HomeMy WebLinkAboutSW3210101_300- The Glenns SIA Report_20210324-mop T 000, _;RP 11 0 , �e-7 --7, :40 THE GLENNS Stormwater Impact Analysis and Final Design of Stormwater Control Measure WADAms THE GLENNS The Town of Wingate, North Carolina Stormwater Impact Analysis & Design of Stormwater Control Measure Project Number: Designed By: Date: TRU-1 9030 Michael Duval, PE March 2021 -10 CARO SE L 048769 WADAMS 3430 Toringdon Way, Suite 110 Charlotte, North Carolina 28277 NC Lic. # C-0293 2 MCADAMS STORMWATER IMPACT ANALYSIS GENERAL DESCRIPTION Located east of Ansonville Rd and north of Monroe Expressway in the Town of Wingate in Union County, North Carolina, is the proposed development known as The Glerms. The existing site consists of areas of woods and trails. Proposed development on this site will consist of the construction of single-family homes, along with associated roads, sidewalks, utility improvements and one stormwater control measure. The proposed development is located within the Yadkin River basin with stormwater runoff from the proposed development draining into the Meadow Branch & Austin Branch in the Richardson Creek Watershed. Per Town of Wingate regulations, stormwater management on this site shall meet the stormwater management performance standards for development set forth in the Town of Wingate Code of Land Ordinances & NCDEQ IVIDC. These are as follows: 6.5 Stormwater Management for the Town of Wingate, NC. All developments shall be constructed and maintained so that adjacent properties are not unreasonably burdened with surface waters as a result of such developments. A. No development may be constructed or maintained so that such development impedes the natural flow of water from higher adjacent properties across such development, thereby causing damage to such higher adjacent properties; and B. No development may be constructed or maintained so that surface waters from such development are collected and channeled onto lower adjacent properties at such locations or at such volumes as to cause damage to lower adjacent properties. 15A NCAC 02H.1003 NCDEQ Requirements that apply to all projects. DESIGN REQUIREMENTS FOR HIGH DENSITY PROJECTS. High density projects are projects that do not conform to Item (2) of this Rule. High density projects shall meet the following minimum design criteria: (a) TREATMENT REQUIREMENTS. SCIVIs shall be designed, constructed, and maintained so that the project achieves either "runoff treatment" or "runoff volume match" as those terms are defined in Rule .1002 of this Section. (b) OFF -SITE STORMWATER. Stormwater runoff from off -site areas and existing development shall not be required to be treated in the SCM. Runoff from off -site areas or existing development that is not bypassed shall be included in the sizing of on -site SCIVIs at its full built -out potential. (c) OFF -SITE SCM. A project that controls runoff through an off -site SCM shall be allowed on a case -by - case basis as determined by the permitting authority if the off -site SCM meets the provisions of Rules .1050 through .1061 of this Section. (d) EXPANSION OR REPLACEMENT OF EXISTING DEVELOPMENT. When new built -upon area is added to existing development or existing development is replaced with new built -upon area, only the area of net increase shall be subject to this Section. creating experiences through experience 3430 Toringdon Way, Suite 110, Charlotte, NC 28277 / 704. 527. 0800 TIMCADAMS STORMWATER IMPACT ANALYSIS (e) IVIDC FOR SCIVIS. SCIVIs shall meetthe relevant IVIDC setforth in Rules .1050through .1062 of this Section except in accordance with Item (6) of this Rule. To meet the above requirements, one wet pond & one sand filter is being proposed to control post - development peak runoff rates to their pre -development condition. Please refer to the appropriate section of this report for additional information. CALCULATION METHODOLOGY • Rainfall data for the analysis was taken from NOAA's database for the Town of Wingate. Please reference the precipitation information section within this report for additional information. • Using maps contained within the Union County Soil Survey, the on -site soils were determined to be hydrologic soil group (HSG) 'C' and 'D' soils. Since the method chosen to compute post - development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Service Curve Number (SCS CN). A composite SCS CN was computed for each pre- and post -development sub -basin. For example, Subbasin #1 in the pre -development analysis consists of approximately 39% HSG 'C' and 61% HSG 'D' soils. Therefore, for the open area cover condition, the composite SCS CN is computed as follows (assuming good condition): > Composite OpenSCS CN= (39%x 74) + (61%x8O) = 78 • A composite SCS Curve Number was calculated for both the pre- and post -development condition for each sub -basin using SCS curve numbers and land cover conditions. Land cover conditions for the pre -development condition were taken from available survey and GIS information. Land cover conditions for the post -development condition were taken from the proposed development plan. • The time of concentration was calculated using SCS TR-55 (Segmental Approach, 1986). The Tc flow path was divided into three segments: overland flow, concentrated flow, and channel flow. The travel time was then computed for each segment, from which the overall time of concentration was determined by taking the sum of each segmental time. • PondPack Version V8i was used in determining the pre- & post -development peak flow rates for the 1-, 10-, 25-, 50-, and 100- year storm events, as well as routing calculations for the proposed stormwater control measures. • The proposed stormwater control measures were designed in accordance with the Minimum Design Criteria (MDQ standards set forth in the NCDEQ Stormwater Design Manual. creating experiences through experience 2 of 3 2 MCADAMS DISCUSSION OF RESULTS STORMWATER IMPACT ANALYSIS Peak Runoff Control Requirements: The proposed project will result in a significant increase in peak flow rates to downstream properties. To mitigate these impacts, the proposed stormwater control measures have been sized such that post - development peak flow rates are no greater than pre -development levels in the 1-, 10-, 25-, and 50- year storm events on site. Water Quality Requirements: The proposed facilities were designed in accordance with the Minimum Design Criteria (MDC) standards set forth in the NCDEQ Stormwater Design Manual. The proposed facilities will provide the required 85% TSS removal. CONCLUSION If the development on this tract is built as proposed within this report, then the requirements set forth in the Town of Wingate Code of Ordinances will be met. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: • The proposed site impervious surface exceeds the amount accounted for in this report. • The post -development watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. creating experiences through experience 3 of 3 SUMMARY OF RESULTS MISCELLANEOUS SITE INFORMATION WATERSHED SOILS INFORMATION SITE PRECIPITATION DATA PRE -DEVELOPMENT HYDROLOGIC CALCULATION �POST -DEVELOPMENT HYDROLOGIC CALCULATIONS �STORMWATER CONTROL MEASURES DESIGN CALCULATIONS SUMMARY OF RESULTS The Glenns TRU-1 9030 9 MCADAMS SUMMARY OF RESULTS Project Name: The Glenns Project Numbet TRU-1 9030 RELEASE RATE MANAGEMENT RESULTS POINT OF ANALYSIS #1 Pre-Dev I Post-Dev Return Period [cfs] [cfs] % Increase 1-year 16.12 6.75 1 -58% 10-year 41.27 38.97 -6% 25-year 51.08 50.9 INA 50-year 58.32 55.2: 100-year 65.21 58.93 -10% POINT OF ANALYSIS #5 Pre-Dev I Post-Dev Return Period rcfsi rcfsi o/ Increase 1-year 9.72 2.90 -70% 10-year 27.81 17.55 -37% 25-year 35.28 28.99 -18% 50-year 40.89 39.88 -2% 100-year 46.32 49.54 7% Date: 3/17/2021 Calculated By: M. Duval, PE 9 MCADAMS SUMMARY OF RESULTS Project Name: The Glenns Project Numbet TRU-1 9030 STORMWATER CONTROL MEASURE SUMMARY Design Drainage Are: 24. �5 � cres Design I mpervio�us Are 8.8 :cres % Impervious 35.811 Water Quality Volume 3 cf 70,431 1 -Year Treatment Volume = ad cf Top of Dam = 578.00 ft NWSE = 572.50 Ift Riser = Riser Elevation = 1 575.00 ft Siphon Diameter = in Siphon Elevation =1 572.50 ft Orifice = 6"W" in Elevation = 1 573.50 Ift Barrel Diameter 24 in I nvert I n 572.50 ft Invert Out 571.85 ft Length 135 ft % Slope = 1 0.48 STORMWATER CONTROL MEASURE ROUTING RESULTS Inflow Outflow Max WSE I Freeboard Return Period I [C1 I [CfSJ [f [ft] 1 67.18 6.45 = 574.35 3.65 10 133.71 37.60 575.76 25 155.74 49.29 576.28 50 171.14 53.32 576.70 100 184.91 56.76 577.08 Date: 3/17/2021 Calculated By: M. Duval, PE 9 MCADAMS SUMMARY OF RESULTS Project Name: The Glenns Project Numbet TRU-1 9030 STORMWATER CONTROL MEASURE SUMMARY Design Drainage Are: 13.75 acres Design I mpervio us Are 6.42 acres % Impervious 46.7% ,979 cf Water Quality Volume 425d Top of Dam = 578.00 ft NWSE = 574.00 Ift Riser = Riser Elevation = 1 576.00 ft Siphon Diameter = in Siphon Elevation =1 574.00 ft Orifice = 6.. x24" in Elevation = 575.00 Ift Barrel Diameter in I nve rt I n ft Invert Out ft Length ft % Slope =ad STORMWATER CONTROL MEASURE ROUTING RESULTS Inflow Outflow Max WSE I Freeboard Return Period I C fs] I `CfS1 [ft] [ft] 1 -----F-1.86 41.19 575.20 10 78.08 13.74 576.23 25 90.00 23.14 576.44 50 98.29 32.29 576.61 100 105.67 41.01 57679 Date: 3/17/2021 Calculated By: M. Duval, PE MISCELLANEOUS SITE INFORMATION The Glenns TRU-1 9030 ik A e&Wll lose ow :A K 010 Sl' or_ AL lft� 116 t te Ja T*,: Aw Soo;- - & 1&fflSjLA—_eur@GcjF2# K cm L , AN THE GLENNS SITE AERIAL MAP 0 335 670 1,340 PROJECT #: TRU-19030 I inch = 666.666667 feet Feet WINGATE, NORTH CAROLINA McADAMS m ey nyto�� ey OW-00 �Fj JR! 0 .9 00 SITE X-7 1754 T rk C=3 S90 ak %.Mae 46 .77 G eld repo Irmo so ubed Cbb c ,,l 3_���� N THE GLENNS USGS TOPO MAP 0 625 1,250 2,500 PROJECT #: TRU-19030 I inch — 1,250 feet Feet WINGATE, NORTH CAROLINA WADAM�) WATERSHED SOILS INFORMATION The Glenns TRU-1 9030 o M..T.SZ .08 0 z 0 0 CL p 0 U) 0) 0 2 M..SE.SZ .08 0Mzsc ONCZSC 0��Zsc OZ67LSC cmzzsc 0Mzsc ONCZSC 0��Zsc OZ67LSC cmzzsc M..T.SZ .08 0 N 0 0 0) 0 (U — IL U) U) U) = M 0 �j U) CL 0 0 Lf) 0 z .2 Ln > 0 0 z .iiiiic 0 z M..SE.SZ .08 0 z 0 0 CL 0 U) 0) 0 2 z 2 0 LL z CL a z LU 0 LU —j CL CL CL m E 0 0 CL E 0 U) 'C� U) 0 — _0 CL M CL M U) E 0 EL U) (U CL 0 C: o 0 W > 0 -0 U) o E m 0 2) E u) u) a) E o) b) E (UU) 'E 2' -CL -�= 6 c -Fu 0 0 Lu E = 6 W— U) U) ('U' -IOU U) Xo a) CL o o u) _0 a) 00 U) a) 2 E a) U) CL a) 0 E ,2 Cc: LO a) a) W M W cr U) (cu: E m U) -0 o 00 :5 =; 2 C: CML au)) a) C) af 2 0 =a) a) U) a) 0 0 > Z o M N U) E u) CL m U) U) I'L 70 m UT) I < 0 N 3: 0 . . ) !E 2 E o C) — U) m L =0 9) U) -r- m IQ 'o 0 z C: in 0 < m a) 0 Z- 0 1) m cu)L 0) 0 CL M (u E C: 2 0 go) -2 E =0; cL E m 0 E U=); au)) ac)) 2 2 o 0 au)) cL -- 0 U) Cc: < m z E 2 0 cL o -v a)J6 j6 a) mO) :L- 0 6 �6 ap)) E 0 0 CL a) U) U) U) .2-0 c- -0 0 a? U) 8 cm -Fu a) 0 m = c: V) E 2 —a) =0 (Su E Or ao) a2) 2 a>) W < 0 CL 0 a) M 00 CL m 0 �5 — 0 a" U) U) ao) 2 U) .2 U) C: 2 CL a) u) a) M 0 E c� F, 0) o a M m a) a) 09 o D U) :5 !E = L 0 =; = 0 o LP 0).s� E m 15 FL E u) 0 2 om u) u) u) m �E- Oo E a) Z > CL 0 0 0 0 0 0 m 0- m a U) 0 z < .2 El 0 0 13 LL 0 u > 0 Z: 0) 0 0 2, 'a) ao m 0 0 0 Z 16 F 0 co 0 co co 0 41 .- 0 a. m 6-0 o z 0) < m S El El 13 13 0 co 0 N 0 0 IL U) U) U) 0 U) CL 0 0 0 0 m z > C/) o . 0 > 0 Hydrologic Soil Group —Union County, North Carolina PL Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Badin channery silt C 0.2 0.4% loam, 2 to 8 percent slopes CmB Cid channery silt loam, 1 D 18.9 40.3% to 5 percent slopes GsB Goldston-Badin D 9.7 20.7% complex, 2 to 8 percent slopes MhA Misenheimer-Cid C/D 18.1 38.6% complex, 0 to 3 percent slopes Totals for Area of Interest 47.0 100.0% USDA Natural Resources Web Soil Survey 10/17/2020 a-= Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina PL Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 10/17/2020 Conservation Service National Cooperative Soil Survey Page 4 of 4 PRECIPITATION DATA The Glenns TRU-1 9030 12/21/2020 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 '1-' in, Location name: Wingate, North Carolina, USA* A Latitude: 34.999*, Longitude: -80.4236* Elevation: 590.3 ft** It *source: ESR I Maps :r wd source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF grap!2j�cal I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inche I Average recurrence interval (years) 1 17 1 100 F-O-.4-29--]F-O-.5-07--]F-O-.5-88--]F-O-.6-47--]F-O-.7-14--] F-0-1-6 -1-] F-O-.8-0-3-] F-O-.8-4-1-] F-O-.8-8-5-] F-O-.9-1-6-] 1(0.395-0.466)11(0.466-0.553)11(0.539-0.641)11(0.593-0.703)11(0.651-0.775) 1(0.691-0.825) 1(0.726-0.871) 1(0.756-0.913) 1(0.788-0.962) 1(0.809-0.998) F-0-.658-5�F-0-.8-1 -1�F-05-4-2�F-T-03-�F-T-1 4-� F-T-2 1-� F-T-28-� F-T-33-� F-T-40-� F-T-44-� 1(0.630-0.745)11(0.745-0.884)11(0.864-1.03)11(0.948-1.12)11 (1.04-1.24) 1 (1.10-1.31) 1 (1.15-1.38) 1 (1.20-1.45) 1 (1.25-1.52) 1 (1.27-1.57) F-05-6-6�F-T-02-�F-T-19-� 1(0.788-0.931)11(0.936-1.11) 11 (1.09-1.30) 1 1 (1.32-1.57) 1 (1.39-1.66) 1 (1.46-1.75) 1 (1.51-1.83) 1 (1.57-1.92) 1 (1.60-1.97) F--l.