Loading...
HomeMy WebLinkAbout20181302 Ver 1_Compliance Evaluation Inspection_20210325Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20181302 NCDOT - SR 1001 Improvements (U-5818) McDowell NCDOT - SR 1001 Improvements (U-5818) NC DOT Division 13 3/25/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 02' 08''+35° 38' 47'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on March 25, 2021 by Kevin Mitchell with the Asheville Regional Office. James Hutchins was present during the inspection. The following are items that require attention. ~Station L 12+50 LT - (East Bound Off Ramp) Recommend removing accumulated sediment from special lateral ditch. ~Station Y 475+00 - 479+00 RT - Slopes are being tracked in. Need groundcover. ~Station L 25+70 LT - Slopes are being tracked in. Need groundcover. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20181302 3/25/2021 Tippett, Lyndo Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2