Loading...
HomeMy WebLinkAbout20210087 Ver 1_More Info Received_20210315IVY RIVER BANK STABILIZATION BUNCOMBE COUNTY - NORTH CAROLINA BUNCOMBE COUNTY S&WCD PROJECT#: USACE ACTION ID#: TBD PROJECT DIRECTORY LANDOWNER GERALD L ANDERSON LIVING TRUST 1096 Barnardsville Highway Weaverville, NC 28787 (828) 626-2304 SPONSOR BUNCOMBE COUNTY S&WCD ON16E CO -,,W(828) 1 ' ,v,,„ GPRoy* Anthony Dowdle Soil Conservationist 250-4786 anthony.dowdle@buncombecounty.org ENGINEER JENNINGS ENVIRONMENTAL PLLC Greg Jennings, PhD, PE President (919) 600-4790 greg@jenningsenv.com Jennings Environmental SHEET INDEX COVER SHEET 1.1 PROJECT NOTES AND SPECIFICATIONS 2.1 EROSION AND SEDIMENT CONTROL PLAN 3.1 - 3.2 BANK STABILIZATION PLAN 4.1 - 4.4 RE -VEGETATION PLAN 5.1 - 5.3 St= „ 1 i p= R 2`� "Lie' 4, -, ,,,6 e a e �� d @ 'Bamm atone �"hko 4 n Re eh...1 "+,en,e s% 1. . - 0 0.25 0.5 I Mlles .. NORTH oe5: Ali, HERE. Gramm, llGGS, InlermaP, IiAGR EM£![R P. MRCen, 'an Je Px- , 11-11,,199I, £5,1 %aye, ESI I I meile n1, NC4C. In, SneetE1p amninok _^=.-. _._.._ Commonly MARCH 12, 2021 PRELIMINARY DRAWING NOT RELEASED FOR CONSTRUCTION IVY RIVER BANK STABILIZATION COVER SHEET PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE AS NOTED H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 1.1 GENERAL PROJECT SPECIFICATION AND NOTES 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. PROJECT SPONSOR: BUNCOMBE COUNTY S&WCD 1.3. LANDOWNER: GERALD L. ANDERSON LIVING TRUST 1.4. ENGINEER: JENNINGS ENVIRONMENTAL 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEQ'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DOT'S "2018 STANDARD PROVISIONS" 2.3. NC DOT'S "2018 SPECIFICATIONS AND SPECIAL PROVISIONS" 2.4. GENERAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 2.5. GENERAL AND SPECIAL CONDITIONS OF NCDEQ'S 401 WATER QUALITY CERTIFICATION 2.6. THE CONSTRUCTION DOCUMENTS 3. NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE. 7. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME PG DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9. THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT OWNER PRIOR TO USE. 10. NO NON -PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM EMBANKMENT EXCAVATION AND CHANNEL WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE. 11. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY AND WORK WEEK. QUANTITIES AND MATERIALS SPECIFICATIONS 12. THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS OR TO A LOCATION SPECIFIED BY CONSTRUCTION DOCUMENTS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS OR ON THE QUANTITIES AND MATERIALS LIST. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 13. THE EROSION CONTROL MEASURES SHOWN IN THE DRAWINGS ARE TO BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE DRAWINGS AND ON THE QUANTITIES AND MATERIALS LIST) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. 14. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 15. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE PROJECT OWNER AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE PROJECT OWNER. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY THE PROJECT OWNER. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. 