HomeMy WebLinkAbout20201735 Ver 1_USACE Permit_20210318U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2021-00216 County: Brunswick County U.S.G.S. Quad: Funston
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Jeff Repp
City Manager (Boiling Spring Lakes)
Address: 9 East Boiling Spring Road
Southport NC, 28461
Telephone Number: (910) 363-0025
E-mail Address: Jrepp@cityofbsl.org
Size (acres) 34.79 acres
Nearest Waterway Allen Creek
USGS HUC 03030005
Nearest Town Boiling Spring Lakes, NC
River Basin Cape Fear
Coordinates Latitude: 34.0216
Longitude: -78.0693
Location description: This protect will include repair work to the Sanford Dam, North Lake Dam, Pine Lake Dam and the
Upper Lake Dam. These (4) dams were severely damaged during Hurricane Florence (September 2018). The dams are located
in The City of Boiling Spring Lakes, Brunswick County, NC.
Description of projects area and activity: Project impacts include:
Impact Location
Permanent Open Water & Creek
Impacts
Temporary Open Water & Creek
Impacts
Allen Creek
90 LF of rip rap for energy dissipator
pad
30 LF for equipment access
Sanford Dam
0.5 acres (new earthen embankment
and new spillway)
2.5 acres for
access and laydown area
North Lake Dam
0.07 acres (new earthen embankment
and new spillway)
1.3 acres for equipment access and lay
down area
Pine Lake Dam
0.09 acres (new earthen embankment
and new spillway)
1.4 acres for equipment access and lay
down area
Upper Lake Dam
0.08 acres (new earthen embankment
and new spillway)
0.7 acres for equipment access and lay
down area
Total Impacts
90 LF Allen Creek
30 LF Allen Creek
0.74 acres Open Water
5.9 acres Open Water
*(Impact details and locations on attached plans)
Applicable Law:
® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number and/or Nationwide Permit Number: 3 Maintenance Work
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application and attached information dated March 18, 2021 Any violation of the attached
SAW-2021-00216
conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class
I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional
general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below,
provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit
authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and
conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to
commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless
discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA),
prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,
State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory
program, please contact Gary Beecher at (910) 251-4694 or Gary.H.Beecher@usace.army.mil.
Digitally signed by GARY H.
GARY H. BEECHER BEECHER
Corps Regulatory Official: Date: 2021.03.18 12:28:36 -04'00' Date: March 18, 2021
Expiration Date of Verification: March 18, 2022
A. Determination of Jurisdiction:
1. ® There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the
Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC 403). This
preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process
(Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting
the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit,
and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process
concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter
the hydrology of waters of the United States.
2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements
of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
3. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
4. ❑ A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you
may request an approved JD, which is an appealable action, by contacting the Corps for further instruction.
5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference
the approved jurisdictional determination issued . Action ID: SAW-
B. Basis For Jurisdictional Determination: An Approved Jurisdictional Determination was not issued with this
permit.
C. Remarks: A pre -application meeting took place on October 17, 2019.
SAW-2021-00216
D. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above).
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed
you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this
determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Philip Shannin, Appeal Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by N/A.
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.
GARY H. BEECH ER Digitally signed by GARY H. HER
Date: 2021031812:28:09-0400'
Corps Regulatory Official:
Gary Beecher
Date of JD: March 18, 2021 Expiration Date of JD: PJD Does not expire
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
http ://corpsmapu.usace.army.mil/cm_apex/f?p= 1 3 6:4: 0.
Copy furnished via e-mail to:
Consultant:
Jon Swaim
McGill Associates
1240 19th Street Lane, NW
Hickory, NC 28601
(828) 328-2024
Jon. swaim(a, mcgillassociates. com
SAW-2021-00216
SPECIAL CONDITIONS
1. Notification of Construction Commencement and Completion: The permittee shall advise the
Corps in writing 30 days prior to beginning the work authorized by this permit and again upon
completion of the work authorized by this permit.