-69--]F--l.-90--]F--2.-14--]F--2.-31--]F--2.-47--]F--2.-62--]F--2.-80--]F--2.-93--] (1.55-1.84) (1.74-2.06) 11 (1.95-2.32) 1 (2.10-2.51) 1 (2.23-2.68) 1 (2.35-2.84) 1 (2.50-3.05) 1 (2.59-3.20) F-T-46-� F--2.-86-�F--3.-13-�F--3.-40-�F--3.-67-�F--4.-02-�F--4.-28-� 1 (1.35-1.59) 1 1 (2.60-3.09) (2.84-3.40) (3.08-3.69) (3.30-3.99) (3.58-4.37) (3.78-4.66) F-T-69-�F-T-06-� 1 (1.55-1.85) 11 (1.87-2.24) (2.65-3.18) 11 (3.08-3.69) (3.39-4.09) (3.70-4.48) (4.00-4.87) (4.37-5.40) (4.65-5.80) F-T-80--] F--3.-12--]F--3.-68--]F--4.-13--]F--4.-57--]F--5.-03--]F--5.-66--]F--6.-15--] (1.64-1.98) 1 1 (2.84-3.43) (3.33-4.03) (3.71-4.51) (4.08-4.98) (4.46-5.49) (4.95-6.18) (5.33-6.73) (2.37-2.85) (2.96-3.56) (4.01-4.84) (4.48-5.43) (4.95-6.04) (5.41-6.66) (6.04-7.53) (6.51-8.22) F--507-�F--586-� F - T-3 3- F - -6.-0 3- F - -677 6- F - T-6 1- F - -8.-6 7- F - -9.-4 3- 1 (2.81-3.38) 11 (3.52-4.22) 1 1 (4.83-5.83) 1 (5.41-6.58) 1 (6.00-7.36) 1 (6.60-8.18) 1 (7.41-9.33) 1 (8.05-10.3) F - -1-0 1- - I F - -3.-6 3- - I F - -5.-3 1- - I F - -6.-3 5- - F - -7.-19- - F - -8.-0 7- - F - -8.-9 9- - F - -10-. 3- - F - -11-. 3- - 1 (2.77-3.26) 11 (3.35-3.94) 1 1 (4.88-5.76) 11 (5.80-6.89) 1 (6.55-7.80) 1 (7.32-8.76) 1 (8.12-9.77) 1 (9.23-11.2) 1 (10.1-12.4) F - -3.-6 4- � F - -4.-2 6- � F - T-3 2- F - T-3 4- F - -833 0- F - -9.-2 9- F - -10-. 3- F - -11-. 8- F - -1 3T. 0- (3.27-3.84) 11 (3.94-4.63) 11 (4.92-5.78) 1 (6.74-7.96) 1 (7.58-8.99) 1 (8.46-10.1) 1 (9.35-11.2) 1 (10.6-12.9) 1 (11.6-14.2) F - T-6 0- F - -6.-4 7- F - T-6 8- F - -8.-6 6- F - -9.-6 8- F - -10-. 7- F - -1 2T. 3- F - -1 3T. 6- 1 (5.18-6.06) 11 (5.97-7.00) 11 (7.06-8.31) 1 (7.94-9.37) 1 (8.84-10.5) 1 (9.76-11.7) 1 (11.1-13.3) 1 (12.1-14.7) F - -3.-9 7- - I F - -4.-7 6- - I F - -5.-8 8- - I F - -8.-0 2- - F - -9.-0 3- - F - -10-. 1- - F - -11-. 2- - F - -12-. 7- - F - -14-. OF - (3.68-4.28) 11 (4.42-5.13) 11 (5.45-6.34) 1 1 (7.39-8.65) 1 (8.29-9.75) 1 (9.22-10.9) 1 (10.2-12.1) 1 (11.5-13.8) 1 (12.6-15.2) F-T-46-�F-T.-66-� F - -8.-9 4- F - -10-. 0- F - -1 T 1- F - -1 2T. 3- F - -1 3T. 9- F - -16-. 3- 1 (5.11-5.85) 11 (6.22-7.14) 1 1 (8.31-9.59) 1 (9.28-10.7) 1 (10.3-11.9) 1 (11.3-13.2) 1 (12.7-15.0) 1 (13.9-16.5) F-T-26-�F-T.-26-� F - -8.-6 6- F - -9.-9 2- F - -1 T 0- F - -1 2T. 1- F - -1 3T. 2- F - -14-. 8- F - -16-. 1- 1 (4.94-5.61) 11 (5.87-6.67) 1 1 (7.99-9.11) 11 (9.25-10.6) 1 (10.2-11.7) 1 (11.2-12.9) 1 (12.2-14.1) 1 (13.6-15.9) 1 (14.7-17.3) F - -7.-0 7- - I F - -8.-3 4- - I F - -9.-8 6- - I F - -12-. 7- - F - -14-. OF - F - -1 K 3- - F - -16-. 6- - F - -18-. 4- - F - -19-. 8- - 1 (6.67-7.49) 11 (7.87-8.84) 11 (9.28-10.5) 1 (11.9-13.5) 1 (13.1-14.8) 1 (14.3-16.2) 1 (15.5-17.6) 1 (17.1-19.6) 1 (18.3-21.2) F - -8.-6 7- � F - -10-. 2- � F - -1 T 9- F - -14-. 9- F - -16-. 2- F - -1 T 6- F - -18-. 8- F - -2 0-. 6- F - -2 T 9- 1 (8.21-9.15) 11 (9.67-10.8) 11 (11.3-12.5) (14.1-15.7) (15.3-17.1) (16.5-18.5) (17.7-20.0) (19.2-21.9) (20.4-23.4) F-71 0-. 9-� F-71 2-.8-� F - -16-. 1- F - -18-. 0- F - -19-. 4- F - -2 0-. 8- F - -2 2T. 1- F - -2 3T. 9- F - -2 6-. 3- (10.4-11.5) 11 (12.2-13.4) (15.3-16.9) (17.0-18.9) (18.3-20.3) (19.6-21.8) (20.8-23.3) (22.4-25.2) (23.6-26.7) ===F-18.-8---JF-20.-8--]F-22.-4--]F-23.-8--]F-25.-2--]F-27.-l--]F-28.-5--] L(11 8.0-19.7) _JL____ (19.8-21.8) JL(21.2-23.4) ____ JL(22.6-24.9) ____ JL(23.9-26.5) ____ JL(25.6-28.5) ____ JL(26.8-30.0) ____ J Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds-printpage. htm I?Iat=34.9990& Ion =-80.4236&data=de pth&u nits=e ng lish&series=pds 1/4 12/21/2020 Precipitation Frequency Data Server M111 20 CL di 15 49 10 CL i 30 25 r- 213 15 49 N CL PDS-based depth -du ratio n-frequency (DDIF) curves Latitude: 34.9990', Longitude: -80.4236' : L : L - J : J : J : J : - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - - - --- - - - -- - - - - - -- - - - - - - I- - - - - - - - - - - - - - - - - - - - - - -- - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . ... . . A L6 r� A 4 6 6 6 Ln 6 r-4 r-I rn LO Duration 1.4 N rn �T LD 0 N.-v W��� M - a - 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Vo I u me 2, Vers iori 3 Created (GMT): Mon Dec 21 18:36:26 2020 Back to Top Maps & aerials Small scale terrain Avwags recurwce intefva I fyears� 2 25 50 100 213C 500 1000 DuFation — 6-min — 2-day — i D-min — 3-day 1 5-min — 4-d my — 3"ir — 71-d ay — 45D-min — I o-clay 2-hr — 20-clay 3-hr — 30-day f-hr — 45-Jay 12-hr — 60-clay 24-Mr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?Iat=34.9990&lon=-80.4236&data=depth&units=engIish&series=pds 2/4 WpAlli Precipitation Frequency Data Server 5A M2rs ill"V Wingate + Mon FOQ Urn --I, 2nni Large scale terrain City Winston-Salem Durham Y, Greensboro Rale-19 NORTH C A R 0 L INA Chajotte Fayetteville Greenville SOUTH CAROLINA Imir V N 100knin —Y hia 60mi Large scale map Win�ston-Saleni Greensboro Durhani J qleigl R, North C Ca aFolina ariotte k Tirribia 1 00krn 'ith -��6�0rni Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage. htm I?Iat=34.9990& Ion =-80.4236&data=de pth&u nits=e ng lish&series=pds 3/4 MMKIYU Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MID 20910 Questions?: HDSC.Questions@noaa.gLv Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?Iat=34.9990&Ion=-80.4236&data=depth&units=english&series=pds 4/4 9 MCADAM Storm Data Detailed Report: Wingate Element Details ID 37 Notes Label Wingate WQV Label WQV End Time 1,440.000 min Return Event 0.10 years Depth 1.90 in Start Time 0.000 min Storm Event Depth Type Incremental Increment 6.000 min w(2V Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.00 0.00 0.00 0.00 30.000 0.00 0.00 0.00 0.00 0.00 60.000 0.00 0.00 0.00 0.00 0.00 90.000 0.00 0.00 0.00 0.00 0.00 120.000 0.00 0.00 0.00 0.00 0.00 150.000 0.00 0.00 0.00 0.00 0.00 180.000 0.00 0.00 0.00 0.00 0.00 210.000 0.00 0.00 0.00 0.00 0.00 240.000 0.00 0.00 0.00 0.00 0.00 270.000 0.00 0.00 0.00 0.00 0.00 300.000 0.00 0.00 0.00 0.00 0.00 330.000 0.00 0.00 0.00 0.00 0.00 360.000 0.00 0.00 0.00 0.00 0.00 390.000 0.00 0.00 0.00 0.00 0.00 420.000 0.00 0.00 0.00 0.00 0.00 450.000 0.00 0.00 0.00 0.00 0.00 480.000 0.00 0.00 0.00 0.00 0.00 510.000 0.01 0.01 0.01 0.01 0.01 540.000 0.01 0.01 0.01 0.01 0.01 570.000 0.01 0.01 0.01 0.01 0.01 600.000 0.01 0.01 0.01 0.01 0.01 630.000 0.01 0.01 0.01 0.01 0.01 660.000 0.01 0.01 0.02 0.02 0.02 690.000 0.02 0.05 0.09 0.15 0.26 720.000 0.18 0.04 0.03 0.03 0.02 750.000 0.02 0.02 0.02 0.01 0.01 780.000 0.01 0.01 0.01 0.01 0.01 810.000 0.01 0.01 0.01 0.01 0.01 840.000 0.01 0.01 0.01 0.01 0.01 870.000 0.01 0.01 0.01 0.01 0.01 900.000 0.01 0.01 0.01 0.01 0.01 930.000 0.01 0.00 0.00 0.00 0.00 960.000 0.00 0.00 0.00 0.00 0.00 990.000 0.00 0.00 0.00 0.00 0.00 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate WQV Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 1,020.000 0.00 0.00 0.00 0.00 0.00 1,050.000 0.00 0.00 0.00 0.00 0.00 1,080.000 0.00 0.00 0.00 0.00 0.00 1,110.000 0.00 0.00 0.00 0.00 0.00 1,140.000 0.00 0.00 0.00 0.00 0.00 1,170.000 0.00 0.00 0.00 0.00 0.00 1,200.000 0.00 0.00 0.00 0.00 0.00 1,230.000 0.00 0.00 0.00 0.00 0.00 1,260.000 0.00 0.00 0.00 0.00 0.00 1,290.000 0.00 0.00 0.00 0.00 0.00 1,320.000 0.00 0.00 0.00 0.00 0.00 1,350.000 0.00 0.00 0.00 0.00 0.00 1,380.000 0.00 0.00 0.00 0.00 0.00 1,410.000 0.00 0.00 0.00 0.00 0.00 1,440.000 0.00 (N/A) (N/A) (N/A) (N/A) yr Label 1 yr Increment 5.000 min Return Event 1.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative 1 yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.00 0.01 0.01 0.01 25.000 0.02 0.02 0.02 0.03 0.03 50.000 0.03 0.04 0.04 0.04 0.05 75.000 0.05 0.05 0.06 0.06 0.06 100.000 0.07 0.07 0.07 0.08 0.08 125.000 0.08 0.09 0.09 0.09 0.10 150.000 0.10 0.10 0.10 0.11 0.11 175.000 0.11 0.12 0.12 0.12 0.13 200.000 0.13 0.13 0.14 0.14 0.14 225.000 0.15 0.15 0.15 0.16 0.16 250.000 0.16 0.17 0.17 0.17 0.18 275.000 0.18 0.18 0.19 0.19 0.19 300.000 0.20 0.20 0.20 0.21 0.21 325.000 0.21 0.22 0.22 0.22 0.23 350.000 0.23 0.23 0.24 0.24 0.25 375.000 0.25 0.26 0.26 0.27 0.27 400.000 0.28 0.28 0.29 0.30 0.30 425.000 0.31 0.31 0.32 0.32 0.33 450.000 0.33 0.34 0.34 0.35 0.35 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 1 yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 475.000 0.36 0.37 0.37 0.38 0.38 500.000 0.39 0.39 0.40 0.40 0.41 525.000 0.41 0.42 0.43 0.43 0.44 550.000 0.45 0.46 0.47 0.48 0.49 575.000 0.50 0.51 0.52 0.53 0.54 600.000 0.55 0.56 0.57 0.58 0.59 625.000 0.60 0.61 0.61 0.62 0.63 650.000 0.64 0.65 0.66 0.68 0.70 675.000 0.72 0.74 0.76 0.78 0.84 700.000 0.91 0.98 1.04 1.26 1.69 725.000 1.90 1.97 2.03 2.10 2.17 750.000 2.24 2.25 2.27 2.29 2.31 775.000 2.33 2.35 2.36 2.37 2.38 800.000 2.39 2.40 2.41 2.42 2.42 825.000 2.43 2.44 2.45 2.46 2.47 850.000 2.48 2.49 2.50 2.51 2.52 875.000 2.53 2.54 2.55 2.56 2.57 900.000 2.58 2.59 2.59 2.60 2.60 925.000 2.61 2.61 2.62 2.62 2.63 950.000 2.63 2.64 2.65 2.65 2.66 975.000 2.66 2.67 2.67 2.68 2.68 1,000.000 2.69 2.69 2.70 2.71 2.71 1,025.000 2.72 2.72 2.73 2.73 2.74 1,050.000 2.74 2.75 2.75 2.76 2.76 1,075.000 2.77 2.78 2.78 2.78 2.79 1,100.000 2.79 2.79 2.80 2.80 2.80 1,125.000 2.80 2.81 2.81 2.81 2.82 1,150.000 2.82 2.82 2.83 2.83 2.83 1,175.000 2.84 2.84 2.84 2.85 2.85 1,200.000 2.85 2.86 2.86 2.86 2.87 1,225.000 2.87 2.87 2.88 2.88 2.88 1,250.000 2.89 2.89 2.89 2.90 2.90 1,275.000 2.90 2.91 2.91 2.91 2.92 1,300.000 2.92 2.92 2.93 2.93 2.93 1,325.000 2.94 2.94 2.94 2.95 2.95 1,350.000 2.95 2.96 2.96 2.96 2.96 1,375.000 2.97 2.97 2.97 2.98 2.98 1,400.000 2.98 2.99 2.99 2.99 3.00 1,425.000 3.00 3.00 3.01 3.01 (N/A) 2 yr Label 2 yr Increment 5.000 min Return Event 2.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 2 yr 2 yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.00 0.01 0.01 0.02 25.000 0.02 0.02 0.03 0.03 0.04 50.000 0.04 0.04 0.05 0.05 0.05 75.000 0.06 0.06 0.07 0.07 0.07 100.000 0.08 0.08 0.09 0.09 0.09 125.000 0.10 0.10 0.11 0.11 0.11 150.000 0.12 0.12 0.12 0.13 0.13 175.000 0.14 0.14 0.14 0.15 0.15 200.000 0.16 0.16 0.16 0.17 0.17 225.000 0.18 0.18 0.18 0.19 0.19 250.000 0.19 0.20 0.20 0.21 0.21 275.000 0.21 0.22 0.22 0.23 0.23 300.000 0.23 0.24 0.24 0.25 0.25 325.000 0.25 0.26 0.26 0.26 0.27 350.000 0.27 0.28 0.28 0.29 0.29 375.000 0.30 0.31 0.31 0.32 0.33 400.000 0.33 0.34 0.35 0.35 0.36 425.000 0.37 0.37 0.38 0.38 0.39 450.000 0.40 0.40 0.41 0.42 0.42 475.000 0.43 0.44 0.44 0.45 0.46 500.000 0.46 0.47 0.48 0.48 0.49 525.000 0.50 0.50 0.51 0.52 0.53 550.000 0.54 0.55 0.56 0.58 0.59 575.000 0.60 0.61 0.62 0.63 0.65 600.000 0.66 0.67 0.68 0.69 0.71 625.000 0.72 0.73 0.74 0.75 0.76 650.000 0.77 0.78 0.79 0.81 0.84 675.000 0.86 0.88 0.91 0.93 1.01 700.000 1.10 1.18 1.26 1.52 2.03 725.000 2.28 2.37 2.45 2.53 2.62 750.000 2.70 2.72 2.75 2.77 2.79 775.000 2.82 2.84 2.85 2.86 2.87 800.000 2.88 2.89 2.90 2.91 2.92 825.000 2.94 2.95 2.96 2.97 2.98 850.000 3.00 3.01 3.02 3.03 3.04 875.000 3.06 3.07 3.08 3.09 3.10 900.000 3.12 3.12 3.13 3.14 3.14 925.000 3.15 3.15 3.16 3.17 3.17 950.000 3.18 3.19 3.19 3.20 3.21 975.000 3.21 3.22 3.23 3.23 3.24 1,000.000 3.25 3.25 3.26 3.27 3.27 1,025.000 3.28 3.29 3.29 3.30 3.30 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 2 yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 1,050.000 3.31 3.32 3.32 3.33 3.34 1,075.000 3.34 3.35 3.35 3.36 3.36 1,100.000 3.37 3.37 3.37 3.38 3.38 1,125.000 3.39 3.39 3.39 3.40 3.40 1,150.000 3.40 3.41 3.41 3.42 3.42 1,175.000 3.42 3.43 3.43 3.44 3.44 1,200.000 3.44 3.45 3.45 3.46 3.46 1,225.000 3.46 3.47 3.47 3.47 3.48 1,250.000 3.48 3.49 3.49 3.49 3.50 1,275.000 3.50 3.51 3.51 3.51 3.52 1,300.000 3.52 3.53 3.53 3.53 3.54 1,325.000 3.54 3.54 3.55 3.55 3.56 1,350.000 3.56 3.56 3.57 3.57 3.58 1,375.000 3.58 3.58 3.59 3.59 3.60 1,400.000 3.60 3.60 3.61 3.61 3.61 1,425.000 3.62 3.62 3.63 3.63 (N/A) 5-yr Label 5-yr Increment 5.000 min Return Event 5.