8202 IVY RIVER BANK STABILIZATION - LIST OF MATERIALS ITEM # DESCRIPTION QTY UNIT EROSION AND SEDIMENTATION CONTROL 2 STANDARD CONSTRUCTION ENTRANCE 1 EA 3 EROSION CONTROL WATTLES 240 LF BANK STABILIZATION 4 BOULDER TOE PROTECTION WILL SOIL LIFTS 147 LF 5 RIVER COBBLE TOE PROTECTION 118 LF 6 BANK GRADING / SHAPING 165 SY 7 BEDROCK OUTCROP REMOVAL 1 LS 8 EROSION CONTROL MATTING 260 SY RE -VEGETATION 9 TEMPORARY SEED, MULCH AND SOIL PREP 0.26 AC 10 PERMANENT SEEDING - ZONE 1 AND ZONE 2 0.18 AC 11 PERMANENT SEEDING - ZONE 3 0.06 AC 12 LIVE STAKES AND BAREROOT PLANTINGS 540 EA FINISH, REPAIR AND REPLACE 13 ACCESS PATH GRAVEL REPAIRS 30 TN z 0 E N J_ m N m PROJECT NOTES AND SPECIFICATIONS PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE 03/12/2021 PLOT SIZE: 11" x 17" NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 2.1 RUSSELL LINC PIN: 9765-59-1079-00000 5.50 AC DILLINGHAM SHAWN WESLEY PIN: 9765-58-3896-00000 6.20 AC GERALD L ANDERSON LIVING TRUST PIN: 9765-58-0445-00000 9.06 AC LIMITS OF DISTURBANCE (LOD) = 0.68 AC 240 LF OF EROSION CONTROL WATTLES AROUND STAGING AREA rA4'.r TEMPORARY STAGING AREA CONSTRUCTION ENTRANCE OF BARNARDSVILLE HIGHWAY MORGAN CECIL PIN: 9765-58-5449-00000 0.23 AC 25 SCALE: 1" = 50' 50 EROSION AND SEDIMENTATION CONTROL (E&SC) PLAN LEGEND - LOD - LIMITS OF DISTURBANCE WAT - EROSION CONTROL WATTLES - ' 1 - PARCEL BOUNDARY CONSTRUCTION SEQUENCE INVAS CONSTRUCTION ENTRANCE TEMPORARY STAGING AREA ACCESS ROUTE 1. OBTAIN AND REVIEW THE IVY RIVER BANK STABILIZATION PROJECT EROSION AND SEDIMENTATION CONTROL PLAN AND ALL OTHER APPLICABLE PERMITS. 2. FLAG THE WORK LIMITS AND STAKE OUT THE LIMITS OF DISTURBANCE (LOD) OF THE PROJECT. THE TOTAL PROJECT LOD IS 0.68 AC. 3. LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORK AREA. 4. INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS. 5. HOLD PRE -CONSTRUCTION MEETING WITH THE PROJECT SPONSOR, ENGINEER AND CONTRACTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. 6. INSTALL CONSTRUCTION ENTRANCE OFF BARNARDSVILLE HIGHWAY AS SHOWN ON THIS SHEET. ESTABLISH TEMPORARY STAGING AREA WITH EROSION CONTROL WATTLES AROUND THE PERIMETER. UTILIZE DESIGNATED ACCESS PATHS FOR ALL CONSTRUCTION ACTIVITIES. 7. INSPECT EROSION PREVENTION AND SEDIMENT CONTROL BMPS DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. KEEP ALL LOGS AND RECORDS UP-TO-DATE. 8. ACQUIRE AND STORE MATERIALS FOR SITE (E.G. ROCK, LOGS, EROSION CONTROL MATTING AND FILTER FABRICS) IN THE TEMPORARY STAGING AREAS. 9. CLEAR EXISTING VEGETATION REQUIRED TO COMPLETE THE WORK TAKING CARE NOT TO DISTURB DESIRABLE VEGETATION TO REMAIN INTACT. 10.GRADE THE RIVER BANKS AND INSTALL BANK STABILIZATION STRUCTURES PER THE PLANS AND DETAILS. WHEN POSSIBLE, PERFORM WORK FROM THE RIVER BANKS TO MINIMIZE TIME SPENT WORKING IN THE CHANNEL. 11.INSTALL TEMPORARY SEEDING, PERMANENT SEEDING AND EROSION CONTROL MATTING ON ALL DISTURBED RIVER BANKS AND GRADED SLOPES AS SHOWN ON SHEETS 4.4 AND 5.1 - 5.3. 12.INSTALL TEMPORARY AND PERMANENT SEEDING AND MULCH TO ALL AREAS DISTURBED FOR CONSTRUCTION ACCESS AS SHOWN ON SHEET 5.1. 