2. Work Limits: All work authorized by this permit shall be performed in strict compliance with the
attached permit plans dated March 18, 2021, which are a part of this permit. The Permittee shall
ensure that the construction design plans for this project do not deviate from the permit plans
attached to this authorization. Any modification to the attached permit plans must be approved by
the U.S. Army Corps of Engineers (Corps) prior to any active construction in waters or wetlands.
Action ID Number: SAW-2021-00216 County: Brunswick County
Permittee: Jeff Repp
Boiling Spring Lakes
Project Name: City of Boiling Spring Lakes Dam Reconstruction
Date Verification Issued: March 18, 2021
Project Manager: Gary Beecher
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Gary Beecher
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
P:\2020\20.07036-BOILINGSPRL-DAMS CONSTRUCTIONRECONSTRUC\DESIGN\PERMITS\JD\JD FIGURES.DWG PLOT DATE 1/20/2021 1:56 PM ALEX LOWDERMILK
l r
F• --
'�.W... u.:..
.. .„
�., ._
` 11 ti\
,s\
..w. .,--"
-h •'JF- \ `h�
.. a,. - w
_ _
-- �` .:_ _.�.-_,z.-
_. w.. w-
.sic
C,..: n` j
/f �7 ��;/ G �'.. .".
Z"- lam }
5�\'a_.�,`,� /
J `-r-' �..... l.764 f
J" r
C'> � /
/
,!
I ai
a
v 1;-4
Vr
It �fl
�hw
,
•�Radro Tower
�., �,.�1 �`., ) 1
.. - 1 �•
�_
-- iQ f%; -
-.. "w
LL ,.i .Y'�
�,.
4*%-
J
G
- _ �C
vv11
,... ���
/ _ • `;,,
/ O i �,
- �� _ , �
�+i
1 7W-�`
% '�J
/'�
C, ���i V.-�_
y
_. -..�—� ,- •.,-'._ ram,
�` S �_�/�TV7
;1
_ .,,- t `� `
'rj_�`J„�z„(,�
� f15 Ll ,�
�.
_, ; i _
��
'°_
In
`� -
.
Sanford Dam
Water Surface
-�
��_
_ —
_-
- �.
"*- --,- _ _ - .. •--a,,
�-+r, ,. __
`,
�: _�,= yam`
\_
.y.
- ... - "'- - ,. ,.a
._.
.u,._ ._w. ..� ... -
-.w •'w- ^_.'—" ".w "` ..,w
r
- '-�
_e-
' .., �,.� . wy
�t `
- -.7
_
_ -�
_
:�. _
.w -_ '''''
-.w.. _ a`wu,�. �
;
4
-
-
.. _ .s 'e
..�s� 1l' �
a c1 �Aka.•
, -'A..'
1
Elev. 30.0 Ft
�� ,
�J; �, _
;N°,- -.,
MSL
� .„
(�
AI
fig ff
AW ,1, ';iyij° l�.�
�,/�
` ��
t )
L-✓� ��� / (\l ie
N, __
J ... � ��—
_
l? rt11 "V ��,i.=/`�r -- r _ �,• �'./�
,' .
� f/„ ✓_ `r-� iul ✓f
J ;�" �% e f '`/ � re r �i r.
North Lake
Dam
' Elev. 34.97 Ft
NAVD 88
sv
(< _. ,
• \/
, '„ M (
•-=�i
1 1
�' .1 5
��
1.�.)�
,I
f �.
(
at
_
�`
±1` -�- . �,., .u.. ->ti!• _ YK
.+
1 • : �,_
.._ ::t:
4e ..w. '--' - -+1.. -ti
- . _,.
-. W.
-` ,I _
_.
'"' i _ ... -
l / ram'% i ��
_= ' f
�✓i r� , �`' A. -b_
r
J/ —' • I rj- T
fi=! ) a C, ';1
Fes_-._.
r - ill
ik,
/`
.141iLl
/ '�/.,o•'
o
...
