Loading...
HomeMy WebLinkAbout20120095 Ver 1_Inspection_20120929Wetland Inspection Report P,ojectNum: 20120095 Version: 1 Status: |nnuod Project Name: Guilford County Board ofEd Autism Classroom ProjectType: Industrial/ Commercial/ Business Builidin County: Guilford Region: Winston-Salem Location: Guilford County Board ofEdAutism Qunnmom Bui|iding Latitude: +30~04'54^ Longitude: '79~44'03^ GVV Plan Location: Site Owner Name: Guilford County Board ofEducation Inspection Date: 09/29/2012 Reason for Inspection: Routine Inspection Type: Site Inspection (non-DOT) Inspection Contact Person: On~GdeRep,esentubve(s): Primary Inspector: Sue LHomewood Secondary Inspector(s): Facility compliance Status: NN Compliant Program Area: 401 (includes isolated/non-404) Question Areas: �� �� Permit (401VVOC) Inspection Summary: Title: Phone: nNot Compliant Phone: 330-771~4904 Permit (401 WQC) v*n No w^ NE Does the impact(s) match what was approved in the 401 VVOCor non 404 permit? 0 [] [] [] Are the culverts and/or filled areas installed properly? [] [] M [] Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 0 0 0 Comment: Site cleared and ready for culvert installation. Stream protected so far. Discussed proper installation methods and constraints of 401 and buffer and stornnvvater conditions within permit. Page: 1