13.ONCE THE WORK AREA IS STABILIZED AND CONSTRUCTION ACTIVITIES ARE COMPLETED, REMOVE AND DISPOSE OF ALL NON -BIODEGRADABLE EROSION AND SEDIMENTATION CONTROL BMPS. 14.NOTIFY THE PROJECT SPONSOR AND THE ENGINEER FOR A FINAL INSPECTION AND WALK THROUGH TO VERIFY FINAL STABILIZATION OF THE SITE. 15.WHEN SEASONALLY APPROPRIATE, INSTALL PERMANENT PLANTINGS ON RIVER BANKS AND WITHIN THE RIPARIAN ZONE AS SHOWN ON SHEETS 5.1 - 5.3. EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS 1. CONSTRUCTION ACTIVITIES SHALL OCCUR IN THE WET WITHOUT THE USE OF A TEMPORARY PUMP AROUND SYSTEM TO PREVENT DRYING OUT SENSITIVE AQUATIC ORGANISMS AND HABITATS. 2. ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALLE BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 3. EQUIPMENT WILL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING OPERATIONS SHALL BE PERFORMED IN A CONTAINED AREA AWAY FROM SURFACE WATER. 4. THE CONTRACTOR SHALL STAGE WORK SUCH THAT DISTURBED AREAS WILL BE STABILIZED IN PHASES WITH SEEDING, MULCH AND EROSION CONTROL MATTING (WHERE APPROPRIATE) WITHIN THREE (3) DAYS. 5. WHEN WORKING IN WET CONDITIONS IT THE CHANNEL, THE CONTRACTOR SHALL SHALL USE GRAVEL AND COBBLE TO CREATE A BERM THAT DIVERTS FLOW AROUND THE THE WORK AREA SUCH THAT INSTREAM FLOWS DO NOT INTERACT WITH DISTURBED EARTH AND CONSTRUCTION MATERIALS. CONSTRUCTION SHALLE BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 6. CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE RIVER CHANNEL. IVY RIVER BANK STABILIZATION EROSION AND SEDIMENTATION CONTROL PLAN PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE 03/12/2021 PLOT SIZE: 11" x 17" H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 3.1 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SECTION A -A %TtAL LOCATION DET„MINED IN FIELD 75, OF THE STRUCTURES CPPALIT.Y SCONErEMM CIAPODWOHOGNM BELOW GRADE WASHOUT STRUCTURE NOTTO SCALE Gry so��eEaM'.�o� c �rvonrv�oevice<exza mw.� PLAN ANDBAG '1'.°141 LOCATION DETERMINED IN FIELD MINIMUM 12 INCHES, FREEBOARD NOTING DEVILE ABOVE GRADE WASHOUT STRUCTURE NoTToscALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 3.2 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self -inspections are required during below. When adverse weather or personnel to be in jeopardy, the inspection which it is safe to perform the inspection. greater than 1.0 inch occurs outside performed upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information Is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event> 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SD0s) At least once per 7 calendar days and within 24 hours of a rain event> 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event> 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event> 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. plan shall be documented in the manner 1. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date The following items pertaining to the E&SC described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. IVY RIVER BANK STABILIZATION SELF INSPECTION AND REPORTING PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE 03/12/2021 PLOT SIZE: 11" x 17" NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 3.2 118 LF RIVER COBBLE TOE PROTECTION AND BANK GRADING FROM STA 1+84 TO 3+02. SEE DETAIL SHEET 4.3. REMOVE BEDROCK OUTCROP TO 0.5' BELOW