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative 5-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.01 0.01 0.02 0.02 25.000 0.03 0.03 0.04 0.04 0.05 50.000 0.05 0.06 0.06 0.07 0.07 75.000 0.08 0.08 0.09 0.09 0.10 100.000 0.10 0.11 0.11 0.12 0.12 125.000 0.13 0.13 0.14 0.14 0.15 150.000 0.15 0.16 0.16 0.17 0.17 175.000 0.18 0.18 0.19 0.19 0.20 200.000 0.20 0.21 0.21 0.22 0.22 225.000 0.23 0.23 0.24 0.24 0.25 250.000 0.25 0.26 0.26 0.27 0.27 275.000 0.28 0.28 0.29 0.29 0.30 300.000 0.30 0.31 0.31 0.32 0.32 325.000 0.33 0.33 0.34 0.34 0.35 350.000 0.35 0.36 0.36 0.37 0.38 375.000 0.39 0.39 0.40 0.41 0.42 400.000 0.43 0.44 0.45 0.45 0.46 425.000 0.47 0.48 0.49 0.50 0.50 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 5-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 450.000 0.51 0.52 0.53 0.54 0.55 475.000 0.56 0.56 0.57 0.58 0.59 500.000 0.60 0.61 0.61 0.62 0.63 525.000 0.64 0.65 0.66 0.67 0.68 550.000 0.69 0.71 0.72 0.74 0.75 575.000 0.77 0.78 0.80 0.81 0.83 600.000 0.84 0.86 0.87 0.89 0.90 625.000 0.92 0.93 0.94 0.96 0.97 650.000 0.99 1.00 1.02 1.05 1.08 675.000 1.11 1.14 1.17 1.20 1.31 700.000 1.42 1.53 1.64 1.94 2.53 725.000 2.83 2.93 3.04 3.15 3.26 750.000 3.37 3.40 3.43 3.46 3.49 775.000 3.52 3.56 3.57 3.58 3.60 800.000 3.61 3.63 3.64 3.66 3.67 825.000 3.68 3.70 3.71 3.73 3.74 850.000 3.76 3.77 3.79 3.80 3.82 875.000 3.83 3.85 3.86 3.88 3.89 900.000 3.91 3.91 3.92 3.93 3.94 925.000 3.95 3.96 3.96 3.97 3.98 950.000 3.99 4.00 4.01 4.02 4.02 975.000 4.03 4.04 4.05 4.06 4.07 1,000.000 4.07 4.08 4.09 4.10 4.11 1,025.000 4.12 4.13 4.13 4.14 4.15 1,050.000 4.16 4.17 4.18 4.19 4.19 1,075.000 4.20 4.21 4.22 4.22 4.23 1,100.000 4.23 4.24 4.24 4.25 4.25 1,125.000 4.26 4.26 4.27 4.27 4.28 1,150.000 4.28 4.29 4.29 4.30 4.30 1,175.000 4.31 4.31 4.32 4.32 4.33 1,200.000 4.33 4.34 4.34 4.35 4.35 1,225.000 4.36 4.36 4.37 4.37 4.38 1,250.000 4.38 4.39 4.39 4.40 4.40 1,275.000 4.41 4.41 4.42 4.42 4.43 1,300.000 4.43 4.44 4.44 4.45 4.45 1,325.000 4.46 4.46 4.47 4.47 4.48 1,350.000 4.48 4.49 4.49 4.50 4.50 1,375.000 4.51 4.51 4.52 4.52 4.53 1,400.000 4.53 4.54 4.54 4.55 4.55 1,425.000 4.56 4.56 4.57 4.57 (N/A) 1 0-yr Label 10-yr Increment 5.000 min Return Event 10.00 years End Time 1,440.000 min TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 1 0-yr Start Time 0.000 min Storm Event Depth Type Cumulative 10-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.01 0.01 0.02 0.02 25.000 0.03 0.04 0.04 0.05 0.05 50.000 0.06 0.06 0.07 0.08 0.08 75.000 0.09 0.09 0.10 0.11 0.11 100.000 0.12 0.12 0.13 0.13 0.14 125.000 0.15 0.15 0.16 0.16 0.17 150.000 0.18 0.18 0.19 0.19 0.20 175.000 0.20 0.21 0.22 0.22 0.23 200.000 0.23 0.24 0.25 0.25 0.26 225.000 0.26 0.27 0.27 0.28 0.29 250.000 0.29 0.30 0.30 0.31 0.32 275.000 0.32 0.33 0.33 0.34 0.34 300.000 0.35 0.36 0.36 0.37 0.37 325.000 0.38 0.39 0.39 0.40 0.40 350.000 0.41 0.41 0.42 0.43 0.44 375.000 0.45 0.46 0.47 0.48 0.49 400.000 0.50 0.51 0.52 0.53 0.54 425.000 0.55 0.56 0.57 0.58 0.59 450.000 0.60 0.61 0.62 0.63 0.64 475.000 0.65 0.66 0.67 0.68 0.69 500.000 0.70 0.71 0.72 0.73 0.74 525.000 0.75 0.76 0.77 0.78 0.80 550.000 0.82 0.83 0.85 0.87 0.89 575.000 0.90 0.92 0.94 0.96 0.97 600.000 0.99 1.01 1.03 1.04 1.06 625.000 1.08 1.10 1.11 1.13 1.15 650.000 1.17 1.18 1.20 1.24 1.27 675.000 1.31 1.35 1.38 1.42 1.55 700.000 1.68 1.81 1.94 2.27 2.91 725.000 3.25 3.37 3.50 3.63 3.76 750.000 3.89 3.93 3.96 4.00 4.04 775.000 4.07 4.11 4.13 4.15 4.16 800.000 4.18 4.20 4.22 4.23 4.25 825.000 4.27 4.29 4.30 4.32 4.34 850.000 4.36 4.37 4.39 4.41 4.43 875.000 4.44 4.46 4.48 4.50 4.51 900.000 4.53 4.54 4.55 4.56 4.57 925.000 4.58 4.59 4.60 4.61 4.62 950.000 4.63 4.64 4.65 4.66 4.67 975.000 4.68 4.69 4.70 4.71 4.72 1,000.000 4.73 4.74 4.75 4.76 4.77 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 10-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 1,025.000 4.78 4.79 4.80 4.81 4.82 1,050.000 4.83 4.84 4.85 4.86 4.87 1,075.000 4.88 4.89 4.90 4.90 4.91 1,100.000 4.91 4.92 4.93 4.93 4.94 1,125.000 4.94 4.95 4.95 4.96 4.97 1,150.000 4.97 4.98 4.98 4.99 5.00 1,175.000 5.00 5.01 5.01 5.02 5.02 1,200.000 5.03 5.04 5.04 5.05 5.05 1,225.000 5.06 5.07 5.07 5.08 5.08 1,250.000 5.09 5.09 5.10 5.11 5.11 1,275.000 5.12 5.12 5.13 5.14 5.14 1,300.000 5.15 5.15 5.16 5.16 5.17 1,325.000 5.18 5.18 5.19 5.19 5.20 1,350.000 5.21 5.21 5.22 5.22 5.23 1,375.000 5.23 5.24 5.25 5.25 5.26 1,400.000 5.26 5.27 5.28 5.28 5.29 1,425.000 5.29 5.30 5.30 5.31 (N/A) 25-yr Label 25-yr Increment 5.000 min Return Event 25.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative 25-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.01 0.01 0.02 0.03 25.000 0.04 0.04 0.05 0.06 0.06 50.000 0.07 0.08 0.09 0.09 0.10 75.000 0.11 0.11 0.12 0.13 0.14 100.000 0.14 0.15 0.16 0.16 0.17 125.000 0.18 0.18 0.19 0.20 0.21 150.000 0.21 0.22 0.23 0.23 0.24 175.000 0.25 0.26 0.26 0.27 0.28 200.000 0.28 0.29 0.30 0.31 0.31 225.000 0.32 0.33 0.33 0.34 0.35 250.000 0.35 0.36 0.37 0.38 0.38 275.000 0.39 0.40 0.40 0.41 0.42 300.000 0.43 0.43 0.44 0.45 0.45 325.000 0.46 0.47 0.48 0.48 0.49 350.000 0.50 0.50 0.51 0.52 0.54 375.000 0.55 0.56 0.57 0.58 0.60 400.000 0.61 0.62 0.63 0.65 0.66 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 25-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 425.000 0.67 0.68 0.70 0.71 0.72 450.000 0.73 0.75 0.76 0.77 0.78 475.000 0.79 0.81 0.82 0.83 0.84 500.000 0.86 0.87 0.88 0.89 0.91 525.000 0.92 0.93 0.94 0.96 0.98 550.000 1.00 1.02 1.04 1.06 1.08 575.000 1.10 1.12 1.15 1.17 1.19 600.000 1.21 1.23 1.25 1.27 1.29 625.000 1.31 1.34 1.36 1.38 1.41 650.000 1.43 1.46 1.48 1.53 1.57 675.000 1.62 1.66 1.71 1.75 1.91 700.000 2.06 2.22 2.38 2.74 3.45 725.000 3.82 3.97 4.13 4.29 4.44 750.000 4.60 4.65 4.69 4.74 4.78 775.000 4.83 4.87 4.89 4.92 4.94 800.000 4.97 4.99 5.02 5.04 5.06 825.000 5.08 5.10 5.12 5.14 5.16 850.000 5.18 5.21 5.23 5.25 5.27 875.000 5.29 5.31 5.33 5.35 5.37 900.000 5.40 5.41 5.42 5.43 5.44 925.000 5.46 5.47 5.48 5.49 5.51 950.000 5.52 5.53 5.54 5.56 5.57 975.000 5.58 5.59 5.61 5.62 5.63 1,000.000 5.64 5.66 5.67 5.68 5.69 1,025.000 5.70 5.72 5.73 5.74 5.75 1,050.000 5.77 5.78 5.79 5.80 5.82 1,075.000 5.83 5.84 5.85 5.85 5.86 1,100.000 5.87 5.88 5.88 5.89 5.90 1,125.000 5.90 5.91 5.92 5.93 5.93 1,150.000 5.94 5.95 5.95 5.96 5.97 1,175.000 5.98 5.98 5.99 6.00 6.00 1,200.000 6.01 6.02 6.02 6.03 6.04 1,225.000 6.05 6.05 6.06 6.07 6.07 1,250.000 6.08 6.09 6.10 6.10 6.11 1,275.000 6.12 6.12 6.13 6.14 6.15 1,300.000 6.15 6.16 6.17 6.17 6.18 1,325.000 6.19 6.19 6.20 6.21 6.22 1,350.000 6.22 6.23 6.24 6.24 6.25 1,375.000 6.26 6.27 6.27 6.28 6.29 1,400.000 6.29 6.30 6.31 6.32 6.32 1,425.000 6.33 6.34 6.34 6.35 (N/A) 50-yr Label 50-yr Increment 5.000 min TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 50-yr Return Event 50.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative 50-yr Time Depth Depth Depth Depth Depth (min) (i n) (i n) (i n) (i n) (i n) 0.000 0.00 0.01 0.02 0.02 0.03 25.000 0.04 0.05 0.06 0.06 0.07 50.000 0.08 0.09 0.10 0.11 0.11 75.000 0.12 0.13 0.14 0.15 0.15 100.000 0.16 0.17 0.18 0.19 0.19 125.000 0.20 0.21 0.22 0.23 0.23 150.000 0.24 0.25 0.26 0.27 0.27 175.000 0.28 0.29 0.30 0.31 0.31 200.000 0.32 0.33 0.34 0.35 0.35 225.000 0.36 0.37 0.38 0.39 0.40 250.000 0.40 0.41 0.42 0.43 0.44 275.000 0.44 0.45 0.46 0.47 0.48 300.000 0.48 0.49 0.50 0.51 0.52 325.000 0.52 0.53 0.54 0.55 0.56 350.000 0.56 0.57 0.58 0.60 0.61 375.000 0.62 0.64 0.65 0.67 0.68 400.000 0.70 0.71 0.73 0.74 0.76 425.000 0.77 0.78 0.80 0.81 0.83 450.000 0.84 0.86 0.87 0.89 0.90 475.000 0.92 0.93 0.95 0.96 0.97 500.000 0.99 1.00 1.02 1.03 1.05 525.000 1.06 1.08 1.09 1.11 1.13 550.000 1.15 1.18 1.20 1.22 1.25 575.000 1.27 1.29 1.32 1.34 1.37 600.000 1.39 1.41 1.44 1.46 1.48 625.000 1.51 1.53 1.56 1.59 1.63 650.000 1.66 1.69 1.72 1.77 1.82 675.000 1.88 1.93 1.98 2.03 2.21 700.000 2.39 2.56 2.74 3.13 3.89 725.000 4.27 4.45 4.63 4.80 4.98 750.000 5.16 5.21 5.26 5.32 5.37 775.000 5.42 5.47 5.50 5.53 5.57 800.000 5.60 5.63 5.66 5.68 5.71 825.000 5.73 5.75 5.78 5.80 5.83 850.000 5.85 5.87 5.90 5.92 5.94 875.000 5.97 5.99 6.01 6.04 6.06 900.000 6.09 6.10 6.11 6.13 6.14 925.000 6.16 6.17 6.19 6.20 6.22 950.000 6.23 6.25 6.26 6.28 6.29 975.000 6.30 6.32 6.33 6.35 6.36 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 50-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 1,000.000 6.38 6.39 6.41 6.42 6.44 1,025.000 6.45 6.46 6.48 6.49 6.51 1,050.000 6.52 6.54 6.55 6.57 6.58 1,075.000 6.60 6.61 6.62 6.63 6.63 1,100.000 6.64 6.65 6.66 6.67 6.67 1,125.000 6.68 6.69 6.70 6.71 6.72 1,150.000 6.72 6.73 6.74 6.75 6.76 1,175.000 6.76 6.77 6.78 6.79 6.80 1,200.000 6.80 6.81 6.82 6.83 6.84 1,225.000 6.84 6.85 6.86 6.87 6.88 1,250.000 6.88 6.89 6.90 6.91 6.92 1,275.000 6.92 6.93 6.94 6.95 6.96 1,300.000 6.96 6.97 6.98 6.99 7.00 1,325.000 7.01 7.01 7.02 7.03 7.04 1,350.000 7.05 7.05 7.06 7.07 7.08 1,375.000 7.09 7.09 7.10 7.11 7.12 1,400.000 7.13 7.13 7.14 7.15 7.16 1,425.000 7.17 7.17 7.18 7.19 (N/A) 1 00-yr Label 100-yr Increment 5.000 min Return Event 100.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative 100-yr Time Depth Depth Depth Depth Depth (min) (i n) (i n) (i n) (i n) (i n) 0.000 0.00 0.01 0.02 0.03 0.04 25.000 0.05 0.06 0.06 0.07 0.08 50.000 0.09 0.10 0.11 0.12 0.13 75.000 0.14 0.15 0.16 0.17 0.17 100.000 0.18 0.19 0.20 0.21 0.22 125.000 0.23 0.24 0.25 0.26 0.27 150.000 0.28 0.28 0.29 0.30 0.31 175.000 0.32 0.33 0.34 0.35 0.36 200.000 0.37 0.38 0.39 0.39 0.40 225.000 0.41 0.42 0.43 0.44 0.45 250.000 0.46 0.47 0.48 0.49 0.50 275.000 0.50 0.51 0.52 0.53 0.54 300.000 0.55 0.56 0.57 0.58 0.59 325.000 0.60 0.61 0.61 0.62 0.63 350.000 0.64 0.65 0.66 0.68 0.69 375.000 0.71 0.73 0.74 0.76 0.78 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 100-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 400.000 0.79 0.81 0.83 0.84 0.86 425.000 0.88 0.89 0.91 0.93 0.94 450.000 0.96 0.98 0.99 1.01 1.03 475.000 1.04 1.06 1.08 1.09 1.11 500.000 1.13 1.14 1.16 1.18 1.19 525.000 1.21 1.23 1.24 1.26 1.29 550.000 1.31 1.34 1.37 1.40 1.42 575.000 1.45 1.48 1.51 1.53 1.56 600.000 1.59 1.61 1.64 1.67 1.70 625.000 1.72 1.75 1.79 1.83 1.86 650.000 1.90 1.94 1.98 2.04 2.10 675.000 2.16 2.22 2.28 2.34 2.53 700.000 2.73 2.93 3.13 3.53 4.34 725.000 4.74 4.94 5.14 5.34 5.54 750.000 5.74 5.80 5.86 5.92 5.98 775.000 6.04 6.10 6.13 6.17 6.21 800.000 6.25 6.28 6.32 6.35 6.37 825.000 6.40 6.43 6.46 6.48 6.51 850.000 6.54 6.57 6.59 6.62 6.65 875.000 6.67 6.70 6.73 6.76 6.78 900.000 6.81 6.83 6.84 6.86 6.88 925.000 6.89 6.91 6.93 6.94 6.96 950.000 6.98 6.99 7.01 7.03 7.04 975.000 7.06 7.08 7.09 7.11 7.13 1,000.000 7.14 7.16 7.18 7.19 7.21 1,025.000 7.23 7.24 7.26 7.28 7.29 1,050.000 7.31 7.33 7.34 7.36 7.38 1,075.000 7.39 7.41 7.42 7.43 7.44 1,100.000 7.45 7.46 7.47 7.47 7.48 1,125.000 7.49 7.50 7.51 7.52 7.53 1,150.000 7.54 7.55 7.56 7.57 7.58 1,175.000 7.58 7.59 7.60 7.61 7.62 1,200.000 7.63 7.64 7.65 7.66 7.67 1,225.000 7.68 7.69 7.69 7.70 7.71 1,250.000 7.72 7.73 7.74 7.75 7.76 1,275.000 7.77 7.78 7.79 7.80 7.80 1,300.000 7.81 7.82 7.83 7.84 7.85 1,325.000 7.86 7.87 7.88 7.89 7.90 1,350.000 7.91 7.91 7.92 7.93 7.94 1,375.000 7.95 7.96 7.97 7.98 7.99 1,400.000 8.00 8.01 8.02 8.02 8.03 1,425.000 8.04 8.05 8.06 8.07 (N/A) 500-yr TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 500-yr Label 500-yr Increment 5.000 min Return Event 500.00 years End Time 1,440.000 min Start Time 0.000 min Storm Event Depth Type Cumulative 500-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.000 0.00 0.01 0.02 0.04 0.05 25.000 0.06 0.07 0.08 0.10 0.11 50.000 0.12 0.13 0.14 0.16 0.17 75.000 0.18 0.19 0.20 0.22 0.23 100.000 0.24 0.25 0.26 0.28 0.29 125.000 0.30 0.31 0.32 0.34 0.35 150.000 0.36 0.37 0.38 0.40 0.41 175.000 0.42 0.43 0.45 0.46 0.47 200.000 0.48 0.49 0.51 0.52 0.53 225.000 0.54 0.55 0.57 0.58 0.59 250.000 0.60 0.61 0.63 0.64 0.65 275.000 0.66 0.67 0.69 0.70 0.71 300.000 0.72 0.73 0.75 0.76 0.77 325.000 0.78 0.79 0.81 0.82 0.83 350.000 0.84 0.85 0.87 0.89 0.91 375.000 0.93 0.96 0.98 1.00 1.03 400.000 1.05 1.07 1.09 1.12 1.14 425.000 1.16 1.19 1.21 1.23 1.26 450.000 1.28 1.30 1.32 1.35 1.37 475.000 1.39 1.42 1.44 1.46 1.48 500.000 1.51 1.53 1.55 1.58 1.60 525.000 1.62 1.64 1.67 1.69 1.73 550.000 1.76 1.80 1.83 1.87 1.90 575.000 1.94 1.97 2.01 2.04 2.08 600.000 2.11 2.15 2.18 2.22 2.25 625.000 2.29 2.32 2.38 2.44 2.50 650.000 2.56 2.62 2.68 2.75 2.83 675.000 