Loading...
HomeMy WebLinkAbout20120072 Ver 4_Approval Letter_20120924NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Mr. Adam Long Piedmont Natural Gas 4720 Piedmont Row Dr. Charlotte, NC 28273 Charles Wakild, P. E. Director Subject: Revisions to PNG Line #70, Mecklenburg /Cabarrus APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Long: Dee Freeman Secretary September 24, 2012 DWQ# 12- 0072V2 Mecklenburg County You have our approval, in accordance with the general certification and those conditions listed below, to impact 0.537 of wetland (convert 0.145 to herbaceous species) and temporarily impact 1,505 linear feet (If) of stream /creek in order to construct the gas line in Mecklenburg and Cabarrus Counties, as described in your application received by the Division of Water Quality (DWQ) on August 17, 2012. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3884, which can be viewed on our web site at http: / /portal.ncdenr.org /web /wq /swo /ws /401. The General Certification allows you to use Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: 1. All additional conditions of the previously issued certification remain in effect as well as those listed in the new general certification. 2. The following request in your application is not approved: "As a pro- active step, PNG determined that the permit as previously - proposed should be modified to include an option to install the pipe through conventional isolation methods at stream features, if conditions permit. As conventional installation is performed "in the dry, "this method provides a discrete and quantifiable expectation of temporary impacts associated with each crossing, and precludes the uncertainty Mooresville Regional Office One Location 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NorthCarolina Phone (704) 663- 1699 \Fax (704) 663 -6040\ Customer Service 1- 877 - 623 -6748 �aturall� Internet http / /portal ncdenr org /web /wq An Equal Opportunity /Affirmative Action Employer — 50% Recycled /10% Post Consumer Paper of additional impacts associated-with potential drill failure and the resulting containment and cleanup of drilling fluids. 3. Continuing Compliance. The applicant (Piedmont Natural Gas) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of DWQ under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Michael Burkhard in the Mooresville Regional Office at 704 - 663 -1699 or Ms. Karen Higgins in the Central Office in Raleigh 919 - 807 -6360. Sincerely, for Charles Wakild, P.E. cc: Army Corps of Engineers, Asheville Karen Higgins, Wetlands Unit Joey Lawler, S &ME