Loading...
HomeMy WebLinkAboutNCG030102_NOD_20210329ROY COOPER Governor DIONNE DELLFGATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality March 29, 2021 CERTIFIED MAIL: 7014 0510 0000 4466 7089 RETURN RECEIPT REQUESTED Putsch & Company Inc Attn: Olav Seimer Post Office Box 5128 Asheville, North Carolina 28813 Subject: NOTICE OF DEFICIENCY (NOD-2021-PC-0129) NPDES Stormwater General Permit NCG030000 Certificate of Coverage NCG030102 Putch & Company Inc Henderson County Dear Mr. Seimer: On March 24, 2021, Isaiah Reed from the Asheville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a compliance inspection for the Putsch & Company Inc. facility located at 354 Cane Creek Road, Henderson County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The inspection and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG030000 under Certificate of Coverage NCG030102. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Pinner Creek, a Class C;Tr waterbody in the French Broad River Basin. As a result of the inspection, the following deficiencies are noted: 1) Stormwater Pollution Prevention Plan (SWPPP) A Stormwater Pollution Prevention Plan (SWPPP) has not been developed, recorded, or properly implemented. rolft North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NGYiM Ce_¢y_�µq 828.296.4500 Notice of Deficiency Putsch & Company Inc. March 29, 2021 Page 2 of 2 2) Analytical Monitoring Analytical Monitoring has not been conducted and recorded in accordance with permit requirements. 3) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. Requested Response You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the above stated deficiencies have occurred, as well as a Plan of Action to prevent them from recurring. Action Items Immediately begin efforts to comply with General Permit NCG030000, including but not limited to: 1. Develop, implement, and maintain an acceptable SWPPP. 2. Begin monitoring at all outfalls. Thank you for your attention to this matter. This office requires that the deficiencies, as noted above and detailed in the enclosed inspection report, be properly resolved. Failure to address the deficiencies could result in the issuance of a Notice of Violation, which could be subject to a civil penalty assessment of up to $25, 000 per day for each violation. Should you have any questions or concerns, please contact Isaiah Reed or myself at (828) 296-4S00. Sincerely, Stanley Aiken, PEG Regional Engin Land Quality Section Enclosure: Inspection Report ec: Alaina Morman, Environmental Specialist Alaina.morman@ncdenr.gov Compliance Inspection Report Permit: NCG030102 Effective: 11/01/18 Expiration: 05/31/21 Owner: Putsch & Company Inc SOC: Effective: Expiration: Facility: Putsch & Company Inc County: Henderson 354 Cane Creek Rd Region: Asheville Fletcher NC 28732 Contact Person:Olav Selmer Title: Phone: 828-684-0671 Ext.112 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/24/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:20PM Exit Time: 03:20PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge CDC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030102 Owner -Facility: Putsch&Company Inc Inspection Date: 03/24/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 24, 2021 this facility was inspected for compliance. I met with Olav Seimer, Henning Wedemeyer, and Bryan Butler on site. During the inspection, the following deficiencies were noted: 1) A Stormwater Pollution Prevention Plan has not been maintained on site. The permittee shall immediately begin efforts to create and maintain a Stormwater Pollution Prevention Plan on site as outlined in the NCG030000 General Permit. 2) Qualitative Monitoring has not been conducted on site. The permittee shall immediately begin qualitative monitoring efforts as outlined in the NCG030000 General Permit. 3) Analytical Monitoring has not been conducted on site. The permittee shall immediately begin Analytical Monitoring efforts as outlined in the NCG030000 General Permit. This facility will be re -inspected on or after April 6, 2021. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030102 Owner -Facility; Putsch & Company Inc Inspection Date: 03/24/2021 Inspection Typo: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: A Stormwater Pollution Plan was not made available at the time of the inspection ❑ N ❑ ❑ ❑ 0 ❑ ❑ ❑ N ❑ ❑ ❑ 0 ❑ ❑ ❑ 0 ❑ ❑ Qualitative Monitorina Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Qualitative monitoring has not been conducted on site. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring has not been conducted on site. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment Page 3 of 3