Loading...
HomeMy WebLinkAbout20050045 Ver 1_Certification of Completion_20070518May 17, 2007 North Carolina Division of Water Quality GEoSCIENCE 401 /Wetlands Unit GROUP 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Reference: RiverGate -Water Quality Pond Certifications DWQ Project #OS-0045 Gentlemen: Consulting Engineers The work approved under project number OS-0045 has been completed and the ponds are operating. I have attached the "Certificate of Completion" as required by your division. If you have any questions, please do not hesitate to contact us. ~ (~^~~~ U illy, ENCE GROUP, INC. MAY 1 ~ ZO01 ~ JEhJR -WATER QiJAUTY ~TLANbS ~'`!0 g,TQ!~'~4VVATER BRANCH Kevin S. Caldwell, P.E. Senior Vice President 500 Clanton Aoad Charlotte, North Carolina Telephone Facsimile Suite K 28217 704.525.2003 704.525.2051 • i Certificate of Coarplet2on D~'Q Project No.: ~'~~ Counn•: -"I~G~i~LLljtJ :applicant: Project Name: Date of Issuance of 401 Rater Quality CertiScstioa: ~ ~~ Upon completion of all work approved within the 401 Waur Qualr~y C ..' "cation and Bu$ar Rules. and any subsequent modifications, the applicant is required to return this cert~eate to the 401IW ctlands Unit; North Carolina Division of Water Quality, 1621 Matt Service Center, Raleigh, NC, 27699-16? 1. This form may be returned to DWQ by the applicant, the applicant's authorized agetst, or the project eay~iaeer It is not necessary to send certificates from aIl of these. _4pplicant's Certification e ~e~ ~' ~ I, , h~ eby state that to the b`st of my abiIiti~. due ~r ~ diligence was cd in the observation of the constricrion such that the construction was oes..--v;,3 to b~ built within substantial compliance and intent of the 4U1 Warm Quality C~rificazion and Buis Rubs, the approved plans and s~ecincations, and other supporting mazerials Signattae: / y ~/~ Dale: o Agetrt's CerufICaiion I, ,hereby s'tatr that, to the best of my abilities, due care and diligence was tsed in the o'oscrvation of the constriction such that the constriction was obsr.--ved to be built within sL a*~*~a compliant; and meat of the 401 Water Quality C,-rtmcazion and Burr Rnl~s, tht approved plans and spetin"cations, and other supportnng ~r^-ialt $ i oTat,trr: Daze: ~f th' project was/desired by a Certified professional I, t~ l~lGt , ~s a duly re~.stes~ Proiessioual ~y,JbNn[ (ice Ln~~ine~r LanescaDe Srchitect, Stav~yor, etc.) to the State oz North Carolina, hiving bern~a~.,..sd to obsezv (periodically, fly, lull time) the constr•u,^rion of the proje.~ for the Pe~rtt,,~ ~~~ Sri; - t~ to the best of my aoulties, due care and ddigence wzs ~ n the ocs... "on of the con_sma..•-aon sn: h that the construction wu obs.,-rued to br but7t within subs,.anriai coamiiance and inapt of the 40I C~~axe: Quaiiry Ce:tinca~on~Bt~.a~uI7auiaro d plans and spwin":ariors, and other supporti~ ,i~^ -~.~jc. $1~T1T*~': lZ-o?~"~On ?V O.: I~K~ ~077iS Date: ~ 1 ~V v p"~~~~~ V ~~ u MAY 1 9 2Q07 ~3ENR • WATER 4UAlITY 4V£TLAND~ A,up STOR~I4YAT ER BRANCH