2.91 2.99 3.06 3.14 3.39 700.000 3.64 3.89 4.14 4.58 5.47 725.000 5.90 6.16 6.41 6.66 6.91 750.000 7.16 7.24 7.32 7.39 7.47 775.000 7.55 7.63 7.68 7.74 7.80 800.000 7.86 7.92 7.98 8.02 8.05 825.000 8.09 8.12 8.16 8.19 8.23 850.000 8.26 8.30 8.33 8.37 8.40 875.000 8.44 8.47 8.51 8.54 8.58 900.000 8.61 8.63 8.66 8.68 8.70 925.000 8.73 8.75 8.77 8.79 8.82 950.000 8.84 8.86 8.89 8.91 8.93 TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 500-yr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 975.000 8.95 8.98 9.00 9.02 9.05 1,000.000 9.07 9.09 9.11 9.14 9.16 1,025.000 9.18 9.21 9.23 9.25 9.28 1,050.000 9.30 9.32 9.34 9.37 9.39 1,075.000 9.41 9.44 9.45 9.46 9.47 1,100.000 9.48 9.50 9.51 9.52 9.53 1,125.000 9.54 9.56 9.57 9.58 9.59 1,150.000 9.60 9.62 9.63 9.64 9.65 1,175.000 9.66 9.68 9.69 9.70 9.71 1,200.000 9.72 9.74 9.75 9.76 9.77 1,225.000 9.78 9.80 9.81 9.82 9.83 1,250.000 9.84 9.86 9.87 9.88 9.89 1,275.000 9.90 9.92 9.93 9.94 9.95 1,300.000 9.96 9.98 9.99 10.00 10.01 1,325.000 10.02 10.04 10.05 10.06 10.07 1,350.000 10.08 10.10 10.11 10.12 10.13 1,375.000 10.14 10.16 10.17 10.18 10.19 1,400.000 10.20 10.22 10.23 10.24 10.25 1,425.000 10.26 10.28 10.29 10.30 (N/A) TRU1903O.ppc TRU1903O.ppc 12/21/2020 MCADAM Storm Data Detailed Report: Wingate 12.50 11.25 10.00 8.75 7.50 P �7- 6.25 5.00 3.75 2.50 1.25 0.00 0.000 200.000 400.000 600.000 800.000 1,000.000 1,200.000 1,400.000 Time (min) 500-yr 100-yr 50-yr 25-yr 10-yr - 5-yr 2 yr 1 yr WQV TRU1903O.ppc TRU1903O.ppc 12/21/2020 PRE -DEVELOPMENT HYDROLOGIC CALCULATIONS The Glenns TRU-1 9030 ME tLISZ 'VNIIOdVD Hi�ON '31VE)NIAA ]ANG IJ�JODN319 S9NI/\AVWl NOuDmiSNNOD 0 SNN319 3Hi LU 0 a_ 0 > n 0 C) w 0 0 a) 0) (D E E 91MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glerms Date: 12/21/2020 Project Numbei TRU-1 9030 Calculated By: M. Duval, PE Subbasin ID: 1 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG:A 0 "' HSG B: 0% HSG'C'= 47% HSG 'D' = 5 W3% Cover Composite Condition SCS CN Comments Impervious 98 &E! 77 Assume good condition ded 74 Assume good condition Pond 100 WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN Isf] [acresl Comments Onsite Impervious 98 9,676 0.22 Onsite Open 77 0 0.00 Assume good condition Onsite Wooded 74 595,225 13.66 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 66,533 1.53 Offsite Open 77 156,810 3.60 Assume good condition Offsite Wooded 74 0 0.00 Assume good condition r Offsite Pond 100 0 0.00 Total Area 828,244 sf 19.01 acres Composite SCS CN 77 % Impervious 9.20�/_6_ TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow --------7ft Segment 2: Concentrated Flow Length = 100 Length = 890 ft Upstream Elevation = 591.5 Upstream Elevation = 590.00 ft Downstream Elevation = 590.00 ft Downstream Elevation = 572.00 ft Height = 1.50 ft Height = 18.00 ft Slope = 0.0150 ft/ft Slope = 0.0202 ft/ft Manning's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-hour) = 3.63 inches (Wingate, NC) Velocity = 2.29 ft/sec Segment Time = minutes Segment Time = minutes Time of Concentration = 29.09 minutes SCS Lag Time = 17.45 minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q� = ((P-0.2 �S)2) / (P+0.8�S) where, Q* = direct runoff (inches) 21MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glerms Project Numbe TRU-19030 Subbasin ID 2 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 100 C 98 74 70 100 D 98 80 77 100 HSG �A 0% H SG B� 0% HSG'C'= 58% HSG'D'= [ 4 M2% Cover Composite Condition SCS CN Comments Impervious 98 Open Assume good condition 73 Assume good condition Pond Im 100 WATERSHED BREAKDOWN Date 12/21/2020 Calculated By: M. Duval, PE Composite Area Area Contributing Area SCS CN [sf] [acres] Comments Onsite Impervious 98 0 0.00 Onsite Open 77 0 0.00 Assume good condition Onsite Wooded 73 162,035 3.72 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 77 0 0.00 Assume good condition gffs,te Wooded 73 0 0.00 Assume good condition Offste Pond 100 0 0.00 Total Area - 162,035 sf 3.72 acres Composite SCS CN = 73 % Impervious = 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 380 ft Upstream Elevation = 591.50 ft Upstream Elevation = 590.00 ft Downstream Elevation = 590.00 ft Downstream Elevation = 581.00 ft Height = 1.50 ft Height = 9.00 ft Slope = 0.0150 ft/ft Slope = 0.0237 ftift Manning's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-hour) - 363 inches (Wingate, NC) Velocity - 248 ft/sec Segment Time = minutes Segment Time = minutes Time of Concentration - 25.17 minutes SCS Lag Time =1 15.10 m inutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q' = ((P-0.2 S)2)/ (P+0.8*S) where, Q* = direct runoff (inches) S = potential abstraction = (1 OOO/CN) - 10 P = accumulated storm rainfall (inches) 21MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glerms Project Numbe TRU-19030 Subbasin ID 3 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG IMDervious Coen Wooded Pond A 98 39 30 100 B 98 61 100 C 98 74 70 100 D 98 80 77 100 HSG �A 0% H SG B� 0% HSG'C'= 13% HSG'D'= [ 8 M7% Cover Composite Condition SCS CN Comments Impervious 9§ 1 - Open �9 Assume good condition 76 Assume good condition Pond Im 100 WATERSHED BREAKDOWN Date 12/21/2020 Calculated By: M. Duval, PE Composite Area Area Contributina Area SCS CN rsfi racresl Comments Onsite Impervious 98 0 0.00 Onsite Open 79 0 0.00 Assume good condition Onsite Wooded 76 534,686 12.27 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 79 0 0.00 Assume good condition 2ffs,te Wooded 76 0 0.00 Assume good condition Offste Pond 100 0 0.00 Total Area - 534,686 sf 12.27 acres Composite SCS CN = 76 % Impervious = 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 936 ft Upstream Elevation = 591.50 ft Upstream Elevation = 590.00 ft Downstream Elevation = 590.00 ft Downstream Elevation = 570.00 ft Height = 1.50 ft Height = 20.00 ft Slope = 0.0150 ft/ft Slope = 0.0214 ft/ft Manning's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-hour) - 363 inches (Wingate, NC) Velocity - 236 ft/sec Segment Time = minutes Segment Time minutes Segment 3: Channel Flow Length = 513 ft Upstream Elevation = 570.00 ft Downstream Elevation = 560.50 ft Height = 9.50 ft Slope = 0.0185 ft/ft Manning's n = 0.045 natural channel Flow Area - 6 sf (assume 2'x3' channel) Wetted Permeter= 7 If (assume 2'x3' channel) Channel Velocity 4.07 ft/sec Segment Time 2.10 minutes Time of Concentration - 31.34 minutes SCS Lag Time =1 18.80 m inutes 0 MCADAMS 19 111:1 BUYN 0] go 1:10 Is: k1J 11 111111111" 14teril 114111 W11 HQ LIM Project Name: The Glerms Project Numbei TRU-1 9030 Subbasin ID 4 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HS C, 1--in", C)npn W-1-1 PnnrI A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG �A 0% HSG B� 0% HSG'C'= 0% HSG'D'= [i 1 E00% Cover Composite C',ndifinn 1qC1_q CIN Impervious 98 Open 80 Assume good condition Wooded 77 Assume good condition Pond 100 WATERSHED BREAKDOWN Date 12/21/2020 Calculated By: M. Duval, PE Composite Area Area ContrihiAinn Arp.a SCS CN rqfl ranrp.ql Cnnnnnp.nts Onsite Impervious 98 0 0.00 Onsite Open 80 0 0.00 Assume good condition Onsite Wooded 77 61,841 1.42 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 80 0 0.00 Assume good condition Offsite Wooded 77 0 0.00 Assume good condition Off ite Pond 100 0 0.00 Offsite 2-ac Lots 0 1 0 1 0.00 Assume 12% impervious Total Area - 61,841 sf 1.42 acres Composite SCS CN = 77 % Impervious = 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow ­770— ft Segment 2: Concentrated Flow Length = Length - 168 ft Upstream Elevation = 586.00 ft Upstream Elevation = 581.50 ft Downstream Elevation = 581.50 ft Downstream Elevation = 575.00 ft Height = 4.50 ft Height = 6.50 ft Slope = 0.0450 ft/ft Slope = 0.0387 ft/ft Manning's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-hour) - 3.63 inches (Wingate, NC) Velocity = 3.17 ft/sec Segment Time = minutes Segment Time = minutes Time of Concentration - L5�46 minu es SCS Lag Time 9 . 8 d minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q* = ((P-0.2 *S)2) / (P+0.8*S) where, Q* = direct runoff (inches) S = potential abstraction = (1000/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A = acres 0 McADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glenns Project Numbei TRU-1 9030 Subbasin ID: 5 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond HSG'A'= HSG'B'= HSG'C'= HSG'D'= Cover Composite C'nnditinn SCS CN C'nmmpnt.-, Impervious 98 77 Open Assume good condition Wooded 73 Assume good condition Pond 100 WATERSHED BREAKDOWN Date: 12/21/2020 Calculated By: M. Duval, PE Composite Area Area Contributina Area SCS CN Isf! Facres'! Comments Onsite Impervious 98 4,596 0.11 Onsite Open 77 0 0.00 Assume good condition Onsite Wooded 73 674,022 16.47 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 77 U 0.00 Assume good condition Offsite Wooded 73 0 0.00 Assume good condition Offsite Pond 100 0 0.00 Offsite 2-ac Lots 0 0 0.00 Assume 12% impervious Total Area 678,618 sf 16.68 acres Composite SCS CN 74 % Impervious= F-0.68% TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow Length = 100 ft Upstream Elevation = 594.50 ft Downstream Elevation = 593.50 ft Height = 1.00 ft Slope = 0.0100 ft/ft Manning's n - 0.40 lwooded-light underbrush P (2-year/24-hour) = 3.63 dinches (Wingate, NC) Segment Time = 26.60 minutes Segment 2: Concentrated Flow Length = 1045 ft Upstream Elevation = 593.50 ft Downstream Elevation = 571.00 ft Height = 22.60 ft Slope = 0.0216 ft/ft Paved? No Velocity = 2.37 ft/sec Segment Time = 7.36 �minutes 9 MCADAM Scenario: Pre I yr SU[-lSU -2 SU[-3 SU -4 su -5 U nIF POA 1 POA 2 POA 3 POA 4 POA 5 TRU1903O.ppc TRU1903O.ppc 12/21/2020 9 MCADAM Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ft3) SUB-1 Pre 1 yr 1.00 73,666.000 738.000 16.12 SUB-1 Pre 10 yr 10.00 197,476.000 738.000 41.27 SUB-1 Pre 25 yr 25.00 259,318.000 738.000 51.08 SUB-1 Pre 50 yr 50.00 310,784.000 738.000 58.32 SUB-1 Pre 100 yr 100.00 365,730.000 738.000 65.21 SUB-2 Pre 1 yr 1.00 11,560.000 735.000 2.62 SUB-2 Pre 10 yr 10.00 33,882.000 735.000 7.64 SUB-2 Pre 25 yr 25.00 45,365.000 735.000 9.67 SUB-2 Pre 50 yr 50.00 55,013.000 735.000 11.18 SUB-2 Pre 100 yr 100.00 65,383.000 735.000 12.62 SUB-3 Pre 1 yr 1.00 45,018.000 741.000 9.27 SUB-3 Pre 10 yr 10.00 123,321.000 738.000 24.54 SUB-3 Pre 25 yr 25.00 162,714.000 738.000 30.69 SUB-3 Pre 50 yr 50.00 195,576.000 738.000 35.26 SUB-3 Pre 100 yr 100.00 230,715.000 738.000 39.64 SUB-4 Pre 1 yr 1.00 5,527.000 729.000 1.74 SUB-4 Pre 10 yr 10.00 14,805.000 729.000 4.27 SUB-4 Pre 25 yr 25.00 19,439.000 729.000 5.20 SUB-4 Pre 50 yr 50.00 23,295.000 729.000 5.87 SUB-4 Pre 100 yr 100.00 27,413.000 729.000 6.50 SUB-5 Pre 1 yr 1.00 51,094.000 744.000 9.72 SUB-5 Pre 10 yr 10.00 146,401.000 741.000 27.81 SUB-5 Pre 25 yr 25.00 195,068.000 741.000 35.28 SUB-5 Pre 50 yr 50.00 235,866.000 741.000 40.89 SUB-5 Pre 100 yr 100.00 279,635.000 741.000 46.32 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ft3) POA 1 Pre 1 yr 1.00 73,666.000 738.000 16.12 POA 1 Pre 10 yr 10.00 197,476.000 738.000 41.27 POA 1 Pre 25 yr 25.00 259,318.000 738.000 51.08 POA 1 Pre 50 yr 50.00 310,784.000 738.000 58.32 POA 1 Pre 100 yr 100.00 365,730.000 738.000 65.21 POA 2 Pre 1 yr 1.00 11,560.000 735.000 2.62 POA 2 Pre 10 yr 10.00 33,882.000 735.000 7.64 POA 2 Pre 25 yr 25.00 45,365.000 735.000 9.67 POA 2 Pre 50 yr 50.00 55,013.000 735.000 11.18 POA 2 Pre 100 yr 100.00 65,383.000 735.000 12.62 POA 3 Pre 1 yr 1.00 45,018.000 741.000 9.27 POA 3 Pre 10 yr 10.00 123,321.000 738.000 24.54 POA 3 Pre 25 yr 25.00 162,714.000 738.000 30.69 POA 3 Pre 50 yr 50.00 195,576.000 738.000 35.26 TRU1903O.ppc TRU1903O.ppc 12/21/2020 9 MCADAM Subsection: Master Network Summary Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ft3) POA 3 Pre 100 yr 100.00 230,715.000 738.000 39.64 POA 4 Pre 1 yr 1.00 5,527.000 729.000 1.74 POA 4 Pre 10 yr 10.00 14,805.000 729.000 4.27 POA 4 Pre 25 yr 25.00 19,439.000 729.000 5.20 POA 4 Pre 50 yr 50.00 23,295.000 729.000 5.87 POA 4 Pre 100 yr 100.00 27,413.000 729.000 6.50 POA 5 Pre 1 yr 1.00 51,094.000 744.000 9.72 POA 5 Pre 10 yr 10.00 146,401.000 741.000 27.81 POA 5 Pre 25 yr 25.00 195,068.000 741.000 35.28 POA 5 Pre 50 yr 50.00 235,866.000 741.000 40.89 POA 5 Pre 100 yr 100.00 279,635.000 741.000 46.32 TRU1903O.ppc TRU1903O.ppc 12/21/2020 POST -DEVELOPMENT HYDROLOGIC CALCULATIONS The Glenns TRU-1 9030 Z� tLISZ 'VNIIOdVD Hi�ON '31VE)NIAA 2 ]ANG IJ�JODN319 S9NI/\AVWl NOuDmiSNNOD -0 Iz SNN319 3Hi Ox 0— ID U T 71 T -�-1 LU a_ 0 > n 0 C) w 0 0 a) 0) (D E E '91 McADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name The Glerms Project N umbe I TRU-19030 Subbasin ID: 1-Bypass SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 1 2 3�O 100 B 9: 'J 100 C 98 74 70 100 D 98 80 77 100 HSG �A 0% HSG B� o 0./ HSG C­ 4F7—OYo HSG'D'= 53% Cover Composite Condition SCS CN Comments Im ry ous 9§ 9�ein 77 Assume good condition Wooded 74 Assume good condition Pond 100 1 - WATERSHED BREAKDOWN Date 3/17/2021 Calculated By: M. Duval, PE Composite Area Area Contributina Area SCS CN rsfl racresl Comments Onsite Impervious 98 0 0.00 Onsite Open 77 25,368 0.58 Assume good condition Onsite Wooded 74 0 0.00 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 77 0 0.00 Assume good condition Offsite Wooded 74 0 0.00 Assume good condition Offsite Pond 100 0 0.00 Total Area - 25,368 sf - 0.58 acres Composite SCS CN - %Impervious=M TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow Length = 100 ft Upstream Elevation = 573.25 ft Downstream Elevation = 572.00 ft Height = T2_5 ft Slope = 00125 fuft Manning's n = 0.40 wooded -light underbrush P (2-year/24-hour) = 363 inches (Wingate, NC) Segment Time =1 24.33 minutes Time of Concentration - minutes SCS Lag Time =1 14.60 minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q� = ((P-0.2 �S) 2) / (P+0.8�S) where, Q* = direct runoff (inches) S = potential abstraction = (1 OOO/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A - acres Onsite SCS CN 77 acres S :?