�, �.
yw
Dam
Water Surface
Elev. 35.0 Ft
MSL7
_
4r... s9
�\ C-J4 `�\ "l
j�
:\
or l� z,r` •�
Q
_
ti� _ 4n
52 • ,�
1 i r� ,
s O rJ�
sb r
K
��4_j J
- '
:_
_
__e .:s-
_ , ...
'
�
, �
o a�
:. — - ��
f ' �i�, �i
JJ
�/
r
1 �� p '�.' •Words
���(((
'/ �. o� ,� ��1/l
i ���� "- `
o• X
J +.l 5� \
`.
`:
�1►.��It�
�%
�'
�_�,
�
Rom.
-�C
•_�
��
c _-
sr
�.r.R, ,� '�
�,-.
c �,
y OA
�� �f _ 1,4 v,�
- r Lam
}
�'%i )-/�S��nv.�
Vim'. ;,
f � �C� ��t
�� �, 1� _`.��
`; �� f_ U ;�
.. -�/�� ���\� � -- -
44.
�\: �p,. l` /tom/
�''-,.-,,1
��
Upper Dam
Water Surface
Elev. 38.0 FtL.
MSL
_
,�
4f,
"` t I
,. ..-_# -_w.
,�
ti r ..,�.. .-+r. �. .. T , .
-e- - - .wd ...,. - r
` ""..,.
_� -`.., 4- '—'�- ..-».
." - _.r
— . _..
.ems - mar -__
\ .. 4 �u.
-�� -mw ,.< ; ter.
--ter,,. 1"'".
r Ado1
,
r. Jr
( „„
r
,\ J
S
i \ ,./d
vj
�•
® •�
y
l `Y� -- .�'.rd�
`
-
e
o \
1,.�.ti!
/i =\o
� ,� l\
�
�e.,, ,°" ' y�<
_ '. f %
y'�'
,
t \ ;
\
(_�.
South B�,sitsw
w Mtsiafe Sch
}
, ,-,
1�\' %.
J�111 \`-At`1 7 �..- ./.
`°�\`n
` f ;,r1
h/ -
` �i
(� j',
�" !�(
�f
�,5 (_ �,..•
!
I , fl/.
r
\\ } ` f
`�I'`ce
�+
_ if,--
{
f�/t_ ,..___\
f %^
/�� 1 �/�
., t)
I
-
� `
\� -' � � �'�k44
!..
1
,.
`'
r r ,----Mai,
r i-
5^
,_
�� '�: ,
J
rl
' ' Y OCEAN T '
�l - _ _......
MINA
.-�
-.
yr.-. /..•
... ` / ,.
}..�:•
Legend
I
"F�
` _
so °\\ V
-
w �?
f \ \
��� -'" _,.Y PO 'T v
ti . <
C
Study I
r
Limits
mcgi
0/4.
1240 19th Street Lane NW
828.328.2024
II Hickory, NC28601
NC Firm License # C-0459
DATE
1/20/2021
PROJECT #
20.07036
BOILING
RECONSTRUCTION
DAM
CONSTRUCTION/
SPRING
PROJECT
LAKES
2000 0 1000 2000 4000
FIGURE
2
OFFICE MANAGER
M. NORTON
DESIGNER
A. LOWDERMILK
� �
GRAPHIC SCALE DIVISION VALUE = 2000FEET
USGS MAP
PROJECT MANAGER
M.HANSON
REVIEWER
J.SWAIM
BRUNSWICK COUNTY, NORTH CAROLINA
mcgillassociates.com
Impacts Table
Permanent
Impact - S1
Permanent
Impact - OW1
Temporary
Impact - S2
Temporary
Impact -
OW2
0.5
Acres
30 LF
— ` L
FLOW
PLAN
Temporary Impact - S2 (Allen
Creek)
Access/Lay Down Area
Approx. 30 LF
—/= - P- mane_nt Impact - S1 (Allen Creek)
Energy Dissipator/Spillway
L
------ _ -- -- — _ Approx. 90 LF
ALLEN
CREEK
4 lily
)� �I),fIIII�, )
ll3t
j" 1
j/JU,
PROPOSED SPILLWAY STRUCTURE ,
—SEE SHEET SD—S-01 ///%
= — ▪ Permanent Impact - OW1
Fill Material/Spillway Structure --
Approx. 0.5 Acres
- L
N
\ \41)
a
- \
\
WAVE PROTECTION RIPRAP
SEE DET. D4
Legend
Permanent
Impact
Original
Toe/Base of
Dam
Temporary
Impact
1013 State Farm Road
mcgull
Boone, NC828.386.1920 28607
NC Firm License # C-0459
mcg i I lassociates.com
CUTOFF WALL, TYP.
