HomeMy WebLinkAbout20120095 Ver 1_Inspection_20120929Wetland Inspection Report
P,ojectNum: 20120095 Version: 1 Status: |nnuod
Project Name: Guilford County Board ofEd Autism Classroom ProjectType: Industrial/ Commercial/ Business
Builidin
County: Guilford Region: Winston-Salem
Location: Guilford County Board ofEdAutism Qunnmom Bui|iding
Latitude: +30~04'54^ Longitude: '79~44'03^
GVV Plan Location:
Site Owner Name: Guilford County Board ofEducation
Inspection Date: 09/29/2012
Reason for Inspection: Routine
Inspection Type: Site Inspection (non-DOT)
Inspection Contact Person:
On~GdeRep,esentubve(s):
Primary Inspector: Sue LHomewood
Secondary Inspector(s):
Facility compliance Status: NN Compliant
Program Area: 401 (includes isolated/non-404)
Question Areas:
��
�� Permit (401VVOC)
Inspection Summary:
Title: Phone:
nNot Compliant
Phone: 330-771~4904
Permit (401 WQC) v*n No w^ NE
Does the impact(s) match what was approved in the 401 VVOCor non 404 permit? 0 [] [] []
Are the culverts and/or filled areas installed properly? [] [] M []
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
0 0 0 0
Comment: Site cleared and ready for culvert installation. Stream protected so far.
Discussed proper installation methods and constraints of 401 and buffer and stornnvvater
conditions within permit.
Page: 1