@ P (1-year/24-IhOUr) - 01 inches Q� = 1.09 inches Onsite Runoff Volume - acre-ft =1 2,301 cf 0 MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glenns Project Numbei TRIJ-1 9030 Subbasin ID 1-To SCM A SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HRC, I mnpn/ini i.q nnpn \A/nnripri Pnnri A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG �A H SG B� HSG'C'= HSG'D'=W Cover Composite (--nrfifi— q(-.q (-.Nl Impervious 98 Open 77 Assume good condition Wooded 74 Assume good condition Pond 100 WATERSHED BREAKDOWN Date 3/17/2021 Calculated By: M. Duval, PE Composite Area Area Cnntrihiifinn ArPA SCIS CN rqfi rAr.rpql C.nmmpnt.q Onsite Impervious 98 318,873 7.32 Onsite Open 77 535,839 12.30 Assume good condition Onsite Wooded 74 0 0.00 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 66,533 1.53 Offsite Open 77 156,810 3.60 Assume good condition 0 Lfsite coded 74 2 2 2 Assume good condition offslt�� Pond Too 0 0�2 00 Total Area - 1,078,055 sf 24.75 acres Composite SCS CN = 85 % Impervious = 35.75�Xo— TIME OF CONCENTRATION Time of Concentration - 5.00 minutes SCS Lag Time = 3.00 minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q� = ((P-0. 2*S) 2) / (P+0.8*S) where, Q* = direct runoff (inches) S = potential abstraction = (1000/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A - 24,75 acres Onsite SCS CN = 85 acres S = 1.82 P (1-year/24-hour) - 3.01 � *ches inches Q* = 1.57 Onsite Runoff Volume - acre-ft cf 2 MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glenns Project Numbe TRU-19030 Subbasin ID 2 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSC� Imnprvinti.q C)npn WnndPd Pnnd A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG �A 0% HSG B� 0% HSG'C'= 58% [ M42% HSG'D'= Cover Composite (-nnclitinn SCS (-N (-nmmpnt.q Impervious 98 Open 77 Assume good condition Wooded 73 Assume good condition Pond 100 WATERSHED BREAKDOWN Date 3/17/2021 Calculated By: M. Duval, PE Composite Area Area (�.nntrihiifinn A— (-.N I r�fi r—r-1 (---mPntQ Onsite Impervious 98 10,234 0.23 Onsite Open 77 20,004 0.46 Assume good condition Onsite Wooded 73 0 0.00 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 77 0 0.00 Assume good condition Offsite Wooded 73 0 0.00 Assume good condition F- Offsite Pond ------ F-100 0 F - - - 0--00---F- Total Area - 30,238 sf 0.69 acres Composite SCS CN = 84 % Impervious = 33.84% TIME OF CONCENTRATION Time of Concentration - 5.00 minutes SCS Lag Time = 3.00 minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q- = ((P-0.2 -S)2)/ (P+0.8*S) where, Q* = direct runoff (inches) S = potential abstraction = (1 OOO/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A - 0.69 acr s Onsite SCS CN = 84 —� acres S = 1.93 P (1-year/24-hou r) - 3.01 linches inc es Q*=J 1.51 Onsite Runoff Volume - acre-ft =1 3,804 cf 91MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Projec IName TheGI enns Date 3/17/2021 Projec Numbe TRU-19030 Calculated By: M. Duval, PE Subbasin ID 3 SCS CURVE NUMBER (REF TR-55 and NRCS Web Soil Sumay). HSG crDervious ODen Wooded Pond 98 32 100 B 98 61 100 rA C 98 71 70 D 98 go 77 HSG �A HSG B� HSG 'C'- HSG D­ Cover Composite Condition SCS CN Comments impervious 98 Open 79 Assume good condition Wooded 76 Assume good condition Pond 100 WATERSHED BREAKDOWN Composite Area Area Contributina Area SCS CN Isf! racresl Comments Ons,te no ous m 98 15,383 0.35 6nsih_ te en 79 45,919 1.05 Assume good condition Onsite Wooded 76 293,466 6.74 Assume good condition Onsite Pond 100 0 0.00 05s,te 'm 'ous 98 0 0.00 Offs ite� �en 79 0 0.00 Assume good condition Offsite Wooded 76 0 0.00 Assume good condition Offsite Pond 100 ___2_jjEj 0.00 Total Area - 354768 sf - 8.14 acres Composite SCS CN - 77 % Impervious = � 4.34%� TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Len g th = 100 ft Len gth = 323 ft Upstream E I evation = 581.50 ft Upstream E I evation = 578.00 ft Downstream Elevation = 578.00 ft Do -stream Elevation = 570.00 ft Height = 3.50 ft Height = 8.00 ft SI ope = 0.0350 ft/ft Slope = 0.0248 ft/ft Manning 's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-h ou r) - 3.63 inches (Wingate, NC) Velocity = 2.54 fl/sec Segm ent Ti m e = 16.12 minutes Segm ent Time = 2.12 minutes Segment 3: Channel Flow Len g th = 513 ft Upstream E I evation = 570.00 ft Downstream Elevation = 560.50 ft Height = 9.50 ft S, ope = 0.0185 ft/ft Manning 's n = 0.045 natural channel Flow Area = 6 sf (assume 2'x3' channel) Wetted Perimeter - 7 If (assume 2'x3' channel) Channel Vel ocity - �O7 fl/ ec Segment Ti m e=� 2.1 0 minutes Time of Concentration = minules SCS Lag Time = 1 12.20 minu es RUNOFF VOLUME CALCULATIONS Runoffvolurce calculations are basedupon the SCS Method Q� = ((P-0.2�S )2)/ (P10.8*S) where, Q* - direct runoff (inches) S = P otential abstraction = (1 000/Cls) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A acres Onsite SCS CN 77 acres S_ 2.91 P (1-year/24-hour) - 3.01 inches Q* 1.10 inches Onsite Runoff Volume acre-ft cf M McADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS ProjectName TheGlerms Project N um be , TRU-19030 Subbasin ID 4 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 32 30 :::::p22 0 B 100 C 98 74 70 100 F001 D 98 80 77 100 HSG �A 2— 0; HSG B� o R HSG'C'= 0% HSG'D'= 100% Cover ­­i­ Composite ­Q — I -- Impervious 98 Open 80 Assume g Wooded 77 Assume g Pond 100 WATERSHED BREAKDOWN Date 3/17/2021 Calculated By: M. Duval, PE Composite Area Area r'.­trih,fi­ Ar— qrl..q r1.1\1 1�fl N-1 r­M­t� Onsite Impervious 98 0 0.00 Onsite Open 80 40,765 0.94 Assume good condition Onsite Wooded 77 18,300 0.42 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 80 0 0.00 Assume good condition Offsite Wooded 77 0 0.00 Assume good condition si�e Po�d C: 120 0 2 20 20 _T EF te 2 c , Lots 0 0 0! Assume 12% impervious Total Area 5 :c res Composite SCS CN % Impervious 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length - 100 ft Length = 168 ft Upstream Elevation = 582.00 ft Upstream Elevation = 578.50 ft Downstream Elevation = 578.50 ft Downstream Elevation = 575.00 ft Height = 3.50 ft Height = 3.50 ft Slope = 00350 ft/ft Slope = 0.0208 ft/ft Manning's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-hour) = 3.63 inches (Charlotte, NC) Velocity = 2.33 ft/sec Segment Time = 16.12 minutes Segment Time = 1.20 minutes Time of Concentration - minutes SCS Lag Time = 1 10.39 minutes RUNOFF VOLUME CALCULATIONS Runoffvolume calculations are based upon the SCS Method Q- = ((P-0. 2-S)2) / (p+0 8-S) where, Q* = direct runoff (inches) S = potential abstraction = (1000/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A - acres Onsite SCS CN = 1 79 acres S_ 2.65 P (11-year/24-hour) - 3.01 inches Q* = 1 1.20 linches Onsite Runoff Volume - 0.14 acre-ft = 1 5,907 Jcf MWADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name The Glenna Project NumberTRU-19030 Subbasin ID: 5-Bypass SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). Pqr 1--i-­ n­ W—H.H P—H 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG�A�-� U% HSG B - o HSG C. - HSG . D. = Cover Composite C',ndifinn R C..q C1. N C,mm—N 1 ImpervLous 1 98 0 pen 77 Assume good condition Wooded 73 Assume good condition Pond 100 1 - WATERSHED BREAKDOWN Date 3/17/2021 Calculated By: M. Duval, PE Composite Area Area r'.—trih,ti— A qr'..q rI.N I F�fl F—r-1 r,­nt� Onsite Impervious 98 0 0.00 Onsite Open 77 19,156 0.44 Assume good condition Onsite Wooded 73 99,832 2.29 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 77 0 0.00 Assume good condition Offsite Wooded 73 0 0.00 Assume good condition Offsite Pond 100 0 0.00 Total Area 88 :f Composite SCS CN �4 cres % Impervious 0.00% TIME OF CONCENTRATION Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 668 ft Upstream Elevation = 591.00 ft Upstream Elevation = 589.50 ft Downstream Elevation = 589.50 ft Downstream Elevation = 578.00 ft Height = 1.50 ft Height = 11.50 ft Slope = 0.0150 ft/ft Slope = 0.0172 fuft Manning's n = 0.40 wooded -light underbrush Paved? No P (2-year/24-hour) = 363 inches (Wingate, NC) Velocity = 2.12 fUsec Segment Time = 22.62 minutes Segment Time = 5.26 minutes Time of Concentration - 27.88 minute SCS Lag Time = 16.73 minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q- = ((P-0.2-S)2) / (p+0 8-S) where, Q* = direct runoff (inches) S = potential abstraction = (1000/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A - acres Onsite SCS CN 74 acres S :21 P (1-year/24-hour) - 01 inches Q� = 0.91 inches Onsite Runoff Volume - acre-ft = 1 9,066 cf 21MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: The Glerms Project Numbe TRU-19030 Subbasin ID 5- To SCM B SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). p.q(- I m n—Ani i� (-)npn W-1-1 P-1 A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG �A 0% H SG B� 0% HSG'C'= 51% [ M9% HSG'D'= 4 Cover Composite (--nrlitinn q(-.q (-.r\l (�--nt� Impervious 98 Open 77 Assume good condition Wooded 73 Assume good condition Pond 100 WATERSHED BREAKDOWN Date 3/17/2021 Calculated By: M. Duval, PE Composite Area Area C'.nntrihiffinn ArPR SCIS CIN rqfi rRr.rpql C.nmmpnt.q Onsite Impervious 98 279,679 6.42 Onsite Open 77 319,262 7.33 Assume good condition Onsite Wooded 73 0 0.00 Assume good condition Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 Offsite Open 77 0 0.00 Assume good condition 2ffs,te coded 73 Assume good conditi Pond offs't� 00 0 0!2 00 Offsite 2-ac Lots 0 0 0.00 Assume 12% impervious Total Area - 598,941 sf 13.75 acres Composite SCS CN = 87 % Impervious = 46.70�/�o TIME OF CONCENTRATION (REF: SCS Segmental Approach, TR-55). Time of Concentration - 5 99 minutes SCS Lag Time = 3�00 minutes RUNOFF VOLUME CALCULATIONS Runoff volume calculations are based upon the SCS Method Q' = ((P-0.2 S)2)/ (P+0.8*S) where, Q* = direct runoff (inches) S = potential abstraction = (1 OOO/CN) - 10 P = accumulated storm rainfall (inches) Onsite Drainage Area, A - 13,75 acres Onsite SCS CN = 87 acres S- 1.52 P (1-year/24-hour) - 3.01 �inches inch s Q*1 1.73 Onsite Runoff Volume - acre-ft =1 86,361 cf 9 MCADAM Scenario: Post I yr POA2 POA3 POA4 9 1-BY ASS TRU1903O.ppc TRU1903O.ppc 12/21/2020 9 MCADAM Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ft3) 1-BYPASS WQV 0.10 400.000 733.000 0.07 1-BYPASS Post 1 yr 1.00 2,259.000 735.000 0.55 1-BYPASS Post 10 yr 10.00 6,055.000 735.000 1.38 1-BYPASS Post 25 yr 25.00 7,951.000 735.000 1.71 1-BYPASS Post 50 yr 50.00 9,529.000 735.000 1.94 1-BYPASS Post 100 yr 100.00 11,214.000 735.000 2.16 2 WQV 0.10 477.000 721.000 0.16 2 Post 1 yr 1.00 2,712.000 723.000 1.21 2 Post 10 yr 10.00 7,258.000 720.000 2.94 2 Post 25 yr 25.00 9,529.000 720.000 3.59 2 Post 50 yr 50.00 11,418.000 720.000 4.06 2 Post 100 yr 100.00 13,436.000 720.000 4.49 3 WQV 0.10 5,597.000 729.000 1.05 3 Post 1 yr 1.00 31,679.000 732.000 8.59 3 Post 10 yr 10.00 84,863.000 732.000 21.49 3 Post 25 yr 25.00 111,422.000 732.000 26.34 3 Post 50 yr 50.00 133,518.000 732.000 29.86 3 Post 