— —SEE SHEET SD—B-0
)�,
— — —
l s
\("�—tia /
I J
-1 —�.J / / nii
/ / J �l _r NN`��� 1 ', /-- 1
SEE SHEET SD—B-01 FOR
EMBANKMENT GRADING
PLAN
Schnabe
ENGINEERIN(
LICENCE NUMBER C-2599
11A Oak Branch Drive / Greensboro, NC / 27407
T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.com
O.
DATE
DESCRIPTION
PROPOSED REBUILD ALTON LENNON DRIVE
Temporary Impact - OW2
Access/Lay Down Area/Flow
Diversion
Approx. 2.5 Acres
BOILING
SPRING
LAKE
DAM CONSTRUCTION/
RECONSTRUCTION PROJECT
BOILING SPRING LAKES
BRUNSWICK COUNTY, NORTH CAROLINA
L
r
GRAPHIC SCALE DIVISION VALUE = 30 FEET
OFFICE MANAGER DESIGNER
M. NORTON J.SWAIM
PROJECT MANAGER
M. HANSON
REVIEWER
M. HANSON
/I
I I(
— _11
J)1))\ /?%ir///////
ENERGY ((c
DISSIPATOR
RIPRAP
) l SEE DETAIL 1
mom,_
1(Ir �11 111 1.x\-;
�l
b
((lit\IL
II \
•
1C) l
90% DESIGN SET
- FOR REVIEW PURPOSES ONLY -
DO NOT USE FOR
CONSTRUCTION
SANFORD DAM - IMPACT MAP
DATE
OCTOBER 1, 2020
SHEET
SD-IM
PROJECTS
20.07036
FUNDING
N/A
\\\ (
/��/ , \ \\\ /
Temporary 1.3 �� �� 1 /
Impact- 1 Acres ( —) I/ —1
!1\A/A
I r ' / NJ( \----' -- — -N
( ( y' ��� , �RODOSED SPILLWAY STRUCTURE
N \ 5 ��-SEE S_ EET NLD-S 01
��� 5' /// ( '» ��\X v%r/
—./ / ) /ice%-=-� 'f��� 7 1
%1 // .
