HomeMy WebLinkAboutNCG030671_NOV_20210329ROY COOPER
Governor
DIONNE DELLFGATTI
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
March 29, 2021
CERTIFIED MAIL: 7014 0510 0000 4466 7072
Prince Manufacturing
Attn: Amanda Medlock
209 Broad Point Drive
Mills River, North Carolina 28759
Subject: NOTICE OF VIOLATION (NOV-2021-PC-0211)
NPDES Stormwater General Permit NCG030000
Prince Manufacturing
Certificate of Coverage NCG030671
Henderson County, North Carolina
Dear Ms. Medlock:
On March 17, 2021, staff from the Asheville Regional Office of the Division of Energy,
Mineral and Land Resources (DEMLR), conducted a site inspection for the Haywood County
Landfill facility located at 209 Broad Point Drive, Henderson County, North Carolina. A copy
of the Compliance Inspection Report is enclosed for your review. The site visit and file
review revealed that the subject facility is covered by NPDES Stormwater General Permit
NCG030000 under Certificate of Coverage NCG030671. Permit coverage authorizes the
discharge of stormwater from the facility to receiving waters designated as an Unnamed
Tributary of McDowell Creek, a Class C waterbody in the French Broad River Basin.
As a result of the site inspection, the following permit conditions violation(s) are noted:
1) Failure to create or maintain a Stormwater Pollution Prevention Plan on site
A Stormwater Polution Prevention Plan had not been created or maintained on site
at the time of the inspection.
2) Failure to conduct Analytical Monitoring
Analytical monitoring had not been conducted on site at the time of the inspection.
3) Failure to conduct Qualitative Monitoring
Qualitative Monitoring had not been conducted on site at the time of the inspection.
D _EQ"� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
_' Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
'•^^^ �^^v�a•��'\ 828.296.4500
Notice of Violation
Prince Manufacturing
March 29, 2021
Page 2 of 2
4) Failure Provide Secondary Containment
Secondary containment has not been provided for all bulk storage of liquid
materials on site.
Corrective Actions
Corrective actions are defined in the enclosed Inspection Report.
Requested Response:
You are asked to respond to this office, in writing, within 30 calendar days from receipt of
this notice. Your written response should include a reasonable explanation as to why the
aforementioned violation(s) have occurred as well as a Plan of Action to prevent these
violation(s) from recurring.
Thank you for your attention to this matter. This Office is considering sending a
recommendation for enforcement to the Director of the Division of Energy, Mineral & Land
Resources regarding these issues. Your above -mentioned response to this correspondence
will be considered in this process. This office requires that the violations, as detailed
above, be properly resolved. These violations and any future violations are subject to
a civil penalty assessment of up to $25,000 per day for each violation. Should you have
any questions regarding these matters, please contact Isaiah Reed or myself at (828) 296-
4500.
Sincerely,
Stanley E. Aiken 1,,
Regional Eng' eer
Land Quality Section
Enclosure:
Inspection Report
ec: Alaina Morman, Environmental Specialist Alaina.mormanna,ncdenr.gov
Stanley E. Aiken- Regional Engineer stan.aikenna,ncdenr.gov
Permit: NCG030671
SOC:
County: Henderson
Region: Asheville
Compliance Inspection Report
Effective: 11/01/18 Expiration: 05/31/21 Owner: Prince Manufacturing
Effective: Expiration: Facility: Prince Manufacturing
209 Broad Pointe Dr
Contact Person: Amanda Medlock Title:
Directions to Facility:
Off Boylston Hwy turn onto Broad Pointe Drive, facility is 1/4 mile on the left.
System Classifications: SWNC,
Primary ORC: Certification:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Mills River NC 28759
Phone:828-681-8860
Phone:
Inspection Date: 03/17/2021 Entry Time 02:OOPM Exit Time: 02:45PM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
N Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030671 Owner- Facility: Prince Manufacturing
Inspection Date: 03/17/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On March 17, 2021 this facility was inspected for compliance. I met with David Maloney on site. During the inspection, the
following violations were noted:
1) A Stormwater Pollution Prevention Plan has not been created or maintained on site. The permittee shall immediately
begin assembling and creating a Stromwater Pollution Prevention Plan as outlined in the NCG030000 General Permit.
2) Analytical Monitoring has not been conducted on site. The permittee shall immediately begin efforts to conduct analytical
monitoring as outlined in the NCG030000 General Permit.
3) Qualitative Monitoring has not been conducted on site. The permittee shall immediately begin efforts to conduct qualitative
monitoring as outlined in the NCG030000 General Permit.
4) Secondary Containment for all bulk storage of liquid materials has not been provided on site. the permittee shall
immediately begin efforts to provide secondary containment as outlined in the NCG030000 General Permit.
Please give the above items your immediate attention.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG030671 Owner- Facility: Prince Manufacturing
Inspection Date: 03/17/2021 Inspection Type :Compliance Evaluation Reason for Visit:
Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
0 ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
0 ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑
0 ❑ ❑
If Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
0 ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
0 ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
0 ❑ ❑
# Does the Plan include a BMP summary?
❑
0 ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
0 ❑ ❑
It Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
0 ❑ ❑
# Does the facility provide and document Employee Training?
❑
❑ ❑
It Does the Plan include a list of Responsible Party(s)?
❑
❑ ❑
# Is the Plan reviewed and updated annually?
❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
N ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
0 ❑ ❑
Comment: A Stormwater Pollution Prevention Plan has been created or maintained on site.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0000
Comment: Qualitative Monitoring has not been conducted on site.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ E ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Analytical Monitoring has not been conducted on site.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ N ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑
Comment:
Page 3 of 3