100 yr 100.00 157,114.000 732.000 33.17 4 WQV 0.10 1,161.000 727.000 0.28 4 Post 1 yr 1.00 5,853.000 729.000 1.76 4 Post 10 yr 10.00 15,045.000 729.000 4.14 4 Post 25 yr 25.00 19,573.000 729.000 5.00 4 Post 50 yr 50.00 23,324.000 729.000 5.63 4 Post 100 yr 100.00 27,318.000 729.000 6.20 5-BYPASS WQV 0.10 1,300.000 736.000 0.15 5-BYPASS Post 1 yr 1.00 8,978.000 738.000 1.93 5-BYPASS Post 10 yr 10.00 25,712.000 738.000 5.43 5-BYPASS Post 25 yr 25.00 34,257.000 735.000 6.85 5-BYPASS Post 50 yr 50.00 41,419.000 735.000 7.92 5-BYPASS Post 100 yr 100.00 49,103.000 735.000 8.95 1-TO SCM A WQV 0.10 37,784.000 716.000 15.50 1-TO SCM A Post 1 yr 1.00 143,260.000 720.000 67.18 1-TO SCM A Post 10 yr 10.00 328,041.000 720.000 133.71 1-TO SCM A Post 25 yr 25.00 415,821.000 720.000 155.74 1-TO SCM A Post 50 yr 50.00 487,692.000 720.000 171.14 1-TO SCM A Post 100 yr 100.00 563,656.000 720.000 184.91 5-TO SCM B WQV 0.10 25,003.000 716.000 10.55 5-TO SCM B Post 1 yr 1.00 87,135.000 720.000 41.19 5-TO SCM B Post 10 yr 10.00 192,455.000 720.000 78.08 5-TO SCM B Post 25 yr 25.00 241,961.000 720.000 90.00 5-TO SCM B Post 50 yr 50.00 282,366.000 720.000 98.29 5-TO SCM B Post 100 yr 100.00 324,985.000 720.000 105.67 Node Summary TRU1903O.ppc 9 MCADAM Subsection: Master Network Summary Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ft3) POA 1 WQV 0.10 35,016.000 733.000 0.19 POA 1 Post 1 yr 1.00 102,359.000 756.000 6.75 POA 1 Post 10 yr 10.00 286,554.000 732.000 38.97 POA 1 Post 25 yr 25.00 374,089.000 732.000 50.99 POA 1 Post 50 yr 50.00 445,861.000 732.000 55.26 POA 1 Post 100 yr 100.00 521,600.000 735.000 58.93 POA 2 WQV 0.10 477.000 721.000 0.16 POA 2 Post 1 yr 1.00 2,712.000 723.000 1.21 POA 2 Post 10 yr 10.00 7,258.000 720.000 2.94 POA 2 Post 25 yr 25.00 9,529.000 720.000 3.59 POA 2 Post 50 yr 50.00 11,418.000 720.000 4.06 POA 2 Post 100 yr 100.00 13,436.000 720.000 4.49 POA 3 WQV 0.10 5,597.000 729.000 1.05 POA 3 Post 1 yr 1.00 31,679.000 732.000 8.59 POA 3 Post 10 yr 10.00 84,863.000 732.000 21.49 POA 3 Post 25 yr 25.00 111,422.000 732.000 26.34 POA 3 Post 50 yr 50.00 133,518.000 732.000 29.86 POA 3 Post 100 yr 100.00 157,114.000 732.000 33.17 POA 4 WQV 0.10 1,161.000 727.000 0.28 POA 4 Post 1 yr 1.00 5,853.000 729.000 1.76 POA 4 Post 10 yr 10.00 15,045.000 729.000 4.14 POA 4 Post 25 yr 25.00 19,573.000 729.000 5.00 POA 4 Post 50 yr 50.00 23,324.000 729.000 5.63 POA 4 Post 100 yr 100.00 27,318.000 729.000 6.20 POA 5 WQV 0.10 23,274.000 740.000 0.23 POA 5 Post 1 yr 1.00 49,497.000 756.000 2.90 POA 5 Post 10 yr 10.00 168,878.000 753.000 17.55 POA 5 Post 25 yr 25.00 225,639.000 741.000 28.99 POA 5 Post 50 yr 50.00 272,204.000 732.000 39.88 POA 5 Post 100 yr 100.00 321,374.000 732.000 49.54 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/S) (years) (ft3) Maximum Maximum Water Pond Storage Surface (ft3) Elevation (ft) SCM A (IN) WQv 0.10 37,784.000 716.000 15.50 (N/A) (N/A) SCM A (OUT) WQV 0.10 34,615.000 1,442.000 0.18 573.27 30,332.000 SCM A (IN) Post 1 yr 1.00 143,260.000 720.000 67.18 (N/A) (N/A) SCM A (OUT) Post 1 yr 1.00 100,100.000 756.000 6.45 574.35 76,933.000 SCM A (IN) Post 10 yr 10.00 328,041.000 720.000 133.71 (N/A) (N/A) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/S) Water Pond Storage (years) (ft3) Surface (ft3) Elevation (ft) SCM A (OUT) Post 10 yr 10.00 280,500.000 732.000 37.60 575.76 142,430.000 SCM A (IN) Post 25 yr 25.00 415,821.000 720.000 155.74 (N/A) (N/A) SCM A (OUT) Post 25 yr 25.00 366,138.000 732.000 49.29 576.28 167,888.000 SCM A (IN) Post 50 yr 50.00 487,692.000 720.000 171.14 (N/A) (N/A) SCM A (OUT) Post 50 yr 50.00 436,332.000 732.000 53.32 576.70 188,882.000 SCM A (IN) Post 100 yr 100.00 563,656.000 720.000 184.91 (N/A) (N/A) SCM A (OUT) Post 100 yr 100.00 510,386.000 735.000 56.76 577.08 208,521.000 SCM B (IN) WQv 0.10 25,003.000 716.000 10.55 (N/A) (N/A) SCM B (OUT) WQV 0.10 21,974.000 1,442.000 0.13 574.45 19,588.000 SCM B (IN) Post 1 yr 1.00 87,135.000 720.000 41.19 (N/A) (N/A) SCM B (OUT) Post 1 yr 1.00 40,519.000 783.000 1.86 575.20 54,645.000 SCM B (IN) Post 10 yr 10.00 192,455.000 720.000 78.08 (N/A) (N/A) SCM B (OUT) Post 10 yr 10.00 143,166.000 753.000 13.74 576.23 105,339.000 SCM B (IN) Post 25 yr 25.00 241,961.000 720.000 90.00 (N/A) (N/A) SCM B (OUT) Post 25 yr 25.00 191,381.000 750.000 23.14 576.44 115,935.000 SCM B (IN) Post 50 yr 50.00 282,366.000 720.000 98.29 (N/A) (N/A) SCM B (OUT) Post 50 yr 50.00 230,785.000 732.000 32.29 576.61 124,563.000 SCM B (IN) Post 100 yr 100.00 324,985.000 720.000 105.67 (N/A) (N/A) SCM B (OUT) Post 100 yr 100.00 272,271.000 729.000 41.01 576.79 134,155.000 TRU1903O.ppc TRU1903O.ppc 3/17/2021 DESIGN OF STORMWATER CONTROL MEASURE"A" The Glenns TRU-1 9030 0 McADAMS STAGE -STORAGE FUNCTION - ABOVE NORMAL POOL Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM A ABOVE NORMAL POOL Date: 3/17/2021 Calculated By: M.Duval, PE Average Incremental Accumulated Calculated Contour Stage Contour Area Contour Area Contour Vol Contour Vol Stage Ffti Ffti Fsfl Fsfl Fcfl Fcfl Ffti 572.50 0.00 37,552 573.00 0.50 40,007 38,780 19,390 19,390 0.50 574.00 1.50 43,796 41,902 41,902 61,291 1.51 575.00 2.50 37,948 40,872 40,872 102,163 2.48 576.00 3.50 46,393 42,171 42,171 144,334 3.46 1 577.00 4.50 1 49,047 47,720 1 47,720 1 192,054 1 4.55 250,000 stalage vs. stage 200,000 y = 39845x'.0374 150,000 R2 = 0.9998 1*000 50,000 0 0.00 1.00 2.00 3.00 4.00 5.00 Stage (feet) b = 1.0374 Ks 39845 9 MCADAMS STAGE -STORAGE FUNCTION - BELOW NORMAL POOL Project Name: The Glenns Date 3/17/2021 Project Number: TRU-19030 Calculated By: M.Duval, PE Facility ID: SCM A MAIN POOL Average Incremental Accumulated Calculated Contour Stage Contour Area Contour Area Contour Vol Contour Vol Stage rffl rffl r�fi rQfl r,fl r,fl rffl FOREBAY 567.00 0.00 20,264 568.00 1.00 21,934 21,099 21,099 21,099 1.01 569.00 2.00 23,664 22,799 22,799 43,898 1.98 570.00 3.00 25,453 24,559 24,559 68,457 2.97 571.00 4.00 27,299 26,376 26,376 94,833 4.00 572.00 5.00 29,203 28,251 28,251 123,084 5.07 Storage vs. Stage 140,000 120,000 y = 20850xl 0111 100,000 R 2 0.9996 80,000 60,000 40,000 20,000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) b = 1.0936 K� = 1 20850 Average Incremental Accumulated Calculated Contour Stage Contour Area Contour Area Contour Vol Contour Vol Stage rffl rffl r�fi rQfl r,fl r,fl rffl 567.00 0.00 2,840 568.00 1.00 3,361 3,101 3,101 3,101 1.02 569.00 2.00 3,739 3,550 3,550 6,651 1.95 570.00 3.00 4,508 4,124 4,124 10,774 2.93 571.00 4.00 5,136 4,822 4,822 15,596 4.50 572.00 5.00 5,795 5,466 5,466 21,062 5.15 Storage vs. Stage 25,000 20,000 y = 3016.5x' R2 0.9983 U 15,000 10,000 5,000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) b = 1.1859 K� = 1 3016 2 MCADAMS VOLUME CALCULATIONS Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM A TOTALVOLUME Volume of Main Pool = 123,084 ef Volume of Forebays = 21,062 ef Total Volume Below NWSE = 144,145 ef = [ 3.31 acre-ft Total Volume Above NWSE 192,054 ef 4.41 acre-ft Total Volume of Facility 336,199 ef 7.72 acre-ft FOREBAY CALCULATION Total Volume Below NWSE = ef Volume of Forebays =1 ef % Forebay = AVERAGE DEPTH OF POND Total Volume Below NWSE = ef Surface Area at NWSE = sf Date: 3/17/2021 Calculated By: M.Duval, PE Fo-rebayyolume should be approximately 20% 1 (code allows 15 Average Depth = JAverage depth mustbe greater th Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM A DRAINAGE CHARACTERISTICS 0 MCADAMS SURFACE AREA CALCULATION Date: 3/17/2021 Calculated By: M.Duval, PE Total Drainage Area 24.75 acres Total Impervious Area 8.85 acres FInclude both onsite and oftsite impervi-ous area % Impervious DETERMINATION OF REQUIRED SURFACE AREA (REF: NCDWQ BMP Handbook, 2007). Average Depth = ft TSS Removal = SAIDA table for PiedmonWountain regio Average Depth 3.5 Lower Boundary 30.0% 1.21 % Impervious 35.8% 1.42 Upper Boundary 40.0% 1.58 SA/DA required = Surface Area Required 15,338 ft 0.35 acres Surface Area Provided = ft 'TiMcADAMS WATER QUALITY VOLUME CALCULATION Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM A WATER QUALITY VOLUME (REF.- Simple Method, Schueler, 1987). where, WQV = P x Rv x A / 12 WQV = Water Quality Volume (acre-ft) Rv = 0.05 + 0.009 x 1, where I is % Impervious Cover A = Area (acres) P = Rainfall (inches) Total Drainage Area, A 24.75 acres Total Impervious Area 8.85 acres % Impervious, 1 35.75% Rainfall, P 1.00 inches Rv =1 0.372 acres WQV=J 0.767 acre-ft = 1 33,397 Gf 1 -YEAR TREATMENT VOLUME PrelPost Difference in I- Year Volume 1 -Year Treatment Volume 70,431 Gf 1.617 acre-ft ASSOCIATED DEPTH OF 1" TREATMENT VOLUME IN POND Water Quality Volume = 1 33,397 Gf Ks =1 39845 b=1 1.0374 NWSE =1 572.50 ft Date: 3/17/2021 Calculated By: M.Duval, PE Depth of WQV in Pond 0.84 ft 10.12 inches Elevation 573.34 ft Spillway must be set above this e/e 0 MCADAMS WATER QUALITY VOLUME DRAWDOWN CALCULATION Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM A DRAWDOWN DESIGN Using falling head Orifice Diameter = 3.00 inches Number of Orifices = 1 Orifice Coefficient, Cd = 0.60 Ks= 39845 b = 1.0374 NWSE = 572.50 ft WQV=l 33,397 WQV Elevation in Pond =1 573.34 ft Date: 3/17/2021 Calculated By: M.Duval, PE Average Incremental Incremental WSEL Storage Siphon Flow Flow Volume Time Ift] 1cf] [cfs] [cfs] 1cf] [see] 573.34 33397 0.200 573.27 30315 0.189 0.195 3,083 15,837 573.19 27243 0.178 0.184 3,072 16,732 573.12 24184 0.166 0.172 3,059 17,808 573.04 21139 0.153 0.159 3,045 19,139 572.97 18109 0.138 0.145 3,029 20,846 572.89 15098 0.122 0.130 3,011 23,190 572.82 12109 0.103 0.113 2,590 26,517 572.74 9146 0.080 0.092 2,963 32,350 572.67 6217 0.046 0.063 2,928 46,719 572.59 3340 0.019 0.032 2,878 89,636 Drawdown Time = days DRAWDOWN DESIGN Us—m—gaverage head Average Head on Orifice 0.359 inches Orifice Coefficient, Cd 0.60 1 Area of Orifice sf Flowrate, Q = efs 12-5 day drawdo Drawdown Time = days 12-5 day drawdo 'M WADAMS CHANNEL PROTECTION VOLUME CALCULATION Project Name: Glencroft Phase 11 Date 3/17/2021 Project Number: TRU-19030 Calculated By: M. Duval, PE Facility ID: SCM A Channel Protection Volume DETERMINATION OF CHANNEL PROTECTION VOLUME PRE DEVELOPMENT Sub -basin ID 1 -Year Runoff Volume - 1cq [acre-feet F1 72,844 1. Totals 72,844 1.6 POST DEVELOPMENT Sub -basin ID 1�Year Runoff Volume cfl racre-feetl 1-Bypass 2,301 1-To SCM 140,974 NO, 5 4 Totals 143,274 3.29 Channel Protection Volume, CPV - 1 70,431 cf =1 1.62 acre-ft TIMCADAMS RISER ANTI -FLOTATION CALCULATION Project Name The Glerms Project Number TRU-19030 Facility ID: SCM A INPUT DATA Inside Length = 4.00 ft Inside Width = 4.00 ft Wall Thickness = 6.00 in Standard Base Length = 5.00 ft Standard Base Width = 5.00 ft Standard Base Thickness - in Inside Height of Riser -Mft Concrete Unit Weight = Pcf Outside Diameter of Barrel = in Drain Pipe (if present) = in TRASH RACK DISPLACEMENT Date 3/17/2021 Calculated By: M. Duval IUnit weight of manhole concrete is 142 pcf p Bottom Length W W�dth 7.00 ft Calculation for truncated square pyramid_ Top Length dth 1.00 ft Height 2.00 ft Trash Rack Displacement 38MOOO cf CONCRETE PRESENT IN RISER STRUCTURE Riser Walls - 22.500 cf Standard Base of Riser = 12.500 cf Less Opening for Ba rrel = 1.571 cf Less Opening for Drain P ipe - 0.175 cf Less Opening for Orifice =� 4.500 Jcf Total Concrete Less Openings - 28.755 cf Weight of Concrete = 4,083 lbs AMOUNT OF WATER DISPLACED BY RISER STRUCTURE Displacement by Concrete - 28.755 cf Displacement by Open Air - 40.000 cf Displacement by Trash Rack= � 38.000 Jcf Total Water Displaced - 106.755 cf Weight of Water Displaced = 6,661 lbs AMOUNT OF CONCRETE TO ADD TO RISER STRUCTURE Safety Factor - Add'I Weight for Bouyancy = lbs Bouyant Weight of Concrete - 79.60 Pcf Bouyant Weight w/ SF = 69.22 Pcf Add'I Concrete to Add - 51.686 cf Less Standard Base - 12.500 � cf �cf New Base Design Required = 64.186 ANTI FLOTATION BLOCK DESIGN CALCULATIONS AF Block ­:idthh = 8.00 ft AF Block' 8.00 ft AF Block Thickness 15.00 in AF Block Provided 800100 cf Total Concrete Present = cf Total Concrete Present = lbs FR;Tommend 1. 