Loading...
HomeMy WebLinkAboutSW3210101_400- RTC to 1st Comments_20210324U11 MCADAMS March 17, 2021 NCIDEQ 512 N. Salisbury Street Raleigh, North Carolina 27699 RE: The Glenns Response to ls' Plan Review Comments TRU-19030 RESPONSE TO COMMENTS > TRU-19030 The following are the response comments for the above -mentioned project. Our response comments are in bold. STORMWATER PROGRAM: Corey Anen 919.707.92000 1. Please revise the SWU-101 Application to address the following comments: a. Please enter the name and title of the signing official for the applicant. Please note that the signing official muse be a principal executive officer of the level of vice president or an authorized representative [15A NCAC 02H .1040(l)]. b. Please provide documentation from the NC Secretary of State or other official documentation stating that the signing official for the property owner meets the signatory requirements above. c. Please provide a phone number and email address for the property owner. d. The Property Owner Authorization was not complete. Please fill in all fields and submit a newly signed copy. e. Please complete the Applicant Certification. This is required for all permit applications. McAdams Response: The SWU application has been updated and the information has been provided. 2. On the existing conditions plan, please show the boundaries of all surface waters, wetlands, regulatory flood zones, protected vegetated setbacks and protected riparian buffers or a note that none exist [15A NCAC 02H .1042(2)(g)(iii)]. McAdams Response: A note has been added that none of these are within the property. 3. The scale on Sheet C3.00 appears incorrect. It currently says I" = 80', but appears to be at the same scale as Sheet C2.00 (1" = 100'). McAdams Response: The scale has been updated. 4. Please show a maintenance access and easement on the design plans that meets the requirements of MIDC 8 & 9 [15A NCAC 02H.1050(8) & (9)]. McAdams Response: The maintenance and access easement have been shown for both SCMs. creating experiences through experience 3430 Toringdon Way, Suite 110, Charlotte, NC 28277 / 704. 527. 0800 U11 MCADAMS RESPONSE TO COMMENTS > TRU-19030 5. Please submit an Operation Maintenance Plan and Agreement that meets the requirements of General MDC 11 and 12 [15A NCAC 02H .1050(11) & (12),.1042(2)(j)]. The O&M EZ form can be used to meet this requirement and can be found on the Stormwater Design Manual website. McAdams Response: The O&M has been provided. 6. Please submit a Supplement EZ form with the design data for the site. The Supplement EZ form can be found on the Stormwater Design Manual website. McAdams Response: The Supplement EZ form has been provided. 7. Please submit a deed restriction form [15A NCAC 02H .1003(7)]. A sample form can be found on the Post - construction Stormwater Forms website. McAdams Response: The deed restriction form has been provided. 8. Please address the following comments regarding the sand filter: a. Sand Filter MDC I requires a separation distance of two feet from the bottom of the system. Please submit a geotechnical report showing that the required separation is provided [15A NCAC 02H .1056(l)]. b. The calculations used to size the sand filter are from an old version of the Stormwater Design Manual and do not meet the current MDC. According to MDC 2 and 3, the sand chamber must be sized to store at least half of the design volume below the first outlet [15A NCAC 02H .1056(2) & 3]. McAdams Response: SCM B has been converted to a wet pond and followed SCM A design/addressed comments that pertained to SCM A. 9. Please address the following comments regarding the wet pond: a. The stage storage calculations shown in the Stormwater Impact Analysis (Page 65 of the PDF document) are incorrect. The table shows the contour area at El. 575 as less than at El. 574. b. The water quality elevation and drawdown time were based on the 1-year storm event, not the I" storm event. The wet pond must be designed based on the I" storm event. c. The forebay is only 11% of the main pool volume. Wet pond MDC 5 requires it to be 15-20% of the main pool volume [15A NCAC 02H .1053(5)]. McAdams Response: These items have been updated for SCM A as requested. 10. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and I hardcopy of other documents. Pdfs must be uploaded using the form at: https:Hedocs.deq.nc.gov/Forms/SW_Project_Submittal McAdams Response: Items have been provided and uploaded. creating experiences through experience 2 of3 U11 MCADAMS RESPONSE TO COMMENTS > TRU-19030 Consideration of this response is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at 704. 527. 0800. Sincerely, MCADAMS Michael Duval, PE Project Manager creating experiences through experience 3 of3