Loading...
HomeMy WebLinkAbout20201735 Ver 1_USACE Permit_20210318U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-00216 County: Brunswick County U.S.G.S. Quad: Funston GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Jeff Repp City Manager (Boiling Spring Lakes) Address: 9 East Boiling Spring Road Southport NC, 28461 Telephone Number: (910) 363-0025 E-mail Address: Jrepp@cityofbsl.org Size (acres) 34.79 acres Nearest Waterway Allen Creek USGS HUC 03030005 Nearest Town Boiling Spring Lakes, NC River Basin Cape Fear Coordinates Latitude: 34.0216 Longitude: -78.0693 Location description: This protect will include repair work to the Sanford Dam, North Lake Dam, Pine Lake Dam and the Upper Lake Dam. These (4) dams were severely damaged during Hurricane Florence (September 2018). The dams are located in The City of Boiling Spring Lakes, Brunswick County, NC. Description of projects area and activity: Project impacts include: Impact Location Permanent Open Water & Creek Impacts Temporary Open Water & Creek Impacts Allen Creek 90 LF of rip rap for energy dissipator pad 30 LF for equipment access Sanford Dam 0.5 acres (new earthen embankment and new spillway) 2.5 acres for access and laydown area North Lake Dam 0.07 acres (new earthen embankment and new spillway) 1.3 acres for equipment access and lay down area Pine Lake Dam 0.09 acres (new earthen embankment and new spillway) 1.4 acres for equipment access and lay down area Upper Lake Dam 0.08 acres (new earthen embankment and new spillway) 0.7 acres for equipment access and lay down area Total Impacts 90 LF Allen Creek 30 LF Allen Creek 0.74 acres Open Water 5.9 acres Open Water *(Impact details and locations on attached plans) Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number: 3 Maintenance Work SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated March 18, 2021 Any violation of the attached SAW-2021-00216 conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Gary Beecher at (910) 251-4694 or Gary.H.Beecher@usace.army.mil. Digitally signed by GARY H. GARY H. BEECHER BEECHER Corps Regulatory Official: Date: 2021.03.18 12:28:36 -04'00' Date: March 18, 2021 Expiration Date of Verification: March 18, 2022 A. Determination of Jurisdiction: 1. ® There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters, including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B. Basis For Jurisdictional Determination: An Approved Jurisdictional Determination was not issued with this permit. C. Remarks: A pre -application meeting took place on October 17, 2019. SAW-2021-00216 D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin, Appeal Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by N/A. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. GARY H. BEECH ER Digitally signed by GARY H. HER Date: 2021031812:28:09-0400' Corps Regulatory Official: Gary Beecher Date of JD: March 18, 2021 Expiration Date of JD: PJD Does not expire The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http ://corpsmapu.usace.army.mil/cm_apex/f?p= 1 3 6:4: 0. Copy furnished via e-mail to: Consultant: Jon Swaim McGill Associates 1240 19th Street Lane, NW Hickory, NC 28601 (828) 328-2024 Jon. swaim(a, mcgillassociates. com SAW-2021-00216 SPECIAL CONDITIONS 1. Notification of Construction Commencement and Completion: The permittee shall advise the Corps in writing 30 days prior to beginning the work authorized by this permit and again upon completion of the work authorized by this permit. 2. Work Limits: All work authorized by this permit shall be performed in strict compliance with the attached permit plans dated March 18, 2021, which are a part of this permit. The Permittee shall ensure that the construction design plans for this project do not deviate from the permit plans attached to this authorization. Any modification to the attached permit plans must be approved by the U.S. Army Corps of Engineers (Corps) prior to any active construction in waters or wetlands. Action ID Number: SAW-2021-00216 County: Brunswick County Permittee: Jeff Repp Boiling Spring Lakes Project Name: City of Boiling Spring Lakes Dam Reconstruction Date Verification Issued: March 18, 2021 Project Manager: Gary Beecher Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Gary Beecher Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date P:\2020\20.07036-BOILINGSPRL-DAMS CONSTRUCTIONRECONSTRUC\DESIGN\PERMITS\JD\JD FIGURES.DWG PLOT DATE 1/20/2021 1:56 PM ALEX LOWDERMILK l r F• -- '�.W... u.:.. .. .„ �., ._ ` 11 ti\ ,s\ ..w. .,--" -h •'JF- \ `h� .. a,. - w _ _ -- �` .:_ _.�.-_,z.- _. w.. w- .sic C,..: n` j /f �7 ��;/ G �'.. .". Z"- lam } 5�\'a_.�,`,� / J `-r-' �..... l.764 f J" r C'> � / / ,! I ai a v 1;-4 Vr It �fl �hw , •�Radro Tower �., �,.�1 �`., ) 1 .. - 1 �• �_ -- iQ f%; - -.. "w LL ,.i .Y'� �,. 4*%- J G - _ �C vv11 ,... ��� / _ • `;,, / O i �, - �� _ , � �+i 1 7W-�` % '�J /'� C, ���i V.-�_ y _. -..�—� ,- •.,-'._ ram, �` S �_�/�TV7 ;1 _ .,,- t `� ` 'rj_�`J„�z„(,� � f15 Ll ,� �. _, ; i _ �� '°_ In `� - . Sanford Dam Water Surface -� ��_ _ — _- - �. "*- --,- _ _ - .. •--a,, �-+r, ,. __ `, �: _�,= yam` \_ .y. - ... - "'- - ,. ,.a ._. .u,._ ._w. ..� ... - -.w •'w- ^_.'—" ".w "` ..,w r - '-� _e- ' .., �,.� . wy �t ` - -.7 _ _ -� _ :�. _ .w -_ ''''' -.w.. _ a`wu,�. � ; 4 - - .. _ .s 'e ..�s� 1l' � a c1 �Aka.• , -'A..' 1 Elev. 30.0 Ft �� , �J; �, _ ;N°,- -., MSL � .„ (� AI fig ff AW ,1, ';iyij° l�.� �,/� ` �� t ) L-✓� ��� / (\l ie N, __ J ... � ��— _ l? rt11 "V ��,i.=/`�r -- r _ �,• �'./� ,' . � f/„ ✓_ `r-� iul ✓f J ;�" �% e f '`/ � re r �i r. North Lake Dam ' Elev. 34.97 Ft NAVD 88 sv (< _. , • \/ , '„ M ( •-=�i 1 1 �' .1 5 �� 1.�.)� ,I f �. ( at _ �` ±1` -�- . �,., .u.. ->ti!• _ YK .+ 1 • : �,_ .._ ::t: 4e ..w. '--' - -+1.. -ti - . _,. -. W. -` ,I _ _. '"' i _ ... - l / ram'% i �� _= ' f �✓i r� , �`' A. -b_ r J/ —' • I rj- T fi=! ) a C, ';1 Fes_-._. r - ill ik, /` .141iLl / '�/.,o•' o ... �, �. yw Dam Water Surface Elev. 35.0 Ft MSL7 _ 4r... s9 �\ C-J4 `�\ "l j� :\ or l� z,r` •� Q _ ti� _ 4n 52 • ,� 1 i r� , s O rJ� sb r K ��4_j J - ' :_ _ __e .:s- _ , ... ' � , � o a� :. — - �� f ' �i�, �i JJ �/ r 1 �� p '�.' •Words ���((( '/ �. o� ,� ��1/l i ���� "- ` o• X J +.l 5� \ `. `: �1►.��It� �% �' �_�, � Rom. -�C •_� �� c _- sr �.r.R, ,� '� �,-. c �, y OA �� �f _ 1,4 v,� - r Lam } �'%i )-/�S��nv.� Vim'. ;, f � �C� ��t �� �, 1� _`.�� `; �� f_ U ;� .. -�/�� ���\� � -- - 44. �\: �p,. l` /tom/ �''-,.-,,1 �� Upper Dam Water Surface Elev. 38.0 FtL. MSL _ ,� 4f, "` t I ,. ..-_# -_w. ,� ti r ..,�.. .-+r. �. .. T , . -e- - - .wd ...,. - r ` ""..,. _� -`.., 4- '—'�- ..-». ." - _.r — . _.. .ems - mar -__ \ .. 4 �u. -�� -mw ,.< ; ter. --ter,,. 1"'". r Ado1 , r. Jr ( „„ r ,\ J S i \ ,./d vj �• ® •� y l `Y� -- .�'.rd� ` - e o \ 1,.�.ti! /i =\o � ,� l\ � �e.,, ,°" ' y�< _ '. f % y'�' , t \ ; \ (_�. South B�,sitsw w Mtsiafe Sch } , ,-, 1�\' %. J�111 \`-At`1 7 �..- ./. `°�\`n ` f ;,r1 h/ - ` �i (� j', �" !�( �f �,5 (_ �,..• ! I , fl/. r \\ } ` f `�I'`ce �+ _ if,-- { f�/t_ ,..___\ f %^ /�� 1 �/� ., t) I - � ` \� -' � � �'�k44 !.. 1 ,. `' r r ,----Mai, r i- 5^ ,_ �� '�: , J rl ' ' Y OCEAN T ' �l - _ _...... MINA .-� -. yr.-. /..• ... ` / ,. }..�:• Legend I "F� ` _ so °\\ V - w �? f \ \ ��� -'" _,.Y PO 'T v ti . < C Study I r Limits mcgi 0/4. 1240 19th Street Lane NW 828.328.2024 II Hickory, NC28601 NC Firm License # C-0459 DATE 1/20/2021 PROJECT # 20.07036 BOILING RECONSTRUCTION DAM CONSTRUCTION/ SPRING PROJECT LAKES 2000 0 1000 2000 4000 FIGURE 2 OFFICE MANAGER M. NORTON DESIGNER A. LOWDERMILK � � GRAPHIC SCALE DIVISION VALUE = 2000FEET USGS MAP PROJECT MANAGER M.HANSON REVIEWER J.SWAIM BRUNSWICK COUNTY, NORTH CAROLINA mcgillassociates.com Impacts Table Permanent Impact - S1 Permanent Impact - OW1 Temporary Impact - S2 Temporary Impact - OW2 0.5 Acres 30 LF — ` L FLOW PLAN Temporary Impact - S2 (Allen Creek) Access/Lay Down Area Approx. 30 LF —/= - P- mane_nt Impact - S1 (Allen Creek) Energy Dissipator/Spillway L ------ _ -- -- — _ Approx. 90 LF ALLEN CREEK 4 lily )� �I),fIIII�, ) ll3t j" 1 j/JU, PROPOSED SPILLWAY STRUCTURE , —SEE SHEET SD—S-01 ///% = — ▪ Permanent Impact - OW1 Fill Material/Spillway Structure -- Approx. 0.5 Acres - L N \ \41) a - \ \ WAVE PROTECTION RIPRAP SEE DET. D4 Legend Permanent Impact Original Toe/Base of Dam Temporary Impact 1013 State Farm Road mcgull Boone, NC828.386.1920 28607 NC Firm License # C-0459 mcg i I lassociates.com CUTOFF WALL, TYP. — —SEE SHEET SD—B-0 )�, — — — l s \("�—tia / I J -1 —�.J / / nii / / J �l _r NN`��� 1 ', /-- 1 SEE SHEET SD—B-01 FOR EMBANKMENT GRADING PLAN Schnabe ENGINEERIN( LICENCE NUMBER C-2599 11A Oak Branch Drive / Greensboro, NC / 27407 T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.com O. DATE DESCRIPTION PROPOSED REBUILD ALTON LENNON DRIVE Temporary Impact - OW2 Access/Lay Down Area/Flow Diversion Approx. 2.5 Acres BOILING SPRING LAKE DAM CONSTRUCTION/ RECONSTRUCTION PROJECT BOILING SPRING LAKES BRUNSWICK COUNTY, NORTH CAROLINA L r GRAPHIC SCALE DIVISION VALUE = 30 FEET OFFICE MANAGER DESIGNER M. NORTON J.SWAIM PROJECT MANAGER M. HANSON REVIEWER M. HANSON /I I I( — _11 J)1))\ /?%ir/////// ENERGY ((c DISSIPATOR RIPRAP ) l SEE DETAIL 1 mom,_ 1(Ir �11 111 1.x\-; �l b ((lit\IL II \ • 1C) l 90% DESIGN SET - FOR REVIEW PURPOSES ONLY - DO NOT USE FOR CONSTRUCTION SANFORD DAM - IMPACT MAP DATE OCTOBER 1, 2020 SHEET SD-IM PROJECTS 20.07036 FUNDING N/A \\\ ( /��/ , \ \\\ / Temporary 1.3 �� �� 1 / Impact- 1 Acres ( —) I/ —1 !1\A/A I r ' / NJ( \----' -- — -N ( ( y' ��� , �RODOSED SPILLWAY STRUCTURE N \ 5 ��-SEE S_ EET NLD-S 01 ��� 5' /// ( '» ��\X v%r/ —./ / ) /ice%-=-� 'f��� 7 1 %1 // . \_--- _ A f —l• (--(1 � ��� �-, \ Legend Permanent Impact Original Toe/Base of Dam Temporary Impact Permanent Impact - OW3 Spillway Structure/Fill Material Approx. 0.07 Acres m cg I I 18B208on3e8,6NiC92208607 NC Firm License # C-0459 mcgillassociates.com 013 State Farm Road ct .. :-..4b,*—Am-4"--__k-el Aww_ii: 7 7DEEP HHIXED SEE SHEE ( FLOW PLAN 7: 7/ RID RA SEE DE DROOSED RECONSTRUCTED E BOIL NG SDR NG ROAD RANEL, TYP, N LD B 06 Schnabel ENGINEERING LICENCE NUMBER C-2599 / 7 NO DATE DESCRIPTION R H r LA 7 7 7 ADRON AIL D 2 7- DEED IVIXED -S - SH- E ) / -31-21 NC GRID NDD-B-06 /'�,�� \\ in 1 1 \ 7 �' )1 \<\�\\ �J/- \�il Temporary Impact - OW4 Access/Lay Down Area/Flow Diversion Approx. 1.3 Acres WAVE DROTECT ON, AIL 9-1 SH AD N BAN DAM CONSTRUCTION/ RECONSTRUCTION PROJECT BOILING SPRING LAKES BRUNSWICK COUNTY, NORTH CAROLINA 20 10 6-7 20 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER M. NORTON DESIGNER J. SWAIM 7 TY 90% DESIGN SET - FOR REVIEW PURPOSES ONLY - DO NOT USE FOR CONSTRUCTION NORTH LAKE DAM - IMPACT MAP PROJECT MANAGER M. HANSON REVIEWER M. HANSON DATE OCTOBER 1, 2020 PROJECT # 20.07036 FUNDING N/A SHEET DAM CONSTRUCTION/ RECONSTRUCTIO P:\2020\20.07036-BOILINGSPRL-DAMS CONSTRUCTIONRECONSTRUC\DESIGN\PERMITS\PCN\IMPACTS MAPS\PINE LAKE DAM - IMPACT MAP.DWG PLOT DATE 1/29/2021 4:23 PM JON SWAIM Impacts Table Permanent Impact - OW5 Temporary Impact - OW6 0.09 Acres 1.4 Acres —44 1 2 I I / / // / // �44 Legend Permanent Impact Original Toe/Base of Dam Temporary Impact 1 42_ _ 3 mcgill i ^39 —� 38— 37— 35 1 3 / _�-� r ( ) �-33�/' _ f - ��- i- / / 30 ,/ 1 J 3� 2 J ti -� �� _/ /'J -I/- y °/__ / / A -1- //�r II)J \ J\ /(r7-------\---- / / ilj5 4/ \// /1l fI J /7/ r A /ir /71 1 0 , h/ / / ��� 1/ 1 )11V \ / o\ I ry II I NK1 7 \ \ ' ) 1 J DRO FLOW BOIL AD ADRO\ -SEE DETA L \G 5 DR \G LA ( PLAN 1 'I I \IN N l4,'l K< E -.9 I l D- 2, SHEET G- 30 I / N\,z- Permanent Impact - OW5 Rip Rap Apron/Fill Material Approx. 