.60 5.0 124.96 0.49 125.59 18 Cir 0.013 1.21 128.45 LB16 46 45 40.653 -50.142 Comb 0.00 0.31 0.50 15.5 125.59 0.49 125.79 18 Cir 0.013 1.66 129.10 LB17 Olde Mill Stream Phase 2 Number of lines: 63 Date: 8/25/2020 Storm Sewers v2021.00 Storm Sewer Inventory Report Page 3 Line No. Alignment Flow Data Physical Data Line ID Dnstr Line No. Line Length (ft) Defl angle (deg) Junc Type Known Q (cfs) Drng Area (ac) Runoff Coeff (C) Inlet Time (min) Invert El Dn (ft) Line Slope (%) Invert El Up (ft) Line Size (in) Line Shape N Value (n) J-Loss Coeff (K) Inlet/ Rim El (ft) 47 46 125.178 -46.180 Comb 0.00 0.54 0.45 13.8 125.79 0.85 126.86 18 Cir 0.013 0.50 130.52 LB19 48 47 104.892 12.111 Comb 0.00 0.81 0.50 18.3 127.11 0.95 128.11 15 Cir 0.013 1.00 131.53 LB20 49 46 24.500 43.814 Comb 0.00 0.44 0.50 5.0 126.33 0.49 126.45 15 Cir 0.013 1.00 129.10 LB18 50 41 27.500 87.857 Comb 0.00 0.71 0.60 5.0 123.76 0.51 123.90 15 Cir 0.013 1.00 126.41 LB12 51 End 169.250 -94.292 Comb 0.00 0.69 0.50 5.0 121.95 0.50 122.79 30 Cir 0.013 0.50 127.00 LB21 52 51 24.500 0.000 Comb 0.00 0.89 0.50 5.0 123.29 0.53 123.42 24 Cir(2b) 0.013 1.50 127.00 LB22 53 52 19.000 -89.279 Comb 0.00 0.64 0.50 5.0 123.54 1.05 123.74 24 Cir 0.013 1.50 127.08 LB25 54 53 149.052 89.259 DrGrt 0.00 0.92 0.50 5.0 123.74 1.20 125.53 24 Cir 0.013 1.50 129.82 LB26 55 54 149.267 0.000 Comb 0.00 0.68 0.50 5.0 125.53 1.20 127.32 24 Cir 0.013 0.50 131.86 LB28 56 55 24.500 0.000 Comb 0.00 4.20 0.35 35.8 127.88 0.49 128.00 24 Cir 0.013 1.50 131.86 LB29 57 56 176.000 90.000 Comb 0.00 1.47 0.30 28.5 128.29 0.95 129.96 15 Cir 0.013 0.50 133.39 LB30 58 57 239.579 0.000 Comb 0.00 0.04 0.60 5.0 129.99 1.15 132.74 15 Cir 0.013 1.12 136.36 LB31 59 58 39.946 -44.990 Comb 0.00 0.08 0.60 5.0 132.96 2.08 133.79 15 Cir 0.013 1.12 137.58 LB32 60 59 28.000 44.954 Comb 0.00 0.12 0.50 5.0 133.99 0.50 134.13 15 Cir 0.013 1.00 137.58 LB33 61 54 96.000 90.019 DrGrt 0.00 0.81 0.50 5.0 127.53 1.00 128.49 15 Cir 0.013 1.00 130.78 LB27 62 52 166.000 90.000 Comb 0.00 0.47 0.50 5.0 124.27 0.50 125.10 15 Cir 0.013 0.50 127.93 LB23 63 62 122.095 0.000 Comb 0.00 0.45 0.50 5.0 125.10 1.00 126.32 15 Cir 0.013 1.00 129.73 LB24 Olde Mill Stream Phase 2 Number of lines: 63 Date: 8/25/2020 Storm Sewers v2021.00 Structure Report Page 1 Struct No. Structure ID Junction Type Rim Elev (ft) Structure Line Out Line In Shape Length (ft) Width (ft) Size (in) Shape Invert (ft) Size (in) Shape Invert (ft) 1 A2 Combination 126.50 Rect 3.00 2.00 42 Cir 121.16 42 Cir 121.16 2 A3 Combination 126.50 Rect 3.00 2.00 42 Cir 121.26 30 Cir 121.91 24 Cir 121.26 3 A10 Combination 127.10 Rect 3.00 2.00 30 Cir 122.10 30 Cir 122.10 4 All Combination 127.10 Rect 3.00 2.00 30 Cir 122.22 30 Cir 122.22 5 Al2 Combination 127.84 Rect 3.00 2.00 30 Cir 123.02 30 Cir 123.02 15 Cir 124.31 6 A14 Combination 129.28 Rect 3.00 2.00 30 Cir 124.52 24 Cir 125.02 15 Cir 125.75 7 A16 Combination 130.68 Rect 3.00 2.00 24 Cir 126.38 24 Cir 126.38 15 Cir 127.27 15 Cir 127.15 8 A20 Combination 131.49 Rect 3.00 2.00 24 Cir 127.19 24 Cir 127.18 9 A21 Combination 132.58 Rect 3.00 2.00 24 Cir 128.28 18 Cir 128.83 18 Cir 128.78 10 A23 Combination 133.18 Rect 3.00 2.00 18 Cir 129.43 18 Cir 129.43 11 A24 Combination 133.79 Rect 3.00 2.00 18 Cir 130.03 18 Cir 130.03 12 A25 Combination 134.43 Rect 3.00 2.00 18 Cir 130.67 18 Cir 130.67 15 Cir 130.90 13 A27 Combination 135.01 Rect 3.00 2.00 18 Cir 131.29 18 Cir 131.29 14 A28 Combination 136.01 Rect 3.00 2.00 18 Cir 132.33 15 Cir 132.58 15 Cir 132.48 15 A30 Combination 137.06 Rect 3.00 2.00 15 Cir 133.34 15 Cir 133.34 16 A31 Combination 137.06 Rect 3.00 2.00 15 Cir 133.46 15 Cir 133.66 17 A32 Combination 138.34 Rect 3.00 2.00 15 Cir 134.94 18 A29 Combination 136.01 Rect 3.00 2.00 15 Cir 132.61 19 A26 Combination 134.43 Rect 3.00 2.00 15 Cir 131.03 Olde Mill Stream Phase 2 Number of Structures: 63 Run Date: 8/25/2020 Storm Sewers v2021.00 Structure Report Page 2 Struct No. Structure ID Junction Type Rim Elev (ft) Structure Line Out Line In Shape Length (ft) Width (ft) Size (in) Shape Invert (ft) Size (in) Shape Invert (ft) 20 A22 Combination 132.58 Rect 3.00 2.00 18 Cir 128.91 21 A18 Combination 132.19 Rect 3.00 2.00 15 Cir 127.96 15 Cir 128.16 22 A19 Combination 132.19 Rect 3.00 2.00 15 Cir 128.28 23 A17 Combination 130.68 Rect 3.00 2.00 15 Cir 127.27 24 A15 Combination 129.28 Rect 3.00 2.00 15 Cir 125.87 25 A4 Combination 126.98 Rect 3.00 2.00 24 Cir 121.72 24 Cir 121.72 26 A5 Combination 126.90 Rect 3.00 2.00 24 Cir 123.10 18 Cir 123.10 15 Cir 123.36 27 A7 Combination 127.18 Rect 3.00 2.00 18 Cir 123.47 15 Cir 123.72 28 A8 Combination 127.84 Rect 3.00 2.00 15 Cir 124.35 15 Cir 124.35 29 A9 DropGrate 128.00 Rect 3.00 2.00 15 Cir 124.47 30 A13 Combination 127.84 Rect 3.00 2.00 15 Cir 124.43 31 A6 Combination 126.90 Rect 3.00 2.00 15 Cir 123.50 32 B2 DropGrate 128.93 Rect 3.00 2.00 42 Cir 120.83 36 Cir 120.83 33 B3 Combination 130.07 Rect 3.00 2.00 36 Cir 121.47 36 Cir 121.47 34 B4 Combination 130.08 Rect 3.00 2.00 36 Cir 121.60 36 Cir 121.60 15 Cir 126.43 35 B7 Combination 127.20 Rect 3.00 2.00 36 Cir 122.17 24 Cir 122.67 30 Cir 122.17 36 B8 DropGrate 132.50 Rect 3.00 2.00 24 Cir 128.24 18 Cir 128.74 37 B9 Combination 137.77 Rect 3.00 2.00 18 Cir 133.99 15 Cir 134.24 38 B10 Combination 137.77 Rect 3.00 2.00 15 Cir 134.36 39 B5 Combination 134.05 Rect 3.00 2.00 15 Cir 130.44 15 Cir 130.64 40 B6 Combination 135.67 Rect 3.00 2.00 15 Cir 132.27 Olde Mill Stream Phase 2 Number of Structures: 63 Run Date: 8/25/2020 Storm Sewers v2021.00 Structure Report Page 3 Struct No. Structure ID Junction Type Rim Elev (ft) Structure Line Out Line In Shape Length (ft) Width (ft) Size (in) Shape Invert (ft) Size (in) Shape Invert (ft) 41 B11 Combination 126.41 Rect 6.00 2.00 30 Cir 122.53 18 Cir 123.53 15 Cir 123.76 42 B13 Combination 127.06 Rect 3.00 2.00 18 Cir 124.21 18 Cir 124.21 43 B14 Combination 127.45 Rect 3.00 2.00 18 Cir 124.60 18 Cir 124.60 44 B15 Combination 127.81 Rect 3.00 2.00 18 Cir 124.96 18 Cir 124.96 45 B16 Combination 128.45 Rect 3.00 2.00 18 Cir 125.59 18 Cir 125.59 46 B17 Combination 129.10 Rect 3.00 2.00 18 Cir 125.79 18 Cir 125.79 15 Cir 126.33 47 B19 Combination 130.52 Rect 3.00 2.00 18 Cir 126.86 15 Cir 127.11 48 B20 Combination 131.53 Rect 3.00 2.00 15 Cir 128.11 49 B18 Combination 129.10 Rect 3.00 2.00 15 Cir 126.45 50 B12 Combination 126.41 Rect 3.00 2.00 15 Cir 123.90 51 B21 Combination 127.00 Rect 6.00 2.00 30 Cir 122.79 24 Cir (2b) 123.29 52 B22 Combination 127.00 Rect 6.00 2.00 24 Cir (2b) 123.42 24 Cir 123.54 15 Cir 124.27 53 B25 Combination 127.08 Rect 3.00 2.00 24 Cir 123.74 24 Cir 123.74 54 B26 DropGrate 129.82 Rect 3.00 2.00 24 Cir 125.53 24 Cir 125.53 15 Cir 127.53 55 B28 Combination 131.86 Rect 3.00 2.00 24 Cir 127.32 24 Cir 127.88 56 B29 Combination 131.86 Rect 6.00 2.00 24 Cir 128.00 15 Cir 128.29 57 B30 Combination 133.39 Rect 3.00 2.00 15 Cir 129.96 15 Cir 129.99 58 B31 Combination 136.36 Rect 3.00 2.00 15 Cir 132.74 15 Cir 132.96 59 B32 Combination 137.58 Rect 3.00 2.00 15 Cir 133.79 15 Cir 133.99 60 B33 Combination 137.58 Rect 3.00 2.00 15 Cir 134.13 61 B27 DropGrate 130.78 Rect 3.00 2.00 15 Cir 128.49 Olde Mill Stream Phase 2 Number of Structures: 63 Run Date: 8/25/2020 Storm Sewers v2021.00 Structure Report Page 4 Struct No. Structure ID Junction Type Rim Elev (ft) Structure Line Out Line In Shape Length (ft) Width (ft) Size (in) Shape Invert (ft) Size (in) Shape Invert (ft) 62 63 B23 B24 Combination Combination 127.93 129.73 Rect Rect 3.00 3.00 2.00 2.00 15 15 Cir Cir 125.10 126.32 15 Cir 125.10 Olde Mill Stream Phase 2 Number of Structures: 63 Run Date: 8/25/2020 Storm Sewers v2021.00 Storm Sewer Summary Report Page 1 Line No. Line ID Flow rate (cfs) Line Size (in) Line shape Line length (ft) Invert EL Dn (ft) Invert EL Up (ft) Line Slope (%) HGL Down (ft) HGL Up (ft) Minor loss (ft) HGL Junct (ft) Dns Line No. Junction Type 1 LA2 26.54 42 Cir 46.003 121.00 121.16 0.348 124.07 124.09 0.07 124.16 End Combination 2 LA3 25.95 42 Cir 27.504 121.16 121.26 0.364 124.16 124.18 0.21 124.39 1 Combination 3 LA10 18.15 30 Cir 38.686 121.91 122.10 0.491 124.39 124.45 0.26 124.71 2 Combination 4 LA11 17.80 30 Cir 24.500 122.10 122.22 0.490 124.71 124.72 0.31 125.03 3 Combination 5 LA12 17.37 30 Cir 80.000 122.22 123.02 1.000 125.03 125.12 0.36 125.48 4 Combination 6 LA14 15.90 30 Cir 142.644 123.02 124.52 1.052 125.48 125.87 n/a 125.87 j 5 Combination 7 LA16 14.19 24 Cir 136.055 125.02 126.38 1.000 126.17 127.74 n/a 127.74 6 Combination 8 LA20 11.19 24 Cir 81.000 126.38 127.19 1.000 127.74 128.39 n/a 128.39 j 7 Combination 9 LA21 10.36 24 Cir 109.750 127.18 128.28 1.002 128.39 129.43 n/a 129.43 j 8 Combination 10 LA23 8.43 18 Cir 60.000 128.83 129.43 1.000 129.85 130.55 n/a 130.55 9 Combination 11 LA24 7.72 18 Cir 60.366 129.43 130.03 0.994 130.55 131.11 n/a 131.11 j 10 Combination 12 LA25 6.88 18 Cir 64.440 130.03 130.67 0.993 131.11 131.68 n/a 131.68 j 11 Combination 13 LA27 5.12 18 Cir 55.663 130.67 131.29 1.114 131.68 132.16 n/a 132.16 j 12 Combination 14 LA28 4.51 18 Cir 94.574 131.29 132.33 1.100 132.16 133.14 n/a 133.14 j 13 Combination 15 LA30 4.23 15 Cir 100.450 132.58 133.34 0.757 133.39 134.17 n/a 134.17 14 Combination 16 LA31 2.78 15 Cir 24.500 133.34 133.46 0.490 134.17 134.22 0.30 134.52 15 Combination 17 LA32 1.80 15 Cir 128.000 133.66 134.94 1.000 134.52 135.47 n/a 135.47 j 16 Combination 18 LA29 1.16 15 Cir 24.500 132.48 132.61 0.531 133.14 133.03 n/a 133.03 