Loading...
HomeMy WebLinkAboutNCC211618_ESC Approval Submitted_20210325Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: August 271h 2019 LETTER OF APPROVAL WITH MODIFICATIONS Michael Johnson JGNC II LLC 323 Walnut Street Statesville, NC 28677 RE: Project Name: Pine Forest II SD Acres Approved with Modifications: 23.9 Project ID: STVLE-2020-011 Project Location: PIN 4742589712.000 Submitted By: R. Joe Harris & Associates, Inc. Date Received: August 131", 2019 Plan Type: New Dear Mr. Johnson: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 413.0129 and Section 9.6.6 of the Iredell County Land Development Code. Title 15A NCAC 413 0118(a) and Section 9.6.9 of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Section 14.2.2 of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Letter of Approval with Modifications Pine Forest II SD August 271", 2019 Page 2 of 3 inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and County water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, &o,4wt W!/lY� Jonathan Williams Erosion Control Inspector I Enclosures: Modifications Fact Sheet on the New NCGO1 Permit Letter of Approval with Modifications Pine Forest II SD August 271h, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Pine Forest II Project ID: STVLE-2020-011 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. l . Provide a statement for offsite work performed at Dependable Dev Inc., Woodlands North LLC and 104 Carolinian Dr. from the property owners granting the Financially Responsible Party permission to perform the land disturbing activity and provide a copy of the deed. —RC 2. Provide a copy of permission from the North Carolina Department of Transportation for land disturbing activity to take place in the road or road right-of-way. —RC 3. Provide a copy of permission from the City of Statesville for off -site utility work. —RC 4. Adjust Basin 100 Final Phase dimensions to meet the required surface area of 15,547ftz. -RC 5. Adjust Basin 100 skimmer orifice size to 2.25 inches in order to dewater the basin required volume of 21,330 ft3 in as close to 3 days' time possible. —RC 6. Use North Carolina Erosion and Sediment Control Planning and Design Manual silt fence detail (section 6.62.5) with 12 inch anchor skirt minimum (8 inches down and 4 inches forward along the trench). —RC 7. Pages EC-1 and EC-5 in Construction Sequence Step 3 note Iredell County Erosion Control Inspector must inspect measures once installed for approval to proceed with project development, not Engineer or Inspector. --RC 8. Stockpiles located on this project must be a minimum of 50 feet from all diversions and basins and protected on the downslope sides. —RC 9. For all off -site disturbance, if there are inlets downslope of disturbance that may be impacted install silt sack curb inlet or hardware cloth and stone inlet protection as needed. —RC