Loading...
HomeMy WebLinkAbout20210412 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210324Strickland, Bev From: laserfiche@ncdenr.gov Sent: Wednesday, March 24, 2021 12:01 AM To: lely@carolina.rr.com Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Installation of rip rap on shoreline at Lake Tillery - 20210412 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Installation of rip rap on shoreline at Lake Tillery that you submitted on 2/21/2021. The ID number for that project is 20210412, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20210412 Version* 1 Regional Office* Fayetteville Regional Office - (910) 433-3300 Reviewer List* Chad Turlington Pre -Filing Meeting Request submitted 2/21/2021 .............................................................................................................................................................................................................................................................................................................. Contact Name * Lincoln Ely Contact Email Address* lely@carolina.rr.com Project Name* Installation of rip rap on shoreline at Lake Tillery Project Owner* Project County* Owner Address: Lincoln Ely Montgomery Street Address 658 Deerfield Rd Address Line 2 aty Mt. Gilead Rbstal / Zip Code 27306 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country us Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below. We have 100-120 feet of shoreline on Lake Tillery where the existing sea wall is deteriorating. We want to stabilize the shoreline with large rock rip rap. Please give a couple of dates you are available for a meeting. 2/26/2021 2/25/2021 3/2/2021 3/1 /2021 Please attach the documentation you would like to have the meeting about. DEERFIELD-SURVEY Shoreline Markup.pdf 44.51KB DEERFIELD-SURVEY.pdf 141.07KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/21/2021