14 Combination 19 LA26 1.80 15 Cir 24.500 130.90 131.03 0.531 131.68 131.70 0.11 131.81 12 Combination 20 LA22 1.76 18 Cir 24.500 128.78 128.91 0.531 129.43 129.41 n/a 129.41 9 Combination 21 LA18 2.05 15 Cir 39.952 127.27 127.96 1.727 127.74 128.53 0.25 128.53 7 Combination 22 LA19 1.62 15 Cir 24.500 128.16 128.28 0.490 128.68 128.80 0.18 128.97 21 Combination 23 LA17 1.69 15 Cir 24.500 127.15 127.27 0.490 127.74 127.79 0.19 127.98 7 Combination 24 LA15 1.27 15 Cir 24.500 125.75 125.87 0.490 126.20 126.32 0.16 126.48 6 Combination Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES: Return period = 10 Yrs. ; j - Line contains hyd. jump. Storm Sewers v2021.00 Storm Sewer Summary Report Page 2 Line No. Line ID Flow rate (cfs) Line Size (in) Line shape Line length (ft) Invert EL Dn (ft) Invert EL Up (ft) Line Slope (%) HGL Down (ft) HGL Up (ft) Minor loss (ft) HGL Junct (ft) Dns Line No. Junction Type 25 LA4 11.27 24 Cir 77.247 121.26 121.72 0.595 124.39* 124.58* 0.10 124.68 2 Combination 26 LA5 10.83 24 Cir 229.515 121.72 123.10 0.601 124.68* 125.21* 0.27 125.48 25 Combination 27 LA7 4.89 18 Cir 74.312 123.10 123.47 0.498 125.48* 125.65* 0.06 125.71 26 Combination 28 LA8 4.06 15 Cir 125.299 123.72 124.35 0.503 125.71* 126.20* 0.26 126.46 27 Combination 29 LA9 3.15 15 Cir 25.485 124.35 124.47 0.471 126.46* 126.52* 0.10 126.62 28 DropGrate 30 LA13 1.57 15 Cir 24.500 124.31 124.43 0.490 125.48 125.49 0.03 125.52 5 Combination 31 LA6 2.79 15 Cir 27.500 123.36 123.50 0.509 125.48* 125.54* 0.08 125.62 26 Combination 32 LB2 20.13 42 Cir 32.250 120.70 120.83 0.403 123.97 122.20 n/a 122.20 End DropGrate 33 LB3 20.42 36 Cir 128.000 120.83 121.47 0.500 122.21 122.92 0.28 122.92 32 Combination 34 LB4 19.97 36 Cir 27.502 121.47 121.60 0.473 122.92 123.03 1.24 123.03 33 Combination 35 LB7 17.22 36 Cir 114.288 121.60 122.17 0.499 123.03 123.50 n/a 123.50 j 34 Combination 36 LB8 8.47 24 Cir 149.763 122.67 128.24 3.719 123.50 129.28 n/a 129.28 35 DropGrate 37 LB9 5.50 18 Cir 175.052 128.74 133.99 2.999 129.31 134.89 0.19 134.89 36 Combination 38 LB10 2.92 15 Cir 24.500 134.24 134.36 0.490 134.97 135.09 0.24 135.33 37 Combination 39 LB5 3.58 15 Cir 154.284 126.43 130.44 2.599 126.94 131.20 n/a 131.20 34 Combination 40 LB6 1.93 15 Cir 112.430 130.64 132.27 1.450 131.20 132.82 n/a 132.82 j 39 Combination 41 LB11 10.49 30 Cir 71.507 122.17 122.53 0.503 123.50 123.61 n/a 123.61 j 35 Combination 42 LB13 6.90 18 Cir 136.160 123.53 124.21 0.499 124.67 125.35 0.18 125.53 41 Combination 43 LB14 6.19 18 Cir 77.418 124.21 124.60 0.504 125.53 125.74 0.14 125.88 42 Combination 44 LB15 5.54 18 Cir 70.612 124.60 124.96 0.510 125.88 126.03 0.13 126.16 43 Combination 45 LB16 4.77 18 Cir 127.906 124.96 125.59 0.493 126.16 126.46 0.38 126.84 44 Combination 46 LB17 4.64 18 Cir 40.653 125.59 125.79 0.492 126.84 126.89 0.29 127.18 45 Combination 47 LB19 3.03 18 Cir 125.178 125.79 126.86 0.855 127.18 127.52 n/a 127.52 j 46 Combination 48 LB20 1.95 15 Cir 104.892 127.11 128.11 0.953 127.59 128.66 n/a 128.66 47 Combination Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES: Return period = 10 Yrs. ; *Surcharged (HGL above crown). ; j - Line contains hyd. jump. Storm Sewers v2021.00 Storm Sewer Summary Report Page 3 Line No. Line ID Flow rate (cfs) Line Size (in) Line shape Line length (ft) Invert EL Dn (ft) Invert EL Up (ft) Line Slope (%) HGL Down (ft) HGL Up (ft) Minor loss (ft) HGL Junct (ft) Dns Line No. Junction Type 49 LB18 1.65 15 Cir 24.500 126.33 126.45 0.490 127.18 127.19 0.07 127.26 46 Combination 50 LB12 3.19 15 Cir 27.500 123.76 123.90 0.509 124.53 124.67 0.26 124.92 41 Combination 51 LB21 15.57 30 Cir 169.250 121.95 122.79 0.496 123.97 124.12 n/a 124.12 j End Combination 52 LB22 14.50 24 Cir(2b) 24.500 123.29 123.42 0.531 124.22 124.28 0.73 125.01 51 Combination 53 LB25 11.58 24 Cir 19.000 123.54 123.74 1.053 125.01 124.96 n/a 124.96 j 52 Combination 54 LB26 10.67 24 Cir 149.052 123.74 125.53 1.201 124.96 126.70 n/a 126.70 j 53 DropGrate 55 LB28 7.95 24 Cir 149.267 125.53 127.32 1.199 126.70 128.32 n/a 128.32 j 54 Combination 56 LB29 6.84 24 Cir 24.500 127.88 128.00 0.490 128.80 128.93 0.54 128.93 55 Combination 57 LB30 2.19 15 Cir 176.000 128.29 129.96 0.949 128.93 130.55 n/a 130.55 j 56 Combination 58 LB31 0.90 15 Cir 239.579 129.99 132.74 1.148 130.55 133.11 n/a 133.11 j 57 Combination 59 LB32 0.77 15 Cir 39.946 132.96 133.79 2.078 133.20 134.13 0.14 134.13 58 Combination 60 LB33 0.45 15 Cir 28.000 133.99 134.13 0.500 134.26 134.40 n/a 134.48 j 59 Combination 61 LB27 3.04 15 Cir 96.000 127.53 128.49 1.000 128.13 129.19 0.29 129.19 54 DropGrate 62 LB23 3.24 15 Cir 166.000 124.27 125.10 0.500 125.05 125.88 0.13 126.00 52 Combination 63 LB24 1.69 15 Cir 122.095 125.10 126.32 0.999 126.00 126.84 n/a 126.84 j 62 Combination Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES: Return period = 10 Yrs. ; *Surcharged (HGL above crown). ; j - Line contains hyd. jump. Storm Sewers v2021.00 Storm Sewer Tabulation Page 1 Station Len (ft) Drng Area Rnoff coeff (C) Area x C Tc Rain (I) (in/hr) Total flow (cfs) Cap full (cfs) Vel (ft/s) Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To Line Incr (ac) Total (ac) Incr Total Inlet (min) Syst (min) Size (in) Slope (%) Dn (ft) Up (ft) Dn (ft) Up (ft) Dn (ft) Up (ft) 1 End 46.003 0.26 12.02 0.60 0.16 5.99 5.0 21.6 4.4 26.54 59.33 3.03 42 0.35 121.00 121.16 124.07 124.09 0.00 126.50 LA2 2 1 27.504 0.22 11.76 0.50 0.11 5.83 5.0 21.4 4.4 25.95 60.66 2.99 42 0.36 121.16 121.26 124.16 124.18 126.50 126.50 LA3 3 2 38.686 0.18 8.28 0.50 0.09 4.06 5.0 21.2 4.5 18.15 28.74 3.75 30 0.49 121.91 122.10 124.39 124.45 126.50 127.10 LA10 4 3 24.500 0.26 8.10 0.50 0.13 3.97 5.0 21.1 4.5 17.80 28.71 3.63 30 0.49 122.10 122.22 124.71 124.72 127.10 127.10 LA11 5 4 80.000 0.36 7.84 0.50 0.18 3.84 5.0 20.7 4.5 17.37 41.01 3.74 30 1.00 122.22 123.02 125.03 125.12 127.10 127.84 LA12 6 5 142.644 0.48 7.06 0.50 0.24 3.45 5.0 20.0 4.6 15.90 42.06 4.58 30 1.05 123.02 124.52 125.48 125.87 127.84 129.28 LA14 7 6 136.055 0.05 6.24 0.60 0.03 3.04 5.0 19.4 4.7 14.19 22.61 6.93 24 1.00 125.02 126.38 126.17 127.74 129.28 130.68 LA16 8 7 81.000 0.46 4.95 0.45 0.21 2.38 17.0 19.1 4.7 11.19 22.62 5.32 24 1.00 126.38 127.19 127.74 128.39 130.68 131.49 LA20 9 8 109.750 0.40 4.49 0.45 0.18 2.17 16.6 18.5 4.8 10.36 22.64 5.38 24 1.00 127.18 128.28 128.39 129.43 131.49 132.58 LA21 10 9 60.000 0.35 3.62 0.45 0.16 1.76 16.7 18.3 4.8 8.43 10.50 6.27 18 1.00 128.83 129.43 129.85 130.55 132.58 133.18 LA23 11 10 60.366 0.41 3.27 0.45 0.18 1.60 17.4 18.1 4.8 7.72 10.47 5.56 18 0.99 129.43 130.03 130.55 131.11 133.18 133.79 LA24 12 11 64.440 0.33 2.86 0.45 0.15 1.41 17.8 17.8 4.9 6.88 10.47 5.24 18 0.99 130.03 130.67 131.11 131.68 133.79 134.43 LA25 13 12 55.663 0.28 2.05 0.50 0.14 1.03 16.8 16.8 5.0 5.12 11.08 4.42 18 1.11 130.67 131.29 131.68 132.16 134.43 135.01 LA27 14 13 94.574 0.25 1.77 0.50 0.13 0.89 16.0 16.0 5.1 4.51 11.01 4.42 18 1.10 131.29 132.33 132.16 133.14 135.01 136.01 LA28 15 14 100.450 0.42 1.21 0.50 0.21 0.61 5.0 6.6 7.0 4.23 5.62 4.95 15 0.76 132.58 133.34 133.39 134.17 136.01 137.06 LA30 16 15 24.500 0.31 0.79 0.50 0.16 0.40 5.0 6.5 7.0 2.78 4.52 3.39 15 0.49 133.34 133.46 134.17 134.22 137.06 137.06 LA31 17 16 128.000 0.48 0.48 0.50 0.24 0.24 5.0 5.0 7.5 1.80 6.46 2.81 15 1.00 133.66 134.94 134.52 135.47 137.06 138.34 LA32 18 14 24.500 0.31 0.31 0.50 0.16 0.16 5.0 5.0 7.5 1.16 4.70 2.46 15 0.53 132.48 132.61 133.14 133.03 136.01 136.01 LA29 19 12 24.500 0.48 0.48 0.50 0.24 0.24 5.0 5.0 7.5 1.80 4.70 2.46 15 0.53 130.90 131.03 131.68 131.70 134.43 134.43 LA26 20 9 24.500 0.47 0.47 0.50 0.24 0.24 5.0 5.0 7.5 1.76 7.65 2.91 18 0.53 128.78 128.91 129.43 129.41 132.58 132.58 LA22 21 7 39.952 0.15 0.79 0.60 0.09 0.41 5.0 16.7 5.0 2.05 8.49 4.34 15 1.73 127.27 127.96 127.74 128.53 130.68 132.19 LA18 22 21 24.500 0.64 0.64 0.50 0.32 0.32 16.4 16.4 5.0 1.62 4.52 3.38 15 0.49 128.16 128.28 128.68 128.80 132.19 132.19 LA19 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES:Intensity = 82.60 / (Inlet time + 13.50) A 0.82; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2021.00 Storm Sewer Tabulation Page 2 Station Len (ft) Drng Area Rnoff coeff (C) Area x C Tc Rain (I) (in/hr) Total flow (cfs) Cap full (cfs) Vel (ft/s) Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To Line Incr (ac) Total (ac) Incr Total Inlet (min) Syst (min) Size (in) Slope (%) Dn (ft) Up (ft) Dn (ft) Up (ft) Dn (ft) Up (ft) 23 7 24.500 0.45 0.45 0.50 0.23 0.23 5.0 5.0 7.5 1.69 4.52 3.23 15 0.49 127.15 127.27 127.74 127.79 130.68 130.68 LA17 24 6 24.500 0.34 0.34 0.50 0.17 0.17 5.0 5.0 7.5 1.27 4.52 3.16 15 0.49 125.75 125.87 126.20 126.32 129.28 129.28 LA15 25 2 77.247 0.27 3.26 0.50 0.14 1.66 5.0 7.4 6.8 11.27 17.45 3.59 24 0.60 121.26 121.72 124.39 124.58 126.50 126.98 LA4 26 25 229.515 1.06 2.99 0.45 0.48 1.53 5.0 6.2 7.1 10.83 17.54 3.45 24 0.60 121.72 123.10 124.68 125.21 126.98 126.90 LA5 27 26 74.312 0.26 1.31 0.50 0.13 0.68 5.0 5.8 7.2 4.89 7.41 2.77 18 0.50 123.10 123.47 125.48 125.65 126.90 127.18 LA7 28 27 125.299 0.21 1.05 0.60 0.13 0.55 5.0 5.2 7.4 4.06 4.58 3.31 15 0.50 123.72 124.35 125.71 126.20 127.18 127.84 LA8 29 28 25.485 0.84 0.84 0.50 0.42 0.42 5.0 5.0 7.5 3.15 4.43 2.57 15 0.47 124.35 124.47 126.46 126.52 127.84 128.00 LA9 30 5 24.500 0.42 0.42 0.50 0.21 0.21 5.0 5.0 7.5 1.57 4.52 1.37 15 0.49 124.31 124.43 125.48 125.49 127.84 127.84 LA13 31 26 27.500 0.62 0.62 0.60 0.37 0.37 5.0 5.0 7.5 2.79 