15 or higher 9 MCADAM Subsection: Elevation -Area Volume Curve Label: SCM A Return Event: 0.00 years Storm Event: WQv Elevation Planimeter Area Al+A2+sqr Volume Volume (Total) (ft) (ft2) (ft2) (Al*A2) (ft3) (ft3) (ft2) 572.50 0.0 37,552.000 0.000 0.000 0.000 573.00 0.0 40,007.000 116,319.068 19,387.000 19,387.000 574.00 0.0 43,796.000 125,661.650 41,887.000 61,274.000 575.00 0.0 46,393.000 135,264.801 45,088.000 106,362.000 576.00 0.0 49,047.000 143,141.546 47,714.000 154,076.000 577.00 0.0 51,758.000 151,189.270 50,396.000 204,472.000 578.00 0.0 54,525.000 159,406.488 53,135.000 257,608.000 TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Label: SCM A Return Event: 0.00 years Storm Event: WQv Requested Pond Water Surface Elevations Minimum (Headwater) 572.50 ft Increment (Headwater) 0.10 ft Maximum (Headwater) 578.00 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Orifice -Area Orifice - 2 Forward Culvert - 1 573.50 578.00 Inlet Box Riser - 1 Forward Culvert - 1 575.00 578.00 Orifice -Circular Siphon Forward Culvert - 1 572.50 578.00 Culvert -Circular Culvert - 1 Forward TW 572.50 578.00 Tailwater Settings Tailwater (N/A) (N/A) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Label: SCIVI A Structure ID: Culvert - 1 Structure Type: Culvert -Circular Number of Barrels 2 Diameter 24.0 in Length 50.00 ft Length (Computed Barrel) 50.00 ft Slope (Computed) 0.010 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.500 Kb 0.012 Kr 0.000 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0098 M 2.0000 C 0.0398 Y 0.6700 T1 ratio (HW/D) 1.155 T2 ratio (HW/D) 1.302 Slope Correction Factor -0.500 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... Return Event: 0.00 years Storm Event: WQv T1 Elevation 574.81 ft T1 Flow 15.55 ft3/S T2 Elevation 575.10 ft T2 Flow 17.77 ft3/S TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Return Event: 0.00 years Label: SCIVI A Storm Event: WQv Structure ID: Riser - 1 Structure Type: Inlet Box Number of Openings 1 Elevation 575.00 ft Orifice Area 16.0 ft2 Orifice Coefficient 1.000 Weir Length 16.00 ft Weir Coefficient 3.00 (ftA0 .5)/s K Reverse 1.000 Manning's n 0.000 Kev, Charged Riser 0.000 Weir Submergence False Orifice H to crest False Structure ID: Siphon Structure Type: Orifice -Circular Number of Openings 1 Elevation 572.50 ft Orifice Diameter 3.0 in Orifice Coefficient 0.600 Structure ID: Orifice - 2 Structure Type: Orifice -Area Number of Openings 1 Elevation 573.50 ft Orifice Area 1.0 ft2 Top Elevation 574.00 ft Datum Elevation 573.75 ft Orifice Coefficient 1.000 Structure ID: TW Structure Type: TW Setup, IDS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 ft (Maximum) Headwater Tolerance 0.01 ft (Minimum) Headwater Tolerance 0.50 ft (Maximum) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Label: SCM A Convergence Tolerances Flow Tolerance (Minimum) 0.001 ft3/S Flow Tolerance (Maximum) 10.000 ft3/S TRU1903O.ppc TRU1903O.ppc Return Event: 0.00 years Storm Event: WQv 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Label: SCM A Composite Outflow Summary Return Event: 0.00 years Storm Event: WQv Water Surface Flow Tailwater Elevation Convergence Error Elevation (ft3/S) (ft) (ft) (ft) 572.50 0.00 (N/A) 0.00 572.60 0.02 (N/A) 0.00 572.70 0.05 (N/A) 0.00 572.80 0.10 (N/A) 0.00 572.90 0.12 (N/A) 0.00 573.00 0.14 (N/A) 0.00 573.10 0.16 (N/A) 0.00 573.20 0.18 (N/A) 0.00 573.30 0.19 (N/A) 0.00 573.40 0.20 (N/A) 0.00 573.50 0.21 (N/A) 0.00 573.60 1.00 (N/A) 0.00 573.70 1.80 (N/A) 0.00 573.80 2.60 (N/A) 0.00 573.90 3.41 (N/A) 0.00 574.00 4.21 (N/A) 0.00 574.10 4.95 (N/A) 0.00 574.20 5.59 (N/A) 0.00 574.30 6.17 (N/A) 0.00 574.40 6.69 (N/A) 0.00 574.50 7.18 (N/A) 0.00 574.60 7.63 (N/A) 0.00 574.70 8.07 (N/A) 0.00 574.80 8.48 (N/A) 0.00 574.90 8.86 (N/A) 0.00 575.00 9.23 (N/A) 0.00 575.10 10.95 (N/A) 0.00 575.20 13.51 (N/A) 0.00 575.30 16.75 (N/A) 0.00 575.40 20.58 (N/A) 0.00 575.50 24.85 (N/A) 0.00 575.60 29.58 (N/A) 0.00 575.70 34.54 (N/A) 0.00 575.80 39.55 (N/A) 0.00 575.90 43.92 (N/A) 0.00 576.00 46.40 (N/A) 0.00 576.10 47.45 (N/A) 0.00 576.20 48.49 (N/A) 0.00 576.30 49.50 (N/A) 0.00 576.40 50.50 (N/A) 0.00 576.50 51.46 (N/A) 0.00 576.60 52.42 (N/A) 0.00 576.70 53.36 (N/A) 0.00 576.80 54.28 (N/A) 0.00 TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Label: SCM A Composite Outflow Summary Return Event: 0.00 years Storm Event: WQv Water Surface Flow Tailwater Elevation Convergence Error Elevation (ft3/S) (ft) (ft) (ft) 576.90 55.18 (N/A) 0.00 577.00 56.08 (N/A) 0.00 577.10 56.96 (N/A) 0.00 577.20 57.82 (N/A) 0.00 577.30 58.67 (N/A) 0.00 577.40 59.51 (N/A) 0.00 577.50 60.33 (N/A) 0.00 577.60 61.15 (N/A) 0.00 577.70 61.96 (N/A) 0.00 577.80 62.75 (N/A) 0.00 577.90 63.54 (N/A) 0.00 1 578.00 1 64.31 1 (N/A) 0.00 Contributing Structures (no Q: Orifice - 2,Riser - 1,Siphon,Culvert - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Siphon,Culvert - 1 (no Q: Orifice - 2,Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Return Event: 0.00 years Label: SCM A Storm Event: WQv Composite Outflow Summary Contributing Structures Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Siphon,Culvert - 1 (no Q: Riser - 1) Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Orifice - 2,Riser - 1,Siphon,Culvert - 1 Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Label: SCM A Composite Outflow Summary Contributing Structures Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - 2,Siphon) Riser - 1,Culvert - 1 (no Q: Orifice - TRU1903O.ppc TRU1903O.ppc Return Event: 0.00 years Storm Event: WQv 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 572.50 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 1.000 min Inflow/Outflow Hydrograph Summary Return Event: 0.00 years Storm Event: WQv Flow (Peak In) 15.50 ft3/S Time to Peak (Flow, In) 716.000 min Flow (Peak Outlet) 0. 18 ft3/S Time to Peak (Flow, Outlet) 1,442.000 min Elevation (Water Surface, 573.27 ft Peak) Volume (Peak) 30,331.943 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 37,784.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 34,615.000 ft3 Outflow) Volume (Retained) 3,164.000 ft3 Volume (Unrouted) -4.000 ft3 Error (Mass Balance) 0.0 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 572.50 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 1.00 years Storm Event: 1 yr Flow (Peak In) 67.18 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 6.45 ft3/S Time to Peak (Flow, Outlet) 756.000 min Elevation (Water Surface, 574.35 ft Peak) Volume (Peak) 76,933.008 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 143,260.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 100,100.000 ft3 Outflow) Volume (Retained) 43,009.000 ft3 Volume (Unrouted) -151.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 572.50 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 10.00 years Storm Event: 10-yr Flow (Peak In) 133.71 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 37.60 ft3/S Time to Peak (Flow, Outlet) 732.000 min Elevation (Water Surface, 575.76 ft Peak) Volume (Peak) 142,430.272 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 328,041.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 280,500.000 ft3 Outflow) Volume (Retained) 47,244.000 ft3 Volume (Unrouted) -297.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 572.50 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 25.00 years Storm Event: 25-yr Flow (Peak In) 155.74 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 49.29 ft3/S Time to Peak (Flow, Outlet) 732.000 min Elevation (Water Surface, 576.28 ft Peak) Volume (Peak) 167,887.992 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 415,821.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 366,138.000 ft3 Outflow) Volume (Retained) 49,315.000 ft3 Volume (Unrouted) -368.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 572.50 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 50.00 years Storm Event: 50-yr Flow (Peak In) 171.14 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 53.32 ft3/S Time to Peak (Flow, Outlet) 732.000 min Elevation (Water Surface, 576.70 ft Peak) Volume (Peak) 188,882.082 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 487,692.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 436,332.000 ft3 Outflow) Volume (Retained) 50,935.000 ft3 Volume (Unrouted) -424.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 572.50 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 100.00 years Storm Event: 100-yr Flow (Peak In) 184.91 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 56.76 ft3/S Time to Peak (Flow, Outlet) 735.000 min Elevation (Water Surface, 577.08 ft Peak) Volume (Peak) 208,520.961 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 563,656.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 510,386.000 ft3 Outflow) Volume (Retained) 52,786.000 ft3 Volume (Unrouted) -484.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 DESIGN OF STORMWATER CONTROL MEASURE"B" The Glenns TRU-1 9030 0 McADAMS STAGE -STORAGE FUNCTION - ABOVE NORMAL POOL Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM B ABOVE NORMAL POOL Date: 3/17/2021 Calculated By: M.Duval, PE Average Incremental Accumulated Calculated Contour Stage Contour Area Contour Area Contour Vol Contour Vol Stage Ffti Ffti Fsfl Fsfl Fcfl Fcfl Ffti 574.00 0.00 42,468 574.50 0.50 45,473 43,971 21,985 21,985 0.50 575.00 1.00 46,997 46,235 23,118 45,103 0.99 576.00 2.00 50,086 48,542 48,542 93,644 1.98 577.00 3.00 53,232 51,659 51,659 145,303 2.99 1 578.00 4.00 1 56,435 54,834 1 54,834 1 200,137 1 4.05 250,000 stalage vs. stage 200,000 y = 45435x' I'll R2 0.9999 150,000 1 *000 50 , 000 'o 0 0.00 1.00 2.00 3.00 4.00 5.00 Stage (feet) b = 1.0605 Ks 45435 9 MCADAMS STAGE -STORAGE FUNCTION - BELOW NORMAL POOL Project Name: The Glenns Date 3/17/2021 Project Number: TRU-19030 Calculated By: M.Duval, PE Facility ID: SCM B MAIN POOL Average Incremental Accumulated Calculated Contour Stage Contour Area Contour Area Contour Vol Contour Vol Stage rffl rffl r�fi rQfl r,fl r,fl rffl FOREBAY 569.00 0.00 19,146 570.00 1.00 21,300 20,223 20,223 20,223 1.01 571.00 2.00 23,522 22,411 22,411 42,634 1.97 572.00 3.00 25,804 24,663 24,663 67,297 2.96 573.00 4.00 28,148 26,976 26,976 94,273 3.99 574.00 5.00 31,775 29,962 29,962 124,235 5.10 Storage vs. Stage 140,000 120,000 y = 1 9906x' 1242 100,000 R 2 0.9993 80,000 60,000 40,000 20,000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) b = 1.1242 K� = 1 19906 Average Incremental Accumulated Calculated Contour Stage Contour Area Contour Area Contour Vol Contour Vol Stage rffl rffl r�fi rQfl r,fl r,fl rffl 569.00 0.00 4,186 570.00 1.00 4,955 4,571 4,571 4,571 1.02 571.00 2.00 5,780 5,368 5,368 9,938 1.95 572.00 3.00 6,661 6,221 6,221 16,159 2.93 573.00 4.00 7,594 7,128 7,128 23,286 3.0 574.00 5.00 9,878 8,736 8,736 32,022 5.17 Storage vs. Stage 35,000 30,000 y = 4448.5xl 201 25,000 R2 0.9982 20,000 15,000 10,000 5,000 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage (feet) b = 1.2010 K� = 1 4448 2 MCADAMS VOLUME CALCULATIONS Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM B TOTALVOLUME Volume of Main Pool = 124,235 ef Volume of Forebays = 32,022 ef Total Volume Below NWSE = 156,257 ef = [ 3.59 acre-ft Total Volume Above NWSE 200,137 ef 4.59 acre-ft Total Volume of Facility 356,393 ef 8.18 acre-ft FOREBAY CALCULATION Total Volume Below NWSE = ef Volume of Forebays =1 ef % Forebay = AVERAGE DEPTH OF POND Total Volume Below NWSE = ef Surface Area at NWSE = sf Date: 3/17/2021 Calculated By: M.Duval, PE Fo-rebayyolume should be approximately 20% 1 (code allows 15 Average Depth = JAverage depth mustbe greater th Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM B DRAINAGE CHARACTERISTICS 0 MCADAMS SURFACE AREA CALCULATION Date: 3/17/2021 Calculated By: M.Duval, PE Total Drainage Area 13.75 acres Total Impervious Area 6.42 acres FInclude both onsite and oftsite impervi-ous area % Impervious DETERMINATION OF REQUIRED SURFACE AREA (REF: NCDWQ BMP Handbook, 2007). Average Depth = ft TSS Removal = SAIDA table for PiedmonWountain regio Average Depth 3.5 Lower Boundary 40.0% 1.21 % Impervious 46.7% 1.46 Upper Boundary 50.0% 1.58 SA/DA required = Surface Area Required ft acres Surface Area Provided = ft 'TiMcADAMS WATER QUALITY VOLUME CALCULATION Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM B WATER QUALITY VOLUME (REF.