BASEFLOW WSE 147 LF BOULDER TOE PROTECTION WITH SOIL LIFTS FROM STA 0+37 TO 1+84. SEE DETAIL SHEET 4.2. IVY RIVER 2,00 1+50 • OD LOD L At 165 SY OF BANK GRADING AND SHAPING. • • • • •_• LOD LOD LIMITS OF DISTURBANCE (LOD) 0,50 15 30 Feet SCALE: 1" = 30' BANK STABILIZATION PLAN LEGEND - LOD - LIMITS OF DISTURBANCE • IVY RIVER CENTERLINE BEDROCK REMOVAL ?86:6388 COBBLE TOE PROECTION BANK GRADING SOIL LIFTS L 1 LJ BOULDER TOE PROTECTION BANK STABILIZATION NOTES AND SPECIFICATIONS 1. FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE DRAWINGS DEPENDING. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE CONTRACTOR TO ADDRESS ANY FIELD CHANGES. 2. THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. 3. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO THE ADJACENT WETLANDS AND SIGNIFICANT TREES. 4. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION STRUCTURES. 5. DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS. 6. IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 7. BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL BE WITHIN 0.1' OF DESIGN ELEVATIONS. 8. FILTER FABRIC SHALL BE USED WITH ALL ROCK AND WOOD STRUCTURES. ALL FILTER FABRIC SHALL BE 80Z. NON -WOVEN GEOTEXTILE UNLESS OTHERWISE SPECIFIED IN STRUCTURE DETAILS OR SPECIFICATIONS. FILTER FABRIC SHALL BE TRIMMED TIGHT TO THE SURFACE OF THE STRUCTURE AND SHOULD NOT BE OBSERVED BY VISUAL INSPECTION. 9. AFTER THE STRUCTURE IS COMPLETE AND NORMAL FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 10.THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 - 6" OF SOIL OR APPLYING 3 - 6" OF TOPSOIL TO THE DESIGN ELEVATIONS AND APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR STREAMBANK STABILIZATION MUST BE CERTIFIED WEED -FREE STRAW OR OTHER NATURAL WEED -FREE / NON -PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. IVY RIVER BANK STABILIZATION BANK STABILIZATION PLAN PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE 03/12/2021 PLOT SIZE: 11" x 17" 1" = 30' H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 4.1 SOIL GEOLIFTS TO BANKFULL STAGE EXCAVATION LIMITS WOOD STAKE 2" X 2" X 18" - 36" COMPACTED ONSITE BACKFILL RIVER GRAVEL AND COBBLE BACKFILL OR NC DOT CLASS A ROCK NON -WOVEN FILTER FABRIC BOULDERS -7 BOULDER TOE PROTECTION LIVE CUTTINGS INSTALLED BETWEEN LIFTS 2.0' O.C. POINT BAR ON INSIDE BEND BANKFULL DETAILED PLAN NOT TO SCALE VA AVAVAVAV• loloseseo zI P. doh_;...;.,-�I I. - 1.0' MAX { 2.0' MIN 1.0' MIN 4.0' MIN DETAILED SECTION A - A NOT TO SCALE LIVE STAKES AND BARE ROOT PLANTINGS INSTALL SOIL LIFTS UP TO BANKFULL STAGE SOIL LIFTS SHALL USE 2 LAYERS OF MATTING: 260Z. / YD2 COIR MATTING (OUTER) AND 11.2 OZ/YD2 COCONUT FIBER BLANKET (INNER). LIVE CUTTINGS BETWEEN LIFTS UNCONSOLIDATED GRAVEL AND TOPSOIL TOP OF BOULDERS APPROXIMATE LOW FLOW WSE PLACE BOULDERS ON EXISTING BED ROCK BOULDER TOE NOTES 1. ALL BOULDERS SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. BOULDERS AVAILABLE ONSITE MAY BE USED IF APPROVED BY THE ENGINEER. BOULDERS SHALL BE 3.0' X 5.0' X 2.5' (W X L X H) +/- 0.5'. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.0'. BOULDERS LONGER (L) THAN 5.5' WILL BE ACCEPTED. 