4.61 2.27 15 0.51 123.36 123.50 125.48 125.54 126.90 126.90 LA6 32 End 32.250 0.01 9.76 0.60 0.01 4.92 5.0 25.1 4.1 20.13 63.88 3.95 42 0.40 120.70 120.83 123.97 122.20 0.00 128.93 LB2 33 32 128.000 0.25 9.75 0.50 0.13 4.91 5.0 24.4 4.2 20.42 47.16 6.23 36 0.50 120.83 121.47 122.21 122.92 128.93 130.07 LB3 34 33 27.502 0.45 9.50 0.50 0.23 4.78 13.7 24.2 4.2 19.97 45.85 5.95 36 0.47 121.47 121.60 122.92 123.03 130.07 130.08 LB4 35 34 114.288 0.86 8.13 0.50 0.43 4.06 16.1 23.4 4.2 17.22 47.10 5.44 36 0.50 121.60 122.17 123.03 123.50 130.08 127.20 LB7 36 35 149.763 0.89 2.37 0.50 0.45 1.19 5.0 6.1 7.1 8.47 43.62 6.03 24 3.72 122.67 128.24 123.50 129.28 127.20 132.50 LB8 37 36 175.052 0.70 1.48 0.50 0.35 0.74 5.0 5.2 7.4 5.50 18.19 6.98 18 3.00 128.74 133.99 129.31 134.89 132.50 137.77 LB9 38 37 24.500 0.78 0.78 0.50 0.39 0.39 5.0 5.0 7.5 2.92 4.52 3.91 15 0.49 134.24 134.36 134.97 135.09 137.77 137.77 LB10 39 34 154.284 0.49 0.92 0.50 0.25 0.50 5.0 6.2 7.1 3.58 10.41 6.13 15 2.60 126.43 130.44 126.94 131.20 130.08 134.05 LB5 40 39 112.430 0.43 0.43 0.60 0.26 0.26 5.0 5.0 7.5 1.93 7.78 3.65 15 1.45 130.64 132.27 131.20 132.82 134.05 135.67 LB6 41 35 71.507 0.86 4.90 0.50 0.43 2.44 5.0 22.9 4.3 10.49 29.10 4.56 30 0.50 122.17 122.53 123.50 123.61 127.20 126.41 LB11 42 41 136.160 0.39 3.33 0.45 0.18 1.59 13.2 22.3 4.4 6.90 7.42 4.77 18 0.50 123.53 124.21 124.67 125.35 126.41 127.06 LB13 43 42 77.418 0.35 2.94 0.45 0.16 1.41 14.7 22.0 4.4 6.19 7.45 4.02 18 0.50 124.21 124.60 125.53 125.74 127.06 127.45 LB14 44 43 70.612 0.43 2.59 0.45 0.19 1.25 15.4 21.6 4.4 5.54 7.50 3.78 18 0.51 124.60 124.96 125.88 126.03 127.45 127.81 LB15 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES:Intensity = 82.60 / (Inlet time + 13.50) A 0.82; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2021.00 Storm Sewer Tabulation Page 3 Station Len (ft) Drng Area Rnoff coeff (C) Area x C Tc Rain (I) (in/hr) Total flow (cfs) Cap full (cfs) Vel (ft/s) Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To Line Incr (ac) Total (ac) Incr Total Inlet (min) Syst (min) Size (in) Slope (%) Dn (ft) Up (ft) Dn (ft) Up (ft) Dn (ft) Up (ft) 45 44 127.906 0.06 2.16 0.60 0.04 1.06 5.0 20.8 4.5 4.77 7.37 3.81 18 0.49 124.96 125.59 126.16 126.46 127.81 128.45 LB16 46 45 40.653 0.31 2.10 0.50 0.16 1.02 15.5 20.6 4.5 4.64 7.37 3.14 18 0.49 125.59 125.79 126.84 126.89 128.45 129.10 LB17 47 46 125.178 0.54 1.35 0.45 0.24 0.65 13.8 19.4 4.7 3.03 9.71 2.90 18 0.85 125.79 126.86 127.18 127.52 129.10 130.52 LB19 48 47 104.892 0.81 0.81 0.50 0.41 0.41 18.3 18.3 4.8 1.95 6.31 4.11 15 0.95 127.11 128.11 127.59 128.66 130.52 131.53 LB20 49 46 24.500 0.44 0.44 0.50 0.22 0.22 5.0 5.0 7.5 1.65 4.52 2.02 15 0.49 126.33 126.45 127.18 127.19 129.10 129.10 LB18 50 41 27.500 0.71 0.71 0.60 0.43 0.43 5.0 5.0 7.5 3.19 4.61 4.05 15 0.51 123.76 123.90 124.53 124.67 126.41 126.41 LB12 51 End 169.250 0.69 11.46 0.50 0.35 4.82 5.0 37.9 3.2 15.57 28.89 4.76 30 0.50 121.95 122.79 123.97 124.12 0.00 127.00 LB21 52 51 24.500 0.89 10.77 0.50 0.45 4.47 5.0 37.8 3.2 14.50 32.95 5.34 24(2b) 0.53 123.29 123.42 124.22 124.28 127.00 127.00 LB22 53 52 19.000 0.64 8.96 0.50 0.32 3.57 5.0 37.7 3.2 11.58 23.21 5.22 24 1.05 123.54 123.74 125.01 124.96 127.00 127.08 LB25 54 53 149.052 0.92 8.32 0.50 0.46 3.25 5.0 36.9 3.3 10.67 24.79 5.45 24 1.20 123.74 125.53 124.96 126.70 127.08 129.82 LB26 55 54 149.267 0.68 6.59 0.50 0.34 2.38 5.0 36.0 3.3 7.95 24.77 4.61 24 1.20 125.53 127.32 126.70 128.32 129.82 131.86 LB28 56 55 24.500 4.20 5.91 0.35 1.47 2.04 35.8 35.8 3.3 6.84 15.83 4.83 24 0.49 127.88 128.00 128.80 128.93 131.86 131.86 LB29 57 56 176.000 1.47 1.71 0.30 0.44 0.57 28.5 28.5 3.8 2.19 6.29 3.66 15 0.95 128.29 129.96 128.93 130.55 131.86 133.39 LB30 58 57 239.579 0.04 0.24 0.60 0.02 0.13 5.0 7.3 6.8 0.90 6.92 2.31 15 1.15 129.99 132.74 130.55 133.11 133.39 136.36 LB31 59 58 39.946 0.08 0.20 0.60 0.05 0.11 5.0 6.3 7.1 0.77 9.31 3.69 15 2.08 132.96 133.79 133.20 134.13 136.36 137.58 LB32 60 59 28.000 0.12 0.12 0.50 0.06 0.06 5.0 5.0 7.5 0.45 4.57 2.36 15 0.50 133.99 134.13 134.26 134.40 137.58 137.58 LB33 61 54 96.000 0.81 0.81 0.50 0.41 0.41 5.0 5.0 7.5 3.04 6.46 4.74 15 1.00 127.53 128.49 128.13 129.19 129.82 130.78 LB27 62 52 166.000 0.47 0.92 0.50 0.24 0.46 5.0 6.5 7.0 3.24 4.57 4.04 15 0.50 124.27 125.10 125.05 125.88 127.00 127.93 LB23 63 62 122.095 0.45 0.45 0.50 0.23 0.23 5.0 5.0 7.5 1.69 6.45 2.66 15 1.00 125.10 126.32 126.00 126.84 127.93 129.73 LB24 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES:Intensity = 82.60 / (Inlet time + 13.50) A 0.82; Return period =Yrs. 10 ; c = cir e = ellip b = box Storm Sewers v2021.00 Hydraulic Grade Line Computations Page 1 Line Size (in) Q (cfs) Downstream Len (ft) Upstream Check JL coeff (K) Minor Toss (ft) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sqft) Vel (ft/s) Vel head (ft) EGL elev (ft) Sf (%) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sqft) Vel (ft/s) Vel head (ft) EGL elev (ft) Sf (%) Ave Sf (%) Enrgy loss (ft) 1 42 26.54 121.00 124.07 3.07 8.94 2.97 0.14 124.21 0.063 46.003 121.16 124.09 2.93 8.60 3.08 0.15 124.24 0.067 0.065 0.030 0.50 0.07 2 42 25.95 121.16 124.16 3.00 8.79 2.95 0.14 124.30 0.062 27.504 121.26 124.18 2.92 8.57 3.03 0.14 124.32 0.065 0.063 0.017 1.50 0.21 3 30 18.15 121.91 124.39 2.48 4.90 3.70 0.21 124.60 0.182 38.686 122.10 124.45 2.35 4.79 3.79 0.22 124.67 0.169 0.176 0.068 1.16 0.26 4 30 17.80 122.10 124.71 2.50 4.91 3.63 0.20 124.91 0.188 24.500 122.22 124.72 2.50 4.91 3.63 0.20 124.92 0.188 0.188 0.046 1.50 0.31 5 30 17.37 122.22 125.03 2.50 4.91 3.54 0.19 125.22 0.180 80.000 123.02 125.12 2.10 4.40 3.95 0.24 125.36 0.172 0.176 0.141 1.50 0.36 6 30 15.90 123.02 125.48 2.46 2.69 3.25 0.54 126.03 0.000 142.644124.52 125.87 j 1.35** 2.69 5.90 0.54 126.41 0.000 0.000 n/a 1.50 n/a 7 24 14.19 125.02 126.17 1.15* 1.87 7.60 0.61 126.78 0.000 136.055126.38 127.74 1.36** 2.27 6.26 0.61 128.34 0.000 0.000 n/a 1.49 n/a 8 24 11.19 126.38 127.74 1.36 1.97 4.94 0.50 128.24 0.000 81.000 127.19 128.39 j 1.20" 1.97 5.69 0.50 128.89 0.000 0.000 n/a 0.50 0.25 9 24 10.36 127.18 128.39 1.21 1.87 5.22 0.48 128.86 0.000 109.750128.28 129.43 j 1.15" 1.87 5.53 0.48 129.91 0.000 0.000 n/a 1.50 0.71 10 18 8.43 128.83 129.85 1.02" 1.28 6.60 0.55 130.40 0.000 60.000 129.43 130.55 1.12** 1.42 5.94 0.55 131.10 0.000 0.000 n/a 0.50 n/a 11 18 7.72 129.43 130.55 1.12 1.36 5.44 0.50 131.06 0.000 60.366 130.03 131.11 j 1.08** 1.36 5.69 0.50 131.61 0.000 0.000 n/a 0.50 0.25 12 18 6.88 130.03 131.11 1.08 1.27 5.07 0.45 131.56 0.000 64.440 130.67 131.68 j 1.01** 1.27 5.41 0.45 132.14 0.000 0.000 n/a 1.50 n/a 13 18 5.12 130.67 131.68 1.01 1.06 4.03 0.36 132.04 0.000 55.663 131.29 132.16 j 0.87" 1.06 4.82 0.36 132.52 0.000 0.000 n/a 0.54 n/a 14 18 4.51 131.29 132.16 0.87 0.98 4.25 0.33 132.49 0.000 94.574 132.33 133.14 j 0.81** 0.98 4.60 0.33 133.47 0.000 0.000 n/a 1.48 0.49 15 15 4.23 132.58 133.39 0.81" 0.84 5.03 0.37 133.76 0.000 100.450133.34 134.17 0.83** 0.87 4.88 0.37 134.54 0.000 0.000 n/a 1.49 n/a 16 15 2.78 133.34 134.17 0.83 0.87 3.21 0.16 134.33 0.303 24.500 133.46 134.22 0.76 0.78 3.57 0.20 134.42 0.397 0.350 0.086 1.50 0.30 17 15 1.80 133.66 134.52 0.86 0.50 2.01 0.20 134.72 0.000 128.000134.94 135.47 j 0.53** 0.50 3.61 0.20 135.68 0.000 0.000 n/a 1.00 0.20 18 15 1.16 132.48 133.14 0.66 0.37 1.75 0.16 133.30 0.000 24.500 132.61 133.03 0.42" 0.37 3.16 0.16 133.19 0.000 0.000 n/a 1.00 n/a 19 15 1.80 130.90 131.68 0.78 0.81 2.22 0.08 131.76 0.150 24.500 131.03 131.70 0.67 0.67 2.70 0.11 131.81 0.250 0.200 0.049 1.00 0.11 20 18 1.76 128.78 129.43 0.65 0.51 2.39 0.18 129.61 0.000 24.500 128.91 129.41 0.50" 0.51 3.43 0.18 129.59 0.000 0.000 n/a 1.00 n/a 21 15 2.05 127.27 127.74 0.47 0.42 4.92 0.22 127.96 0.000 39.952 127.96 128.53 0.57** 0.55 3.76 0.22 128.75 0.000 0.000 n/a 1.13 0.25 22 15 1.62 128.16 128.68 0.52" 0.48 3.37 0.18 128.85 0.489 24.500 128.28 128.80 0.52 0.48 3.38 0.18 128.97 0.492 0.491 0.120 1.00 0.18 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 Notes: " Normal depth assumed; ** Critical depth.; j-Line contains hyd. jump ; c = cir e = ellip b = box Storm Sewers v2021.00 Hydraulic Grade Line Computations Page 2 Line Size (in) Q (cfs) Downstream Len (ft) Upstream Check JL coeff (K) Minor Toss (ft) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sqft) Vel (Ws) Vel head (ft) EGL elev (ft) Sf (%) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sqft) Vel (ft/s) Vel head (ft) EGL elev (ft) Sf (%) Ave Sf (%) Enrgy loss (ft) 23 15 1.69 127.15 127.74 0.59 0.48 2.99 0.14 127.87 0.341 24.500 127.27 127.79 0.52** 0.48 3.48 0.19 127.98 0.516 0.429 0.105 1.00 0.19 24 15 1.27 125.75 126.20 0.45* 0.39 3.16 0.16 126.36 0.489 24.500 125.87 126.32 0.45"* 0.40 3.16 0.16 126.48 0.489 0.489 0.120 1.00 0.16 25 24 11.27 121.26 124.39 2.00 3.14 3.59 0.20 124.59 0.249 77.247 121.72 124.58 2.00 3.14 3.59 0.20 124.78 0.249 0.249 0.192 0.50 0.10 26 24 10.83 121.72 124.68 2.00 3.14 3.45 0.18 124.87 0.230 229.515123.10 125.21 2.00 3.14 3.45 0.18 125.40 0.229 0.230 0.527 1.48 0.27 27 18 4.89 123.10 125.48 1.50 1.77 2.77 0.12 125.60 0.217 74.312 123.47 125.65 1.50 1.77 2.77 0.12 125.76 0.217 0.217 0.161 0.50 0.06 28 15 4.06 123.72 125.71 1.25 1.23 3.31 0.17 125.88 0.396 125.299124.35 126.20 1.25 1.23 3.31 0.17 126.37 0.396 0.396 0.496 1.50 0.26 29 15 3.15 124.35 126.46 1.25 1.23 2.57 0.10 126.56 0.238 25.485 124.47 126.52 1.25 1.23 2.57 0.10 126.62 0.238 0.238 0.061 1.00 0.10 30 15 1.57 124.31 