\_--- _ A
f —l• (--(1 � ��� �-, \
Legend
Permanent
Impact
Original
Toe/Base of
Dam
Temporary
Impact
Permanent Impact - OW3
Spillway Structure/Fill Material
Approx. 0.07 Acres
m cg I I 18B208on3e8,6NiC92208607
NC Firm License # C-0459
mcgillassociates.com
013 State Farm Road
ct
.. :-..4b,*—Am-4"--__k-el Aww_ii:
7
7DEEP HHIXED
SEE SHEE
(
FLOW
PLAN
7:
7/
RID RA
SEE DE
DROOSED RECONSTRUCTED
E BOIL NG SDR NG ROAD
RANEL, TYP,
N LD B 06
Schnabel
ENGINEERING
LICENCE NUMBER C-2599
/
7
NO
DATE
DESCRIPTION
R
H
r
LA
7
7
7
ADRON
AIL D 2
7-
DEED IVIXED
-S - SH- E
) /
-31-21
NC GRID
NDD-B-06 /'�,��
\\ in 1 1 \ 7 �' )1
\<\�\\ �J/-
\�il
Temporary Impact - OW4
Access/Lay Down Area/Flow Diversion
Approx. 1.3 Acres
WAVE DROTECT ON,
AIL 9-1
SH
AD N
BAN
DAM CONSTRUCTION/
RECONSTRUCTION PROJECT
BOILING SPRING LAKES
BRUNSWICK COUNTY, NORTH CAROLINA
20
10
6-7
20
GRAPHIC SCALE
DIVISION VALUE = 20 FEET
OFFICE MANAGER
M. NORTON
DESIGNER
J. SWAIM
7
TY
90% DESIGN SET
- FOR REVIEW PURPOSES ONLY -
DO NOT USE FOR
CONSTRUCTION
NORTH LAKE DAM - IMPACT MAP
PROJECT MANAGER
M. HANSON
REVIEWER
M. HANSON
DATE
OCTOBER 1, 2020
PROJECT #
20.07036
FUNDING
N/A
SHEET
DAM CONSTRUCTION/ RECONSTRUCTIO
P:\2020\20.07036-BOILINGSPRL-DAMS CONSTRUCTIONRECONSTRUC\DESIGN\PERMITS\PCN\IMPACTS MAPS\PINE LAKE DAM - IMPACT MAP.DWG PLOT DATE 1/29/2021 4:23 PM JON SWAIM
Impacts Table
Permanent
Impact -
OW5
Temporary
Impact -
OW6
0.09
Acres
1.4
Acres
—44
1
2
I I
/ /
//
/ //
�44
Legend
Permanent
Impact
Original
Toe/Base of
Dam
Temporary
Impact
1
42_ _
3
mcgill
i
^39
—� 38—
37—
35
1 3 / _�-�
r ( ) �-33�/' _
f - ��-
i-
/ / 30 ,/
1 J 3� 2 J ti -� �� _/
/'J -I/- y °/__ / /
A -1-
//�r II)J \ J\
/(r7-------\----
/
/ ilj5 4/ \//
/1l fI J /7/
r A /ir
/71
1 0
, h/ / /
��� 1/ 1 )11V \ /
o\ I ry II I NK1 7 \ \ ' ) 1
J
DRO
FLOW
BOIL
AD ADRO\
-SEE DETA L
\G
5
DR
\G LA
(
PLAN
1
'I
I \IN N
l4,'l
K< E -.9 I
l
D- 2, SHEET G- 30
I / N\,z-
Permanent Impact - OW5
Rip Rap Apron/Fill Material
Approx. 0.09 Acres
DOSED RECO\STR„CTED E BC
2
1013 State Farm Road
Boone, NC 28607
828.386.1920
NC Firm License # C-0459
mcgillassociates.com
3 Schnabs.
ENGINEERING
LICENCE NUMBER C-2599
11A Oak Branch Drive / Greensboro, NC / 27407
0
7
i
7
L\G S
DR \GS ROAD
_43_
41----.