2. A BEDDING COURSE CONSISTING OF 70% NCDOT CLASS B AND 30% NCDOT CLASS A SHALL BE INSTALLED BELOW THE FIRST ROW OF BOULDERS. IF BEDROCK IS ENCOUNTERED ONSITE, THE FIRST LIFT OF BOULDERS SHALL BE PLACED DIRECTLY ON THE BEDROCK. ALL BOULDERS SHALL FIT TIGHTLY TOGETHER. INSTALL EACH LIFT OF BOULDERS WITH A 0.5' SETBACK FROM THE FRONT EDGE OF THE PREVIOUS LIFT OF BOULDERS. 3. UNCONSOLIDATED GRAVEL AND TOPSOIL SHALL BE INSTALLED AS A LEVELING COURSE THE ABOVE BOULDERS BEFORE THE LIVE CUTTINGS AND SOIL LIFTS ARE INSTALLED. 4. PLACE LAYER OF LIVE CUTTINGS (MIN. 4' LENGTH) A 1.0' O.C. ON THE GRAVEL AND TOPSOIL SUCH THAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2' TO 4') OF EACH LIVE BRANCH WILL BE COVERED BY THE SOIL LIFT. LIVE BRANCHES SHALL BE OF THE SPECIES SPECIFIED FOR LIVE STAKES OR APPROVED BY THE ENGINEER. 5. INSTALL SOIL LIFTS FROM THE LIVE CUTTINGS UP TO THE BANKFULL STAGE. LIFTS SHALL NOT EXCEED 1.0' THICKNESS. LIFTS SHALL INCLUDE ALL SOIL PREPARATION, TEMPORARY AND PERMANENT SEEDING AND MULCH. SOIL LIFTS SHALL USE 2 LAYERS OF MATTING: 260Z. / YD2 COIR MATTING (OUTER) AND 11.2 OZ/YD2 COCONUT FIBER BLANKET (INNER). EROSION CONTROL MATTING USED FOR SOIL LIFTS SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. 6. PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0 FT BEING CAREFUL NOT TO PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED. 7. REPEAT STEPS #4, #5 AND #6 AS NEEDED TO INSTALL SOIL LIFTS UP TO THE BANKFULL STAGE. 8. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. 9. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. IVY RIVER BANK STABILIZATION DETAIL: BOULDER TOE PROTECTION PRELIMINARY DRAWING REVISIONS NCWRC: 01/13/2021 DATE 03/12/2021 PLOT SIZE NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 4.2 GRADE BANKS AT 3:1 SLOPE TO EXISTING GROUND 4" - 6" OF TOP SOIL COMPACTED ONSITE BACKFILL OR EXISTING EARTH • '.4'.- ' ♦��♦30'MAX •=, • , ,.. , - ir 10 # 4101100,, . A--..s, • 0 Q DIIP (Y)* O tom/ si nc) :AC VAC $A4A0A0A$1, VAVAVAVAAAVAVAVAVAVAVA RIVER COBBLE TOE PROTECTION DETAILED PLAN NOT TO SCALE TAWAWACCOVAMOVAWAWAWAWAOM CtVAtVACODMVAWASVACCOMVAaaef TACCOVACOVADVACCOVACOY PLANTINGS INSTALLED 3.0' O.C. POINT BAR ON INSIDE BEND BANKFULL 1 O1.5' IMIN OOOUU O RIVER COBBLE AND GRAVEL SOURCED O� ONSITE GRADE RIVER BANK AT 3:1 SLOPE TO EXISTING GROUND LIVE STAKES AND BARE ROOT PLANTINGS EROSION CONTROL MATTING: 260Z. / YD2 COIR KEY EROSION CONTROL MATTING INTO RIVER COBBLE TOE PROTECTION TOP OF RIVER GRAVEL AND COBBLE 1.5' ABOVE BASEFLOW WSE APPROXIMATE BASEFLOW WSE /////� /////�i// 4' 6' RIVER COBBLE TOE NOTES 1. ROCK USED IN THE RIVER COBBLE TOE SHALL CONSIST OF RIVER GRAVELS AND COBBLES HARVESTED FROM THE RIVER. LARGE VOIDS SHALL BE FILLED WITH GRAVEL. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER. GRAVEL AND COBBLES SHALL BE INSTALLED IN 1.0' LIFTS. EACH LIFT SHALL BE COMPACTED WITH THE EXCAVATOR BUCKET AND COVERED WITH A LAYER OF ALLUVIUM OR MIXED SOIL AND GRAVEL TO FORM A DENSE LAYER OF ROCK MATERIAL AND SOIL TO LINES, ELEVATIONS AND GRADES IN THE DRAWINGS. 2. GRADE RIVER BANK AT 3:1 SLOPE TO EXISTING GROUND. INSTALL 4" - 6" OF TOPSOIL, SOIL PREPARATION, TEMPORARY AND PERMANENT SEEDING AND MULCH. INSTALL 260Z. / YD2 COIR EROSION CONTROL MATTING ON ALL GRADED RIVER BANKS. EROSION CONTROL MATTING SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. 3. THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS -SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. 4. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN -STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. IVY RIVER BANK STABILIZATION DETAIL: BOULDER TOE PROTECTION PRELIMINARY DRAWING REVISIONS NCW RC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 4.3 4" MIN. HORIZONTAL — OVERLAP BANKFULL TOE OF SLOPE EROSION CONTROL MATTING FROM TOE OF CHANNEL TO 3.0' BEYOND BANKFULL STAGE DETAILED PLAN NOT TO SCALE VERTICAL OVERLAP MIN. 12" WITH DOUBLE ECO-STAKES 2' DETAILED STAKING PLAN NOT TO SCALE EDGE OVERLAP MIN. 4" WITH DOUBLE ECO-STAKES AT 2' O.C. EROSION CONTROL MATTING BANKFULL STAGE SINGLE 12" ECO-STAKES OFFSET ROWS AT 2'-3' O.C. EROSION CONTROL MATTING NOTES 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAMBANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. 2. BEFORE INSTALLING EROSION CONTROL MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND PERMANENT SEED, SOIL PREPARATION AND MULCH. 3. EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPE OUT TO A MINIMUM OF 6.0' BEYOND THE BANKFULL STAGE. 4. SECURE MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAM FLOW AS SHOWN IN THE DETAIL. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. EROSION CONTROL —\ MATTING 6.0' BANKFULL lilt ECO-STAKE MIN 12" LENGTH BURY 6" BELOW STREAMBED DETAILED SECTION A - A' NOT TO SCALE SECURE MATTING WITH 4" OVERLAP AND DOUBLED ECO-STAKES 5 CY)C C(1) •— E c c O N Lu IVY RIVER BANK STABILIZATION DETAIL: EROSION CONTROL MATTING PRELIMINARY DRAWING REVISIONS NCW RC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 4.4 1 1 SCALE: 1" = 50' RE -VEGETATION PLAN LEGEND - LOD - LIMITS OF DISTURBANCE — i 1 — PARCEL BOUNDARY L��- ZONE 1: RIVER BANK • + + 4 + + + + + 4 -__ LIVE STAKES, BAREROOTS AND CONTAINER PLANTING ZONE 2: FLOODPLAIN ZONE 3: UPLAND 1. SEE SHEET 5.2 FOR DETAILED PLANTING NOTES AND INSTRUCTIONS. ZONE 1 AND ZONE 2 PLANTINGS SHALL BE INSTALLED AS LIVE STAKES OR BAREROOT STOCK DEPENDING AVAILABILITY. SPECIES LIST MAY BE ADJUSTED BY THE ENGINEER DEPENDING ON SPECIES AVAILABILITY. SEE SHEET 5.3 FOR DETAIL VEGETATION SCHEDULES. TEMPORARY SEEDING AND MULCHING ZONE 3:UPLAND STABILIZATION (0.08 AC) NOXIOUS WEED SEED AND INVASIVE SPECIES. 3. ALL DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY SEED AND MULCHED WITH WHEAT STRAW. SEEDING WILL BE PERFORMED USING A BROADCAST SPREADER. OTHER METHODS MAY BE USED BUT MUST BE APPROVED BY ENGINEER IN ADVANCE OF INSTALLATION. 4. MAINTENANCE OF SEEDED AREAS SHALL CONSIST OF WATERING, WEED AND PEST CONTROL, FERTILIZATION, EROSION REPAIR, RESEEDING, AND INCIDENTAL OPERATIONS AS NECESSARY TO ESTABLISH A HEALTHY, VIGOROUS, WEED FREE AND DISEASE FEE UNIFORM STAND OF GRASS. ALL AREAS WHICH FAIL TO SHOW A UNIFORM STAND OF GRASS FOR ANY REASON SHALL BE TREATED REPEATEDLY UNTIL A UNIFORM STAND OF AT LEAST 90% COVERAGE IS ATTAINED WITH NO BARE AREA GREATER THAN FIVE SQUARE FEET. PERMANENT SEEDING 5. PERMANENT SEEDING SHALL OCCUR IN CONJUNCTION WITH TEMPORARY SEEDING WHERE APPLICABLE. IDEALLY, PERMANENT SEEDING SHALL OCCUR DURING THE PLANTING SEASON FOR EACH SEED TYPE. AREAS FERTILIZED FOR TEMPORARY SEEDING SHALL BE SUFFICIENTLY FERTILIZED FOR PERMANENT SEEDING; ADDITIONAL FERTILIZER IS NOT REQUIRED FOR PERMANENT SEEDING. NOXIOUS WEED SEED AND INVASIVE SPECIES. 