125.48 1.17 1.20 1.32 0.03 125.51 0.051 24.500 124.43 125.49 1.06 1.11 1.42 0.03 125.52 0.056 0.054 0.013 1.00 0.03 31 15 2.79 123.36 125.48 1.25 1.23 2.27 0.08 125.56 0.187 27.500 123.50 125.54 1.25 1.23 2.27 0.08 125.62 0.186 0.186 0.051 1.00 0.08 32 42 20.13 120.70 123.97 3.27 3.50 2.15 0.51 124.48 0.000 32.250 120.83 122.20 1.37** 3.50 5.75 0.51 122.72 0.000 0.000 n/a 0.51 n/a 33 36 20.42 120.83 122.21 1.38" 3.18 6.43 0.57 122.78 0.000 128.000121.47 122.92 1.45" 3.38 6.04 0.57 123.49 0.000 0.000 n/a 0.50 0.28 34 36 19.97 121.47 122.92 1.45 3.33 5.90 0.56 123.48 0.000 27.502 121.60 123.03 1.43** 3.33 5.99 0.56 123.59 0.000 0.000 n/a 2.22 1.24 35 36 17.22 121.60 123.03 1.43 3.01 5.17 0.51 123.54 0.000 114.288122.17 123.50 j 1.33** 3.01 5.71 0.51 124.00 0.000 0.000 n/a 1.96 0.99 36 24 8.47 122.67 123.50 0.83 1.22 6.91 0.41 123.91 0.000 149.763128.24 129.28 1.04** 1.64 5.15 0.41 129.69 0.000 0.000 n/a 0.50 n/a 37 18 5.50 128.74 129.31 0.57" 0.61 9.01 0.38 129.69 0.000 175.052133.99 134.89 0.90" 1.11 4.95 0.38 135.27 0.000 0.000 n/a 0.50 0.19 38 15 2.92 134.24 134.97 0.73* 0.75 3.91 0.24 135.21 0.489 24.500 134.36 135.09 0.73 0.75 3.91 0.24 135.33 0.487 0.488 0.120 1.00 0.24 39 15 3.58 126.43 126.94 0.51 * 0.47 7.69 0.32 127.26 0.000 154.284130.44 131.20 0.76** 0.79 4.56 0.32 131.53 0.000 0.000 n/a 0.50 n/a 40 15 1.93 130.64 131.20 0.56 0.52 3.60 0.21 131.42 0.000 112.430132.27 132.82 j 0.55" 0.52 3.69 0.21 133.03 0.000 0.000 n/a 1.00 n/a 41 30 10.49 122.17 123.50 1.33 2.04 3.97 0.41 123.91 0.000 71.507 122.53 123.61 j 1.08** 2.04 5.15 0.41 124.02 0.000 0.000 n/a 1.50 0.62 42 18 6.90 123.53 124.67 1.14" 1.45 4.77 0.35 125.03 0.499 136.160124.21 125.35 1.14 1.45 4.77 0.35 125.71 0.500 0.500 0.680 0.50 0.18 43 18 6.19 124.21 125.53 1.32 1.65 3.76 0.22 125.75 0.312 77.418 124.60 125.74 1.14 1.44 4.29 0.29 126.03 0.404 0.358 0.277 0.50 0.14 44 18 5.54 124.60 125.88 1.28 1.61 3.44 0.18 126.07 0.260 70.612 124.96 126.03 1.07 1.35 4.11 0.26 126.29 0.379 0.319 0.225 0.50 0.13 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 Notes: * Normal depth assumed; ** Critical depth.; j-Line contains hyd. jump ; c = cir e = ellip b = box Storm Sewers v2021.00 Hydraulic Grade Line Computations Page 3 Line Size (in) Q (cfs) Downstream Len (ft) Upstream Check JL coeff (K) Minor Toss (ft) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sqft) Vel (ft/s) Vel head (ft) EGL elev (ft) Sf (%) Invert elev (ft) HGL elev (ft) Depth (ft) Area (sqft) Vel (ft/s) Vel head (ft) EGL elev (ft) Sf (%) Ave Sf (%) Enrgy loss (ft) 45 18 4.77 124.96 126.16 1.20 1.52 3.15 0.15 126.32 0.216 127.906125.59 126.46 0.87 1.07 4.48 0.31 126.77 0.504 0.360 0.460 1.21 0.38 46 18 4.64 125.59 126.84 1.25 1.57 2.95 0.14 126.97 0.190 40.653 125.79 126.89 1.10 1.39 3.34 0.17 127.06 0.247 0.218 0.089 1.66 0.29 47 18 3.03 125.79 127.18 1.39 0.75 1.77 0.25 127.43 0.000 125.178126.86 127.52 j 0.66** 0.75 4.03 0.25 127.77 0.000 0.000 n/a 0.50 0.13 48 15 1.95 127.11 127.59 0.48" 0.43 4.52 0.21 127.80 0.000 104.892128.11 128.66 0.55"" 0.53 3.70 0.21 128.88 0.000 0.000 n/a 1.00 n/a 49 15 1.65 126.33 127.18 0.85 0.89 1.86 0.05 127.23 0.101 24.500 126.45 127.19 0.74 0.76 2.18 0.07 127.26 0.151 0.126 0.031 1.00 0.07 50 15 3.19 123.76 124.53 0.77" 0.79 4.05 0.26 124.78 0.509 27.500 123.90 124.67 0.77 0.79 4.06 0.26 124.92 0.510 0.509 0.140 1.00 0.26 51 30 15.57 121.95 123.97 2.02 2.66 3.66 0.53 124.50 0.000 169.250122.79 124.12 j 1.33** 2.66 5.86 0.53 124.66 0.000 0.000 n/a 0.50 n/a 52 24(2b) 14.50 123.29 124.22 0.93" 2.86 5.08 0.40 124.62 0.530 24.500 123.42 124.28 0.86 2.59 5.60 0.49 124.77 0.693 0.612 0.150 1.50 0.73 53 24 11.58 123.54 125.01 1.47 2.01 4.67 0.52 125.53 0.000 19.000 123.74 124.96 j 1.22"" 2.01 5.77 0.52 125.48 0.000 0.000 n/a 1.50 0.78 54 24 10.67 123.74 124.96 1.22 1.91 5.31 0.49 125.45 0.000 149.052125.53 126.70 j 1.17** 1.91 5.59 0.49 127.19 0.000 0.000 n/a 1.50 0.73 55 24 7.95 125.53 126.70 1.17 1.58 4.17 0.40 127.10 0.000 149.267127.32 128.32 j 1.00"" 1.58 5.05 0.40 128.72 0.000 0.000 n/a 0.50 n/a 56 24 6.84 127.88 128.80 0.92" 1.41 4.85 0.36 129.16 0.000 24.500 128.00 128.93 0.93** 1.42 4.80 0.36 129.29 0.000 0.000 n/a 1.50 0.54 57 15 2.19 128.29 128.93 0.64 0.57 3.48 0.23 129.16 0.000 176.000129.96 130.55 j 0.59"" 0.57 3.84 0.23 130.78 0.000 0.000 n/a 0.50 0.11 58 15 0.90 129.99 130.55 0.56 0.31 1.69 0.13 130.68 0.000 239.579132.74 133.11 j 0.37** 0.31 2.94 0.13 133.25 0.000 0.000 n/a 1.12 0.15 59 15 0.77 132.96 133.20 0.24" 0.17 4.58 0.12 133.33 0.000 39.946 133.79 134.13 0.34" 0.27 2.81 0.12 134.26 0.000 0.000 n/a 1.12 0.14 60 15 0.45 133.99 134.26 0.27" 0.19 2.37 0.09 134.34 0.500 28.000 134.13 134.40 j 0.27** 0.19 2.36 0.09 134.48 0.496 0.498 0.139 1.00 0.09 61 15 3.04 127.53 128.13 0.60" 0.59 5.18 0.29 128.42 0.000 96.000 128.49 129.19 0.70** 0.71 4.29 0.29 129.48 0.000 0.000 n/a 1.00 0.29 62 15 3.24 124.27 125.05 0.78" 0.80 4.03 0.25 125.30 0.499 166.000125.10 125.88 0.78 0.80 4.04 0.25 126.13 0.502 0.501 0.831 0.50 0.13 63 15 1.69 125.10 126.00 0.90 0.48 1.78 0.19 126.20 0.000 122.095126.32 126.84 j 0.52** 0.48 3.54 0.19 127.03 0.000 0.000 n/a 1.00 n/a Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 Notes: " Normal depth assumed; "" Critical depth.; j-Line contains hyd. jump ; c = cir e = ellip b = box Storm Sewers v2021.00 Inlet Report Page 1 Line No Inlet ID Q = CIA (cfs) Q carry (cfs) Q capt (cfs) Q Byp (cfs) Junc Type Curb Inlet Grate Inlet Gutter Inlet Byp Line No Ht (in) L (ft) Area (sqft) L (ft) W (ft) So (ft/ft) W (ft) Sw (ft/ft) Sx (ft/ft) n Depth (ft) Spread (ft) Depth (ft) Spread (ft) Depr (in) 1 A2 0.90 0.22 1.11 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.08 2.00 0.29 2.00 2.5 Off 2 A3 0.63 0.21 0.84 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.08 2.00 0.29 2.00 2.5 Off 3 Al 0.52 0.49 0.80 0.21 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.17 6.12 0.31 2.66 2.5 2 4 All 0.75 0.38 0.88 0.26 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.17 6.46 0.31 3.05 2.5 25 5 Al2 1.04 0.40 1.05 0.38 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.19 7.15 0.33 3.85 2.5 4 6 A14 1.38 0.08 1.07 0.40 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.19 7.21 0.33 3.93 2.5 5 7 A16 0.17 0.47 0.56 0.08 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.14 4.97 0.28 1.65 2.5 6 8 A20 0.77 0.12 0.73 0.16 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.16 5.80 0.30 2.27 2.5 7 9 A21 0.67 0.10 0.65 0.12 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.15 5.45 0.29 1.92 2.5 8 10 A23 0.59 0.12 0.60 0.10 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.15 5.21 0.28 1.78 2.5 9 11 A24 0.67 0.08 0.63 0.12 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.15 5.37 0.29 1.87 2.5 10 12 A25 0.54 0.08 0.54 0.08 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.14 4.90 0.28 1.60 2.5 11 13 A27 0.52 0.12 0.56 0.08 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.14 4.98 0.28 1.64 2.5 12 14 A28 0.48 0.29 0.64 0.12 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.15 5.41 0.29 1.89 2.5 13 15 A30 1.21 0.00 0.92 0.29 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 6.64 0.32 3.28 2.5 14 16 A31 0.89 0.36 0.95 0.31 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 6.75 0.32 3.40 2.5 18 17 A32 1.38 0.00 1.02 0.36 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 7.04 0.33 3.73 2.5 16 18 A29 0.89 0.31 0.92 0.28 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 6.62 0.32 3.24 2.5 19 19 A26 1.38 0.28 1.17 0.49 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 7.62 0.34 4.37 2.5 20 20 A22 1.35 0.49 1.27 0.58 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 7.95 0.35 4.74 2.5 23 21 A18 0.52 0.00 0.48 0.04 Comb 5.0 3.00 0.00 3.00 2.00 0.015 2.00 0.042 0.020 0.013 0.13 4.05 0.26 1.16 2.5 7 22 A19 1.20 0.00 0.94 0.26 Comb 5.0 3.00 0.00 3.00 2.00 0.015 2.00 0.042 0.020 0.013 0.17 6.06 0.31 2.73 2.5 7 23 A17 1.29 0.58 1.28 0.59 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 8.00 0.35 4.79 2.5 24 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES: Inlet N-Values = 0.013; Intensity = 74.06 / (Inlet time + 13.30) A 0.88; Return period = 2 Yrs. ; * Indicates Known Q added. All curb inlets are Horiz throat. Storm Sewers v2021.00 Inlet Report Page 2 Line No Inlet ID Q = CIA (cfs) Q carry (cfs) Q capt (cfs) Q Byp (cfs) Junc Type Curb Inlet Grate Inlet Gutter Inlet Byp Line No Ht (in) L (ft) Area (sqft) L (ft) W (ft) So (ft/ft) W (ft) Sw (ft/ft) Sx (ft/ft) n Depth (ft) Spread (ft) Depth (ft) Spread (ft) Depr (in) 24 A15 0.98 0.59 1.12 0.45 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.19 7.43 0.34 4.17 2.5 30 25 A4 0.78 0.26 0.82 0.22 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.17 6.20 0.31 2.75 2.5 1 26 A5 2.75 0.06 2.81 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.20 7.77 0.41 7.77 2.5 Off 27 A7 0.75 0.11 0.79 0.06 Comb 5.0 3.00 0.00 3.00 2.00 0.051 2.00 0.042 0.020 0.013 0.12 3.82 0.25 1.09 2.5 26 28 A8 0.73 0.30 0.92 0.11 Comb 5.0 3.00 0.00 3.00 2.00 0.051 2.00 0.042 0.020 0.013 0.13 4.20 0.26 1.33 2.5 27 29 A9 2.42 0.00 2.42 0.00 DrGrt 0.0 0.00 3.00 3.00 2.00 Sag 3.00 0.330 0.330 0.013 0.19 4.13 0.19 4.13 0.0 Off 30 A13 1.21 0.45 1.17 0.49 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 7.60 0.34 4.35 2.5 3 31 A6 2.14 0.00 2.14 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.16 5.61 0.36 5.61 2.5 Off 32 B2 0.03 0.00 0.03 0.00 DrGrt 0.0 0.00 0.00 3.00 2.00 0.010 2.00 0.020 0.020 0.013 0.02 4.10 0.02 4.10 0.0 Off 33 B3 0.72 0.00 0.65 0.07 Comb 5.0 3.00 0.00 3.00 2.00 0.025 2.00 0.042 0.020 0.013 0.13 4.21 0.26 1.30 2.5 50 34 B4 0.92 0.56 1.15 0.34 Comb 5.0 3.00 0.00 3.00 2.00 0.025 2.00 0.042 0.020 0.013 0.16 5.94 0.31 2.72 2.5 35 35 B7 1.63 0.34 1.41 0.55 Comb 5.0 3.00 0.00 3.00 2.00 0.025 2.00 0.042 0.020 0.013 0.18 6.73 0.33 3.66 2.5 41 36 B8 2.56 0.00 2.56 0.00 DrGrt 0.0 0.00 3.00 3.00 2.00 Sag 3.00 0.330 0.330 0.013 0.19 4.17 0.19 4.17 0.0 Off 37 B9 2.01 0.00 2.01 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.15 5.17 0.36 5.17 2.5 Off 38 B10 2.24 0.00 2.24 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.16 5.96 0.37 5.96 2.5 Off 39 B5 1.41 0.41 1.25 0.56 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 7.90 0.35 4.69 2.5 34 40 B6 1.48 0.00 1.08 0.41 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.19 7.26 0.33 3.98 2.5 39 41 B11 2.47 0.73 3.20 0.00 Comb 5.0 6.00 6.