- Simple Method, Schueler, 1987). where, WQV = P x Rv x A/ 12 WQV = Water Quality Volume (acre-ft) Rv = 0.05 + 0.009 x 1, where I is % Impervious Cover A = Area (acres) P = Rainfall (inches) Total Drainage Area ' A 1 3.75 acres Total Impervious Area 6.42 acres % Impervious, 1 46.70% Rainfall, P 1.00 inches Rv =1 0.470 acres WQV=J 0.539 acre-ft = 1 23,472 Gf 1 -YEAR TREATMENT VOLUME PrelPost Difference in I- Year Volume 1 -Year Treatment Volume = 1 44,883 Gf = L 1.030 acre-ft ASSOCIATED DEPTH OF 1 -YEAR TREATMENT VOLUME IN POND Water Quality Volume = 1 23,472 Gf Ks =1 45435 b=1 1.0605 NWSE =1 574.00 ft Date: 3/17/2021 Calculated By: M.Duval, PE Depth of WQV in Pond 0.54 ft 6.44 inches Elevation 574.54 ft Spillway must be set above this e/e 0 MCADAMS WATER QUALITY VOLUME DRAWDOWN CALCULATION Project Name: The Glenns Project Number: TRU-19030 Facility ID: SCM B DRAWDOWN DESIGN Using falling head Orifice Diameter = 3.00 inches Number of Orifices = 1 Orifice Coefficient, Cd = 0.60 Ks= 45435 b = 1.0605 NWSE = 574.00 ft WQV=l 23,472 WQV Elevation in Pond =1 574.54 ft Date: 3/17/2021 Calculated By: M.Duval, PE Average Incremental Incremental WSEL Storage Siphon Flow Flow Volume Time Ift] 1cf] [cfs] [cfs] 1cf] [see] 574.54 23472 0.151 574.49 21272 0.142 0.147 2,199 14,975 574.44 19086 0.133 0.138 2,186 15,895 574.39 16914 0.122 0.128 2,172 17,030 574.35 14758 0.111 0.117 2,156 18,478 574.30 12619 0.098 0.105 2,138 20,424 574.25 10501 0.084 0.091 2,118 23,242 574.20 8408 0.062 0.073 2,094 28,788 574.16 6344 0.041 0.051 2,064 40,102 574.11 4318 0.024 0.033 2,026 61,999 574.06 2347 0.010 0.017 1,971 115,504 Drawdown Time = days DRAWDOWN DESIGN Us—m—gaverage head Average Head on Orifice 0.206 inches Orifice Coefficient, Cd 0.60 1 Area of Orifice sf Flowrate, Q = efs 12-5 day drawdo Drawdown Time = days 12-5 day drawdo 'M WADAMS CHANNEL PROTECTION VOLUME CALCULATION Project Name: Glencroft Phase 11 Date 3/17/2021 Project Number: TRU-19030 Calculated By: M. Duval, PE Facility ID: SCM A Channel Protection Volume DETERMINATION OF CHANNEL PROTECTION VOLUME PRE DEVELOPMENT Sub -basin ID 1 -Year Runoff Volume 1cq [acre-feet FT05 50,544 1 1� tals 50,544 1.1 POST DEVELOPMENT Sub -basin ID 1�Year Runoff Volume cfl racre-feetl 5-Bypass 9,066 9 2918 5-To SCM 86,361 1! Totals 95,427 2.19 Channel Protection Volume, CPV - 1 44,883 cf =1 1.03 acre-ft TIMCADAMS RISER ANTI -FLOTATION CALCULATION Project Name The Glerms Project Number TRU-19030 Facility ID: SCM A INPUT DATA Inside Length = 4.00 ft Inside Width = 4.00 ft Wall Thickness = 6.00 in Standard Base Length = 5.00 ft Standard Base Width = 5.00 ft Standard Base Thickness - in Inside Height of Riser -Mft Concrete Unit Weight = Pcf Outside Diameter of Barrel = in Drain Pipe (if present) = in TRASH RACK DISPLACEMENT Date 3/17/2021 Calculated By: M. Duval IUnit weight of manhole concrete is 142 pcf p Bottom Length W W�dth 7.00 ft Calculation for truncated square pyramid_ Top Length dth 1.00 ft Height 2.00 ft Trash Rack Displacement 38MOOO cf CONCRETE PRESENT IN RISER STRUCTURE Riser Walls - 40.500 cf Standard Base of Riser = 12.500 cf Less Opening for Ba rrel = 1.571 cf Less Opening for Drain P ipe - 0.175 cf Less Opening for Orifice =� 4.500 Jcf Total Concrete Less Openings - cf Weight of Concrete = 1 6,639 lbs AMOUNT OF WATER DISPLACED BY RISER STRUCTURE Displacement by Concrete - 46.755 cf Displacement by Open Air - 72.000 cf Displacement by Trash Rack= � 38.000 Jcf Total Water Displaced - 156.755 cf Weight of Water Displaced = 9,781 lbs AMOUNT OF CONCRETE TO ADD TO RISER STRUCTURE Safety Factor - Add'I Weight for Bouyancy = lbs Bouyant Weight of Concrete - 79.60 Pcf Bouyant Weight w/ SF = 69.22 Pcf Add'I Concrete to Add - 66.595 cf Less Standard Base - 12.500 � cf �cf New Base Design Required = 79.095 ANTI FLOTATION BLOCK DESIGN CALCULATIONS AF Block ­:idthh = 8.00 ft AF Block' 8.00 ft AF Block Thickness 15.00 in AF Block Provided 800100 cf Total Concrete Present = cf Total Concrete Present = lbs FR;Tommend 1. 15 or higher 9 MCADAM Subsection: Elevation -Area Volume Curve Label: SCM B Return Event: 0.00 years Storm Event: WQv Elevation Planimeter Area Al+A2+sqr Volume Volume (Total) (ft) (ft2) (ft2) (Al*A2) (ft3) (ft3) (ft2) 574.00 0.0 42,468.000 0.000 0.000 0.000 574.50 0.0 45,473.000 131,885.822 21,981.000 21,981.000 575.00 0.0 46,997.000 138,698.720 23,116.000 45,097.000 576.00 0.0 50,086.000 145,599.922 48,533.000 93,631.000 577.00 0.0 53,232.000 154,953.046 51,651.000 145,282.000 578.00 0.0 56,435.000 164,477.108 54,826.000 200,107.000 TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Label: SCM B Return Event: 0.00 years Storm Event: WQv Requested Pond Water Surface Elevations Minimum (Headwater) 574.50 ft Increment (Headwater) 0.10 ft Maximum (Headwater) 578.00 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Inlet Box Riser - 1 Forward Culvert - 1 576.00 578.00 Orifice -Circular Orifice - 1 Forward Culvert - 1 574.00 578.00 Culvert -Circular Culvert - 1 Forward TW 571.50 578.00 Orifice -Area Orifice - 2 Forward TW 575.00 578.00 Tailwater Settings Tailwater (N/A) (N/A) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Label: SCIVI B Structure ID: Culvert - 1 Structure Type: Culvert -Circular Number of Barrels 1 Diameter 24.0 in Length 55.00 ft Length (Computed Barrel) 55.00 ft Slope (Computed) 0.011 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.500 Kb 0.012 Kr 0.000 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0098 M 2.0000 C 0.0398 Y 0.6700 T1 ratio (HW/D) 1.155 T2 ratio (HW/D) 1.301 Slope Correction Factor -0.500 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... Return Event: 0.00 years Storm Event: WQv T1 Elevation 573.81 ft T1 Flow 15.55 ft3/S T2 Elevation 574.10 ft T2 Flow 17.77 ft3/S TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Return Event: 0.00 years Label: SCIVI B Storm Event: WQv Structure ID: Riser - 1 Structure Type: Inlet Box Number of Openings 1 Elevation 576.00 ft Orifice Area 16.0 ft2 Orifice Coefficient 1.000 Weir Length 16.00 ft Weir Coefficient 3.00 (ftA0 .5)/s K Reverse 1.000 Manning's n 0.000 Kev, Charged Riser 0.000 Weir Submergence False Orifice H to crest False Structure ID: Orifice - 1 Structure Type: Orifice -Circular Number of Openings 1 Elevation 574.00 ft Orifice Diameter 3.0 in Orifice Coefficient 0.600 Structure ID: Orifice - 2 Structure Type: Orifice -Area Number of Openings 1 Elevation 575.00 ft Orifice Area 1.0 ft2 Top Elevation 575.50 ft Datum Elevation 575.25 ft Orifice Coefficient 1.000 Structure ID: TW Structure Type: TW Setup, IDS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 ft (Maximum) Headwater Tolerance 0.01 ft (Minimum) Headwater Tolerance 0.50 ft (Maximum) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Outlet Input Data Label: SCM B Convergence Tolerances Flow Tolerance (Minimum) 0.001 ft3/S Flow Tolerance (Maximum) 10.000 ft3/S TRU1903O.ppc TRU1903O.ppc Return Event: 0.00 years Storm Event: WQv 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Label: SCM B Composite Outflow Summary Return Event: 0.00 years Storm Event: WQv Water Surface Flow Tailwater Elevation Convergence Error Elevation (ft3/S) (ft) (ft) (ft) 574.00 0.00 (N/A) 0.00 574.10 0.02 (N/A) 0.00 574.20 0.05 (N/A) 0.00 574.30 0.10 (N/A) 0.00 574.40 0.12 (N/A) 0.00 574.50 0.14 (N/A) 0.00 574.60 0.16 (N/A) 0.00 574.70 0.18 (N/A) 0.00 574.80 0.19 (N/A) 0.00 574.90 0.21 (N/A) 0.00 575.00 0.22 (N/A) 0.00 575.10 1.04 (N/A) 0.00 575.20 1.85 (N/A) 0.00 575.30 2.66 (N/A) 0.00 575.40 3.48 (N/A) 0.00 575.50 4.29 (N/A) 0.00 575.60 5.03 (N/A) 0.00 575.70 5.68 (N/A) 0.00 575.80 6.26 (N/A) 0.00 575.90 6.78 (N/A) 0.00 576.00 7.27 (N/A) 0.00 576.10 9.25 (N/A) 0.00 576.20 12.45 (N/A) 0.00 576.30 16.45 (N/A) 0.00 576.40 21.09 (N/A) 0.00 576.50 26.30 (N/A) 0.00 576.60 31.92 (N/A) 0.00 576.70 37.95 (N/A) 0.00 576.80 41.37 (N/A) 0.00 576.90 42.07 (N/A) 0.00 577.00 42.77 (N/A) 0.00 577.10 43.45 (N/A) 0.00 577.20 44.13 (N/A) 0.00 577.30 44.78 (N/A) 0.00 577.40 45.43 (N/A) 0.00 577.50 46.07 (N/A) 0.00 577.60 46.69 (N/A) 0.00 577.70 47.31 (N/A) 0.00 577.80 47.92 (N/A) 0.00 577.90 48.52 (N/A) 0.00 1 578.00 1 49.11 1 (N/A) 0.00 Contributing Structures (no Q: Riser - 1,Orifice - 1,Culvert 1,Orifice - 2) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Return Event: 0.00 years Label: SCM B Storm Event: WQv Composite Outflow Summary Contributing Structures Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1 (no Q: Riser - 1,Orifice - 2) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Orifice - 1,Culvert - 1,Orifice - 2 (no Q: Riser - 1) Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Composite Rating Curve Return Event: 0.00 years Label: SCM B Storm Event: WQv Composite Outflow Summary Contributing Structures Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 Riser - 1,Orifice - 1,Culvert - 1,Orifice - 2 Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) Riser - 1,Culvert - 1,Orifice - 2 (no Q: Orifice - 1) TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM B (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 574.00 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 1.000 min Inflow/Outflow Hydrograph Summary Return Event: 0.00 years Storm Event: WQv Flow (Peak In) 10.55 ft3/S Time to Peak (Flow, In) 716.000 min Flow (Peak Outlet) 0. 13 ft3/S Time to Peak (Flow, Outlet) 1,442.000 min Elevation (Water Surface, 574.45 ft Peak) Volume (Peak) 19,587.747 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 25,003.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 21,974.000 ft3 Outflow) Volume (Retained) 3,022.000 ft3 Volume (Unrouted) -7.000 ft3 Error (Mass Balance) 0.0 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM B (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 574.00 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 1.00 years Storm Event: 1 yr Flow (Peak In) 41.19 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 1.86 ft3/S Time to Peak (Flow, Outlet) 783.000 min Elevation (Water Surface, 575.20 ft Peak) Volume (Peak) 54,645.365 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 87,135.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 40,519.000 ft3 Outflow) Volume (Retained) 46,527.000 ft3 Volume (Unrouted) -89.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM B (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 574.00 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 10.00 years Storm Event: 10-yr Flow (Peak In) 78.08 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 13.74 ft3/S Time to Peak (Flow, Outlet) 753.000 min Elevation (Water Surface, 576.23 ft Peak) Volume (Peak) 105,338.654 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 192,455.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 143,166.000 ft3 Outflow) Volume (Retained) 49,120.000 ft3 Volume (Unrouted) -170.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM B (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 574.00 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 25.00 years Storm Event: 25-yr Flow (Peak In) 90.00 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 23.14 ft3/S Time to Peak (Flow, Outlet) 750.000 min Elevation (Water Surface, 576.44 ft Peak) Volume (Peak) 115,935.424 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 241,961.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 191,381.000 ft3 Outflow) Volume (Retained) 50,371.000 ft3 Volume (Unrouted) -209.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM B (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 574.00 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 50.00 years Storm Event: 50-yr Flow (Peak In) 98.29 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 32.29 ft3/S Time to Peak (Flow, Outlet) 732.000 min Elevation (Water Surface, 576.61 ft Peak) Volume (Peak) 124,563.028 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 282,366.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 230,785.000 ft3 Outflow) Volume (Retained) 51,341.000 ft3 Volume (Unrouted) -241.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021 9 MCADAM Subsection: Level Pool Pond Routing Summary Label: SCM B (IN) Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 574.00 ft Initial) Volume (Initial) 0.000 ft3 Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 3.000 min Inflow/Outflow Hydrograph Summary Return Event: 100.00 years Storm Event: 100-yr Flow (Peak In) 105.67 ft3/S Time to Peak (Flow, In) 720.000 min Flow (Peak Outlet) 41.01 ft3/S Time to Peak (Flow, Outlet) 729.000 min Elevation (Water Surface, 576.79 ft Peak) Volume (Peak) 134,154.996 ft3 Mass Balance (ft) Volume (Initial) 0.000 ft3 Volume (Total Inflow) 324,985.000 ft3 Volume (Total Infiltration) 0.000 ft3 Volume (Total Outlet 272,271.000 ft3 Outflow) Volume (Retained) 52,439.000 ft3 Volume (Unrouted) -276.000 ft3 Error (Mass Balance) 0.1 % TRU1903O.ppc TRU1903O.ppc 3/17/2021