7. THE CONTRACTOR SHALL LOOSEN THE SOIL TO A MINIMUM DEPTH OF 4-INCHES AND GRADE TO A SMOOTH, EVEN SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. THE AREAS TO BE SEEDED ARE THEN TO BE ROLLED AND RAKED TO REMOVE RIDGES AND FILL DEPRESSIONS TO MEET FINISH GRADES. THE CONTRACTOR IS TO LIMIT SUB GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS ARE TO BE RESTORED IF ERODED OR OTHERWISE DISTURBED AFTER FINE GRADING AND BEFORE PLANTING. 8. SEED SHALL BE SOWN WITH A SPREADER OR A SEEDING MACHINE. SEED IS NOT TO BE BROADCAST OR DROPPED WHEN WIND VELOCITY EXCEEDS 5 MPH. SEED SHALL BE EVENLY DISTRIBUTED BY SOWING IN TWO DIRECTIONS AT RIGHT ANGLES TO EACH OTHER. WET SEED OR SEED THAT IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR STORAGE IS NOT TO BE USED. AFTER BEGIN SOWN, THE SEED SHALL BE RAKED INTO THE TOP 1/4 INCH OF THE TOPSOIL, LIGHTLY ROLLED, AND WATERED WITH FINE SPRAY. SEEDED AREAS ON STREAM BANKS SHALL BE PROTECTED WITH COIR FIBER MATTING. IVY RIVER BANK STABILIZATION RE -VEGETATION PLAN PRELIMINARY DRAWING REVISIONS NCW RC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 5.1 2. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED 6. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED BUFFER WIDTH — VARIES SPACING PER PLANTING PLAN INSERT THE DIBBLE STRAIGHT DOWN INTO THE SOIL TO THE FULL DEPTH OF THE BLADE AND PULL BACK ON THE HANDLE TO OPENT THE PLANTING HOLE. DO NOT ROCK THE SHOVEL BACK AND FORTH AS THIS CAUSES THE SOIL IN THE PLANTING HOLE TO BE COMPACTED, INHIBITING ROOT GROWTH. BANKFULL TOE OF SLOPE + + + + + + + + + + + + + + BARE ROOT SEEDLING —\ BANKFULL LIVE STAKE JUNCUS PLUG / // ; i/ REMOVE THE DIBBLE AND PUSH THE SEEDLING ROOTS DEEP INTO THE PLANTING HOLE. PULL THE SEEDLING BACK UP TO THE CORRECT PLANTING DEPTH. THE ROOT COLLAR SHOULD BE 1" - 3" BELOW THE SOIL SURFACE. GENTLY SHAKE THE SEEDLING TO ALLOW THE ROOTS TO STRAIGHTEN OUT. DO NOT TWIST OR SPIN THE SEEDLING OR LEAVE THE ROOTS J-ROOTED. / BARE ROOT PLANTINGS 3.0' FROM BANKFULL INSERT THE DIBBLE SEVERAL INCHES IN FRONT OF THE SEEDLING AND PUSH THE BLADE HALFWAY INTO THE SOIL. TWIST AND PUSH THE HANDLE FORWARD TO CLOSE THE TOP OF THE PLANTING HOLE TO HOLD THE SEEDLING IN PLACE. DIBBLE BAR PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS-SECTION, AND SHALL BE 12" LONG, 4" WIDE AND 1" THINK AT THE CENTER. ROOT PRUNING ALL ROOTS SHALL BE PRUNED TO AN APPROPRIATE LENGTH FOR PLANTING TO PREVENT J-ROOTIING. PUSH THE DIBBLE DOWN TO THE FULL DEPTH OF THE BLADE. BARE ROOT DETAILS 3' O.C. LIVE STAKE AND PLUG SPACING / 3' ROW SPACING 0 NOTES 1. ALL SOILS WITHIN THE BUFFER PLANTING AREA SHALL BE DISKED, AS REQUIRED, PRIOR TO PLANTING. 