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.18 6.67 0.39 6.67 2.5 Off 42 B13 0.73 0.14 0.70 0.17 Comb 5.0 3.00 0.00 3.00 2.00 0.005 2.00 0.042 0.020 0.013 0.18 6.69 0.31 2.96 2.5 41 43 B14 0.62 0.14 0.63 0.14 Comb 5.0 3.00 0.00 3.00 2.00 0.005 2.00 0.042 0.020 0.013 0.17 6.34 0.30 2.56 2.5 42 44 B15 0.75 0.03 0.64 0.14 Comb 5.0 3.00 0.00 3.00 2.00 0.005 2.00 0.042 0.020 0.013 0.17 6.40 0.30 2.63 2.5 43 45 B16 0.21 0.19 0.36 0.03 Comb 5.0 3.00 0.00 3.00 2.00 0.005 2.00 0.042 0.020 0.013 0.14 4.67 0.26 1.35 2.5 44 46 B17 0.60 0.36 0.77 0.19 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.16 6.00 0.30 2.51 2.5 45 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES: Inlet N-Values = 0.013; Intensity = 74.06 / (Inlet time + 13.30) A 0.88; Return period = 2 Yrs. ; * Indicates Known Q added. All curb inlets are Horiz throat. Storm Sewers v2021.00 Inlet Report Page 3 Line No Inlet ID Q = CIA (cfs) Q carry (cfs) Q capt (cfs) Q Byp (cfs) Junc Type Curb Inlet Grate Inlet Gutter Inlet Byp Line No Ht (in) L (ft) Area (sqft) L (ft) W (ft) So (ft/ft) W (ft) Sw (ft/ft) Sx (ft/ft) n Depth (ft) Spread (ft) Depth (ft) Spread (ft) Depr (in) 47 B19 0.99 0.39 1.02 0.36 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 7.04 0.33 3.72 2.5 46 48 B20 1.44 0.00 1.06 0.39 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.19 7.17 0.33 3.88 2.5 47 49 B18 1.27 0.00 0.97 0.30 Comb 5.0 3.00 0.00 3.00 2.00 0.012 2.00 0.042 0.020 0.013 0.17 6.48 0.32 3.16 2.5 28 50 B12 2.45 0.07 2.52 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.18 6.86 0.39 6.86 2.5 Off 51 B21 1.99 0.00 1.99 0.00 Comb 5.0 6.00 6.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.12 3.89 0.33 3.89 2.5 Off 52 B22 2.56 1.07 3.63 0.00 Comb 5.0 6.00 6.00 6.00 2.00 Sag 2.00 0.042 0.020 0.013 0.18 6.93 0.39 6.93 2.5 Off 53 B25 1.84 0.00 1.27 0.58 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 7.95 0.35 4.74 2.5 52 54 B26 2.65 0.94 3.59 0.00 DrGrt 0.0 0.00 3.00 3.00 2.00 Sag 3.00 0.330 0.330 0.013 0.24 4.47 0.24 4.47 0.0 Off 55 B28 1.96 0.00 1.96 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.14 4.97 0.35 4.97 2.5 Off 56 B29 3.56 0.29 3.85 0.00 Comb 5.0 6.00 6.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 0.20 7.99 0.41 7.99 2.5 Off 57 B30 1.23 0.00 0.93 0.29 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 6.69 0.32 3.33 2.5 56 58 B31 0.14 0.01 0.14 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.07 1.78 0.21 0.00 2.5 57 59 B32 0.28 0.00 0.27 0.01 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.11 3.20 0.23 0.63 2.5 58 60 B33 0.35 0.00 0.35 0.00 Comb 5.0 3.00 3.00 3.00 2.00 Sag 2.00 0.042 0.020 0.013 -0.03 1.24 0.18 1.24 2.5 Off 61 B27 2.33 0.00 1.39 0.94 DrGrt 0.0 0.00 0.00 3.00 2.00 0.010 3.00 0.330 0.330 0.013 0.20 4.22 0.20 4.22 0.0 54 62 B23 1.35 0.32 1.18 0.50 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.20 7.64 0.34 4.40 2.5 52 63 B24 1.29 0.00 0.97 0.32 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.18 6.85 0.32 3.50 2.5 62 Olde Mill Stream Phase 2 Number of lines: 63 Run Date: 8/25/2020 NOTES: Inlet N-Values = 0.013; Intensity = 74.06 / (Inlet time + 13.30) A 0.88; Return period = 2 Yrs. ; * Indicates Known Q added. All curb inlets are Horiz throat. Storm Sewers v2021.00 DISSIPATOR PAD/OUTLET PROTECTION SCHEDULE (NYDOT METHOD) NUMBER APRON APRON STONE D50 LOCATION Qmax Q10 V10 Vmax PIPE DIA.1 OF PIPES LENGTH2 WIDTH3 CLASS DEPTH 4 STONE CFS CFS FPS FPS INCHES ZONE M (La) FEET FEET STONE INCHES SIZE PIPE "LA2" 64.20 26.54 3.03 7.07 42 2 6 1 21 14 B 22 9 PIPE "LB2" 68.63 20.13 3.95 7.56 42 2 6 1 21 14 B 22 9 PIPE "LB21" 27.98 15.57 4.76 6.04 30 2 6 1 15 10 B 22 9 Note: Q10 and V10 values are Hydraflow calculations. WET POND DESIGN CALCULATIONS  NUTRIENT CALCULATIONS  SUPPLEMENT-EZ  STORMWATER POND DESIGN DATA  10-YR & 25-YR HYDROGRAPH REPORT  POND CALCULATIONS Piedmont of the Tar-Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name:Olde Mill Stream - Phase 1 & 2 Date:8/25/2020 By:Bartlett Engineering and Surveying, PC Checked By: Directions (same for pre-development and post-development tables): Pre-development: (2)(3)(4)(5)(6)(7) Area (acres) S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 0.00 0.47 2.60 0.00 0.19 0.00 0.15 0.47 1.95 0.14 0.11 0.01 37.56 0.47 1.42 25.23 0.28 4.98 33.54 0.47 4.23 67.12 1.23 19.52 0.00 0.47 2.04 0.00 0.62 0.00 24.02 0.47 0.94 10.68 0.14 1.59 0.00 TN Loading (lb/yr) =103.17 TP Loading (lb/yr) =26.09 95.27 TN Exp. Coeff. (lb/ac/yr) =1.08 TP Exp. Coeff. (lb/ac/yr) =0.27 Post-development: (2)(3)(4)(5)(6)(7) Area (acres) S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 7.47 1.98 2.60 38.44 0.19 2.81 9.95 1.98 1.95 38.38 0.11 2.17 64.98 1.98 1.42 182.62 0.28 36.01 12.87 1.98 0.95 24.19 0.14 3.57 0.18 TN Loading (lb/yr) =283.64 TP Loading (lb/yr) =44.55 95.27 TN Exp. Coeff. (lb/ac/yr) =2.98 TP Exp. Coeff. (lb/ac/yr) =0.47 Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post-development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post-development TN and TP loadings after BMPs are installed. Fraction Impervious (I) = Total Area of Development = Roof impervious (1) Type of Land Cover Transportation impervious > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. Managed pervious Wooded pervious (1) Type of Land Cover Transportation impervious Roof impervious Managed pervious (lawn/landscaped) Managed pervious (cropland) Managed pervious (pasture) Wooded pervious Fraction Impervious (I) = Total Area of Development = Piedmont of the Tar-Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties BMP Removal Calculation Worksheet (Automated) Project Name:Olde Mill Stream - Phase 1 & 2 Date:8/25/2020 By:Bartlett Engineering and Surveying, PC Checked By: Directions: TN TP Design Standard BMP 25 40 NC BMP Manual Nutrient 40 35 NC BMP Manual Removal 35 45 NC BMP Manual Rates 35 45 NC BMP Manual 20 20 NC BMP Manual 20 35 NC BMP Manual 10 10 NC BMP Manual Catchment 1: Total acreage of catchment 1 =2.55 ac First BMP's TN removal rate =40 %First BMP's TP removal rate =35 % Second BMP's TN removal rate =%Second BMP's TP removal rate =% Third BMP's TN removal rate =%Third BMP's TP removal rate =% TOTAL TN REMOVAL RATE =40 %TOTAL TP REMOVAL RATE =35 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 0.84 4.28 2.60 9.39 0.19 0.69 0.33 4.28 1.95 2.73 0.11 0.15 1.09 4.28 1.42 6.60 0.28 1.30 0.00 4.28 0.94 0.00 0.14 0.00 0.29 4.28 1.95 2.43 0.11 0.14 0.46 Pre-BMP TN Load (lb/yr) =21.15 Pre-BMP TP Load (lb/yr) =2.28 2.55 Pre-BMP TN Export (lb/ac/yr) =8.30 Pre-BMP TP Export (lb/ac/yr) =0.89 Post-BMP TN Load (lb/yr) =12.69 Post-BMP TP Load (lb/yr) =1.48 Post-BMP TN Export (lb/ac/yr) =4.98 Post-BMP TP Export (lb/ac/yr) =0.58 Area taken up by BMP Fraction Impervious (I) = Total Area of Development = Type of Land Cover Transportation impervious Roof impervious Managed pervious Wooded pervious (1) > It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless runoff > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post-development TN and TP export coefficients you calculated above to the rule requirements of 4.0 lb/ac/yr TN and 0.4 lb/ac/yr TP, select BMP(s) from t > Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in th Wet Detention Pond Stormwater Wetland Sand Filter Bioretention Grass Swale Vegetated Filter Strip w/ Level Spreader Dry Detention Catchment 2: Total acreage of catchment 2 =6.52 ac First BMP's TN removal rate =40 % First BMP's TP removal rate =35 % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =40 % TOTAL TP REMOVAL RATE =35 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 1.42 3.78 2.60 14.00 0.19 1.02 1.18 3.78 1.95 8.71 0.11 0.49 3.53 3.78 1.42 18.95 0.28 3.74 0.00 3.78 0.94 0.00 0.14 0.00 0.38 3.78 1.95 2.82 0.11 0.16 0.40 Pre-BMP TN Load (lb/yr) =44.49 Pre-BMP TP Load (lb/yr) =5.41 6.52 Pre-BMP TN Export (lb/ac/yr) =6.83 Pre-BMP TP Export (lb/ac/yr) =0.83 Post-BMP TN Load (lb/yr) =26.69 Post-BMP TP Load (lb/yr) =3.52 Post-BMP TN Export (lb/ac/yr) =4.10 Post-BMP TP Export (lb/ac/yr) =0.54 Catchment 3: Total acreage of catchment 3 =12.69 ac First BMP's TN removal rate =25 % First BMP's TP removal rate =40 % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =25 % TOTAL TP REMOVAL RATE =40 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 2.02 3.61 2.60 18.94 0.19 1.38 2.78 3.61 1.95 19.56 0.11 1.10 7.59 3.61 1.42 38.87 0.28 7.67 0.00 3.61 0.94 0.00 0.14 0.00 0.29 3.61 1.95 2.05 0.11 0.12 0.38 Pre-BMP TN Load (lb/yr) =79.42 Pre-BMP TP Load (lb/yr) =10.27 12.69 Pre-BMP TN Export (lb/ac/yr) =6.26 