Loading...
HomeMy WebLinkAbout20120821 Ver 1_Staff Comments_20120924Lucas, Annette From: Lucas, Annette Sent: Monday, September 24, 2012 2:19 PM To: Witherspoon, Lauren Cc: Lucas, Annette Subject: 12 -0821 South Lakes SD Attachments: 12 -0821 South Lakes SD docx See attached. 12 -0821 South Lakes SD AML comments September 24, 2012 1. Written Stormwater Management Plan Needed for the Future Phases A final, written stormwater management plan for each future phase (including a BMP Supplement Form for each proposed BMP and all required items at the scales specified in the Required Items Checklist) shall be submitted to the DWQ Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 - 1650). The stormwater management plan must be designed to treat the runoff from the entire built upon area in the phase in accordance with the version of the 401 Stormwater Requirements on the place of the date of the submittal. The stormwater management plan must be approved by the DWQ before any land disturbance associated with that phase may occur. Before any future permanent building, the corresponding stormwater management plan as approved by the DWQ must constructed and operational.