HomeMy WebLinkAbout20210425 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210326Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, March 26, 2021 12:01 AM
To: coates@smeinc.com
Cc: Mairs, Robb L
Subject: Pre -Filing Time Clock has been reached for Cape Cottages - 20210425 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cape Cottages
that you submitted on 2/23/2021. The ID number for that project is 20210425, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210425
Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 2/23/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Charles Oates
coates@smeinc.com
Cape Cottages
WGTRACT6, LLC and WG MM TRACT6, LLC
Brunswick
Street Address
Post Office Box 3167
Address Line 2
aty
Wilmington
Fbstal / Zip Code
28406
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
I do not.
Please give a brief project description below.
The property has a current JD letter issued by the USACE under
SAW-2006-00699, dated July 22, 2019 (valid until July 20, 2024).
Thomas & Hutton, the project engineer, has designed a proposed
residential development for the referenced property located in
Leland, North Carolina. The project engineer has designed the
development to avoid adverse impacts to wetland ecosystems to the
extent practicable while meeting state and county requirements. The
proposed development has one minor wetland impact associated with
road crossing that totals 0.095-acre. We will be applying for a
Nationwide Permit #18 through the Wilmington district Office of the US
Army Corps of Engineers.
Please give a couple of dates you are available for a meeting.
3/8/2021
2/16/2021
Please attach the documentation you would like to have the meeting about.
27388.0004 - Cape Cottages Wetland Permit
2.22MB
Drawings - 2021-02-23.pdf
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
04,7,tlev 06!l w
Submittal Date 2/23/2021