Pre-BMP TP Export (lb/ac/yr) =0.81 Post-BMP TN Load (lb/yr) =59.56 Post-BMP TP Load (lb/yr) =6.16 Post-BMP TN Export (lb/ac/yr) =4.70 Post-BMP TP Export (lb/ac/yr) =0.49 Wooded pervious Area taken up by BMP Fraction Impervious (I) = Total Area of Development = Type of Land Cover Managed pervious Roof impervious Managed pervious Wooded pervious Area taken up by BMP Fraction Impervious (I) = Total Area of Development = (1) Type of Land Cover Transportation impervious Roof impervious (1) Transportation impervious Catchment 4: Total acreage of catchment 3 =22.01 ac First BMP's TN removal rate =25 % First BMP's TP removal rate =40 % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =25 % TOTAL TP REMOVAL RATE =40 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 3.18 2.71 2.60 22.44 0.19 1.64 2.78 2.71 1.95 14.71 0.11 0.83 15.34 2.71 1.42 59.08 0.28 11.65 0.00 2.71 0.94 0.00 0.14 0.00 0.70 2.71 1.95 3.71 0.11 0.21 0.27 Pre-BMP TN Load (lb/yr) =99.94 Pre-BMP TP Load (lb/yr) =14.33 22.01 Pre-BMP TN Export (lb/ac/yr) =4.54 Pre-BMP TP Export (lb/ac/yr) =0.65 Post-BMP TN Load (lb/yr) =74.96 Post-BMP TP Load (lb/yr) =8.60 Post-BMP TN Export (lb/ac/yr) =3.41 Post-BMP TP Export (lb/ac/yr) =0.39 Catchment 5: Total acreage of catchment 3 =51.51 ac First BMP's TN removal rate = % First BMP's TP removal rate = % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE =0 % TOTAL TP REMOVAL RATE =0 % (2)(3)(4)(5)(6)(7) Catchment Acreage S.M. Formula (0.46 + 8.3I) Average EMC of TN (mg/L) Column (2) * (3) * (4) Average EMC of TP (mg/L) Column (2) * (3) * (6) 0.00 0.92 2.60 0.00 0.19 0.00 2.87 0.92 1.95 5.17 0.11 0.29 37.44 0.92 1.42 49.10 0.28 9.68 11.20 0.92 0.94 9.72 0.14 1.45 0.00 0.92 1.95 0.00 0.11 0.00 0.06 Pre-BMP TN Load (lb/yr) =63.99 Pre-BMP TP Load (lb/yr) =11.42 51.51 Pre-BMP TN Export (lb/ac/yr) =1.24 Pre-BMP TP Export (lb/ac/yr) =0.22 Post-BMP TN Load (lb/yr) =63.99 Post-BMP TP Load (lb/yr) =11.42 Post-BMP TN Export (lb/ac/yr) =1.24 Post-BMP TP Export (lb/ac/yr) =0.22 (1) Wooded pervious (1) Type of Land Cover Transportation impervious Roof impervious Roof impervious Transportation impervious Type of Land Cover Total Area of Development = Fraction Impervious (I) = Area taken up by BMP Managed pervious Managed pervious Wooded pervious Area taken up by BMP Fraction Impervious (I) = Total Area of Development = Weighted Average of Nutrient Loadings from the Catchments: Catchment Acreage Post-BMP TN Loading (lb/ac/yr) Post-BMP TP Loading (lb/ac/yr) 2.55 4.98 0.58 6.52 4.10 0.54 12.69 4.70 0.49 22.01 3.41 0.39 51.51 1.24 0.22 95.27 2.50 0.33 Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post-development nutrient loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMPs and/or modifications in development plans are required. TOTAL FOR DEVELOPMENT Catchment 4 Catchment 5 Catchment 1 Catchment 2 Catchment 3 SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1 Project Name Olde Mill Stream Ph2 2 Project Area (ac)38.42 3 Coastal Wetland Area (ac)N/A 4 Surface Water Area (ac)0 5 Is this project High or Low Density?High 6 Does this project use an off-site SCM? No 7 Width of vegetated setbacks provided (feet)50 8 Will the vegetated setback remain vegetated?Yes 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback?Yes 10 Is streambank stabilization proposed on this project? No 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH)0 18 Green Roof 0 19 Level Spreader-Filter Strip (LS-FS)0 20 Disconnected Impervious Surface (DIS)0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED 27 Name and Title:Ronald G. Fuentes 28 Organization:Bartlett Engineering & Surveying, PC 29 Street address:1906 Nash Street N 30 City, State, Zip:Wilson, NC 27893 31 Phone number(s):(252) 399-0704 32 Email: ronaldf@bartletteng.com Certification Statement: Designer ______________________________________________ Signature of Designer ______________________________________________ Date I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. PROJECT INFORMATION NUMBER AND TYPE OF SCMs: DESIGNER CERTIFICATION COMPLIANCE WITH 02H .1003(4) Seal DRAINAGE AREAS 1 Is this a high density project?Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/part of this project subject to previous rule versions?No FORMS LOADED Entire Site 1 2 4 Type of SCM N/A Wet Pond Wet Pond 5 Total BUA in project (sq ft)590685 sf 213799 sf 325287 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft)414540 sf 148740 sf 214200 sf 7 New BUA outside of subdivided lots (subject to permitting) (sf)176145 sf 65058 sf 111087 sf 8 Offsite - total area (sq ft) 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft)76140 sf 27540 sf 48600 sf - Sidewalk (sq ft) - Roof (sq ft)338400 sf 121200 sf 165600 sf - Roadway (sq ft)176145 sf 65059 sf 1110567 sf - Future (sq ft) - Other, please specify in the comment box below (sq ft) 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 38%30% 17 Design storm (inches)1 in 1 in 18 Design volume of SCM (cu ft)18337 cf 28843 cf 19 Calculation method for design volume 20 DRAINAGE AREA INFORMATION ADDITIONAL INFORMATION Please use this space to provide any additional information about the drainage area(s): WET POND 1 Drainage area number 1 2 2 Design volume of SCM (cu ft)18173 cf 28843 cf 3 Is the SCM sized to treat the SW from all surfaces at build-out?Yes Yes 4 Is the SCM located away from contaminated soils?Yes Yes 5 What are the side slopes of the SCM (H:V)?2:1 2:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance?Pump (preferred)Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction?Yes Yes 11 Does the maintenance access comply with General MDC (8)?Yes Yes 12 Does the drainage easement comply with General MDC (9)?Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)?Yes Yes 16 Does the SCM follow the device specific MDC?Yes Yes 17 Was the SCM designed by an NC licensed professional?Yes Yes 18 Method used HRT HRT 19 Has a stage/storage table been provided in the calculations?Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 114.00 117.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 115.00 118.00 22 Elevation of the bottom of the vegetated shelf (fmsl)121.00 121.50 23 Elevation of the permanent pool (fmsl)121.00 121.50 24 Elevation of the top of the vegetated shelf (fmsl)122.00 122.50 25 Elevation of the temporary pool (fmsl)122.30 122.40 26 Surface area of the main permanent pool (square feet)9843:1 24748:1 27 Volume of the main permanent pool (cubic feet)44691 cf 75403 cf 28 Average depth of the main pool (feet)6.00 ft 6.50 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet)7392 cf 12263 cf 33 Is this 15-20% of the volume in the main pool?Yes Yes 34 Clean-out depth for forebay (inches)12 in 12 in 35 Design volume of SCM (cu ft)18173 cf 28843 cf 36 Is the outlet an orifice or a weir?Orifice Orifice 37 If orifice, orifice diameter (inches)2 in 3 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days)2.95 2.28 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path?No No 43 Depth of forebay at entrance (inches)72 in 42 in 44 Depth of forebay at exit (inches)60 in 30 in 45 Does water flow out of the forebay in a non-erosive manner?Yes Yes 46 Width of the vegetated shelf (feet)6 ft 6 ft 47 Slope of vegetated shelf (H:V)6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Bermuda Bermuda 54 Has a planting plan been provided for the vegetated shelf?Yes Yes 55 Please use this space to provide any additional information about the wet pond(s): WET POND MDC FROM 02H .1053 GENERAL MDC FROM 02H .1050 ADDITIONAL INFORMATION Pond 2 consists of two (2) forebays and the value entered in item 32 is the total forebay volume. OLDE MILL STREAM -PHASE 2 POND DESIGN DATA Wet Detention Pond #1 Drainage Area (DA) 552,620 sf Built Upon Area (BUA) 213,799 sf BUA/DA 0.39 Runoff Coefficient (Rv) 0.40 Storm Rainfall Depth (Rd) 1 in Water Quality Volume (WQv)18,337 cf Main Pool (HRT Method) and Forebay Main Pool Volume Required (VMP) 44,670 cf Main Pool Volume Provided (MPV) 44,691 cf Forebay Volume Provided 1,179 cf Forebay Volume/Main Pond Volume 2.64 % Drawdown Orifice Water Quality Volume (WQv) 18,337 cf Temporary Pool Elevation 122.30 ft Normal Pool Elevation 121.00 ft Orifice size 2.00 in Driving Head (Ho/3) 0.46 ft Discharge 0.07 cfs Drawdown time 2.98 days Planting Plan (Minimum Requirements) Dam & Embankment Slopes Seeding Mixture Species Rate (lb/ac) Seeding Dates Bermuda Grass 80 4/15-8/15 Perimeter Shelf Perimeter shelf surface area 2140 sf Minimum planting rate 50 plants/200 sf Minimum number of plants required 535 plants Plant Name Qty Spacing Size Ascelepias Incarnata (Swamp Milkweed) 70 3' 4" pots Hibiscus Coccineus (Scarlet Rose Mallow) 70 3' 4" pots Lebelia Elongata (Longleaf Lobelia)395 1.5'4" pots OLDE MILL STREAM -PHASE 2 POND DESIGN DATA Wet Detention Pond #2 Drainage Area (DA) 1,067,143 sf Built Upon Area (BUA) 325,287 sf BUA/DA 0.30 Runoff Coefficient (Rv) 0.32 Storm Rainfall Depth (Rd) 1 in Water Quality Volume (WQv)28,843 cf Main Pool (HRT Method) and Forebay Main Pool Volume Required (VMP) 70,261 cf Main Pool Volume Provided (MPV) 75,403 cf Forebay Volume Provided 1,179 cf Forebay Volume/Main Pond Volume 1.56 % Drawdown Orifice Water Quality Volume (WQv) 28,843 cf Temporary Pool Elevation 122.40 ft Normal Pool Elevation 121.50 ft Orifice size 3.00 in Driving Head (Ho/3) 0.34 ft Discharge 0.14 cfs Drawdown time 2.42 days Planting Plan (Minimum Requirements) Dam & Embankment