8
CF\,/ z
O O O
/moo,—
32--
_,,,\
�� 1
/ "
a J I
f
DEED V XED
-SEE SHEET
DA
�L
EL, TY
D-B 05
NO
DATE
BY
DESCRIPTION
D
/\
29
31
f c.�
\N--
'6 \ J
0
-S
D
ti
�\\
J
s
I / / r` -�
� J
DOS
-E SH
-D
rJ
/
i
r
7
46'
ti
53 LLWAY ST
-T DLD-5-01
AIN
7
i
I
-41
4111 imp
9,511•414kb/--
42-
;_- \,,, /lc\ \ \
1- 1\ \\ \1:1:\1:\_ IIINI..,\:—\N----Ti___, -1_,---Ny— \-a- \
`-t-\)K c \ \ \
LA
DAM CONSTRUCTION/
RECONSTRUCTION PROJECT
BOILING SPRING LAKES
BRUNSWICK COUNTY, NORTH CAROLINA
20
10
20
40
GRAPHIC SCALE
DIVISION VALUE = 20 FEET
OFFICE MANAGER
M. NORTON
PROJECT MANAGER
M. HANSON
DESIGNER
J. SWAIM
REVIEWER
M. HANSON
L
NC GRID
NAD 83(2011)
-43—
Temporary Impact - OW6
Access/Lay Down Area
Flow Diversion
Approx. 1.4 Acres
38
7
90% DESIGN SET
- FOR REVIEW PURPOSES ONLY -
DO NOT USE FOR
CONSTRUCTION
PINE LAKE DAM - IMPACT MAP
DATE
OCTOBER 1, 2020
PROJECT #
20.07036
FUNDING #
N/A
SHEET
PLD-IM
20.07036 - BOILING SPRING LAKES - DAM CONSTRUCTION/ RECONSTRUCTION PROJECT
t
Permanent
Impact
Original
Toe/Base of
Dam
Temporary
Impact
Impacts Table
Permanent
Impact -
OW7
0.08
Acres
I 1(
y> L ( /
\ )
r it /
\ �,, J I �� (I
^(iII7/ (/ )v\�2 f� �v
I � _ I
< J ( rJ
F ��\ II/ ( f ) �� r
s Y.J// ) \ '— —\ JC /
7 % 1 / IIII 1 (�J/�/ce /�'� / <<� J
f / l J 7-)
( I(\v� ,5�i/ \V(/!:----
////iJ= �l
e—Isi \k ' 1
--
— \ i\ — _i
)6,
(
•
FLOW`
PLAN
J v
/)
�-/
/\� /// (
I
/1 t \ .,
J
\�� r ""‘
_) \ ` 1
Temporary Impact - OW8
Access/Lay Down Area
Flow Diversion
Approx. 0.7 Acres
—PROPOSED GRAVEL ROAD
-
5.7
MIDDLE LAKE
.00
=�f g,cX"v v..
40
f
01
::::: n ..„..f.. lorsi,,
J 1 —J— — ,a—
I\ l
N. /
til .-m l
\ l i `, _,
`� \\` ,yam /
))
t c7 r` \\\ 1 f \f ,/ 1
1 I71nrc ,wit- (- vim. -\L__ › ..��`,j
— �~ —�e
1,
mcuII
7
1013 State Farm Road
Boone, NC 28607
828.386.1920
NC Firm License # C-0459
mcg it lassoci ates. co m
7
(/
SEE SHEET
ULD—B-01 FOR
EMBANKMENT
GRADING PLAN
Schnabel
ENGINEERING
LICENCE NUMBER C-2599
11A Oak Branch Drive / Greensboro, NC / 27407
T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.com
NO.
DATE
BY
DESCRIPTION
f
)
UPPER LAKE
DAM CONSTRUCTION/
RECONSTRUCTION PROJECT
JI
BOILING SPRING LAKES
BRUNSWICK COUNTY, NORTH CAROLINA
/
/
20 0 10 20
40
-
GRAPHIC SCALE DIVISION VALUE = 20 FEET
OFFICE MANAGER
M. NORTON
DESIGNER
J. SWAIM
\
PROPOSED SPILLWAY STRUCTURE I
—SEE SHEET ULD—S-01
v//
III
t(( (`\/
v nn v ; u-ti 4.-07_, -a- Jar/ �,n
`.� -- - Jam\ N
Ir\� I
I)1
\
i 4///
Permanent Impact - OW7 )
Rip Rap Apron/Fill Material /
Approx. 0.08 Acres
90% DESIGN SET
- FOR REVIEW PURPOSES ONLY -
DO NOT USE FOR
CONSTRUCTION
UPPER LAKE DAM - IMPACT MAP
PROJECT MANAGER
M. HANSON
REVIEWER
M. HANSON
DATE
OCTOBER 1, 2020
PROJECT
20.07036
FUNDING 6
N/A
SHEET
ULD-III
20.07036 - BOILING SPRING LAKES - DAM CONSTRUCTION/ RECONSTRUCTION PROJEC