Loading...
HomeMy WebLinkAboutNCG030572_Inspection Report_20210329ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director Continental Automotive Systems Inc Attention: Jeff Scott 1 Quality Way Fletcher, North Carolina 28732 NORTH CAROLINA Environmental Quality March 24, 2021 Subject: Compliance Evaluation Inspection Continental Automotive Systems, Inc. Permit:NCG030000 Certificate of Coverage: NCG030572 Henderson County, North Carolina Dear Mr. Scott: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on March 24, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sinc re Isaiah Reed, EI, CPSWQ, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ"North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 ala -� ;11%1� 828.296.4500 Compliance Inspection Report Permit: NCG030572 Effective: 11/O1/18 Expiration: 05/31/21 Owner : Continental Automotive Systems Inc SOC: Effective: Expiration: Facility: Continental Automotive Systems, Inc. County: Henderson One Quality Way Region: Asheville Fletcher NC 28732 Contact Person: Lisa Foster -Morrow Title: Phone: 828-654-2240 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/24/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 11:OOAM Exit Time: 12:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030572 Owner - Facility: Continental Automotive Systems Inc Inspection Date: 03/24/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On March 24, 2021 this facility was inspected for compliance. I met with Wesley Mull and Brian Deckard on site. During the inspection, the following items were noted: 1) The Stromwater Pollution Prevention Plan has not been maintained annually. Including updating the spill log and non-stormwater discharge certification. the permittee shall immediately begin efforts to review, revise, and update the SWPPP as outlined in the NCG030000 General Permit. 2) Analytical Monitoring has not been conducted at all outfalls. The permittee shall immediately begin efforts to monitor all outfalls from areas of the facility which could impact stormwater. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030572 Owner -Facility: Continental Automotive Systems Inc Inspection Date: 03/24/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? N ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information, Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0111111 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Page 3 of 3