Slopes Seeding Mixture Species Rate (lb/ac) Seeding Dates Bermuda Grass 80 4/15-8/15 Perimeter Shelf Perimeter shelf surface area 3956 sf Minimum planting rate 50 plants/200 sf Minimum number of plants required 989 plants Plant Name Qty Spacing Size Ascelepias Incarnata (Swamp Milkweed) 129 3' 4" pots Hibiscus Coccineus (Scarlet Rose Mallow) 129 3' 4" pots Lobelia Elongata (Longleaf Lobelia)731 1.5'4" pots 1 2 4 6 7 8 9 10 11 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Project: 20-042 Pond 1 & 2 Hydrograph.gpw Wednesday, 08 / 26 / 2020 Hyd.Origin Description Legend 1 SCS Runoff Existing 2 SCS Runoff Post from WL1 4 SCS Runoff Post from WL2 6 SCS Runoff Post to Pond 1 7 Reservoir To Pond 1 8 SCS Runoff Post to Pond 2 9 Reservoir To Pond 2 10 SCS Runoff Offsite 11 Combine Proposed Hydrograph Summary Report 2 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 129.59 2 730 519,360 ------ ------ ------ Existing 2 SCS Runoff 15.38 2 718 36,676 ------ ------ ------ Post from WL1 4 SCS Runoff 40.51 2 716 85,425 ------ ------ ------ Post from WL2 6 SCS Runoff 59.08 2 716 119,490 ------ ------ ------ Post to Pond 1 7 Reservoir 17.59 2 724 117,721 6 124.07 49,472 To Pond 1 8 SCS Runoff 99.34 2 718 199,963 ------ ------ ------ Post to Pond 2 9 Reservoir 10.29 2 744 195,676 8 123.97 91,787 To Pond 2 10 SCS Runoff 62.22 2 730 257,527 ------ ------ ------ Offsite 11 Combine 106.98 2 720 693,027 2, 4, 7, 9, 10 ------ ------ Proposed 20-042 Pond 1 & 2 Hydrograph.gpw Return Period: 10 Year Wednesday, 08 / 26 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 129.59 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 519,360 cuft Drainage area = 95.270 ac Curve number = 60.8 Basin Slope = 0.7 % Hydraulic length = 3170 ft Tc method = KIRPICH Time of conc. (Tc) = 26.15 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 3 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Existing Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 2 Post from WL1 Hydrograph type = SCS Runoff Peak discharge = 15.38 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 36,676 cuft Drainage area = 2.547 ac Curve number = 88.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.60 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Post from WL1 Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 4 Post from WL2 Hydrograph type = SCS Runoff Peak discharge = 40.51 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 85,425 cuft Drainage area = 6.516 ac Curve number = 87.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 5 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (min) Post from WL2 Hyd. No. 4 -- 10 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 6 Post to Pond 1 Hydrograph type = SCS Runoff Peak discharge = 59.08 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 119,490 cuft Drainage area = 12.685 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Post to Pond 1 Hyd. No. 6 -- 10 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 7 To Pond 1 Hydrograph type = Reservoir Peak discharge = 17.59 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 117,721 cuft Inflow hyd. No. = 6 - Post to Pond 1 Max. Elevation = 124.07 ft Reservoir name = Pond 1 Max. Storage = 49,472 cuft Storage Indication method used. 7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) To Pond 1 Hyd. No. 7 -- 10 Year Hyd No. 7 Hyd No. 6 Total storage used = 49,472 cuft Pond Report 8 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Pond No. 3 - Pond 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 121.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 121.00 12,685 0 0 1.00 122.00 15,397 14,017 14,017 2.00 123.00 17,038 16,209 30,226 3.00 124.00 18,737 17,879 48,105 4.00 125.00 20,492 19,606 67,711 5.00 126.00 22,303 21,389 89,100 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 24.00 2.00 0.00 0.00 Span (in)= 24.00 2.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 121.00 121.00 0.00 0.00 Length (ft)= 46.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 12.00 3.00 20.00 0.00 Crest El. (ft)= 124.00 122.30 124.40 0.00 Weir Coeff.= 3.33 3.33 2.60 3.33 Weir Type = 1 Rect Broad --- Multi-Stage = Yes Yes No No Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 121.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 1.00 14,017 122.00 0.11 ic 0.10 ic --- --- 0.00 0.00 0.00 --- --- --- 0.098 2.00 30,226 123.00 5.95 ic 0.10 ic --- --- 0.00 5.85 0.00 --- --- --- 5.952 3.00 48,105 124.00 16.51 oc 0.08 ic --- --- 0.00 16.43 s 0.00 --- --- --- 16.51 4.00 67,711 125.00 25.97 ic 0.02 ic --- --- 14.75 s 11.20 s 24.17 --- --- --- 50.13 5.00 89,100 126.00 30.19 ic 0.01 ic --- --- 20.14 s 10.00 s 105.24 --- --- --- 135.40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 8 Post to Pond 2 Hydrograph type = SCS Runoff Peak discharge = 99.34 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 199,963 cuft Drainage area = 24.498 ac Curve number = 71.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 9 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 Q (cfs) Time (min) Post to Pond 2 Hyd. No. 8 -- 10 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 9 To Pond 2 Hydrograph type = Reservoir Peak discharge = 10.29 cfs Storm frequency = 10 yrs Time to peak = 744 min Time interval = 2 min Hyd. volume = 195,676 cuft Inflow hyd. No. = 8 - Post to Pond 2 Max. Elevation = 123.97 ft Reservoir name = Pond 2 Max. Storage = 91,787 cuft Storage Indication method used. 10 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 4320 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 Q (cfs) Time (min) To Pond 2 Hyd. No. 9 -- 10 Year Hyd No. 9 Hyd No. 8 Total storage used = 91,787 cuft Pond Report 11 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Pond No. 4 - Pond 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 121.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 121.50 32,527 0 0 0.50 122.00 35,049 16,888 16,888 1.50 123.00 38,068 36,545 53,433 2.50 124.00 41,145 39,593 93,025 3.50 125.00 44,278 42,697 135,723 4.50 126.00 47,467 45,859 181,581 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 18.00 3.00 0.00 0.00 Span (in)= 18.00 3.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 121.50 121.50 0.00 0.00 Length (ft)= 38.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 12.00 3.00 30.00 0.00 Crest El. (ft)= 124.00 122.40 124.30 0.00 Weir Coeff.= 3.33 3.33 2.60 3.33 Weir Type = 1 Rect Broad --- Multi-Stage = Yes Yes No No Exfil.(in/hr)= 0.000 (by Wet area) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 121.50 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.50 16,888 122.00 0.14 ic 0.14 ic --- --- 0.00 0.00 0.00 --- --- --- 0.138 1.50 53,433 123.00 4.61 oc 0.16 ic --- --- 0.00 4.42 s 0.00 --- --- --- 4.574 2.50 93,025 124.00 10.45 oc 0.10 ic --- --- 0.00 10.34 s 0.00 --- --- --- 10.45 3.50 135,723 125.00 14.08 ic 0.02 ic --- --- 8.14 s 5.91 s 45.68 --- --- --- 59.75 4.50 181,581 126.00 16.47 ic 0.01 ic --- --- 10.99 s 5.29 s 172.89 --- --- --- 189.19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 10 Offsite Hydrograph type = SCS Runoff Peak discharge = 62.22 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 257,527 cuft Drainage area = 52.686 ac Curve number = 58.6 Basin Slope = 0.3 % Hydraulic length = 2120 ft Tc method = KIRPICH Time of conc. (Tc) = 25.63 min Total precip. = 5.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 12 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (min) Offsite Hyd. No. 10 -- 10 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 11 Proposed Hydrograph type = Combine Peak discharge = 106.98 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 693,027 cuft Inflow hyds. = 2, 4, 7, 9, 10 Contrib. drain. area = 61.749 ac 13 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Proposed Hyd. No. 11 -- 10 Year Hyd No. 11 Hyd No. 2 Hyd No. 4 Hyd No. 7 Hyd No. 9 Hyd No. 10 Hydrograph Summary Report 14 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 205.63 2 730 788,083 ------ ------ ------ Existing 2 SCS Runoff 19.57 2 718 47,364 ------ ------ ------ Post from WL1 4 SCS Runoff 51.76 2 716 110,874 ------ ------ ------ Post from WL2 6 SCS Runoff 80.51 2 716 163,945 ------ ------ ------ Post to Pond 1 7 Reservoir 38.70 2 722 162,161 6 124.81 63,988 To Pond 1 8 SCS Runoff 138.97 2 716 280,963 ------ ------ ------ Post to Pond 2 9 Reservoir 34.88 2 724 276,637 8 124.72 123,903 To Pond 2 10 SCS Runoff 102.27 2 730 398,420 ------ ------ ------ Offsite 11 Combine 188.28 2 722 995,455 2, 4, 7, 9, 10 ------ ------ Proposed 20-042 Pond 1 & 2 Hydrograph.gpw Return Period: 25 Year Wednesday, 08 / 26 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 205.63 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 788,083 cuft Drainage area = 95.270 ac Curve number = 60.8 Basin Slope = 0.7 % Hydraulic length = 3170 ft Tc method = KIRPICH Time of conc. (Tc) = 26.15 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 15 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Existing Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 2 Post from WL1 Hydrograph type = SCS Runoff Peak discharge = 19.57 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 47,364 cuft Drainage area = 2.547 ac Curve number = 88.