0.09 Acres DOSED RECO\STR„CTED E BC 2 1013 State Farm Road Boone, NC 28607 828.386.1920 NC Firm License # C-0459 mcgillassociates.com 3 Schnabs. ENGINEERING LICENCE NUMBER C-2599 11A Oak Branch Drive / Greensboro, NC / 27407 0 7 i 7 L\G S DR \GS ROAD _43_ 41----. 8 CF\,/ z O O O /moo,— 32-- _,,,\ �� 1 / " a J I f DEED V XED -SEE SHEET DA �L EL, TY D-B 05 NO DATE BY DESCRIPTION D /\ 29 31 f c.� \N-- '6 \ J 0 -S D ti �\\ J s I / / r` -� � J DOS -E SH -D rJ / i r 7 46' ti 53 LLWAY ST -T DLD-5-01 AIN 7 i I -41 4111 imp 9,511•414kb/-- 42- ;_- \,,, /lc\ \ \ 1- 1\ \\ \1:1:\1:\_ IIINI..,\:—\N----Ti___, -1_,---Ny— \-a- \ `-t-\)K c \ \ \ LA DAM CONSTRUCTION/ RECONSTRUCTION PROJECT BOILING SPRING LAKES BRUNSWICK COUNTY, NORTH CAROLINA 20 10 20 40 GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER M. NORTON PROJECT MANAGER M. HANSON DESIGNER J. SWAIM REVIEWER M. HANSON L NC GRID NAD 83(2011) -43— Temporary Impact - OW6 Access/Lay Down Area Flow Diversion Approx. 1.4 Acres 38 7 90% DESIGN SET - FOR REVIEW PURPOSES ONLY - DO NOT USE FOR CONSTRUCTION PINE LAKE DAM - IMPACT MAP DATE OCTOBER 1, 2020 PROJECT # 20.07036 FUNDING # N/A SHEET PLD-IM 20.07036 - BOILING SPRING LAKES - DAM CONSTRUCTION/ RECONSTRUCTION PROJECT t Permanent Impact Original Toe/Base of Dam Temporary Impact Impacts Table Permanent Impact - OW7 0.08 Acres I 1( y> L ( / \ ) r it / \ �,, J I �� (I ^(iII7/ (/ )v\�2 f� �v I � _ I < J ( rJ F ��\ II/ ( f ) �� r s Y.J// ) \ '— —\ JC / 7 % 1 / IIII 1 (�J/�/ce /�'� / <<� J f / l J 7-) ( I(\v� ,5�i/ \V(/!:---- ////iJ= �l e—Isi \k ' 1 -- — \ i\ — _i )6, ( • FLOW` PLAN J v /) �-/ /\� /// ( I /1 t \ ., J \�� r ""‘ _) \ ` 1 Temporary Impact - OW8 Access/Lay Down Area Flow Diversion Approx. 0.7 Acres —PROPOSED GRAVEL ROAD - 5.7 MIDDLE LAKE .00 =�f g,cX"v v.. 40 f 01 ::::: n ..„..f.. lorsi,, J 1 —J— — ,a— I\ l N. / til .-m l \ l i `, _, `� \\` ,yam / )) t c7 r` \\\ 1 f \f ,/ 1 1 I71nrc ,wit- (- vim. -\L__ › ..��`,j — �~ —�e 1, mcuII 7 1013 State Farm Road Boone, NC 28607 828.386.1920 NC Firm License # C-0459 mcg it lassoci ates. co m 7 (/ SEE SHEET ULD—B-01 FOR EMBANKMENT GRADING PLAN Schnabel ENGINEERING LICENCE NUMBER C-2599 11A Oak Branch Drive / Greensboro, NC / 27407 T/ 336-274-9456 F/ 336-274-9486 / schnabel-eng.com NO. DATE BY DESCRIPTION f ) UPPER LAKE DAM CONSTRUCTION/ RECONSTRUCTION PROJECT JI BOILING SPRING LAKES BRUNSWICK COUNTY, NORTH CAROLINA / / 20 0 10 20 40 - GRAPHIC SCALE DIVISION VALUE = 20 FEET OFFICE MANAGER M. NORTON DESIGNER J. SWAIM \ PROPOSED SPILLWAY STRUCTURE I —SEE SHEET ULD—S-01 v// III t(( (`\/ v nn v ; u-ti 4.-07_, -a- Jar/ �,n `.� -- - Jam\ N Ir\� I I)1 \ i 4/// Permanent Impact - OW7 ) Rip Rap Apron/Fill Material / Approx. 0.08 Acres 90% DESIGN SET - FOR REVIEW PURPOSES ONLY - DO NOT USE FOR CONSTRUCTION UPPER LAKE DAM - IMPACT MAP PROJECT MANAGER M. HANSON REVIEWER M. HANSON DATE OCTOBER 1, 2020 PROJECT 20.07036 FUNDING 6 N/A SHEET ULD-III 20.07036 - BOILING SPRING LAKES - DAM CONSTRUCTION/ RECONSTRUCTION PROJEC