2. ALL PLANTS SHALL BE HANDLED PROPERLY PRIOR TO INSTALLATION TO ENSURE SURVIVAL AND VIGOR. PULLBACK ON THE HANDLE TO CLOSE THE BOTTOM OF THE PLANTING HOLE. THEN PUSH FORWARD TO CLOSE THE TOP ELIMINATING AIR POCKETS AROUND THE ROOT. PLANT LIVE STAKES AND PLUGS IN ROWS FROM TOE OF SLOPE TO 3' BEYOND THE BANKFULL STAGE q 0 REMOVE THE DIBBLE. CLOSE AND FIRM UP THE OPENING WITH YOUR HEEL. BE CAREFUL TO AVOID DAMAGING THE SEEDING. LIVE STAKES PLANTED IN OFFSET ROWS PER PLANTING PLAN JUNCUS PLUG PER PLANTING PLAN 1.5x CONTAINER DEPTH 2' - 3' 2x CONTAINER WIDTH NOTES 1. PLANTS SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. 2. PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS. 3. THE DIAMETER OF THE PLANTING PITS FOR EACH PLANT SHOULD BE AT LEAST TWO TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. 4. SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. 5. PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. //i SECTION A - A' NOTES CONTAINER PLANT DETAILS 1/2" TO 2" DIAMETER 2' TO 3' LIVE STAKE TAPERED AT BOTTOM LIVE STAKE 1. LIVE STAKES MUST BE DORMANT WHEN CUT. KEEP LIVE STAKES MOIST UNTIL PLANTING. THE STAKE SHOULD BE PREPARED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR INSERTION INTO THE GROUND. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURING INSTALLATION. 2. LIVE STAKES SHALL BE 0.5" - 2" IN DIAMETER AND 2' - 3' IN LENGTH. 3. LIVE STAKES SHOULD BE PLACED WITH 3 TO a OF THE LENGTH OF THE STAKE BELOW GROUND AND ANGLED DOWNSTREAM. ENSURE THE BASE OF THE LIVE STAKE WILL REACH THE WATER TABLE. AFTER INSTALLATION THE TOP OF THE LIVE STAKE SHALL BE PRUNED WITH A SQUARE CUT LEAVING NO LESS THAN 3" AND NO LESS THAN 6" ABOVE THE GROUND. 4. PLANT LIVE STAKES AND JUNCUS PLUGS IN OFFSET ROWS AND SPACINGS PER PLANTING PLAN. LIVE STAKING DETAILS IVY RIVER BANK STABILIZATION STABILIZATION AND RE -VEGETATION DETAILS PRELIMINARY DRAWING REVISIONS NCW RC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 5.2 TEMPORARY SEEDING - 0.26 AC DATE TYPE APPLICATION RATE (LBS/AC) JAN 1 - MAY 1 RYE GRAIN 120 GROUND AGRICULTURAL LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 MAY 1 - AUG 15 GERMAN MILLET 50 GROUND AGRICULTURAL LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 AUG 15 - DEC 30 RYE GRAIN 120 GROUND AGRICULTURAL LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 ZONE 1 AND ZONE 2 PERMANENT SEEDING - 0.18 AC 0 25 LBS / AC SPECIES COMMON NAME PERCENT Agrostisperennans AUTUMN BENTGRASS 15 Dichantheliumclandestinum DEER-TOUNGE WITCHGRASS 10 Schizachyriumscoparium LITTLE BLUESTEM 5 Vernonia noveboracensis NEW YORK IRONWEED 10 Elymus virginicus VIRGINIA WILDRYE 20 Juncus effusus SOFT RUSH 5 Panicum virgatum SWITCHGRASS 15 Rudbeckia hirta BLACKEYED SUSAN 10 Sorghastrumnutans INDIAN GRASS 5 Tripsacumdactyloides EASTERN GAMAGRASS 5 ZONE 3 PERMANENT SEEDING - 0.08 AC 0 30 LBS / AC SPECIES COMMON NAME PERCENT Tridens flavus TALL REDTOP 50 Panicum virgatum SWITCHGRASS 50 ZONE 1 STREAMBANK PLANTINGS - 0.12 AC 0 3' O.C. SPECIES COMMON NAME STEMS Cornus amomum SILKY DOGWOOD 150 Salixsericea SILKY WILLOW 150 Physocarpus opulifolius NINEBARK 150 Sambucus nigra ELDERBERRY 150 ZONE 2 FLOODPLAIN PLANTINGS - 0.06 AC 0 8' O.C. SPECIES COMMON NAME STEMS Betula nigra RIVER BIRCH 10 Platanus occidentalis SYCAMORE 10 Alnus serrulata TAG ALDER 10 Liriodendron tulipifera TULIP POPLAR 10 IVY RIVER BANK STABILIZATION RE -VEGETATION SCHEDULE PRELIMINARY DRAWING REVISIONS NCW RC: 01/13/2021 DATE: 03/12/2021 PLOT SIZE NTS H.D.: NAD83 V.D.: NAVD88 JE PID: 8202 5.3