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.60 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 16 0 120 240 360 480 600 720 840 960 1080 1200 1320 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (min) Post from WL1 Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 4 Post from WL2 Hydrograph type = SCS Runoff Peak discharge = 51.76 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 110,874 cuft Drainage area = 6.516 ac Curve number = 87.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 17 0 120 240 360 480 600 720 840 960 1080 1200 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (min) Post from WL2 Hyd. No. 4 -- 25 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 6 Post to Pond 1 Hydrograph type = SCS Runoff Peak discharge = 80.51 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 163,945 cuft Drainage area = 12.685 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 18 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) Post to Pond 1 Hyd. No. 6 -- 25 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 7 To Pond 1 Hydrograph type = Reservoir Peak discharge = 38.70 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 162,161 cuft Inflow hyd. No. = 6 - Post to Pond 1 Max. Elevation = 124.81 ft Reservoir name = Pond 1 Max. Storage = 63,988 cuft Storage Indication method used. 19 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (min) To Pond 1 Hyd. No. 7 -- 25 Year Hyd No. 7 Hyd No. 6 Total storage used = 63,988 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 8 Post to Pond 2 Hydrograph type = SCS Runoff Peak discharge = 138.97 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 280,963 cuft Drainage area = 24.498 ac Curve number = 71.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 20 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) Post to Pond 2 Hyd. No. 8 -- 25 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 9 To Pond 2 Hydrograph type = Reservoir Peak discharge = 34.88 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 276,637 cuft Inflow hyd. No. = 8 - Post to Pond 2 Max. Elevation = 124.72 ft Reservoir name = Pond 2 Max. Storage = 123,903 cuft Storage Indication method used. 21 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (min) To Pond 2 Hyd. No. 9 -- 25 Year Hyd No. 9 Hyd No. 8 Total storage used = 123,903 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 10 Offsite Hydrograph type = SCS Runoff Peak discharge = 102.27 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 398,420 cuft Drainage area = 52.686 ac Curve number = 58.6 Basin Slope = 0.3 % Hydraulic length = 2120 ft Tc method = KIRPICH Time of conc. (Tc) = 25.63 min Total precip. = 6.48 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 22 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (min) Offsite Hyd. No. 10 -- 25 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Wednesday, 08 / 26 / 2020 Hyd. No. 11 Proposed Hydrograph type = Combine Peak discharge = 188.28 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 995,455 cuft Inflow hyds. = 2, 4, 7, 9, 10 Contrib. drain. area = 61.749 ac 23 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (min) Proposed Hyd. No. 11 -- 25 Year Hyd No. 11 Hyd No. 2 Hyd No. 4 Hyd No. 7 Hyd No. 9 Hyd No. 10 SCM OPERATIONS AND MAINTENANCE MANUAL Permit Number:_______________________ (to be provided by DWQ) Drainage Area Number:_________________ Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): does does not incorporate a vegetated filter at the outlet. This system (check one): does does not incorporate pretreatment other than a forebay. Important maintenance procedures:  Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks).  No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf.  Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin.  If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical.  Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at a height of approximately six inches. Permit Number:_______________________ (to be provided by DWQ) Drainage Area Number:_________________ Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or otherwise damaged. Replace the pipe. Erosion is occurring in the swale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to a depth greater than the original design depth for sediment storage. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices show that pruning is needed to maintain optimal plant health. Prune according to best professional practices Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to a depth greater than the original design sediment storage depth. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over 50% of the area. Consult a professional to remove and control the algal growth. Cattails, phragmites or other invasive plants cover 50% of the basin surface. Remove the plants by wiping them with pesticide (do not spray). Permit Number:_______________________ (to be provided by DWQ) Drainage Area Number:_________________ Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow on the embankment. Remove shrubs immediately. Evidence of muskrat or beaver activity is present. Use traps to remove muskrats and consult a professional to remove beavers. A tree has started to grow on the embankment. Consult a dam safety specialist to remove the tree. An annual inspection by an appropriate professional shows that the embankment needs repair. (if applicable) Make all needed repairs. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of damage have occurred at the outlet. Contact the local NC Division of Water Quality Regional Office, or the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads _6_ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads _5_ feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 121' Sediment Removal El. 116' Permanent Pool Volume Sediment Removal Elevation 115' Volume Bottom Elevation 115' 1-ft Min. Sediment Bottom Elevation 114' 1-ft Min. Storage Sediment Storage FOREBAY MAIN POND Permit Number:_______________________ (to be provided by DWQ) Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Olde Mill Stream (Phase 2) BMP drainage area number:1 Print name: Ralph Hodge Title: Member - Manager Address: 2101 F Miller Road Wilson, NC 27893 Phone: (252) 237-3663 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Permit Number:_______________________ (to be provided by DWQ) Drainage Area Number:_________________ Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): does does not incorporate a vegetated filter at the outlet. This system (check one): does does not incorporate pretreatment other than a forebay. Important maintenance procedures:  Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks).  No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf.  Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin.  If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical.  Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at a height of approximately six inches. Permit Number:_______________________ (to be provided by DWQ) Drainage Area Number:_________________ Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or otherwise damaged. Replace the pipe. Erosion is occurring in the swale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to a depth greater than the original design depth for sediment storage. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices show that pruning is needed to maintain optimal plant health. Prune according to best professional practices Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to a depth greater than the original design sediment storage depth. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over 50% of the area. Consult a professional to remove and control the algal growth. Cattails, phragmites or other invasive plants cover 50% of the basin surface. Remove the plants by wiping them with pesticide (do not spray). Permit Number:_______________________ (to be provided by DWQ) Drainage Area Number:_________________ Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow on the embankment. Remove shrubs immediately. Evidence of muskrat or beaver activity is present. Use traps to remove muskrats and consult a professional to remove beavers. A tree has started to grow on the embankment. Consult a dam safety specialist to remove the tree. An annual inspection by an appropriate professional shows that the embankment needs repair. (if applicable) Make all needed repairs. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of damage have occurred at the outlet. Contact the local NC Division of Water Quality Regional Office, or the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads _3.5_ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads _2.5_ feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 121.5' Sediment Removal El. 119' Permanent Pool Volume Sediment Removal Elevation 118' Volume Bottom Elevation 118' 1-ft Min. Sediment Bottom Elevation 117' 1-ft Min. Storage Sediment Storage FOREBAY MAIN POND Permit Number:_______________________ (to be provided by DWQ) Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Olde Mill Stream (Phase 2) BMP drainage area number:2 Print name: Ralph Hodge Title: Member - Manager Address: 2101 F Miller Road Wilson, NC 27893 Phone: (252) 237-3663 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _____________________________________, a Notary Public for the State of ____________________, County of ____________________, do hereby certify that ______________________________________ personally appeared before me this day of _________________, _______, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires