HomeMy WebLinkAboutNCG030156_DMR_20200519Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and kand Resources General Permit No. NCG030000
Date submitted 101 �70ZD
CERTIFICATE OF COVERAGE NO. NCG03 U ( 5 (o SAMPLE COLLECTION YEAR
FACILITY NAME��,��� t f���� C SAMPLE PERIOD 01an-June ® July -Dec
COUNTY or 13 Monthly'_ (month)
PERSON COLLECTING SAMPLES , a DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY_ Te)L Lab Cert. # ?���� ❑Zero -flow [:]Water Supply ❑SA
Comments on sample collection or analysis: ❑Other
MAY 2 9 2020
CErV rfj�� - ' LE,
Part A: Stormwater Benchmarks and Monitoring Results OVVR SeCTION
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -)
F-1 Aln 4;i J __ +b,:. ..,4J2
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches s
Total Suspended Solids
H
Standard units
Total Co PPer
L
Total Lead
yc wu
Total Zinc
Ncnuu:
Non -Polar O&G
Total Petroleum
Hydrocarbons
Total Toxic
Organics
Benchmarks
_
-
100 mg/L or 50 mg/L°
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46529
C0530
00400
0/1�1/1�9
01051
01094
UV
3S�
f/ nr ,�z1
�%
lo�
J
�IhVI
MVi
i
A/ %00552
rV�z^
/7�/8141
.• "
s
. 010m&Gaul
nr
- ivionimy sampling pristeaci or semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single.outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Name (Print name)
Title (Print title)
Signature
Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring'Results: only for facilities averaging > 55 gal of new oil per month.
n No dischome this period?'
Outfall No.
Date Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
Inches3
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/0
Parameter Code
-
46529
NCOIL
00552
CO530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ®NO
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES [:I NO
REGIONAL OFFICE CONTACT NAME:
Mail an original copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitorina period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
XJ
Signature of
Permit Date:11/1/2018-05/31/2021
511 9rLot o
Date
SWU-245, last revised 11/1/2018
Page 3 of 3