HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20120907V
Ao
NCDENR 4TH
North Carolina Department of Environment and Natural Res 6& �vqr PO/
<;)
FR Z
Division of Water Quality 0 o�,
Beverly Eaves Perdue Charles Waklld P E *g1ANe, Freeman
Governor Director 4ecretary
September 7 2012
Mr J B Setzer P E
Division 14 Engineer
N C Department of Transportation
253 Webster Road
Sylva North Carolina 28779
Subject Inspection
NCSR 1783 Upward Road
DWQ Project 08 1
TIP No R 4430
Henderson County
Dear Mr Setzer
On September 6 2012 I inspected the construction work on Upward Road between US Highway 176 and
Howard Gap Road in Henderson County Construction work is continuing all along Upward Road between
Howard Gap Road and US Highway 176 with the main focus on grading and paving
Please ensure that all sediment and erosion control structures are being maintained as required and that seeding
and mulching are being performed as needed to protect State surface waters
Please refer to the attached copy of the inspection report for additional comments regarding the inspection
If you have questions please call me at 828 296 4500
Sincerely��t 4QQ
�;W
46"�
Michael R Parker
Environmental Senior Specialist
Attachment
cc Aaron Powell
Mark Davis Division 14 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
Upward Road R 4430 Inspection Letter September 2012
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500 \ FAX 828 299 7043
Internet www ncwaterquality orq
An Equal Opportunity \ Affirmative Action Employer
NorthCarohna
Natura!!lr
Wetland Inspection Report
Project Num 20081327 Version 1 Status Issued
Project Name NCDOT SR 1783 (R 4430) Project Type Road /Highway Widening
County Henderson Region Asheville
Location NCDOT SR 1783 (R 4430)
Latitude +35 1751 Longitude 82 2425
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 09/06/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person Title Phone
On Site Representative(s)
Primary Inspector Michael R Parker Phone 828 296 4500
Secondary Inspector(s)
Facility compliance Status N Compliant n Not Compliant
Program Area Construction SW (NCG010000)
Question Areas
N NCGO10000 Permit
Inspection Summary
Seed and mulch all disturbed areas as soon as possible
Seed disturbed area near stormwater pond dam below guardrail
Ensure that all stormwater discharge outlets are inspected after every 0 5 inch rainfall event and at least once per week
Page 1
Protect Num 20081327 Owner NC DOT PDEA
Inspection Date 09/06/2012 Inspection Type Site Inspection (DOT)
FJ
Reason for Visit Routine
N_C_GO10000 Permit
# Is this inspection related to a DLR/delegated program inspection?
If Yes what was the DLR/delegated program inspection date?
Is the site following its E &SC Plan as per DLR or delegated program?
Is the site maintaining their E &SC measures as per DLR or delegated program?
Is a copy of the approved E &SC plan on site?
Is a rain gauge present on site or is MPE in use for the site?
Is rain gauge data or MPE data recorded?
Are inspection records complete?
Is the site compliant with other conditions of the NCGO10000 permit?
Comment Ensure that all that all stormwater discharges are Inspected after each 0 5
Inch rainfall event and at least once /week
■000
■0 [10
■[1 13 0
■000
■000
■1300
■000
■ 0 0 0
Page 2